CN207194429U - A kind of construction scaffold - Google Patents
A kind of construction scaffold Download PDFInfo
- Publication number
- CN207194429U CN207194429U CN201720899654.1U CN201720899654U CN207194429U CN 207194429 U CN207194429 U CN 207194429U CN 201720899654 U CN201720899654 U CN 201720899654U CN 207194429 U CN207194429 U CN 207194429U
- Authority
- CN
- China
- Prior art keywords
- scaffold
- fixator
- connecting rod
- buckle
- button
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 19
- 239000000203 mixture Substances 0.000 claims abstract description 5
- 239000002184 metal Substances 0.000 claims description 4
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 4
- 235000017491 Bambusa tulda Nutrition 0.000 description 4
- 241001330002 Bambuseae Species 0.000 description 4
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 4
- 239000011425 bamboo Substances 0.000 description 4
- 239000000463 material Substances 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 229910001092 metal group alloy Inorganic materials 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 229920002994 synthetic fiber Polymers 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Landscapes
- Surgical Instruments (AREA)
Abstract
The utility model discloses a kind of construction scaffold,Including scaffold,The scaffold surface is fixed with fixator,The fixator is connected by connecting rod with scaffold fixator,The scaffold fixator is by connecting shaft,Support bar,Base and connecting rod composition,The fixator is by left buckle,Right jamming button and connector composition,Right jamming button surface side is welded with fixed card buckle,The fixed card buckle surface is provided with button,And fixed card buckle is internally provided with fixed lobe,In the utility model,By adding scaffold fixator on the basis of existing scaffold,Aid in fixing scaffold by using fixator,Strengthen the usage time and security of scaffold,Scaffold is blocked by fixator,Connecting rod is recycled to be connected in connecting shaft,The pressure that scaffold itself bears is shared by using bearing bar,It is evenly distributed to building or the object that bearing bar is depended on,Strengthen the security of scaffold.
Description
Technical field
It the utility model is related to construction engineering technical field, more particularly to a kind of construction scaffold.
Background technology
Scaffold refers to job site for operation and solves vertically and horizontally to transport the various supports set up, and builds
The generic term on boundary, refer to and exterior wall, inside fitting or the higher place that can not directly construct of floor height are used on construction site.Predominantly
Workmen is worked up and down or perimeter security net is safeguarded and high-altitude installation component etc., is exactly plainly build a framework, scaffold system
Making material generally has:Bamboo and wood, steel pipe or synthetic material etc..Some engineerings are also with scaffold when template use, in addition in advertisement
The departments such as industry, municipal administration, traffic road and bridge, mine are also used extensively.
Current architectural engineering use it is most of be all the scaffold built using bamboo as raw material, this scaffold because
So as to receive the favor of vast builder and real estate businessman, this scaffold is not only cheap to be cheap,
And can be used for multiple times, easily build, easily recovery.
Due to the self reason of bamboo product, and it is used for multiple times, exposes to the weather etc. in the presence of factor, bamboo scaffold exists
After a period of time, the phenomenon to follow the string occurs in scaffold, and after there is this phenomenon, scaffold easily collapses
Collapse situation, therefore, it is necessary to scaffold is reinforced.
Utility model content
The purpose of this utility model is to solve shortcoming present in prior art, and a kind of construction proposed is used
Scaffold.
To achieve these goals, the utility model employs following technical scheme:A kind of construction scaffold, bag
Scaffold is included, the scaffold surface is fixed with fixator, and the fixator is connected by connecting rod with scaffold fixator, institute
State scaffold fixator to be made up of connecting shaft, support bar, base and connecting rod, the fixator is by left buckle, right jamming button and company
Device composition is connect, right jamming button surface side is welded with fixed card buckle, and the fixed card buckle surface is provided with button, and fixing card
Button is internally provided with fixed lobe, and the side surface of connector one is provided with whorl brace rod, and the scaffold fixator passes through
Threaded rod is connected with bearing bar, the bearing bar opposite side set it is fluted, and inside grooves be provided with it is metal threaded.
As further describing for above-mentioned technical proposal:
The left buckle is welded on the side surface of connector one.
As further describing for above-mentioned technical proposal:
The scaffold fixator is provided with threaded rod with the symmetrical side of bearing bar.
As further describing for above-mentioned technical proposal:
The whorl brace rod is arranged on symmetrical two faces of connector with left buckle and right jamming button.
As further describing for above-mentioned technical proposal:
The fixator is connected through a screw thread bar and is connected with connecting rod.
In the utility model, by adding scaffold fixator on the basis of existing scaffold, by using solid
Device is determined to aid in fixing scaffold, strengthens the usage time and security of scaffold, scaffold is blocked by fixator, is recycled
Connecting rod is connected in connecting shaft, is shared the pressure that scaffold itself bears by using bearing bar, is evenly distributed to and held
The building or object that weight bar is depended on, strengthen the security of scaffold.
Brief description of the drawings
Fig. 1 be the utility model proposes a kind of construction scaffold front view;
Fig. 2 be the utility model proposes a kind of construction scaffold scaffold fixator structural representation;
Fig. 3 be the utility model proposes a kind of construction scaffold fixator structural representation.
Fig. 4 be the utility model proposes a kind of construction scaffold fixator explosion views;
Fig. 5 be the utility model proposes a kind of construction scaffold bearing bar structural representation.
Marginal data:
1- scaffolds fixator, 11- connecting shafts, 12- support bars, 13- bases, 14- connecting rods, 2- fixators, the left cards of 21-
Button, 22- right jamming buttons, 23- connectors, 24- whorl brace rods, 25- fixed card buckles, 26- fixed lobes, 27- buttons, 3- load-bearing
Bar, 31- threaded rods, 32- grooves, 33- are metal threaded, 4- scaffolds.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.
Reference picture 1-5, a kind of construction scaffold, including scaffold 4, the surface of scaffold 4 are fixed with fixator 2,
Fixator 2 is connected by connecting rod 14 with scaffold fixator 1, and scaffold fixator 1 is by connecting shaft 11, support bar 12, base
13 and connecting rod 14 form, fixator 2 is made up of left buckle 21, right jamming button 22 and connector 23, the surface side of right jamming button 22 weldering
Fixed card buckle 25 is connected to, the surface of fixed card buckle 25 is provided with button 27, and fixed card buckle 25 is internally provided with fixed lobe 26, even
Connect the side surface of device 23 1 and be provided with whorl brace rod 24, scaffold fixator 1 is connected by threaded rod 31 with bearing bar 3, load-bearing
The opposite side of bar 3 sets fluted 32, and groove 32 is internally provided with metal threaded 33.
Left buckle 21 is welded on the side surface of connector 23 1.
Scaffold fixator 1 is provided with threaded rod 31 with 3 symmetrical side of bearing bar.
Whorl brace rod 24 is arranged on 23 symmetrical two faces of connector with left buckle 21 and right jamming button 22.
Fixator 2 is connected through a screw thread bar 24 and is connected with connecting rod 14.
Bearing bar 3 is used to share the pressure that scaffold 4 affords, using the good metal alloy of elastic performance as former material
Material, the bottom of base 13 is provided with slip-resistant texture
Operation principle:In use, bearing bar 3 is first fixed on to the connecting shaft on scaffold fixator 1 by threaded rod 31
At 11, fixator 2 is connected through a screw thread the rotation of bar 24 and is fixed in connecting rod 14, and the left inner side of buckle 21 is fixed on into scaffold 4
On, right jamming button 22 is connected by fixed card buckle 25 with connector 23, meanwhile, the fixed lobe 26 inside fixed card buckle 25 blocks
Connector 23, if it is desired, can then press button 27 to release the connection bearing bar 3 between connector 23 from building
Load-bearing pillar rear through building up extends through, and shares pressure using bearing bar 3.
It is described above, the only preferable embodiment of the utility model, but the scope of protection of the utility model is not
This is confined to, any one skilled in the art is in the technical scope that the utility model discloses, according to this practicality
New technical scheme and its utility model design are subject to equivalent substitution or change, should all cover in protection model of the present utility model
Within enclosing.
Claims (5)
1. a kind of construction scaffold, including scaffold(4), it is characterised in that the scaffold(4)Surface is fixed with
Determine device(2), the fixator(2)Pass through connecting rod(14)With scaffold fixator(1)Connection, the scaffold fixator(1)
By connecting shaft(11), support bar(12), base(13)And connecting rod(14)Composition, the fixator(2)By left buckle(21), it is right
Buckle(22)And connector(23)Composition, the right jamming button(22)Surface side is welded with fixed card buckle(25), the fixing card
Button(25)Surface is provided with button(27), and fixed card buckle(25)It is internally provided with fixed lobe(26), the connector(23)
One side surface is provided with whorl brace rod(24), the scaffold fixator(1)Pass through threaded rod(31)With bearing bar(3)Even
Connect, the bearing bar(3)Opposite side sets fluted(32), and groove(32)It is internally provided with metal threaded(33).
A kind of 2. construction scaffold according to claim 1, it is characterised in that the left buckle(21)It is welded on
Connector(23)One side surface.
A kind of 3. construction scaffold according to claim 1, it is characterised in that the scaffold fixator(1)
With bearing bar(3)Symmetrical side is provided with threaded rod(31).
A kind of 4. construction scaffold according to claim 1, it is characterised in that the whorl brace rod(24)With
Left buckle(21)And right jamming button(22)It is arranged on connector(23)On symmetrical two faces.
A kind of 5. construction scaffold according to claim 1, it is characterised in that the fixator(2)Pass through spiral shell
Line connecting rod(24)With connecting rod(14)Connection.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720899654.1U CN207194429U (en) | 2017-07-24 | 2017-07-24 | A kind of construction scaffold |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720899654.1U CN207194429U (en) | 2017-07-24 | 2017-07-24 | A kind of construction scaffold |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207194429U true CN207194429U (en) | 2018-04-06 |
Family
ID=61798467
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720899654.1U Active CN207194429U (en) | 2017-07-24 | 2017-07-24 | A kind of construction scaffold |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207194429U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108824824A (en) * | 2018-08-22 | 2018-11-16 | 杭州市市政工程集团有限公司 | A kind of square column fastener fast-positioning device and positioning construction method |
-
2017
- 2017-07-24 CN CN201720899654.1U patent/CN207194429U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108824824A (en) * | 2018-08-22 | 2018-11-16 | 杭州市市政工程集团有限公司 | A kind of square column fastener fast-positioning device and positioning construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204098239U (en) | The connected node of profile steel concrete column and reinforced concrete beam | |
| CN207194429U (en) | A kind of construction scaffold | |
| CN206681333U (en) | A kind of portable building construction scaffold | |
| CN104372923B (en) | Scaffolding | |
| CN204212385U (en) | Scaffold strengthened by truss | |
| CN203594257U (en) | Large-span coal shed of suspension cable and pipe truss structure | |
| CN109853932A (en) | A kind of construction scaffold | |
| CN206438747U (en) | It is a kind of to store integral scaffold | |
| CN204676865U (en) | A kind of building scaffold | |
| CN205330195U (en) | Safety device of outer wall scaffold | |
| CN201771169U (en) | Horizontal diagonal rod for bracing frame or scaffold | |
| CN207453424U (en) | A kind of construction scaffold | |
| CN205558389U (en) | Modified reinforcing bar protection canopy | |
| CN205677220U (en) | A kind of construction support for shuttering | |
| CN205400005U (en) | Steel tubes clamps formula scaffold | |
| CN205557823U (en) | Connection structure of whole bathroom steel frame and steel column | |
| CN206681329U (en) | A kind of construction scaffold | |
| CN204174915U (en) | Scaffold | |
| CN208668899U (en) | A kind of scaffold for building with fast construction function | |
| CN205530883U (en) | Novel cavity glass curtain wall of fire prevention | |
| CN206957319U (en) | A kind of damping type building | |
| CN205530828U (en) | Modular aluminium wall | |
| CN205804999U (en) | The attachment structure of prefabrication tower crane | |
| CN204174919U (en) | Scaffold | |
| CN221095409U (en) | Steel structure skeleton movable modular building room |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20190725 Address after: 410000 Room 79, Datangji Community, Xiufeng Street, Kaifu District, Changsha City, Hunan Province Patentee after: Hunan Chuangfeng Construction Engineering Technology Co., Ltd. Address before: 241300 Anhui Province, Wuhu city Nanling County town streets Yan Dun Patentee before: NANLING COUNTY PRODUCTION FORCE PROMOTION CENTER CO., LTD. |