CN207176507U - Hanging cable of stay cable construction platform - Google Patents

Hanging cable of stay cable construction platform Download PDF

Info

Publication number
CN207176507U
CN207176507U CN201720845847.9U CN201720845847U CN207176507U CN 207176507 U CN207176507 U CN 207176507U CN 201720845847 U CN201720845847 U CN 201720845847U CN 207176507 U CN207176507 U CN 207176507U
Authority
CN
China
Prior art keywords
platform
cable
construction
distribution beam
main bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720845847.9U
Other languages
Chinese (zh)
Inventor
苟勇
倪红
林伟
罗载重
黄永红
白文奇
姚昌良
刘金鑫
刘猛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Road & Bridge Engineering Co Ltd
Original Assignee
Sichuan Road & Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Road & Bridge Engineering Co Ltd filed Critical Sichuan Road & Bridge Engineering Co Ltd
Priority to CN201720845847.9U priority Critical patent/CN207176507U/en
Application granted granted Critical
Publication of CN207176507U publication Critical patent/CN207176507U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of hanging cable of stay cable construction platform, it is tied to form by jacking system and operating platform.Jacking system collectively forms space structure system construction tower end drag-line with operating platform.The utility model carries out the construction method of suspension cable installation under the conditions of high pylon cable-stayed bridge is without tower crane auxiliary lifting using construction platform, and so as to enrich construction method, increase working security, accelerate construction speed, economic benefit is obvious with social benefit.

Description

Hanging cable of stay cable construction platform
Technical field
The tower end drag-line installation field of high pylon cable-stayed bridge is the utility model is related to, specifically a kind of hanging cable of stay cable is applied Work platform.
Background technology
Drag-line installation conventional construction in high tower Tower Column of A Cable Stayed Bridge end easily arises a problem that:(1)In terms of safety index, because Tower crane lifting hanging basket is operated, and security is poor;(2)In terms of difficulty of construction, influenceed by barrel structure, the scope of operation is narrow and small, construction Difficulty is big;(5)Refer to from economy, tower crane hold facility time length, economic benefit and social benefit are poor;As for construction technology, because To be routinely scheme progress, technical maturity, also only this point is dominant, but synthesis sees that working security is poor, and difficulty of construction is big, It is less economical, it is necessary to improve.
Utility model content
The purpose of this utility model is to overcome disadvantages mentioned above, there is provided a kind of simplified construction platform, increase operation side, letter Change is constructed, had a safety feature, improving the economic and social benefits obvious hanging cable of stay cable construction platform construction high tower oblique pull Bridge tower end drag-line.
The utility model is achieved in that a kind of hanging cable of stay cable construction platform of construction, it is characterised in that:It is by lifting System, operation platform system are formed;Jacking system collectively forms space structure system construction tower end drag-line with operation platform system;Institute Stating operating platform includes main bearing platform, middle platform, lower platform;
The jacking system includes assembly pulley, haulage cable, distribution beam, center of gravity regulation cucurbit;Haulage cable and volume The lifting that machine connection drives operating platform is raised, haulage cable is connected with distribution beam after bypassing assembly pulley, passed through below distribution beam Steel wire rope is connected with main bearing platform, sets center of gravity to adjust cucurbit on the steel wire rope below distribution beam.
According to hanging cable of stay cable construction platform described in the utility model, it is characterised in that:It is each in the operating platform Platform is respectively provided with guard rail, slides rubber tire, limiting card, to drawing wind resistance rope;Operating platform is tightened up to drawing wind resistance rope pair afterwards in place Operation platform system is fixed.
According to hanging cable of stay cable construction platform described in the utility model, it is characterised in that:In the operation platform system Main bearing platform, middle platform and lower platform are formed by welding by shaped steel assembly.
According to hanging cable of stay cable construction platform described in the utility model, it is characterised in that:Assembly pulley is logical with distribution beam Cross the connection of 4 φ 32mm steel cables;Distribution beam with main bearing platform is connected by 4 φ 32mm steel cables.
According to hanging cable of stay cable construction platform described in the utility model, it is characterised in that:Wind resistance rope only upper strata is drawn to set, Main bearing platform, middle platform, lower platform, which are every layer, all to be had guard rail, slides rubber tire, limiting card;
Limiting card is arranged on the inside of king-post;
Slide every layer of rubber tire and be respectively provided with 2;
Main bearing platform, middle platform, three layers of lower platform are by being welded into entirety.
The utility model has the advantage of:
A kind of hanging cable of stay cable construction platform described in the utility model, by improving and redesigning by jacking system, behaviour Make platform composition;The operating platform by main bearing platform, middle platform, lower platform, guard rail, slide rubber tire, limiting card, right Draw wind resistance rope composition;The jacking system includes assembly pulley, haulage cable, distribution beam, center of gravity regulation cucurbit;Lifting platform When, the lifting of haulage cable progress operating platform is driven by bridge floor hoist engine, operating platform is tightened up to drawing wind resistance rope afterwards in place Operation platform system is fixed.
Hoist engine, haulage cable, tackle pulley are engineering construction common device used by the jacking system during implementation, Reach lifting purpose by being mutually combined.
The operation platform system is that shaped steel is commonly used in market during implementation, carries out assembly using crane, passes through between component It is welded to connect.
The utility model eliminates conventional tower crane lifting nacelle construction, and security is preferable.Tower end drag-line installation system arrangement After the completion of i.e. remove tower crane equipment.Economic benefit and social benefit are obvious.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is hanging cable of stay cable construction platform elevational schematic view;
Fig. 3 is hanging cable of stay cable construction platform floor map.
Wherein:1st, main bearing platform;2nd, middle platform;3rd, lower platform;4th, guard rail;5th, assembly pulley;6th, haulage cable; 7th, distribution beam;8th, center of gravity regulation cucurbit;9th, rubber tire is slided;10th, limiting card;11st, to drawing wind resistance rope.
Embodiment
The utility model is described in detail below in conjunction with accompanying drawing 1- Fig. 3, to the technical side in the embodiment of the present invention Case is clearly and completely described, it is clear that and described embodiment is only part of the embodiment of the present invention, rather than all Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not making creative work premise Lower obtained every other embodiment, belong to the scope of the utility model protection.
The utility model provides a kind of hanging cable of stay cable construction platform by improving, as Figure 1-3, can be according to as follows Mode is practiced;The utility model is made up of jacking system, operation platform system;By jacking system, operation platform system structure Into;Jacking system collectively forms space structure system construction tower end drag-line with operation platform system;
Jacking system collectively forms space structure system construction tower end drag-line with operation platform system;The operating platform bag Include main bearing platform 1, middle platform 2 and lower platform 3;
Each platform is respectively provided with guard rail 4, slides rubber tire 9, limiting card 10, to drawing wind resistance rope in the operating platform 11;Operating platform is tightened up to drawing wind resistance rope 11 that operation platform system is fixed afterwards in place.
Main bearing platform 1, middle platform 2 and lower platform 3 are formed by welding by shaped steel assembly in the operation platform system.
The jacking system includes assembly pulley 5, haulage cable 6, distribution beam 7, center of gravity regulation cucurbit 8;Haulage cable 6 The lifting for driving operating platform is connected with hoist engine, haulage cable 6 is connected after bypassing assembly pulley 5 with distribution beam 7, distribution beam 7 Lower section is connected by steel wire rope with main bearing platform 1, sets center of gravity to adjust cucurbit 8 on the steel wire rope of the lower section of distribution beam 7;
During lifting platform, haulage cable is driven to carry out the lifting of operating platform by bridge floor hoist engine, operating platform is in place After tighten up to draw wind resistance rope operation platform system is fixed, while using rope card by traction steel rope of cable lock to prevent under platform It is sliding.The utility model provides a kind of simplified drag-line installation platform, increase operation side, simplifies construction, has a safety feature, Economic benefit and social benefit are obvious.
The assembly pulley 5 with distribution beam 7 is connected by 4 φ 32mm steel cables;Distribution beam 7 and main bearing platform 1 are by 4 φ 32mm steel cables connect.
The only upper strata of wind resistance rope 11 is drawn to set, main bearing platform 1, middle platform 2, lower platform 3, which are every layer, all has guard rail 4th, rubber tire 9, limiting card 10 are slided;
Limiting card 10 is arranged on the inside of king-post, prevents platform double swerve in construction, also serves as protection from the wind effect.
Slide every layer of rubber tire and be respectively provided with 2.Main bearing platform 1, middle platform 2,3 three layers of lower platform are whole by being welded into Body.
Wherein, hoist engine, haulage cable, tackle pulley are engineering construction common device used by the jacking system, Reach lifting purpose by being mutually combined.Operation platform system is that shaped steel is commonly used in market, carried out using crane it is assembled, component it Between by being welded to connect.
The foregoing description of the disclosed embodiments, professional and technical personnel in the field are enable to realize or new using this practicality Type.A variety of modifications to these embodiments will be apparent for those skilled in the art, determine herein The General Principle of justice can be realized in other embodiments in the case where not departing from spirit or scope of the present utility model.Cause This, the utility model is not intended to be limited to the embodiments shown herein, and is to fit to and principles disclosed herein The most wide scope consistent with features of novelty.

Claims (5)

  1. A kind of 1. hanging cable of stay cable construction platform, it is characterised in that:It is made up of jacking system, operation platform system;Jacking system Space structure system construction tower end drag-line is collectively formed with operation platform system;The operating platform includes main bearing platform(1)、 Middle platform(2), lower platform(3);
    The jacking system includes assembly pulley(5), haulage cable(6), distribution beam(7), center of gravity regulation cucurbit(8);Draw steel Cord(6)The lifting for driving operating platform, haulage cable are connected with hoist engine(6)Around assembly pulley(5)Afterwards with distribution beam(7) Connection, distribution beam(7)Lower section passes through steel wire rope and main bearing platform(1)Connection, distribution beam(7)Weight is set on the steel wire rope of lower section The heart adjusts cucurbit(8).
  2. 2. hanging cable of stay cable construction platform according to claim 1, it is characterised in that:Each platform in the operating platform It is respectively provided with guard rail(4), slide rubber tire(9), limiting card(10), to draw wind resistance rope(11);Operating platform is tightened up pair afterwards in place Draw wind resistance rope(11)Operation platform system is fixed.
  3. 3. hanging cable of stay cable construction platform according to claim 1, it is characterised in that:Master holds in the operation platform system Galassing platform(1), middle platform(2)And lower platform(3)It is formed by welding by shaped steel assembly.
  4. 4. hanging cable of stay cable construction platform according to claim 1, it is characterised in that:Assembly pulley(5)With distribution beam(7)It is Connected by 4 φ 32mm steel cables;Distribution beam(7)With main bearing platform(1)It is to be connected by 4 φ 32mm steel cables.
  5. 5. hanging cable of stay cable construction platform according to claim 1, it is characterised in that:Draw wind resistance rope(11)Only upper strata is set Put, main bearing platform(1), middle platform(2), lower platform(3)Being every layer all has guard rail(4), slide rubber tire(9), it is spacing Card(10);
    Limiting card(10)It is arranged on the inside of king-post;
    Slide rubber tire(9)Every layer is respectively provided with 2;
    Main bearing platform(1), middle platform(2), lower platform(3)Three layers by being welded into entirety.
CN201720845847.9U 2017-07-13 2017-07-13 Hanging cable of stay cable construction platform Active CN207176507U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720845847.9U CN207176507U (en) 2017-07-13 2017-07-13 Hanging cable of stay cable construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720845847.9U CN207176507U (en) 2017-07-13 2017-07-13 Hanging cable of stay cable construction platform

Publications (1)

Publication Number Publication Date
CN207176507U true CN207176507U (en) 2018-04-03

Family

ID=61736881

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720845847.9U Active CN207176507U (en) 2017-07-13 2017-07-13 Hanging cable of stay cable construction platform

Country Status (1)

Country Link
CN (1) CN207176507U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113944108A (en) * 2021-10-29 2022-01-18 中铁十四局集团有限公司 Supporting device for bridge tower construction and construction method applying supporting device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113944108A (en) * 2021-10-29 2022-01-18 中铁十四局集团有限公司 Supporting device for bridge tower construction and construction method applying supporting device

Similar Documents

Publication Publication Date Title
CN102556854B (en) Mine hydraulic hoisting traveling crane
CN107354873A (en) A kind of cable hoisting and rotator construction system
CN203700963U (en) Bridge cable PVF strap intelligent winding and covering equipment
CN201148310Y (en) A new crane for cable crane running on the upper part of the main cable
CN105672138A (en) Through type stayed cable installation circulation system and cable threading construction method thereof
CN201148312Y (en) Double cable stride lifting system carriage
CN104577870B (en) A kind of active obstacle type overhauls property-line driving
CN207176507U (en) Hanging cable of stay cable construction platform
CN205474866U (en) Through suspension cable installation circulation system
CN105048726B (en) A kind of equipment removed for power station stator bar
CN207419264U (en) A kind of cable hoisting and rotator construction system
CN102344086B (en) Method for replacing lifting ropes of multi-rope frictional geared winch
CN201801807U (en) Movable temporary bridge vehicle for emergency rescue
CN108643058A (en) Anchor after cable crane main rope cross sliding type
CN205346676U (en) High -speed railway of not stopping transport across device's span beam becomes width of cloth rotary mechanism
CN105480873B (en) Support bar amplitude variation rotating mechanism of non-shutdown high-speed rail spanning device
CN205367533U (en) Agricultural hoist device convenient to remove
CN206735691U (en) A kind of handling apparatus for deep basal pit installation reinforcing bar
CN205653068U (en) Reinforcement type gantry crane
CN205742958U (en) A kind of building hanging basket of energy translation-angle
CN207313007U (en) A kind of pulley arrangements form of conveying trolley used in inclined shaft trailer system
CN205329544U (en) High -speed railway of not stopping transport across device crosses over bridge floor system
CN205709367U (en) A kind of elevator cab of high intensity
CN206645739U (en) A kind of crane with fixing function
CN207524867U (en) Double hoisting luffing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant