CN207194924U - A kind of novel combined artificial ore pillar - Google Patents
A kind of novel combined artificial ore pillar Download PDFInfo
- Publication number
- CN207194924U CN207194924U CN201720923978.4U CN201720923978U CN207194924U CN 207194924 U CN207194924 U CN 207194924U CN 201720923978 U CN201720923978 U CN 201720923978U CN 207194924 U CN207194924 U CN 207194924U
- Authority
- CN
- China
- Prior art keywords
- truss
- ore pillar
- drainage cloth
- novel combined
- artificial ore
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of novel combined artificial ore pillar, it is related to mining technical field, it includes truss, drainage cloth, reinforcement, anchor pole, fill cylinder and steel wire rope, described anchor pole is separately fixed on the country rock of stope roof and stope bottom wall, the upper and lower ends of the truss are affixed with anchor pole respectively, if the truss is provided with arterial highway reinforcement, described drainage cloth is fixed on truss by screw and steel wire rope, described drainage cloth is seamlessly connected by way of cement mortar sealing with stope bottom wall, filling cylinder is filled with the inside of described drainage cloth and truss, it is reasonable in design, it is simple in construction, it is fast with speed is constructed, cost is low, intensity is high, the advantages that applied widely.
Description
Technical field
It the utility model is related to mining technical field, and in particular to a kind of novel combined artificial ore pillar.
Background technology
With gradually decreasing for resource, most mines turn to the exploitation of residual ore deposit, the particularly higher mine of metal values.It is residual
Ore deposit is primarily referred to as in the conventional recovery process of bargh, due to technology restriction, the ore body that can not be produced completely under safety condition,
The predominantly top-bottom pillar of ore body, studding etc..At present to ensure the safety of remaining ore recovery, first scene manually builds ore pillar by laying bricks or stones, rear to carry out
The ore actual mining at scene.This way can not efficiently quick production ore, can not and due to by the way of manually building by laying bricks or stones
Ensure that ore pillar connects top completely, cause supporting not consolidate for a long time, easily stay potential safety hazard.
Thus being necessary to develop a kind of has the advantages that to construct that convenient, stability is good, good supporting force combined type artificial
Ore pillar, to improve the security of remnant reclaiming.
Utility model content
In view of the above-mentioned problems, the technical problems to be solved in the utility model is to provide a kind of novel combined people's industrial and mineral
Post, to solve the problems such as Traditional Man Pillar Stability is poor, it is long to construct the time, complex procedures, and then ensure to return during remaining ore recovery
The safety problem adopted.
In order to solve above-mentioned technical problem, the utility model is realized using following technical scheme:A kind of NEW TYPE OF COMPOSITE
Formula artificial ore pillar, including truss, drainage cloth, reinforcement, anchor pole, filling cylinder and steel wire rope, described anchor pole are fixed respectively
On the platform dug on stope roof and on stope bottom wall, the upper and lower ends of described truss are affixed with anchor pole respectively, institute
If the truss stated is provided with arterial highway reinforcement, described drainage cloth is fixed on truss by screw and steel wire rope, described
The lower end of drainage cloth is seamlessly connected by way of cement mortar sealing with platform, is set on the inside of described drainage cloth and truss
There is filling cylinder.
Preferably, described reinforcement is fixed on truss in parallel or M shape structure, the truss that is connected is played
Effect.
Preferably, described drainage cloth is geotextiles, more preferably long filament woven geotextile, it is fixed on purlin
The inner or outer side of frame.
Preferably, described steel wire rope is in the latticed outside for being fixed on drainage cloth.
Preferably, described anchor pole is resin anchor, play a part of fixed truss.
Preferably, described drainage cloth replaces with plank or glued board.
Preferably, described filling cylinder be pumped into by filling slurry in the cavity that drainage cloth and truss formed solidify and
Into.
Preferably, described truss is replaced with by the affixed framework formed of steel pipe or rod.
The utility model proposes novel combined artificial ore pillar, introduce truss skeleton and drainage cloth, it is and traditional
Technology is compared, and is had the advantages that:
1. constructing, simple, labor strength is low;
2. the speed of constructing of ore pillar can be increased substantially, operating efficiency is improved, and then accelerate the recovery speed of residual ore deposit;
3. directly can be constructed using filling slurry, simplify ore pillar constructs program;
4. the pillar recovery that the orebody mining for being applicable to various inclination angles is left, applied widely;
5. it is flexible to construct mode, suitable for the various execution conditions in underground.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the attachment structure schematic diagram of truss in the utility model, reinforcement and anchor pole;
Fig. 3 is the attachment structure schematic diagram of drainage cloth and steel wire rope in the utility model;
Fig. 4 is structural representation when drainage cloth of the present utility model is arranged on truss inner side.
