CN207177006U - Curtain wall splices with Fast Installation structure soon - Google Patents

Curtain wall splices with Fast Installation structure soon Download PDF

Info

Publication number
CN207177006U
CN207177006U CN201721097292.0U CN201721097292U CN207177006U CN 207177006 U CN207177006 U CN 207177006U CN 201721097292 U CN201721097292 U CN 201721097292U CN 207177006 U CN207177006 U CN 207177006U
Authority
CN
China
Prior art keywords
curtain wall
quick
curtain
slider
installation structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721097292.0U
Other languages
Chinese (zh)
Inventor
姚金满
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhongnan Construction Group Co Ltd
Original Assignee
Zhejiang Zhongnan Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Zhongnan Construction Group Co Ltd filed Critical Zhejiang Zhongnan Construction Group Co Ltd
Priority to CN201721097292.0U priority Critical patent/CN207177006U/en
Application granted granted Critical
Publication of CN207177006U publication Critical patent/CN207177006U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

本实用新型提供幕墙快拼接用快速安装结构。所述幕墙快拼接用快速安装结构包括安装板、第一安装孔、防雨檐、滑轨、连接机构、斜杆、中心柱、弹簧、第一幕墙、第二幕墙、滑块、顶板、第二安装孔、限位槽、滑槽和卡扣。本实用新型提供的幕墙快拼接用快速安装结构,通过螺钉将所述安装板固定于墙面处,在安装所述第二幕墙时,将所述滑块移动至所述第二幕墙的两侧,对所述滑块进行固定,通过将所述第二幕墙上下端的两侧均插入到所述滑槽的内部,实现第二幕墙的安装,在进行所述第一幕墙的安装时,将所述第一幕墙的背部的所述连接机构插入到所述限位槽的内部,所述斜杆在所述弹簧的作用下被弹开,实现所述第一幕墙的安装。

The utility model provides a quick installation structure for quick splicing of curtain walls. The quick installation structure for quick splicing of curtain walls includes installation boards, first installation holes, rainproof eaves, slide rails, connecting mechanisms, oblique rods, central columns, springs, first curtain walls, second curtain walls, sliders, top plates, second Two mounting holes, limit slots, sliding slots and buckles. The utility model provides a quick installation structure for quick splicing of curtain walls. The installation board is fixed on the wall by screws, and the sliders are moved to both sides of the second curtain wall when the second curtain wall is installed. , the slider is fixed, and the installation of the second curtain wall is realized by inserting both sides of the lower end of the second curtain wall into the inside of the chute. When installing the first curtain wall, the The connecting mechanism on the back of the first curtain wall is inserted into the limiting groove, and the oblique rod is bounced off under the action of the spring to realize the installation of the first curtain wall.

Description

幕墙快拼接用快速安装结构Quick installation structure for quick splicing of curtain wall

技术领域technical field

本实用新型涉及建筑设备应用技术领域,尤其涉及幕墙快拼接用快速安装结构。The utility model relates to the technical field of construction equipment application, in particular to a quick installation structure for quick splicing of curtain walls.

背景技术Background technique

幕墙是建筑物外墙上的围护结构,是现代大型和高层建筑常用的带有装饰效果的轻质墙体,随着我国国民经济的高速发展和人民生活水平的不断提高,建筑幕墙产品也必然向高新技术和多功能的方向发展,才能适应人们日渐增强的环保节能意识,满足市场对建筑幕墙功能的需求,双层幕墙因此出现。The curtain wall is the enclosure structure on the outer wall of the building. It is a light-weight wall with decorative effects commonly used in modern large-scale and high-rise buildings. With the rapid development of my country's national economy and the continuous improvement of people's living standards, building curtain wall products are also It must develop in the direction of high-tech and multi-functional, in order to adapt to people's increasing awareness of environmental protection and energy conservation, and meet the market's demand for building curtain wall functions, so double-layer curtain walls appear.

目前在进行幕墙安装时,是根据需求定制特定大小的幕墙,使用T型钢或立柱、横梁进行安装,这种安装方式操作复杂,且对于双层幕墙的安装,若为玻璃幕墙,需要进行钻孔,而后固定在支架上,耗费时间较多,安装效率低下,并且在玻璃的角上打孔之后,使得玻璃发生破碎的几率大大的增加,严重影响玻璃幕墙的使用寿命。At present, when installing the curtain wall, the curtain wall of a specific size is customized according to the needs, and the installation is performed using T-shaped steel, columns, and beams. This installation method is complicated to operate, and for the installation of double-layer curtain walls, if it is a glass curtain wall, drilling is required. , and then fixed on the bracket, it takes more time and the installation efficiency is low, and after punching holes in the corners of the glass, the probability of glass breaking is greatly increased, which seriously affects the service life of the glass curtain wall.

因此,有必要提供新的幕墙快拼接用快速安装结构解决上述技术问题。Therefore, it is necessary to provide a new quick installation structure for curtain wall quick splicing to solve the above technical problems.

实用新型内容Utility model content

本实用新型解决的技术问题是提供安装方便、快速的幕墙快拼接用快速安装结构。The technical problem solved by the utility model is to provide a quick installation structure for quick splicing of curtain walls which is convenient and quick to install.

为解决上述技术问题,本实用新型提供幕墙快拼接用快速安装结构包括:安装板;第一安装孔,所述第一安装孔设置于所述安装板的表面;滑轨,所述滑轨连接于所述安装板的侧面中心处;防雨檐,所述防雨檐连接于所述滑轨的侧部顶端;卡扣,所述卡扣滑动连接所述滑轨;滑块,所述滑块连接于所述卡扣的一端;第二安装孔,所述第二安装孔设置于所述滑块的表面;限位槽,所述限位槽位于所述第二安装孔的中心处;滑槽,所述滑槽位于所述滑块的两侧侧壁;顶板,所述顶板安装于所述滑槽的顶部;第二幕墙,所述第二幕墙卡合于所述滑槽的内部;连接机构,所述连接机构连接于所述限位槽的内部;第一幕墙,所述第一幕墙连接于所述连接结构的一侧。In order to solve the above technical problems, the utility model provides a quick installation structure for quick splicing of curtain walls, including: a mounting plate; a first mounting hole, the first mounting hole is arranged on the surface of the mounting plate; a slide rail, the slide rail connects At the center of the side of the mounting plate; the rain-proof eaves, the rain-proof eaves are connected to the top side of the slide rail; the buckle, the buckle is slidably connected to the slide rail; the slider, the slide A block is connected to one end of the buckle; a second mounting hole, the second mounting hole is set on the surface of the slider; a limiting groove, the limiting groove is located at the center of the second mounting hole; a chute, the chute is located on both side walls of the slider; a top plate, the top plate is installed on the top of the chute; a second curtain wall, the second curtain wall is engaged inside the chute a connection mechanism, the connection mechanism is connected to the inside of the limiting groove; a first curtain wall, the first curtain wall is connected to one side of the connection structure.

优选的,所述连接机构包括中心柱以及转动连接在所述中心柱的两侧的斜杆,所述斜杆与所述中心柱之间设有弹簧。Preferably, the connecting mechanism includes a central column and oblique rods rotatably connected to both sides of the central column, and a spring is provided between the oblique rod and the central column.

优选的,所述中心柱与所述斜杆之间的转动角度为0°-60°。Preferably, the rotation angle between the central column and the oblique rod is 0°-60°.

优选的,所述限位槽采用圆台形结构,且所述限位槽的内部卡合所述连接结构。Preferably, the limiting groove adopts a cone-shaped structure, and the inside of the limiting groove engages with the connecting structure.

优选的,所述安装板的侧面焊接滑轨,且所述滑轨的外侧滑动连接所述滑块;所述滑块、所述滑轨、所述安装板的组合设有对称且平行的两组。Preferably, the side of the mounting plate is welded with a slide rail, and the outer side of the slide rail is slidably connected to the slider; the combination of the slider, the slide rail, and the mounting plate is provided with two symmetrical and parallel Group.

优选的,所述滑轨的表面滑动连接多个相互对称的所述滑块。Preferably, the surface of the slide rail is slidingly connected with a plurality of mutually symmetrical sliders.

优选的,所述滑块的侧表面至少设有两个所述限位槽和四个所述第二安装孔,且所述限位槽和所述第二安装孔均对称分布。Preferably, at least two limiting grooves and four second mounting holes are provided on the side surface of the slider, and the limiting grooves and the second mounting holes are distributed symmetrically.

优选的,所述第一幕墙的侧部四角处均焊接所述连接机构。Preferably, the connecting mechanism is welded at four corners of the side of the first curtain wall.

优选的,所述卡扣采用弯钩形,且所述卡扣焊接与所述滑块的侧部。Preferably, the buckle is in the shape of a hook, and the buckle is welded to the side of the slider.

优选的,上下对称的所述滑块之间的间距等于所述第二幕墙、所述第一幕墙的高度,左右对称的所述滑块之间的间距等于所述第二幕墙、所述第一幕墙的宽度。Preferably, the distance between the vertically symmetrical sliders is equal to the height of the second curtain wall and the first curtain wall, and the distance between the left-right symmetrical sliders is equal to the height of the second curtain wall and the first curtain wall. The width of a curtain wall.

与相关技术相比较,本实用新型提供的幕墙快拼接用快速安装结构具有如下有益效果:Compared with related technologies, the quick installation structure for curtain wall quick splicing provided by the utility model has the following beneficial effects:

本实用新型提供幕墙快拼接用快速安装结构,通过螺钉将所述安装板固定于墙面处,在安装所述第二幕墙时,将所述滑块移动至所述第二幕墙的两侧,对所述滑块进行固定,通过将所述第二幕墙上下端的两侧均插入到所述滑槽内部,实现所述第二幕墙的安装,在所述滑块另一侧的滑槽内部装入第二幕墙,可实现所述第二幕墙的拼接;在进行所述第一幕墙的安装时,将所述第一幕墙背部的所述连接机构插入到所述限位槽内部,所述斜杆在所述弹簧的作用下被弹开,实现卡合固定于所述限位槽内部,实现所述第一幕墙的安装,在进行所述第一幕墙的拼接时,只需在所述滑块的另一所述限位槽内部插入所述连接机构,实现对所述第一幕墙的拼接;该实用新型可实现两层幕墙的安装,安装方便,且可实现快速拼接,对幕墙无损坏,使用寿命长,有良好的经济效益和社会效益,适合推广和使用。The utility model provides a quick installation structure for quick splicing of curtain walls. The installation board is fixed on the wall by screws, and when the second curtain wall is installed, the sliders are moved to both sides of the second curtain wall. The slider is fixed, and the installation of the second curtain wall is realized by inserting both sides of the lower end of the second curtain wall into the chute, and the chute on the other side of the slider is installed Inserting the second curtain wall can realize the splicing of the second curtain wall; when installing the first curtain wall, insert the connecting mechanism on the back of the first curtain wall into the limiting groove, and the inclined The rod is bounced off under the action of the spring to be snapped and fixed inside the limiting groove to realize the installation of the first curtain wall. When splicing the first curtain wall, only the slide The other limit slot of the block is inserted into the connecting mechanism to realize the splicing of the first curtain wall; the utility model can realize the installation of two layers of curtain walls, which is easy to install, and can realize fast splicing without damage to the curtain wall , long service life, good economic and social benefits, suitable for popularization and use.

附图说明Description of drawings

图1为本实用新型提供的幕墙快拼接用快速安装结构的较佳实施例的结构示意图;Fig. 1 is a schematic structural view of a preferred embodiment of the quick installation structure for quick splicing of curtain walls provided by the present invention;

图2为图1所示的连接机构结构示意图;Fig. 2 is a structural schematic diagram of the connecting mechanism shown in Fig. 1;

图3为图1所示的滑块结构示意图;Fig. 3 is a schematic diagram of the structure of the slider shown in Fig. 1;

图4为图1所示的滑块与所述滑轨连接结构示意图。FIG. 4 is a schematic diagram of the connection structure between the slider shown in FIG. 1 and the slide rail.

图中所示:1、安装板,2、第一安装孔,3、防雨檐,4、滑轨,5、连接机构,51、斜杆,52、中心柱,53、弹簧,6、第一幕墙,7、第二幕墙,8、滑块,81、顶板,82、第二安装孔,83、限位槽,84、滑槽,9、卡扣。Shown in the figure: 1, mounting plate, 2, the first mounting hole, 3, rain-proof eaves, 4, slide rail, 5, connecting mechanism, 51, inclined rod, 52, central column, 53, spring, 6, the first The first curtain wall, 7, the second curtain wall, 8, the slider, 81, the top plate, 82, the second installation hole, 83, the limit slot, 84, the chute, 9, the buckle.

具体实施方式Detailed ways

下面结合附图和实施方式对本实用新型作进一步说明。Below in conjunction with accompanying drawing and embodiment the utility model is further described.

请结合参阅图1、图2、图3及图4,其中,图1为本实用新型提供的幕墙快拼接用快速安装结构的较佳实施例的结构示意图;图2为图1所示的连接机构结构示意图;图3为图1所示的滑块结构示意图;图4为图1所示的滑块与所述滑轨连接结构示意图。幕墙快拼接用快速安装结构包括:安装板1;第一安装孔2,所述第一安装孔2设置于所述安装板1的表面,在安装时可通过所述第一安装孔2内部插入螺钉,实现对所述安装板1进行固定;滑轨4,所述滑轨4连接于所述安装板1的侧面中心处,所述滑轨4焊接于所述安装板1的中心处;防雨檐3,所述防雨檐3连接于所述滑轨4的侧部顶端,所述防雨檐3焊接于所述滑轨4侧部顶端,且所述防雨檐3的宽度大于所述滑块8的宽度,便于对整体进行防雨,避免雨水伸入到幕墙内部;卡扣9,所述卡扣9滑动连接所述滑轨4;滑块8,所述滑块8连接于所述卡扣9的一端,所述滑块8设有若干个,且滑动连接于所述滑轨4的所述滑块8均对称设置,便于对所述第二幕墙7进行固定;第二安装孔82,所述第二安装孔82设置于所述滑块8表面,所述第二安装孔82可对所述滑块8进行固定;限位槽83,所述限位槽83位于所述第二安装孔82中心处;滑槽84,所述滑槽84位于所述滑块8的两侧侧壁,所述滑槽84可卡合固定所述第二幕墙7,且可实现所述第二幕墙7的拼接;顶板81,所述顶板81安装于所述滑槽84顶部;第二幕墙7,所述第二幕墙7卡合于所述滑槽84内部;连接机构5,所述连接机构5连接于所述限位槽83内部;第一幕墙6,所述第一幕墙6连接于所述连接结构5的一侧,可通过所述连接机构5插入到所述限位槽83内部实现对所述第一幕墙6进行固定和拼接。Please refer to Fig. 1, Fig. 2, Fig. 3 and Fig. 4 in combination, wherein Fig. 1 is a structural schematic diagram of a preferred embodiment of the quick installation structure for curtain wall splicing provided by the utility model; Fig. 2 is the connection shown in Fig. 1 Schematic diagram of the structure of the mechanism; FIG. 3 is a schematic diagram of the structure of the slider shown in FIG. 1; FIG. 4 is a schematic diagram of the connection structure between the slider shown in FIG. 1 and the slide rail. The fast installation structure for quick splicing of curtain walls includes: a mounting plate 1; a first mounting hole 2, the first mounting hole 2 is set on the surface of the mounting plate 1, and can be inserted through the first mounting hole 2 during installation Screws to fix the mounting plate 1; slide rail 4, the slide rail 4 is connected to the center of the side of the mounting plate 1, and the slide rail 4 is welded to the center of the mounting plate 1; Rain eaves 3, the rain eaves 3 are connected to the side top of the slide rail 4, the rain eaves 3 are welded to the slide rail 4 side tops, and the width of the rain eaves 3 is greater than the The width of the slider 8 is convenient to prevent the rain from entering the inside of the curtain wall; buckle 9, the buckle 9 is slidably connected to the slide rail 4; slider 8, the slider 8 is connected to the One end of the buckle 9, the slider 8 is provided with several, and the slider 8 slidingly connected to the slide rail 4 is symmetrically arranged, which is convenient for fixing the second curtain wall 7; Mounting hole 82, the second mounting hole 82 is arranged on the surface of the slider 8, the second mounting hole 82 can fix the slider 8; limiting groove 83, the limiting groove 83 is located in the The center of the second installation hole 82; the sliding groove 84, the sliding groove 84 is located on the side walls of the two sides of the slider 8, the sliding groove 84 can engage and fix the second curtain wall 7, and can realize the The splicing of the second curtain wall 7; the top plate 81, the top plate 81 is installed on the top of the chute 84; the second curtain wall 7, the second curtain wall 7 is engaged inside the chute 84; the connecting mechanism 5, the The connecting mechanism 5 is connected to the inside of the limiting groove 83; the first curtain wall 6, the first curtain wall 6 is connected to one side of the connecting structure 5, and can be inserted into the limiting groove through the connecting mechanism 5 83 realizes the fixing and splicing of the first curtain wall 6 inside.

本实施例中,所述连接机构5包括中心柱52以及转动连接在所述中心柱52两侧的斜杆51,所述斜杆51与所述中心柱52之间设有弹簧53,可通过将所述连接机构5插入到所述限位槽83实现所述第一幕墙6进行固定和拼接。In this embodiment, the connecting mechanism 5 includes a central column 52 and oblique rods 51 rotatably connected to both sides of the central column 52. A spring 53 is provided between the oblique rod 51 and the central column 52, which can be passed through Inserting the connecting mechanism 5 into the limiting groove 83 realizes the fixing and splicing of the first curtain wall 6 .

本实施例中,所述中心柱52与所述斜杆51之间的转动角度为0°-60°,实现所述斜杆51卡合在所述限位槽83内部。In this embodiment, the rotation angle between the central column 52 and the oblique rod 51 is 0°-60°, so that the oblique rod 51 is engaged in the limiting slot 83 .

本实施例中,所述限位槽83采用圆台形结构,且所述限位槽83的内部卡合所述连接结构5,实现所述第一幕墙6进行固定和拼接。In this embodiment, the limiting groove 83 adopts a frustum-shaped structure, and the inside of the limiting groove 83 engages with the connection structure 5 to realize the fixing and splicing of the first curtain wall 6 .

本实施例中,所述安装板1的侧面焊接滑轨4,且所述滑轨4外侧滑动连接所述滑块8;所述滑块8、所述滑轨4、所述安装板1的组合设有对称且平行的两组,可对所述第一幕墙6、所述第二幕墙7上下端进行固定。In this embodiment, the side of the mounting plate 1 is welded with a slide rail 4, and the outside of the slide rail 4 is slidably connected to the slider 8; The combination is provided with two symmetrical and parallel groups, which can fix the upper and lower ends of the first curtain wall 6 and the second curtain wall 7 .

本实施例中,所述滑轨4表面滑动连接多个相互对称的所述滑块8,可实现幕墙的拼接。In this embodiment, the surface of the slide rail 4 is slidably connected with a plurality of mutually symmetrical sliders 8 to realize the splicing of the curtain wall.

本实施例中,所述滑块8侧表面至少设有两所述限位槽83和四所述第二安装孔82,且所述限位槽83和所述第二安装孔82均对称分布。In this embodiment, the side surface of the slider 8 is provided with at least two limiting grooves 83 and four second mounting holes 82, and the limiting grooves 83 and the second mounting holes 82 are symmetrically distributed. .

本实施例中,所述第一幕墙6的侧部四角处均焊接所述连接机构5,实现对所述第一幕墙6进行固定。In this embodiment, the connecting mechanism 5 is welded at the four corners of the side part of the first curtain wall 6 to realize the fixing of the first curtain wall 6 .

本实施例中,所述卡扣9采用弯钩形,且所述卡扣9焊接与所述滑块8的侧部,实现所述滑块8的滑动。In this embodiment, the buckle 9 adopts a hook shape, and the buckle 9 is welded to the side of the slider 8 to realize the sliding of the slider 8 .

本实施例中,上下对称的所述滑块8之间的间距等于所述第二幕墙7、所述第一幕墙6的高度,左右对称的所述滑块8之间的间距等于所述第二幕墙7、所述第一幕墙6的宽度,实现对幕墙的固定。In this embodiment, the distance between the vertically symmetrical sliders 8 is equal to the height of the second curtain wall 7 and the first curtain wall 6, and the distance between the left-right symmetrical sliders 8 is equal to the height of the first curtain wall 7. The width of the second curtain wall 7 and the first curtain wall 6 realizes the fixing of the curtain wall.

与相关技术相比较,本实用新型提供的幕墙快拼接用快速安装结构具有如下有益效果:Compared with related technologies, the quick installation structure for curtain wall quick splicing provided by the utility model has the following beneficial effects:

本实用新型提供幕墙快拼接用快速安装结构,通过螺钉将所述安装板1固定于墙面处,在安装所述第二幕墙7时,将所述滑块8移动至所述第二幕墙7的两侧,对所述滑块8进行固定,通过将所述第二幕墙7上下端的两侧均插入到所述滑槽84内部,实现第二幕墙7的安装,在所述滑块8另一侧的滑槽84内部装入第二幕墙7,可实现所述第二幕墙7的拼接;在进行所述第一幕墙6的安装时,将所述第一幕墙6背部的连接机构5插入到所述限位槽83内部,所述斜杆51在所述弹簧53的作用下被弹开,实现卡合固定于所述限位槽83内部,实现所述第一幕墙6的安装,在进行所述第一幕墙6的拼接时,只需在所述滑块8的另一所述限位槽83内部插入所述连接机构5,实现对对第一幕墙6的拼接;该新型个实现两层幕墙的安装,安装方便,且可实现快速拼接,对幕墙无损坏,使用寿命长,有良好的经济效益和社会效益,适合推广和使用。The utility model provides a quick installation structure for quick splicing of curtain walls, the installation plate 1 is fixed on the wall by screws, and when the second curtain wall 7 is installed, the slider 8 is moved to the second curtain wall 7 The two sides of the slider 8 are fixed, by inserting both sides of the upper and lower ends of the second curtain wall 7 into the inside of the chute 84, the installation of the second curtain wall 7 is realized, and the slider 8 is installed on the other side. The chute 84 on one side is installed inside the second curtain wall 7, which can realize the splicing of the second curtain wall 7; when installing the first curtain wall 6, insert the connecting mechanism 5 on the back of the first curtain wall 6 to the inside of the limiting groove 83, the inclined rod 51 is bounced off under the action of the spring 53, and is engaged and fixed inside the limiting groove 83 to realize the installation of the first curtain wall 6. When splicing the first curtain wall 6, it is only necessary to insert the connecting mechanism 5 inside the other limiting groove 83 of the slider 8 to realize the splicing of the first curtain wall 6; The installation of the two-layer curtain wall is easy to install, and can realize fast splicing, no damage to the curtain wall, long service life, good economic and social benefits, and is suitable for promotion and use.

以上所述仅为本实用新型的实施例,并非因此限制本实用新型的专利范围,凡是利用本实用新型说明书及附图内容所作的等效结构或等效流程变换,或直接或间接运用在其它相关的技术领域,均同理包括在本实用新型的专利保护范围内。The above descriptions are only examples of the utility model, and are not intended to limit the patent scope of the utility model. Any equivalent structure or equivalent process transformation made by using the utility model specification and accompanying drawings may be directly or indirectly used in other applications. Related technical fields are all included in the patent protection scope of the present utility model in the same way.

Claims (10)

1.幕墙快拼接用快速安装结构,其特征在于,包括:1. The rapid installation structure for quick splicing of curtain walls, characterized in that it includes: 安装板;mounting plate; 第一安装孔,所述第一安装孔设置于所述安装板的表面;a first mounting hole, the first mounting hole is disposed on the surface of the mounting plate; 滑轨,所述滑轨连接于所述安装板的侧面中心处;a slide rail, the slide rail is connected to the center of the side of the mounting plate; 防雨檐,所述防雨檐连接于所述滑轨的侧部顶端;rain-proof eaves, the rain-proof eaves are connected to the top side of the slide rail; 卡扣,所述卡扣滑动连接所述滑轨;a buckle, the buckle is slidably connected to the slide rail; 滑块,所述滑块连接于所述卡扣的一端;a slider, the slider is connected to one end of the buckle; 第二安装孔,所述第二安装孔设置于所述滑块的表面;a second mounting hole, the second mounting hole is disposed on the surface of the slider; 限位槽,所述限位槽位于所述第二安装孔的中心处;a limiting groove, the limiting groove is located at the center of the second mounting hole; 滑槽,所述滑槽位于所述滑块的两侧侧壁;a chute, the chute is located on both side walls of the slider; 顶板,所述顶板安装于所述滑槽的顶部;a top plate, the top plate is installed on the top of the chute; 第二幕墙,所述第二幕墙卡合于所述滑槽的内部;a second curtain wall, the second curtain wall is engaged with the inside of the chute; 连接机构,所述连接机构连接于所述限位槽的内部;a connection mechanism, the connection mechanism is connected to the inside of the limiting groove; 第一幕墙,所述第一幕墙连接于所述连接机构的一侧。The first curtain wall is connected to one side of the connecting mechanism. 2.根据权利要求1所述的幕墙快拼接用快速安装结构,其特征在于,所述连接机构包括中心柱以及转动连接在所述中心柱的两侧的斜杆,所述斜杆与所述中心柱之间设有弹簧。2. The quick installation structure for curtain wall quick splicing according to claim 1, characterized in that, the connecting mechanism comprises a central column and oblique rods rotatably connected to both sides of the central column, the oblique rod and the Springs are arranged between the central columns. 3.根据权利要求2所述的幕墙快拼接用快速安装结构,其特征在于,所述中心柱与所述斜杆之间的转动角度为0°-60°。3. The quick installation structure for quick splicing of curtain walls according to claim 2, wherein the rotation angle between the central column and the diagonal bar is 0°-60°. 4.根据权利要求1所述的幕墙快拼接用快速安装结构,其特征在于,所述限位槽采用圆台形结构,且所述限位槽的内部卡合所述连接机构。4 . The quick installation structure for quick splicing of curtain walls according to claim 1 , wherein the limiting groove adopts a truncated circular structure, and the inside of the limiting groove engages the connecting mechanism. 5.根据权利要求1所述的幕墙快拼接用快速安装结构,其特征在于,所述安装板的侧面焊接滑轨,且所述滑轨的外侧滑动连接所述滑块;所述滑块、所述滑轨、所述安装板的组合设有对称且平行的两组。5. The quick installation structure for quick splicing of curtain wall according to claim 1, characterized in that, the side of the mounting plate is welded with slide rails, and the outer side of the slide rail is slidably connected to the slider; the slider, The combination of the slide rail and the mounting plate is provided in two symmetrical and parallel groups. 6.根据权利要求1所述的幕墙快拼接用快速安装结构,其特征在于,所述滑轨的表面滑动连接多个相互对称的所述滑块。6 . The quick installation structure for quick splicing of curtain walls according to claim 1 , characterized in that, the surface of the slide rail is slidably connected to a plurality of mutually symmetrical sliders. 7 . 7.根据权利要求1所述的幕墙快拼接用快速安装结构,其特征在于,所述滑块的侧表面至少设有两个所述限位槽和四个所述第二安装孔,且所述限位槽和所述第二安装孔均对称分布。7. The quick installation structure for curtain wall quick splicing according to claim 1, characterized in that, the side surface of the slider is provided with at least two limiting grooves and four second installation holes, and the Both the limiting slots and the second mounting holes are distributed symmetrically. 8.根据权利要求1所述的幕墙快拼接用快速安装结构,其特征在于,所述第一幕墙的侧部四角处均焊接所述连接机构。8. The quick installation structure for quick splicing of curtain walls according to claim 1, characterized in that, the connecting mechanisms are all welded at the four corners of the sides of the first curtain wall. 9.根据权利要求1所述的幕墙快拼接用快速安装结构,其特征在于,所述卡扣采用弯钩形,且所述卡扣焊接于所述滑块的侧部。9. The quick installation structure for quick splicing of curtain walls according to claim 1, wherein the buckle is in the shape of a hook, and the buckle is welded to the side of the slider. 10.根据权利要求1所述的幕墙快拼接用快速安装结构,其特征在于,上下对称的所述滑块之间的间距等于所述第二幕墙、所述第一幕墙的高度,左右对称的所述滑块之间的间距等于所述第二幕墙、所述第一幕墙的宽度。10. The quick installation structure for quick splicing of curtain walls according to claim 1, characterized in that the distance between the vertically symmetrical sliders is equal to the height of the second curtain wall and the first curtain wall, and the left-right symmetrical The distance between the sliders is equal to the width of the second curtain wall and the first curtain wall.
CN201721097292.0U 2017-08-30 2017-08-30 Curtain wall splices with Fast Installation structure soon Expired - Fee Related CN207177006U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721097292.0U CN207177006U (en) 2017-08-30 2017-08-30 Curtain wall splices with Fast Installation structure soon

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721097292.0U CN207177006U (en) 2017-08-30 2017-08-30 Curtain wall splices with Fast Installation structure soon

Publications (1)

Publication Number Publication Date
CN207177006U true CN207177006U (en) 2018-04-03

Family

ID=61738396

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721097292.0U Expired - Fee Related CN207177006U (en) 2017-08-30 2017-08-30 Curtain wall splices with Fast Installation structure soon

Country Status (1)

Country Link
CN (1) CN207177006U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108661491A (en) * 2018-06-28 2018-10-16 浙江解放装饰工程有限公司 A kind of abnormal shape multi-cavity thin-wall frame heat insulation aluminum alloy door window
CN108678243A (en) * 2018-06-28 2018-10-19 浙江解放装饰工程有限公司 A kind of connecting tooling of ecological energy-saving double-layer curtain wall design and construction
CN108691374A (en) * 2018-06-28 2018-10-23 浙江解放装饰工程有限公司 One kind can automatic temperature-control double-layer curtain wall
CN108756031A (en) * 2018-06-28 2018-11-06 浙江解放装饰工程有限公司 A kind of hot summer and warm winter region special-purpose thermal insulation curtain wall
CN112594587A (en) * 2020-12-11 2021-04-02 泸州禾苗通信科技有限公司 Full-weather intelligent module control device for street lamp
CN113818610A (en) * 2021-10-26 2021-12-21 深圳市博大建设集团有限公司 Super high-rise full-special-shaped unit type curtain wall design structure and construction method
CN116480049A (en) * 2023-05-05 2023-07-25 浙江梅杭金属制造有限公司 A metal curtain wall quick installation system

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108661491A (en) * 2018-06-28 2018-10-16 浙江解放装饰工程有限公司 A kind of abnormal shape multi-cavity thin-wall frame heat insulation aluminum alloy door window
CN108678243A (en) * 2018-06-28 2018-10-19 浙江解放装饰工程有限公司 A kind of connecting tooling of ecological energy-saving double-layer curtain wall design and construction
CN108691374A (en) * 2018-06-28 2018-10-23 浙江解放装饰工程有限公司 One kind can automatic temperature-control double-layer curtain wall
CN108756031A (en) * 2018-06-28 2018-11-06 浙江解放装饰工程有限公司 A kind of hot summer and warm winter region special-purpose thermal insulation curtain wall
CN108678243B (en) * 2018-06-28 2023-07-21 浙江解放建设有限公司 Connecting tool for design and construction of ecological energy-saving double-layer curtain wall
CN108661491B (en) * 2018-06-28 2023-09-05 浙江解放建设有限公司 Abnormal shape multicavity thin wall frame heat insulation aluminum alloy door and window
CN108691374B (en) * 2018-06-28 2023-12-26 浙江解放装饰工程有限公司 Double-layer curtain wall capable of automatically adjusting temperature
CN108756031B (en) * 2018-06-28 2023-12-26 浙江解放装饰工程有限公司 Special heat preservation curtain in hot winter warm area in summer
CN112594587A (en) * 2020-12-11 2021-04-02 泸州禾苗通信科技有限公司 Full-weather intelligent module control device for street lamp
CN113818610A (en) * 2021-10-26 2021-12-21 深圳市博大建设集团有限公司 Super high-rise full-special-shaped unit type curtain wall design structure and construction method
CN116480049A (en) * 2023-05-05 2023-07-25 浙江梅杭金属制造有限公司 A metal curtain wall quick installation system
CN116480049B (en) * 2023-05-05 2026-04-03 浙江梅杭金属制造有限公司 A quick-installation system for metal curtain walls

Similar Documents

Publication Publication Date Title
CN210266501U (en) Detention place wisdom security protection watch-dog convenient to maintenance
CN206874047U (en) A kind of novel environment friendly gear column of construction fast just
CN202392398U (en) Hanging rack applicable to liquid crystal television
CN213233927U (en) Building concatenation type curtain
CN204820511U (en) Novel honeycomb raised movable floor
CN208473060U (en) A kind of metal curtain wall
CN219569300U (en) A prefabricated curtain wall installation structure
CN218623026U (en) Venue construction decoration panel mounting structure
CN201981728U (en) Stainless steel composite covered column structure
CN203922363U (en) Modularization elevator hoistways sole plate
CN220336102U (en) Assembled building frame
CN202492935U (en) Dedicated connecting piece for compound wallboard and floorslab
CN217949851U (en) Constructional engineering frame roof beam reinforcing apparatus
CN214253677U (en) A two-way pole number plate hoop bracket
CN221258250U (en) Mounting bracket for thin plate ceiling equipment
CN204491844U (en) Steel structure connecting member
CN220953952U (en) Hall canopy structure column of external wall insulation integrated board structure
CN204216831U (en) Photovoltaic module support and photovoltaic component system
CN217106476U (en) A construction site protection fence based on construction safety
CN219158547U (en) Multilayer assembled energy-saving building
CN104078914A (en) Fixing base for metal roof lightning strip and installation method thereof
CN209244153U (en) A kind of hotel's architectural surface dragon bone anchoring device
CN223907973U (en) A type of guardrail for multi-level parking garages
CN203769306U (en) Multi-ribbed floor system pouring formwork processing device
CN202731143U (en) An installation structure of a railing corner handrail

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180403