CN207160354U - An integrated assembled lightweight floor slab - Google Patents

An integrated assembled lightweight floor slab Download PDF

Info

Publication number
CN207160354U
CN207160354U CN201720725877.6U CN201720725877U CN207160354U CN 207160354 U CN207160354 U CN 207160354U CN 201720725877 U CN201720725877 U CN 201720725877U CN 207160354 U CN207160354 U CN 207160354U
Authority
CN
China
Prior art keywords
steel
floor
integrated
plate
steel construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720725877.6U
Other languages
Chinese (zh)
Inventor
段坤朋
张帅彬
楼颖
徐晗
吕骅昕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhongtian Hengzhu Steel Structure Co Ltd
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Zhejiang Steel Structure Co ltd
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Zhejiang Steel Structure Co ltd, Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Zhejiang Steel Structure Co ltd
Priority to CN201720725877.6U priority Critical patent/CN207160354U/en
Application granted granted Critical
Publication of CN207160354U publication Critical patent/CN207160354U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Floor Finish (AREA)

Abstract

The utility model discloses an integrated assembled light floor belongs to the building material field. This integrated assembled light floor does not destroy major structure stress system, and monoblock integrated form floor adopts the factory modularization production, improves the assembly rate, and integrated floor adopts the bolt formula to be connected with the steel construction girder, the manifold cycles of being convenient for use. The welding quantity is not much, and the integral height of the integrated floor slab is small, so that the indoor clear height is effectively improved. Meanwhile, the floor slab uses less steel, and the construction cost is effectively reduced.

Description

一种集成装配式轻质楼板An integrated assembled lightweight floor slab

技术领域technical field

本实用新型属于钢结构建筑领域,尤其涉及一种集成装配式轻质楼板。The utility model belongs to the field of steel structure buildings, in particular to an integrated assembled light-weight floor slab.

背景技术Background technique

2013年~2016年,中央先后出台《绿色建筑行动方案》、《国务院关务化解产能严重过剩矛盾的指导意见》、《促进绿色建材生产和应用行动方案》、《关于钢铁行业化解过剩产能实现脱困发展的意见》等四项相关文件及多项配套文件推广钢结构建筑,增加钢结构在公共建筑领域的,在地震等自然灾害高发地区推广轻钢结构集成房屋等抗震型建筑。From 2013 to 2016, the central government successively issued the "Green Building Action Plan", "Guiding Opinions of the State Council on Resolving Serious Overcapacity Conflicts", "Action Plan for Promoting the Production and Application of Green Building Materials", "Regarding the Resolution of Excess Capacity in the Iron and Steel Industry to Get Out of Difficulties Development Opinions" and other four related documents and a number of supporting documents to promote steel structure buildings, increase the use of steel structures in the field of public buildings, and promote earthquake-resistant buildings such as light steel structure integrated houses in areas with high incidence of natural disasters such as earthquakes.

目前装配式钢结构建筑中,占主流地位的是改进型混凝土楼板,包括钢筋桁架楼承板、预制钢筋桁架叠合板等。钢筋桁架楼承板可以免除支模工序和费用,但是楼板需现浇,存在大量现场湿作业,与传统现浇混凝土楼板相比,工期优势不明显,楼板裂缝较多,且楼板成形后需增加工序拆除楼板底部的薄钢板,费时费力。预制钢筋桁架叠合板减少了现场湿作业,楼板与钢梁连接处为叠合板结合处,该部分需要现场钢筋绑扎连接,并现浇混凝土,依旧存在现场湿作业情况。以上两种楼板均未实现完全工业化生产,且不能多次循环使用。At present, in prefabricated steel structure buildings, improved concrete floor slabs occupy the mainstream position, including reinforced truss floor decks, prefabricated steel truss laminated slabs, etc. Reinforced truss floor slabs can avoid the formwork process and cost, but the slab needs to be cast-in-place, and there are a lot of wet work on site. The process of removing the thin steel plate at the bottom of the floor slab is time-consuming and labor-intensive. The prefabricated steel truss laminated slab reduces on-site wet work. The joint between the floor slab and the steel beam is the joint of the laminated slab. This part needs to be connected by on-site steel reinforcement and cast-in-situ concrete, and there is still on-site wet work. The above two floor slabs have not been fully industrialized and cannot be recycled for many times.

随着装配式技术的发展,一种钢结构桁架式楼板逐渐进入市场,该楼板可实现完全工业化生产,在工厂专业生产线上完成钢梁与楼板的集成。虽然此种楼板适用与钢结构建筑,但其钢梁与楼板的集成导致钢柱截断,对竖向受力构件的传力效果和钢柱整体性造成较大影响。其后,虽有改进产品做到钢柱不截断,以保证钢结构建筑的竖向传力效果,但桁架式钢梁的焊接量过多,集成楼板整体高度较大,用钢量较大,整体造价较高。With the development of prefabricated technology, a steel structure truss floor has gradually entered the market. This floor can realize complete industrial production, and the integration of steel beams and floors can be completed on the factory's professional production line. Although this kind of floor is suitable for steel structure buildings, the integration of steel beams and floors leads to the truncation of steel columns, which has a great impact on the force transmission effect of vertical stressed members and the integrity of steel columns. Later, although there were improved products to ensure that the steel columns were not cut off to ensure the vertical force transmission effect of the steel structure building, the amount of welding of the truss-type steel beams was too much, the overall height of the integrated floor was relatively large, and the amount of steel used was relatively large. The overall cost is higher.

在此背景下,研发设计一种适用于钢结构建筑的集成装配式轻质楼板,不破坏主体结构受力体系,整块集成式楼板采用工厂模块化生产,提高装配化率,集成楼板与钢结构主梁采用螺栓式连接,便于多次循环使用。焊接量不多,且集成楼板整体高度小,有效提高室内净高。同时该楼板用钢量较小,有效降低工程造价。In this context, research and development design an integrated assembled lightweight floor slab suitable for steel structure buildings, without destroying the stress system of the main structure. The main beam of the structure is connected by bolts, which is convenient for repeated use. The amount of welding is not much, and the overall height of the integrated floor is small, which effectively improves the indoor net height. At the same time, the amount of steel used in the floor slab is small, which effectively reduces the construction cost.

实用新型内容Utility model content

本实用新型的目的在于解决现有技术中存在的问题,并提供一种集成装配式轻质楼板。该集成装配式轻质楼板,不破坏主体结构受力体系,整块集成式楼板采用工厂模块化生产,提高装配化率,集成楼板与钢结构主梁采用螺栓式连接,便于多次循环使用。焊接量不多,且集成楼板整体高度小,有效提高室内净高。同时该楼板用钢量较小,有效降低工程造价。The purpose of the utility model is to solve the problems existing in the prior art, and to provide an integrated assembled lightweight floor. The integrated assembly lightweight floor slab does not damage the stress system of the main structure. The entire integrated floor slab is produced in a factory modularized manner to improve the assembly rate. The integrated floor slab and the steel structure main beam are connected by bolts, which is convenient for multiple cycles. The amount of welding is not much, and the overall height of the integrated floor is small, which effectively improves the indoor net height. At the same time, the amount of steel used in the floor slab is small, which effectively reduces the construction cost.

本实用新型所采用的具体技术方案如下:The concrete technical scheme that the utility model adopts is as follows:

集成装配式轻质楼板,包括水泥纤维板、钢结构井字梁和钢结构龙骨;钢结构井字梁由若干条矩形钢管呈井字形焊接而成;钢结构井字梁上铺设有钢结构龙骨,钢结构井字梁和钢结构龙骨组成楼板主体结构,水泥纤维板作为楼板基层,铺设在楼板主体结构表面并通过连接件与楼板主体结构组装成一体;矩形钢管的端部均固定有连接节点,用于连接层间钢结构主梁上的节点。Integrated assembled lightweight floor slabs, including cement fiber boards, steel structure well-shaped beams and steel structure keels; steel structure well-shaped beams are welded by several rectangular steel pipes in a well-shaped shape; The well-shaped beam and the steel structure keel form the main structure of the floor. The cement fiber board is used as the base of the floor, laid on the surface of the main structure of the floor and assembled with the main structure of the floor through connectors; Nodes on steel girders.

作为优选,所述的连接节点包括一块竖向连接钢板和两块水平连接钢板三块连接钢板上均开设有螺孔,且水平连接钢板上的螺孔呈椭圆形。Preferably, the connection node includes a vertical connection steel plate and two horizontal connection steel plates, and screw holes are opened on the three connection steel plates, and the screw holes on the horizontal connection steel plates are elliptical.

作为优选,所述的连接件为自攻钉。Preferably, the connecting piece is a self-tapping screw.

本实用新型的另一目的在于提供一种集成装配式轻质楼板结构,包括钢结构主梁、水泥纤维板、钢结构井字梁和钢结构龙骨;钢结构井字梁由若干条矩形钢管呈井字形焊接而成;钢结构井字梁上铺设有钢结构龙骨,钢结构井字梁和钢结构龙骨组成楼板主体结构,水泥纤维板作为楼板基层,铺设在楼板主体结构表面并通过连接件与楼板主体结构组装成一体;矩形钢管的端部均固定有连接节点;所述的钢结构主梁水平架设于钢结构钢柱上,作为楼板的受力梁;钢结构主梁上设有若干个与所述的连接节点位置契合的牛腿,所述的楼板主体结构通过各连接节点固定于所述的牛腿上;所述的水泥纤维板与钢结构主梁之间留有后补段,其宽度为水泥纤维板边缘与钢结构主梁翼缘板边缘间的距离。Another purpose of this utility model is to provide an integrated assembled lightweight floor structure, including steel structure main girder, cement fiber board, steel structure well-shaped beam and steel structure keel; the steel structure well-shaped beam is welded by several rectangular steel pipes in a well shape The steel structure keel is laid on the steel structure well-shaped beam, the steel structure well-shaped beam and the steel structure keel form the main structure of the floor slab, and the cement fiber board is used as the base layer of the floor slab, laid on the surface of the main floor structure and assembled with the main structure of the floor slab through connectors The ends of the rectangular steel pipes are all fixed with connection nodes; the steel structure main beam is erected horizontally on the steel structure steel column as the stressed beam of the floor slab; the steel structure main beam is provided with several connection nodes Corbels with matching positions, the main structure of the floor slab is fixed on the corbels through each connection node; there is a supplementary section between the cement fiber board and the steel structure main beam, and its width is between the edge of the cement fiber board and the The distance between the edges of the flange plates of the main girder of the steel structure.

作为优选,所述的连接节点包括一块竖向连接钢板和两块水平连接钢板三块连接钢板上均开设有螺孔,且水平连接钢板上的螺孔呈椭圆形;所述的牛腿上也同时固定有与所述的竖向连接钢板相匹配的节点定位板,两者之间通过10.9级M20高强螺栓连接;两块水平连接钢板通过M16普通螺栓与所述的牛腿连接。As a preference, the connection node includes a vertical connection steel plate and two horizontal connection steel plates. Screw holes are provided on the three connection steel plates, and the screw holes on the horizontal connection steel plates are oval; At the same time, a node positioning plate matching the vertical connecting steel plate is fixed, and the two are connected by 10.9-grade M20 high-strength bolts; two horizontal connecting steel plates are connected to the corbel by M16 ordinary bolts.

本实用新型相对于现有技术而言,具有以下有益效果:Compared with the prior art, the utility model has the following beneficial effects:

1)钢结构建筑的集成装配式轻质楼板,不破坏主体结构受力体系,采用工厂模数化生产,配合工厂专业生产线的模块化工具,可以进行批量化生产,方便快捷的生产过程可以提高加工速度和加工质量,降低加工成本。1) The integrated assembled lightweight floor slab of the steel structure building does not damage the stress system of the main structure. It adopts factory modular production and cooperates with the modular tools of the factory's professional production line. It can be mass-produced, and the convenient and fast production process can improve Processing speed and processing quality, reduce processing costs.

2)表面平正,无需二次抹灰找平即可直接安装装饰地面层,现场无任何湿作业,不影响环境。2) The surface is flat, and the decorative ground layer can be directly installed without secondary plastering and leveling. There is no wet work on site and does not affect the environment.

3)提高装配化率,集成楼板与钢结构主梁采用螺栓式连接,可实现异地多次循环使用。3) To improve the rate of assembly, the integrated floor slab and the main beam of the steel structure are connected by bolts, which can realize multiple recycling in different places.

4)整体高度小,有效提高室内净高。楼板用钢量较小,有效降低工程造价。4) The overall height is small, effectively increasing the indoor net height. The amount of steel used for the floor slab is small, which effectively reduces the construction cost.

5)现场工序减少,仅需直接安装就位,减少工期优势明显。5) The on-site process is reduced, and only needs to be installed directly, which has obvious advantages in reducing the construction period.

附图说明Description of drawings

图1是集成装配式轻质楼板主体结构平面图;Figure 1 is a plan view of the main structure of the integrated assembly lightweight floor slab;

图2是集成装配式轻质楼板立面图;Figure 2 is an elevation view of the integrated assembly lightweight floor;

图3是集成装配式轻质楼板与钢结构主梁连接的结构示意图;Fig. 3 is a structural schematic diagram of the connection between the integrated assembled lightweight floor slab and the steel structure main beam;

图4是安装楼层位置连接示意图;Figure 4 is a schematic diagram of the installation floor location connection;

图5是集成楼板钢构件反面拼装示意图;Figure 5 is a schematic diagram of the reverse assembly of the integrated floor steel components;

图6是四点吊装示意图。Figure 6 is a schematic diagram of four-point hoisting.

图中:1、钢结构钢柱;2、钢结构主梁;3、钢结构井字梁;4、钢结构龙骨;5、水泥纤维板;6、10.9级M20高强螺栓;7、M16普通螺栓;8、后补段;9、自攻钉;10、椭圆孔;11、平台;12、底座;13、牛腿。In the figure: 1. Steel structure steel column; 2. Steel structure main beam; 3. Steel structure well beam; 4. Steel structure keel; 5. Cement fiber board; 6. 10.9 grade M20 high-strength bolt; 7. M16 ordinary bolt; 8. Supplementary section; 9. Self-tapping screw; 10. Oval hole; 11. Platform; 12. Base; 13. Corbel.

具体实施方式Detailed ways

下面结合附图和具体实施方式对本实用新型做进一步阐述和说明。本实用新型中各个实施方式的技术特征在没有相互冲突的前提下,均可进行相应组合。The utility model will be further elaborated and illustrated below in conjunction with the accompanying drawings and specific embodiments. The technical features of each embodiment in the utility model can be combined correspondingly on the premise that there is no mutual conflict.

如图1~3所示,一种集成装配式轻质楼板,包括水泥纤维板5、钢结构井字梁3和钢结构龙骨4;钢结构井字梁3由若干条矩形钢管呈井字形焊接而成,钢管截面尺寸为100mm~150mm,由设计计算确定,有效增加室内净高。钢结构井字梁3上铺设有钢结构龙骨4,钢结构井字梁3和钢结构龙骨4组成楼板主体结构,钢结构龙骨为50mm×3.0mm方钢管,作为水泥纤维板5的支撑,保证楼面舒适度。钢结构井字梁和钢结构龙骨均为市场常用成品钢管,采购方便。水泥纤维板5作为楼板基层,铺设在楼板主体结构表面并通过自攻钉与楼板主体结构组装成一体,自攻钉间距200mm。;矩形钢管的端部均固定有连接节点,用于连接层间钢结构主梁2上的节点。As shown in Figures 1 to 3, an integrated assembled lightweight floor slab includes cement fiber board 5, steel structure cross beam 3 and steel structure keel 4; steel structure cross beam 3 is welded by several rectangular steel pipes in a well shape As a result, the cross-sectional size of the steel pipe is 100mm to 150mm, which is determined by design calculations, effectively increasing the indoor net height. A steel structure keel 4 is laid on the steel structure well-shaped beam 3, and the steel structure well-shaped beam 3 and the steel structure keel 4 form the main structure of the floor slab. face comfort. Steel structure well-shaped beams and steel structure keels are commonly used finished steel pipes in the market, which are easy to purchase. The cement fiberboard 5 is used as the base of the floor, laid on the surface of the main structure of the floor and assembled with the main structure of the floor by self-tapping screws, the distance between the self-tapping screws is 200mm. The ends of the rectangular steel pipes are fixed with connection nodes, which are used to connect the nodes on the main beam 2 of the interlayer steel structure.

连接节点包括一块竖向连接钢板和两块水平连接钢板三块连接钢板上均开设有螺孔,且水平连接钢板上的螺孔呈椭圆形。The connection node includes one vertical connection steel plate and two horizontal connection steel plates, and the three connection steel plates are all provided with screw holes, and the screw holes on the horizontal connection steel plates are elliptical.

该轻质楼板用于吊装至钢结构主梁2上,其装配结构如图4所示。钢结构主梁2水平架设于钢结构钢柱1上,作为楼板的受力梁。钢结构主梁2上设有若干个与连接节点位置契合的牛腿13。钢结构井字梁3末端的连接节点包括一块竖向连接钢板和两块水平连接钢板三块连接钢板上均开设有螺孔,且水平连接钢板上的螺孔呈椭圆形,在集成装配式轻质楼板的长边和短边方向均有节点设置,因此可以利用椭圆孔调整两个方向的安装位置,以防出现因加工和安装误差导致集成装配式轻质楼板无法安装就位的问题。牛腿上也同时固定有与竖向连接钢板相匹配的节点定位板,牛腿13上也可以事先固定节点定位板,楼板主体结构通过各连接节点固定于节点定位板上。其中,竖向连接钢板过10.9级M20高强螺栓6连接,两块水平连接钢板通过M16普通螺栓7连接。水泥纤维板5与钢结构主梁2之间留有后补段,其宽度为水泥纤维板边缘与钢结构主梁2翼缘板边缘间的距离,可取200mm。设置后补段,有利于集成装配式轻质楼板的安装。The lightweight floor slab is used to be hoisted to the main beam 2 of the steel structure, and its assembly structure is shown in FIG. 4 . The steel structure main girder 2 is erected horizontally on the steel structure steel column 1, and serves as a stressed beam of the floor slab. The steel structure girder 2 is provided with several corbels 13 matching the positions of the connection nodes. The connecting nodes at the end of the steel structure well-shaped beam 3 include a vertical connecting steel plate and two horizontal connecting steel plates. There are screw holes on the three connecting steel plates, and the screw holes on the horizontal connecting steel plates are elliptical. There are node settings on the long side and short side of the light floor, so the installation position in the two directions can be adjusted by using the oval hole to prevent the problem that the integrated light floor can not be installed in place due to processing and installation errors. Node positioning plates matching the vertical connecting steel plates are also fixed on the corbels, and the node positioning plates can also be fixed on the corbel 13 in advance, and the main structure of the floor slab is fixed on the node positioning plates through each connecting node. Among them, the vertically connected steel plates are connected by 10.9-grade M20 high-strength bolts 6, and the two horizontally connected steel plates are connected by M16 ordinary bolts 7. There is a supplementary section between the cement fiber board 5 and the steel structure main beam 2, and its width is the distance between the edge of the cement fiber board and the flange plate edge of the steel structure main beam 2, which may be 200mm. Setting up the supplementary section is beneficial to the installation of the integrated prefabricated lightweight floor.

本实用新型中所采用的水泥纤维板5为20mm厚,容重仅为钢筋混凝土容重的一半左右,属于轻质材料。表面平正,无需二次抹灰找平即可直接安装装饰地面层,现场无湿作业。水泥纤维板5拼接处均为钢结构主体结构表面,且两块水泥纤维板5间距为10mm,作为楼板伸缩缝。The cement fiber board 5 adopted in the utility model is 20mm thick, and the bulk density is only about half of the bulk density of reinforced concrete, which belongs to lightweight materials. The surface is flat, and the decorative ground layer can be directly installed without secondary plastering and leveling, and there is no wet work on site. The joints of the cement fiber boards 5 are all on the surface of the main structure of the steel structure, and the distance between the two cement fiber boards 5 is 10mm, serving as floor expansion joints.

钢结构井字梁各钢梁间距、钢结构龙骨与井字梁各钢梁间距均为模数化取值,,例如取模数300mm,则间距均为300mm的整数倍,利用工厂专业生产线的模数化胎模工具,集成装配式轻质楼板主体结构的批量化生产,方便快捷的生产过程可以提高加工速度和加工质量,降低加工成本。集成装配式轻质楼板与钢结构主梁连接方式为螺栓连接,现场无焊接,可实现异地多次循环使用。The spacing between the steel beams of the steel structure well-shaped girder, and the spacing between the steel structure keels and the well-shaped beams are all modular values. For example, if the modulus is 300mm, the spacing is an integer multiple of 300mm. Modular tire mold tools, mass production of integrated assembled lightweight floor main structure, convenient and fast production process can improve processing speed and processing quality, and reduce processing cost. The integrated assembled light-weight floor slab is connected to the main beam of the steel structure by bolts, and there is no welding on site, which can realize multiple recycling in different places.

下面介绍一种集成装配式轻质楼板的施工方法,其步骤如下:The following introduces a construction method of an integrated assembled lightweight floor slab, the steps are as follows:

1、钢结构构件下料:包括楼盖梁与节点板,采用数控切割机设备,保证精度要求。1. Cutting of steel structure components: including floor beams and gusset plates, using CNC cutting machine equipment to ensure accuracy requirements.

2、节点拼装:将下料及打孔好的节点板按图拼装成节点。制作简易拼装模具,提升拼装效率与质量。2. Node assembly: Assemble the blanked and punched node plates into nodes according to the diagram. Make simple assembly molds to improve assembly efficiency and quality.

3、胎模平台的组成与加工制作:3. Composition and processing of tire mold platform:

(1)胎模平台的组成由底座和钢板组成,平台需采用翼缘板表面平整度较高的H型钢,钢板由数控平面钻床开孔,并且攻丝后使用;(1) The tire mold platform is composed of a base and a steel plate. The platform needs to use H-shaped steel with a high flatness of the flange plate. The steel plate is drilled by a CNC plane drilling machine and used after tapping;

(2)胎模平台的加工制作采用反面拼装,即开孔攻丝后的钢板平铺在操作平台,H型钢根据孔位定位拼装。(2) The tire mold platform is processed and manufactured by reverse assembly, that is, the steel plate after drilling and tapping is laid on the operation platform, and the H-shaped steel is assembled according to the hole position.

(3)胎模平台的要求:平台表面平整度≥1/1000,有多组定位孔,每组4个孔,可根据矩形管的尺寸选择相应的孔位配合使用。(3) Requirements for the tire mold platform: the surface flatness of the platform is ≥1/1000, there are multiple sets of positioning holes, each set of 4 holes, and the corresponding hole positions can be selected according to the size of the rectangular tube for use.

4、靠山的组成与加工制作:4. The composition and processing of the backing:

(1)靠山分为大靠山和小靠山,宽度相同,长度相差较大,其主要作用为钢梁和骨架定位,由钢板制作;(1) The backing is divided into a large backing and a small backing, with the same width and a large difference in length. Its main function is the positioning of steel beams and skeletons, which are made of steel plates;

(2)钢板由数控切割并由数控平面钻床开孔,垂直拼装;(2) The steel plate is cut by CNC and drilled by a CNC plane drilling machine, and assembled vertically;

(3)靠山要求:表面平整度≥1/1000,有多组定位孔,每组孔位2个,可根据矩形管尺寸选择相应孔位配合使用。(3) Requirements for backing: surface flatness ≥ 1/1000, multiple sets of positioning holes, each set of 2 holes, which can be selected according to the size of the rectangular tube for use.

5、胎模上拼装楼盖梁集成楼板钢构件操作要点:5. Operation points for assembling floor beams and integrated floor steel components on tire formwork:

(1)为充分利用胎模平台平整度,减少支撑垫块造成的加工误差,楼盖梁集成楼板钢构件采用反面拼装的方式,如图5所示,即将所述的楼板主体结构中用于安装水泥纤维板5的一侧面向胎模平台进行安装;(1) In order to make full use of the flatness of the tire formwork platform and reduce the processing error caused by the supporting pads, the floor beam integrated floor steel components are assembled on the opposite side, as shown in Figure 5, which is used in the main structure of the floor slab Install the side of the cement fiber board 5 facing the tire mold platform for installation;

(2)大靠山定位:靠山定位前,用直角尺复核其垂直度;根据矩形管尺寸选择相应孔位安装螺栓,并校准平台孔位到靠山肢背间距;(2) Large backing positioning: Before the backing is positioned, check its verticality with a square; select the corresponding hole to install the bolts according to the size of the rectangular tube, and calibrate the distance between the platform hole and the back of the backing limb;

单侧小靠山定位:至少2点定位,并根据矩形管尺寸选择相应孔位安装螺栓,校准平台孔位到靠山肢背间距;Small backer positioning on one side: at least 2 points of positioning, and according to the size of the rectangular tube, select the corresponding hole to install the bolt, and calibrate the distance between the hole position of the platform and the back of the backer;

节点定位:以相邻两个节点孔位间距校准节点位置;Node positioning: Calibrate the node position with the spacing between two adjacent node holes;

(3)楼盖梁定位:底部贴紧平台表面,侧面贴紧靠山肢背,校准楼盖梁对角线距离;(3) Floor beam positioning: the bottom is close to the surface of the platform, the side is close to the back of the mountain limb, and the diagonal distance of the floor beam is calibrated;

(4)另一侧小靠山定位:与前述靠山夹紧楼盖梁构件,做到三点成一线的要求;(4) Positioning of the small backing on the other side: Clamp the floor beam components with the aforementioned backing to meet the requirement that three points form a line;

(5)点焊拼装:点焊位置与平台保持足够距离,勿损伤平台表面平整度;(5) Spot welding assembly: keep a sufficient distance between the spot welding position and the platform, so as not to damage the flatness of the platform surface;

(6)重复(5)(6)(7)工序进行龙骨拼装;(6) Repeat (5) (6) (7) process to carry out keel assembly;

(7)胎模平台上焊渣清理。(7) Clean up the welding slag on the tire mold platform.

6、拼装完成后的楼盖梁集成楼板钢构件由胎模平台转移至焊接生产线,进行全面满焊、抛丸、油漆等工序。在抛丸之前对集成构件需要安装楼板一面进行水准尺校准并做磨平处理,尤其是楼盖梁与龙骨、楼盖梁与节点连接处的焊缝磨平处理。6. After the assembly is completed, the floor beam integrated floor steel components are transferred from the tire mold platform to the welding production line for full welding, shot blasting, painting and other processes. Before shot blasting, the integrated components need to be calibrated and ground on the side of the floor where the floor is installed, especially the welds at the joints between floor beams and keels, and floor beams and nodes.

7、楼板基层板排版:7. Typesetting of floor and base boards:

(1)楼板基层板的排版应分为工厂专业生产线集成加工部分与施工现场后补段部分;(1) The typesetting of the floor slab should be divided into the integrated processing part of the professional production line of the factory and the supplementary part of the construction site;

(2)相邻楼板基层板保留3-5mm孔隙做伸缩缝;(2) 3-5mm pores are reserved for the base slab of the adjacent floor as expansion joints;

(3)工厂集成加工部分编号规则如下:(3) The numbering rules for the factory integrated processing part are as follows:

aJL—b—caJL—b—c

式中a——表示层数,如2,3,4……等;In the formula, a—indicates the number of layers, such as 2, 3, 4...etc.;

JL——表示集成楼板;JL——Indicates integrated floor;

b——表示集成楼板编号,如1,2,3……等;b——Indicates the integrated floor number, such as 1, 2, 3...etc.;

c——表示该集成楼板上的楼板基层板编号,如1,2,3……等。c—indicates the number of the base plate on the integrated floor, such as 1, 2, 3...etc.

(1)施工现场后补段部分编号规则如下:(1) The numbering rules for the supplementary sections on the construction site are as follows:

aJL—b.daJL—b.d

式中a——表示层数,如2,3,4……等;In the formula, a—indicates the number of layers, such as 2, 3, 4...etc.;

JL——表示集成楼板;JL——Indicates integrated floor;

b——表示集成楼板编号,如1,2,3……等;b——Indicates the integrated floor number, such as 1, 2, 3...etc.;

d——表示该集成楼板上的节点编号,如1,2,3……等。d——Indicates the node number on the integrated floor, such as 1, 2, 3...etc.

8、楼板基层板切割:采用木工设备进行切割,并按规则编号在显著位置。8. Floor slab cutting: use woodworking equipment to cut, and number it in a prominent position according to the rules.

9、楼板基层板安装:9. Floor base plate installation:

(1)在楼板基层板上弹线,以表示龙骨以及钢梁相应位置;(1) Stretch the line on the base plate of the floor to indicate the corresponding position of the keel and the steel beam;

(2)以20cm的间距在楼板基层板上打孔;(2) Punch holes on the base plate of the floor at a distance of 20cm;

(3)自攻钉安装。(3) self-tapping screw installation.

10、运输防护:10. Transportation protection:

(1)集成楼板可上下叠加堆放,但是每相邻两个集成楼板间应至少对称放置两块枕木;(1) Integrated floors can be stacked up and down, but at least two sleepers should be placed symmetrically between two adjacent integrated floors;

(2)集成楼板出厂需配套相应已编号的后补段水泥纤维板,且水泥纤维板上不得堆放其他钢构件等重物。(2) The integrated floor slab must be equipped with corresponding numbered supplementary cement fiber boards before leaving the factory, and other heavy objects such as steel components must not be stacked on the cement fiber boards.

(3)须有专用护具进行节点防护,防止节点扭曲;(3) There must be special protective equipment for node protection to prevent node distortion;

11、集成楼板现场吊装:采用一吊钩多吊点的形式,控制吊装过程中集成楼板的倾斜度<10%,便于节点定位调整与安装;节点定位板可以作为楼板支撑,进行定位微调,无需搭设支撑架;经标高校准后,安装节点处的螺栓。11. On-site hoisting of the integrated floor: adopt the form of one hook and multiple lifting points to control the inclination of the integrated floor to <10% during the hoisting process, which is convenient for node positioning adjustment and installation; the node positioning plate can be used as the floor support for fine-tuning of positioning without the need for Set up the support frame; after the elevation is calibrated, install the bolts at the nodes.

集成楼板现场堆放:Integrated floor stacking on site:

(1)集成楼板堆放场地需平整,地面不能有凸出物;(1) The stacking site of the integrated floor slab must be flat, and there should be no protrusions on the ground;

(2)集成楼板可上下叠加堆放,但是每相邻两个集成楼板间应至少对称放置两块枕木,枕木高度应保持一致,以使集成楼板保持水平;(2) The integrated floors can be stacked up and down, but at least two sleepers should be placed symmetrically between each two adjacent integrated floors, and the height of the sleepers should be consistent to keep the integrated floors level;

(3)集成楼板上下堆放不能超过5个模块;(3) No more than 5 modules can be stacked up and down on the integrated floor;

(4)有一定的防御措施,如雨篷布等。(4) There are certain defensive measures, such as rain tarpaulins.

吊装目标:Hoisting target:

(1)控制集成楼板吊装过程的倾斜度<10%及就位后的平整度≥1/1000;(1) Control the inclination of the integrated floor slab hoisting process < 10% and the flatness after being in place ≥ 1/1000;

(2)集成部品损伤小;(2) The damage of integrated parts is small;

(3)节点就位顺利,螺栓安装顺畅;(3) The nodes are in place smoothly and the bolts are installed smoothly;

起重吊装带要求:Lifting sling requirements:

(1)选用扁平式起重吊装带,减少吊装过程中集成楼板的滑动,并且起到保护钢构件表面油漆的作用;(1) Use a flat lifting belt to reduce the sliding of the integrated floor during the hoisting process and protect the paint on the surface of the steel member;

(2)起重吊装带材质选择合成纤维优质的涤纶和强力拉丝混合;(2) The material of the hoisting belt is a mixture of synthetic fiber, high-quality polyester and strong drawing;

(3)起重吊装带吨位选择:吊装带极限吨位≥max(集成楼板重量)×5~6。(3) Selection of the tonnage of the hoisting belt: the limit tonnage of the hoisting belt ≥ max (integrated floor weight) × 5-6.

吊点选择:Hanging point selection:

(1)起重吊装带长度足够时,可以采用两带四点吊装方式;(1) When the length of the hoisting belt is sufficient, the two-belt four-point hoisting method can be used;

(2)起重吊装带长度不足时,需采用四带四点吊装方式。(2) When the length of the hoisting belt is insufficient, a four-belt and four-point hoisting method is required.

吊装状态如图6所示。The hoisting state is shown in Figure 6.

安装定位与调整:Installation positioning and adjustment:

(1)楼盖梁集成楼板节点处部分节点板可作为楼板支撑,故集成楼板下部无需搭设支撑架,操作人员只需在安装集成楼板的同层进行安装操作;(1) Part of the joint plate at the joint of the integrated floor of the floor beam can be used as a floor support, so there is no need to erect a support frame at the lower part of the integrated floor, and the operator only needs to perform installation on the same floor where the integrated floor is installed;

(2)集成楼板起吊时需绑扎至少2个定位牵引绳,当集成楼板起吊至安装位置上方时,由安装工人通过牵引绳的调整,逐步下落至安装楼层,减少汽车吊吊臂移动造成的集成楼板晃动和定位不准;(2) When the integrated floor is hoisted, at least two positioning traction ropes need to be tied. When the integrated floor is hoisted above the installation position, the installer will gradually lower it to the installation floor through the adjustment of the traction rope, so as to reduce the integration caused by the movement of the boom of the truck crane. Floor shaking and inaccurate positioning;

(3)根据节点预留间隙,将集成楼板下落至主梁相应的可作为安装支撑的节点板上;(3) According to the gap reserved at the joint, drop the integrated floor to the corresponding joint plate of the main beam that can be used as an installation support;

(4)待集成楼板稳定后,拆除吊装带,通过撬棍等安装工具进行定位微调,直至每个节点孔位对正;(4) After the integrated floor is stable, remove the hoisting belt, and fine-tune the positioning with installation tools such as crowbars until the holes of each node are aligned;

(5)用水准仪进行标高校准;(5) Altitude calibration with a level gauge;

(6)水准尺水平校准;(6) Horizontal calibration of the leveling rod;

(7)安装螺栓,宜两侧对称同时进行。(7) The bolts should be installed symmetrically on both sides at the same time.

12、油漆损伤处处理:吊装过程中如果出现油漆破损,在节点安装完成后,需现场涂刷油漆后方可进行下一道工序。12. Treatment of paint damage: If the paint is damaged during the hoisting process, after the node installation is completed, the paint needs to be painted on site before proceeding to the next process.

13、楼板后补段安装:集成楼板节点处一定范围内为后补段楼板。13. The installation of the supplementary section of the floor: within a certain range of the node of the integrated floor is the supplementary section of the floor.

后补段堆放:Post-fill segment stacking:

(1)后补段楼板应在工厂专业生产线上完成切割工序,并编号(1) The floor slab of the supplementary section shall complete the cutting process on the factory's professional production line and number it

(2)不同块集成楼板上的后补段宜分块堆放;(2) The supplementary sections on different integrated floors should be stacked in blocks;

(3)要有一定的防雨措施,如雨篷布等。(3) There must be certain rainproof measures, such as rain tarpaulins.

后补段安装:Subsequent section installation:

(1)校准节点连接处的表面平整度;(1) Calibrate the surface flatness of the node connection;

(2)按编号放置后补段水泥纤维板;(2) Place the cement fiberboard of the post-filling section according to the number;

(3)在水泥纤维板上弹线,以表示龙骨以及楼盖梁相应位置;(3) Stretch the line on the cement fiber board to indicate the corresponding position of the keel and the floor beam;

(4)以20cm的间距在水泥纤维板上打孔,避开节点区域;(4) Punch holes in the cement fiberboard at a distance of 20cm, avoiding the node area;

(5)自攻钉安装。(5) self-tapping screw installation.

14、地板层安装:地板层安装前,将水泥纤维板上的自攻钉涂刷防锈剂,水泥纤维板接缝处进行填充。14. Floor layer installation: Before the floor layer is installed, paint the self-tapping nails on the cement fiber board with antirust agent, and fill the joints of the cement fiber board.

以上所述的实施例只是本实用新型的一种较佳的方案,然其并非用以限制本实用新型。有关技术领域的普通技术人员,在不脱离本实用新型的精神和范围的情况下,还可以做出各种变化和变型。因此凡采取等同替换或等效变换的方式所获得的技术方案,均落在本实用新型的保护范围内。The above-mentioned embodiment is only a preferred solution of the present utility model, but it is not intended to limit the present utility model. Various changes and modifications can be made by those skilled in the art without departing from the spirit and scope of the present invention. Therefore, all technical solutions obtained by means of equivalent replacement or equivalent transformation fall within the protection scope of the present utility model.

Claims (5)

1. a kind of integrated assembled type light floor, it is characterised in that including cement fibrolite plate(5), steel construction cross beam(3)And steel Structure keel(4);Steel construction cross beam(3)It is welded by some rectangular steel pipes in groined type;Steel construction cross beam(3)On It is equipped with steel structure keel(4), steel construction cross beam and steel structure keel form floor agent structure, cement fibrolite plate(5)Make For floor basic unit, it is laid on floor agent structure surface and is assembled integrally by connector and floor agent structure;Rectangle steel The end of pipe is respectively and fixedly provided with connecting node, for connecting interlayer steel construction girder(2)On node.
2. integrated assembled type light floor as claimed in claim 1, it is characterised in that described connecting node includes one piece and erected Screw, and the screw on horizontal connection steel plate are offered on to three pieces of junction steel plates of junction steel plate and two blocks of horizontal connection steel plates It is oval.
3. integrated assembled type light floor as claimed in claim 1, it is characterised in that described connector is self threading pin.
4. a kind of integrated assembled type light floor, it is characterised in that including steel construction girder(2), cement fibrolite plate(5), steel knot Structure cross beam(3)And steel structure keel(4);Steel construction cross beam(3)It is welded by some rectangular steel pipes in groined type;Steel Structure cross beam(3)On be equipped with steel structure keel(4), steel construction cross beam and steel structure keel composition floor agent structure, Cement fibrolite plate(5)As floor basic unit, floor agent structure surface is laid on and by connector and floor agent structure group Dress up one;The end of rectangular steel pipe is respectively and fixedly provided with connecting node;Described steel construction girder(2)Level frame is located at steel construction steel Post(1)On, the bearing beam as floor;Steel construction girder(2)It is provided with what several agreed with described connecting node position Bracket, described floor agent structure are fixed on by each connecting node on described bracket;Described cement fibrolite plate(5)With Steel construction girder(2)Between leave after mend section, its width is cement fibrolite plate edge and steel construction girder(2)Between flange plate edge Distance.
5. integrated assembled type light floor as claimed in claim 4, it is characterised in that described connecting node includes one piece and erected Screw, and the screw on horizontal connection steel plate are offered on to three pieces of junction steel plates of junction steel plate and two blocks of horizontal connection steel plates It is oval;The node locating plate to match with described vertical junction steel plate also is fixed with simultaneously on described bracket, both Between pass through 10.9 grades of M20 high-strength bolts(6)Connection;Two blocks of horizontal connection steel plates pass through M16 plain bolts(7)With described ox Leg connects.
CN201720725877.6U 2017-06-21 2017-06-21 An integrated assembled lightweight floor slab Expired - Fee Related CN207160354U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720725877.6U CN207160354U (en) 2017-06-21 2017-06-21 An integrated assembled lightweight floor slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720725877.6U CN207160354U (en) 2017-06-21 2017-06-21 An integrated assembled lightweight floor slab

Publications (1)

Publication Number Publication Date
CN207160354U true CN207160354U (en) 2018-03-30

Family

ID=61710492

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720725877.6U Expired - Fee Related CN207160354U (en) 2017-06-21 2017-06-21 An integrated assembled lightweight floor slab

Country Status (1)

Country Link
CN (1) CN207160354U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107299710A (en) * 2017-06-21 2017-10-27 中天建设集团浙江钢构有限公司 Integrated prefabricated lightweight floor slab and its construction method
CN112523462A (en) * 2020-12-25 2021-03-19 中铁钢结构有限公司 Convenient installation modularization integration box house floor

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107299710A (en) * 2017-06-21 2017-10-27 中天建设集团浙江钢构有限公司 Integrated prefabricated lightweight floor slab and its construction method
CN112523462A (en) * 2020-12-25 2021-03-19 中铁钢结构有限公司 Convenient installation modularization integration box house floor

Similar Documents

Publication Publication Date Title
CN103352563B (en) The board-like bar frame gang form of self-supporting and construction method thereof
CN112900692B (en) Large-span special-shaped steel structure building, supporting device thereof and construction method
CN105089178B (en) A kind of pre-splicing Standard formula building of prefabricated steel reinforced concrete shear walls
CN113756443B (en) Construction method of steel structure medium-large-span steel bar truss floor bearing plate
CN204040464U (en) A kind of slab form supporting construction
CN206859479U (en) A kind of steel bar girder laminated floor slab
CN113958138A (en) Green formwork system construction method
CN105178604A (en) Construction method of assembly type superimposed floor slab
CN111576878A (en) Construction process for quick-release system of aluminum alloy template
CN113202222A (en) Construction method for assembled type superposed beam slab
CN111851825A (en) A prefabricated formwork-free prefabricated steel truss floor and its construction method
CN108277882A (en) Super-huge steel structure canopy construction technology under mal-condition
CN106193402B (en) Truss beam integrated floor module and installation method thereof
CN107299710A (en) Integrated prefabricated lightweight floor slab and its construction method
CN110409624A (en) A large-scale equipment installation and main structure reverse calculation and construction method
CN207160354U (en) An integrated assembled lightweight floor slab
CN217711698U (en) Steel bar truss combined template free of supporting detachable bottom die
CN201915631U (en) High-altitude long-span reinforced concrete corridor construction supporting structure
CN116411694A (en) Adjustable modular disc buckle type supporting system and supporting method thereof
CN101694127A (en) Formwork support system for steel frame structure cast-in-place concrete floorslabs
CN110258890A (en) A kind of broken line type exterior wall is connected the construction method of concrete structure with roofing
CN212802185U (en) Prefabricated steel bar truss floor of assembled form removal-free
CN202865996U (en) Room modular structure for nuclear power plant
CN206737145U (en) For installing the node of multi-storied garage steel construction
CN109707152B (en) Aluminum alloy formwork system and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 311300 No. 520 Heting Street, Qingshan Lake Street, Linan District, Hangzhou City, Zhejiang Province

Co-patentee after: Zhongtian Construction Group Co., Ltd.

Patentee after: Zhejiang Zhongtian Hengzhu Steel Structure Co., Ltd.

Address before: 311300 Linan Economic Development Zone, Hangzhou City, Zhejiang Province

Co-patentee before: Zhongtian Construction Group Co., Ltd.

Patentee before: Zhongtian Construction Group Zhejiang Steel Co., Ltd.

CP03 Change of name, title or address
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180330

Termination date: 20200621

CF01 Termination of patent right due to non-payment of annual fee