In figure, 1- truss, 2- drainage clothes, 3- reinforcements, 4- anchor poles, 5- stope roofs, 6- stope bottom walls, 7- fillings
Cylinder, 8- platforms, 9- steel wire ropes.
Embodiment
Principle of the present utility model and feature are described below in conjunction with accompanying drawing, example is only used for explaining this practicality
It is new, it is not intended to limit the scope of the utility model.
As Figure 1-4, combined type artificial ore pillar of the present utility model, including truss 1, drainage cloth 2, reinforcement 3, anchor
Bar 4, filling cylinder 7 and steel wire rope 9, described anchor pole 4 are separately fixed on stope roof 5 and dug on stope bottom wall 6
On platform 8, the upper and lower ends of described truss 1 are affixed with anchor pole 4 respectively, if described truss 1 is provided with arterial highway reinforcement 3,
Described drainage cloth 2 is fixed on truss 1 by screw and steel wire rope 9, and the lower end of described drainage cloth 2 passes through cement mortar
The mode of sealing is seamlessly connected with platform 8, and the inner side of described drainage cloth 2 and truss 1 is filled with filling cylinder 7.
Preferably, described truss 1 is steel truss,
Preferably, described reinforcement 3 be underground day frequently with reinforcing bar, it is fixed in parallel or M shape structure
On truss 1, play a part of the truss 1 that is connected.
Preferably, described drainage cloth 2 is geotextiles, more preferably long filament woven geotextile, it is fixed on
The inner or outer side of truss 1.
Preferably, described steel wire rope 9 is in the latticed outside for being fixed on drainage cloth 2.
Preferably, described anchor pole 4 is resin anchor, play a part of fixed truss 1.
Preferably, described drainage cloth 2 could alternatively be plank or glued board.
Preferably, described filling cylinder 7 is pumped into the cavity that drainage cloth 2 and truss 1 are formed admittedly by filling slurry
Change forms.
Preferably, described truss 1 can be by being substituted by the affixed framework formed of steel pipe or rod.
The construction method of combined type artificial ore pillar of the present utility model is, first, it is determined that to carry out the residual region adopted and adopt
, and recyclable ore pillar is determined, according to the size of ore pillar and stope roof country rock situation, calculate the people's industrial and mineral for determining to construct
The parameters such as the size of post, intensity;Then, according to the parameter of the required artificial ore pillar constructed, suitable truss 1 and rational is chosen
Filling slurry is matched, and selects suitable reinforcement 3, and its intensity and reliability are verified;Dug on stope bottom wall 6
Platform 8, its size determine according to the dimensional parameters of ore pillar, according to the dimensional parameters of ore pillar, determine anchor pole 4 in the He of stope roof 5
The installation site on platform 8 on stope bottom wall 6, after squeezed into the country rock of stope top bottom wall, inclined according to stope roof 5
Rake angle, the truss 1 of suitable shape is chosen, to ensure preferably to connect top, truss 1 is placed on anchor pole 4, and use welding side
Itself and truss 1 are connected by formula, and the reinforcement 3 chosen is welded on truss 1, ensures the steadiness of frame structure, makes
Drainage cloth 2 is installed on truss 1 with screw, and it is fixed using steel wire rope 9, with cement mortar by drainage cloth 2
Lower end sealed up with stope bottom wall 6, form the cavity of a closing, be then connected with moving filling pump or fixed Filling Station
Filling slurry pipeline to being filled in cavity, treat that its solidification reaches design strength, that is, form the people needed for the utility model
Industrial and mineral post.
Claims (9)
- A kind of 1. novel combined artificial ore pillar, it is characterised in that:It include truss (1), drainage cloth (2), reinforcement (3), Anchor pole (4), filling cylinder (7) and steel wire rope (9), described anchor pole (4) are separately fixed on stope roof (5) and at stope bottom On the platform (8) dug on wall (6), the upper and lower ends of described truss (1) are affixed with anchor pole (4) respectively, described truss (1) If being provided with arterial highway reinforcement (3), described drainage cloth (2) is fixed on truss (1) by screw and steel wire rope (9), institute The lower end for the drainage cloth (2) stated is seamlessly connected by way of cement mortar sealing with platform (8), described drainage cloth (2) Filling cylinder (7) is provided with the inner side of truss (1).
- A kind of 2. novel combined artificial ore pillar according to claim 1, it is characterised in that:Described reinforcement (3) is in Parallel or M shape structure is fixed on truss (1).
- A kind of 3. novel combined artificial ore pillar according to claim 1, it is characterised in that:Described drainage cloth (2) For geotextiles, it is fixed on the inner or outer side of truss (1).
- A kind of 4. novel combined artificial ore pillar according to claim 3, it is characterised in that:Described geotextiles are long filament Woven geotextile.
- A kind of 5. novel combined artificial ore pillar according to claim 1, it is characterised in that:Described steel wire rope (9) is in The latticed outside for being fixed on drainage cloth (2).
- A kind of 6. novel combined artificial ore pillar according to claim 1, it is characterised in that:Described anchor pole (4) is tree Fat anchor pole.
- A kind of 7. novel combined artificial ore pillar according to claim 1, it is characterised in that:Described drainage cloth (2) Replace with plank or glued board.
- A kind of 8. novel combined artificial ore pillar according to claim 1, it is characterised in that:Described filling cylinder (7) Solidification in the cavity that drainage cloth (2) and truss (1) formed is pumped into by filling slurry to form.
- A kind of 9. novel combined artificial ore pillar according to claim 1, it is characterised in that:Described truss (1) is replaced For by the affixed framework formed of steel pipe or rod.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720923978.4U CN207194924U (en) | 2017-07-27 | 2017-07-27 | A kind of novel combined artificial ore pillar |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720923978.4U CN207194924U (en) | 2017-07-27 | 2017-07-27 | A kind of novel combined artificial ore pillar |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207194924U true CN207194924U (en) | 2018-04-06 |
Family
ID=61799146
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720923978.4U Expired - Fee Related CN207194924U (en) | 2017-07-27 | 2017-07-27 | A kind of novel combined artificial ore pillar |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207194924U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108825233A (en) * | 2018-06-06 | 2018-11-16 | 徐庆余 | A kind of pillar recovery method |
-
2017
- 2017-07-27 CN CN201720923978.4U patent/CN207194924U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108825233A (en) * | 2018-06-06 | 2018-11-16 | 徐庆余 | A kind of pillar recovery method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103161480A (en) | Method for actively supporting lane side filling gob-side entry retaining | |
CN112727539B (en) | Construction method for filling false roof by using shrinkable mesh material | |
CN109595029B (en) | Goaf partial stowage supporting structure and its construction method under the conditions of tight roof | |
CN104806267A (en) | Shield end socket reinforcing system of scree soil layer advance large pipe roof and construction method thereof | |
CN105756702B (en) | A kind of lane side cylinder mould filling and support gob-side entry retaining method | |
CN106593467A (en) | Supporting method for underground soft rock roadway of coal mine | |
CN110118089B (en) | Mining FRP grid-coal gangue-self-compacting concrete regenerated top plate and construction method thereof | |
CN103291305A (en) | Quick and low-cost artificial fake roof construction method for ground mine | |
CN202543906U (en) | Precast pile with reserved grouting pipes | |
CN101525880A (en) | Plastic sleeve concrete pile and method thereof for reinforcing soft soil foundation | |
CN203321531U (en) | Lining processing structure for underground cavern after collapse of top arch | |
CN103982188A (en) | Supporting structure system of rock stratum large-section deep vertical shaft and construction method of supporting structure system | |
CN110528533A (en) | A kind of microorganism solidification impacting steel tube for soil-nail and its construction method | |
CN201358456Y (en) | Plastic sleeve concrete pile | |
CN103147792A (en) | Drift type coal mining filling method | |
CN105484763B (en) | A kind of semiclosed reinforced concrete segment method for protecting support of deep coalmine | |
CN102605767A (en) | Precast pile reserved with grouting pipe and piling process of precast pile | |
CN210948688U (en) | Artificial false lane | |
CN103790176B (en) | A kind of construction method of pre-buried manomelia rod structure | |
CN207194924U (en) | A kind of novel combined artificial ore pillar | |
CN103161498B (en) | Half-edge coal seam section coal pillar roadside packing method | |
CN203441498U (en) | Anti-seepage structure for large-section water-bearing layer passing shaft of inclined shaft | |
CN2568815Y (en) | Strengthening slip casting anchor stock | |
CN103046765B (en) | Construction process for continued application of air-raid shelter | |
CN106870001B (en) | Tunnel is layered pocket type self-support filling counterfort construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |