CN207160019U - A kind of deep pit support protection unit - Google Patents

A kind of deep pit support protection unit Download PDF

Info

Publication number
CN207160019U
CN207160019U CN201720882499.2U CN201720882499U CN207160019U CN 207160019 U CN207160019 U CN 207160019U CN 201720882499 U CN201720882499 U CN 201720882499U CN 207160019 U CN207160019 U CN 207160019U
Authority
CN
China
Prior art keywords
reinforced concrete
deep
deposited
construction
pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720882499.2U
Other languages
Chinese (zh)
Inventor
帅军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangling Demonstration Zone Municipal Garden Engineering Co Ltd
Original Assignee
Yangling Demonstration Zone Municipal Garden Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangling Demonstration Zone Municipal Garden Engineering Co Ltd filed Critical Yangling Demonstration Zone Municipal Garden Engineering Co Ltd
Priority to CN201720882499.2U priority Critical patent/CN207160019U/en
Application granted granted Critical
Publication of CN207160019U publication Critical patent/CN207160019U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

Construction project foundation dredging technical field of construction is the utility model is related to, discloses a kind of deep pit support protection unit, including:Interval is embedded in more deposited reinforced concrete piles of surrounding on the inside of deep basal pit to be dug in advance, polylith prefabricated reinforced concrete block is provided with from top to down between the outside of every adjacent two deposited reinforced concrete piles and the edge of deep basal pit, the length of prefabricated reinforced concrete block is more than the spacing of adjacent two deposited reinforced concrete piles, this deep pit support protection unit, so that polylith prefabricated reinforced concrete block forms one of barricade on the inside of more deposited reinforced concrete piles, effective support protection is carried out to periphery geological structure section to end to beginning, excavation can be carried out continuously, the phenomenon that disturbance produces drift sand slump occurs when efficiently solving the concrete spraying support continuous excavation construction of construction, it ensure that the duration, quality and safety.

Description

A kind of deep pit support protection unit
Technical field
Construction project foundation dredging technical field of construction is the utility model is related to, more particularly to a kind of deep foundation pit support dress Put.
Background technology
The engineering deep foundation pit construction such as building and municipal administration, is more and more cheated by new construction project land used, due to geology The many factors such as condition, level of ground water limit, and can not meet the sloping coefficient requirement of design specification, job specfication, it is necessary to It is safe when thering is design working drawing to carry out the special design of Support of Foundation Pit Excavation to meet deep pit digging.The supporting specialty used at present The detail design that design is combined using soil nailing reinforced mesh combination reinforced steel concrete stake.Practical example is applied demonstrates in Yang Ling The sewage collecting pool deep pit digging supporting of the second sewage treatment plant of area.In practice of construction, the coloured surveying engineering company design in northwest The part structure pit supporting of the second sewage treatment plant of Yangling Area and dewatering project construction drawing in, sewage collecting pool foundation ditch Depth 21m, level of ground water 6m below+- 0.00 absolute altitude.Double diameter phi 1000mm, axial spacing is used to use δ between stake for 2m =80, the@200 of φ 6 reinforced mesh injection C20 concrete carries out supporting, and reinforced mesh is anchored on support pile inboard surface, Form the support system of overall excavated section.In practice of construction, due to level of ground water reduce after, original gravel, boulder bed from Structure, changed because water level reduces, form the very poor particle loose type structure of the viscous extensional of no water filling.Mechanical equivalent of light excavation people Work clear side, mesh sheet installation, anchor bar being when hammering into, spraying concrete technology construction activities, the excavated section to need reinforcement, slightly After disturbing just large area slump, or jetting cement supporting, when carrying out new cutting depth, due to disturbance, jetting cement is caused to protect Sheath inner vertical stream leaks, and forms branch sheath and is separated with protection section, causes the space of very big spacing, lose the effect of supporting, Form significant safety hazards.
Utility model content
The utility model provides a kind of deep pit support protection unit, can solve above mentioned problem of the prior art.
The utility model provides a kind of deep pit support protection unit, including:Interval is embedded on the inside of deep basal pit to be dug in advance More deposited reinforced concrete piles of surrounding, per the outside of adjacent two deposited reinforced concrete piles and the edge of deep basal pit Between be provided with polylith prefabricated reinforced concrete block from top to down, the length of prefabricated reinforced concrete block is mixed more than adjacent two reinforcing bars Coagulate the spacing of native bored concrete pile.
Further, the cross section of the more deposited reinforced concrete piles for circle, deposited reinforced concrete pile it is straight Footpath is 1.0m, and the spacing of adjacent two deposited reinforced concrete piles is 2.0m.
Compared with prior art, the beneficial effects of the utility model are:
The utility model is embedded in more deposited reinforced concrete piles of deep basal pit surrounding to be dug by being spaced in advance, plays Supporting role, by setting prefabricated reinforced concrete between adjacent two deposited reinforced concrete piles and deep basal pit edge Block, pass through the gravel or cobble between adjacent two deposited reinforced concrete piles that gradually scoop away with prefabricated reinforced concrete block bottom Layer, prefabricated reinforced concrete block under gravity, gradually sink, freely fall to the base substrate do not excavated, from top not The quantity of disconnected increase prefabricated reinforced concrete block so that polylith prefabricated reinforced concrete block is in more deposited reinforced concrete piles Side forms one of barricade, carries out effective support protection to periphery geological structure section to end to beginning, can be carried out continuously foundation ditch and open Excavation construction, the phenomenon that disturbance produces drift sand slump occurs when efficiently solving the concrete spraying support continuous excavation construction of construction, It ensure that duration, quality and safety.
Brief description of the drawings
Fig. 1 is a kind of structural representation of deep pit support protection unit longitudinal cross-section provided by the utility model.
Fig. 2 is a kind of structural representation in deep foundation pit support device lateral section provided by the utility model.
Description of reference numerals:
1- deep basal pits, 2- deposited reinforced concrete piles, 3- prefabricated reinforced concrete blocks.
Embodiment
Below in conjunction with the accompanying drawings, an embodiment of the present utility model is described in detail, it is to be understood that this The protection domain of utility model is not limited by embodiment.
As depicted in figs. 1 and 2, a kind of deep pit support protection unit that the utility model embodiment provides, including:Interval in advance More deposited reinforced concrete piles 2 of the inner side surrounding of deep basal pit 1 to be dug are embedded in, per adjacent two deposited reinforced concrete piles 2 Outside and deep basal pit 1 edge between be provided with polylith prefabricated reinforced concrete block 3, prefabricated reinforced concrete from top to down The length of block 3 is more than the spacing of adjacent two deposited reinforced concrete piles 2.
Further, the cross section of the more deposited reinforced concrete piles 2 is circle, deposited reinforced concrete pile 2 A diameter of 1.0m, the spacing of adjacent two deposited reinforced concrete piles 2 is 2.0m.
The course of work and support principle:In digging process, by between two neighboring deposited reinforced concrete pile 2 and position After gravel or boulder bed between the two neighboring outside of deposited reinforced concrete pile 2 and the edge of deep basal pit 1 scoop away, Outside per adjacent two deposited reinforced concrete piles 2 and one piece of precast reinforced coagulation of placement between the edge of deep basal pit 1 Soil block 3, with the depth increase of the excavation of deep basal pit 1, the gravel and boulder bed of the bottom of prefabricated reinforced concrete block 3 are scooped away, Prefabricated reinforced concrete block 3 under self gravitation effect along between deep basal pit edge and deposited reinforced concrete pile 2 to sinking, from The base substrate do not excavated is fallen on by down, when the difference in height between the prefabricated reinforced concrete block 3 on top and ground is more than prefabricated During 3 half height of reinforced concrete block, increase by one piece between adjacent two deposited reinforced concrete piles 2 and edge Prefabricated reinforced concrete block 3, as the cutting depth of deep basal pit 1 continues to increase, the quantity of prefabricated reinforced concrete block 3 gradually increases Add, under the collective effect of deposited reinforced concrete pile 2 and polylith prefabricated reinforced concrete block 3, to the beginning to end to periphery geology Structure section carries out effective support protection, can be carried out continuously the excavation construction of deep basal pit 1, efficiently solve gunite concrete branch Protect and the phenomenon that disturbance produces drift sand slump occurs in continuous excavation construction, ensure that duration and quality safety.
As shown in Fig. 2 the spacing of adjacent two deposited reinforced concrete piles 2 is d, the length of prefabricated reinforced concrete block 3 For l, l > d so that deposited reinforced concrete pile 2 collectively constitutes porotective wall with prefabricated reinforced concrete block 3, when precast reinforced When the length l of concrete block 3 is equal with the distance between the center of circle of adjacent two deposited reinforced concrete piles, polylith is precast reinforced Concrete block 3 forms alone porotective wall, and deposited reinforced concrete pile 2 plays a supportive role.
The height of deposited reinforced concrete pile 2 is more than the depth of deep basal pit 1 to be dug, it is ensured that deposited reinforced concrete pile 2 Ballistic support acts on.
It is gravel, cobble structure in geological structure, and groundwater level depth is than shallower, the limitation of surrounding enviroment condition, does not have When there are enough excavation sloping coefficients, when carrying out deep foundation pit construction, the support technology of wall is formed using prefabricated reinforced concrete block, Can solve because of artificial degradation level of ground water, change natural sand gravel and cobble structural texture system in the range of foundation pit construction, propping up Fender pile is excavated after being formed, and in reinforced mesh concrete spraying support construction, careless slightly disturbance, foundation ditch week will occur Side gravel, the leakage slump of pebbly structure layer section Vertical Flow, formed concrete spraying support layer and supporting emaciated face from, cause space, Then big face, large volume slump are caused, serious accident occurs.
Disclosed above is only several specific embodiments of the present utility model, and still, the utility model embodiment is not office It is limited to this, the changes that any person skilled in the art can think of should all fall into the scope of protection of the utility model.

Claims (2)

  1. A kind of 1. deep pit support protection unit, it is characterised in that including:Interval is embedded in surrounding on the inside of deep basal pit to be dug (1) in advance More deposited reinforced concrete piles (2), four of outside and deep basal pit (1) per adjacent two deposited reinforced concrete piles (2) Polylith prefabricated reinforced concrete block (3) is provided between circumferential edges from top to down, the length of prefabricated reinforced concrete block (3) is more than The spacing of adjacent two deposited reinforced concrete piles (2).
  2. 2. deep pit support protection unit as claimed in claim 1, it is characterised in that the more deposited reinforced concrete piles (2) Cross section for circle, a diameter of 1.0m of deposited reinforced concrete pile (2), adjacent two deposited reinforced concrete piles (2) Spacing is 2.0m.
CN201720882499.2U 2017-07-19 2017-07-19 A kind of deep pit support protection unit Expired - Fee Related CN207160019U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720882499.2U CN207160019U (en) 2017-07-19 2017-07-19 A kind of deep pit support protection unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720882499.2U CN207160019U (en) 2017-07-19 2017-07-19 A kind of deep pit support protection unit

Publications (1)

Publication Number Publication Date
CN207160019U true CN207160019U (en) 2018-03-30

Family

ID=61713446

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720882499.2U Expired - Fee Related CN207160019U (en) 2017-07-19 2017-07-19 A kind of deep pit support protection unit

Country Status (1)

Country Link
CN (1) CN207160019U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113846653A (en) * 2021-11-17 2021-12-28 广州市市政工程试验检测有限公司 Prefabricated test block back-pressure foundation pit supporting system and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113846653A (en) * 2021-11-17 2021-12-28 广州市市政工程试验检测有限公司 Prefabricated test block back-pressure foundation pit supporting system and construction method

Similar Documents

Publication Publication Date Title
CN108442382B (en) In-situ protection and enclosure soil-retaining structure for pressure pipeline crossing deep foundation pit and construction method
CN105672348A (en) Construction method for cropping bridge pile foundation at sandy gravel stratum of abyssal region
CN105179011B (en) A kind of tunnel closure facility and its method for blocking
CN106013171B (en) A kind of semi-rigid supporting construction semi-flexible and method of deep-foundation side wall
CN104131575A (en) Plugging and drainage method for dam foundation on karst highly developed stratum
CN107503257A (en) One kind is close to mountain high-filled subgrade stabilization and Deformation control structure and construction method
CN106703044B (en) One kind stream modeling shape rinse fill soft stratum slope combination supporting method
CN207109475U (en) It is close to mountain high-filled subgrade stabilization and Deformation control structure
CN105544576A (en) Foundation ditch dewatering and drainage excavation structure and application method
CN113463670A (en) Water pumping and draining method and water pumping and draining structure for deep foundation pit bottom plate construction
CN108951641A (en) It is a kind of for the compound support method of ultra-deep pipe gallery foundation trench in water river
CN108867673A (en) A kind of underwater prevention method in the foundation pit based on the curtain that draws water
CN106013178B (en) A kind of placement method of shallow buried type Karst surface collapse
CN207047796U (en) A kind of light-duty mud-rock flow arch blocking dam
CN106012971A (en) Vegetation concrete protection slope and construction method thereof
CN207160019U (en) A kind of deep pit support protection unit
CN102995647A (en) Underground water control method used for grouting and seepage insulation of pile hole
CN107700434A (en) A kind of dome grating formula armored concrete mud-rock flow blocking dam and its construction process
CN207727514U (en) A kind of library basin antiseepage is anti-to lift structure
CN110685292A (en) Foundation pit drainage system and construction method thereof
CN115162347A (en) Deep foundation pit pipe network construction process
CN104846837A (en) Construction method for ultra-deep well pit in surface drainage foundation pit
CN103821106B (en) Small-sized fishing port and channel revetment structure
CN205062744U (en) Half gravity type two -stage view anti -flood wall on half cantilever
CN103485358B (en) The construction method of underground structure precipitation open caisson

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180330

Termination date: 20180719