Prior art keywords
double
fixed cover
fastening bolt
hexagon socket
positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721053248.XU
Other languages
Chinese (zh)
Inventor
徐公科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Antaike Engineering Material Co Ltd
Original Assignee
Shandong Antaike Engineering Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Antaike Engineering Material Co Ltd filed Critical Shandong Antaike Engineering Material Co Ltd
Priority to CN201721053248.XU priority Critical patent/CN207144959U/en
Application granted granted Critical
Publication of CN207144959U publication Critical patent/CN207144959U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

本实用新型属于建筑施工技术领域,涉及一种塑料制预埋槽道定位固定装置,用于地铁、高铁、建筑领域预埋槽道施工场合;解决构架基础施工中预埋螺栓预埋安装时间过长且预埋精度低的难题,其主体结构包含固定盖、防灌浆垫片、内六角平端紧定螺钉、预埋槽道、管片模具、双头紧固螺栓和锚杆,竖直设置的上下结构的固定盖通过防灌浆垫片与预埋槽道相连,固定盖顶部设有用于锚固的锚杆,固定盖的底部通过内六角平端紧定螺钉与双头紧固螺栓螺纹式固定连接,双头紧固螺栓与管片模具螺纹式固定连接,其结构简单,拆装方便且经济实用性强,提高施工效率,节约工程成本,保证施工质量,具有良好的经济效益和广阔的市场应用前景。

The utility model belongs to the technical field of building construction, and relates to a positioning and fixing device for a pre-buried channel made of plastic, which is used in the construction occasions of the pre-buried channel in the field of subway, high-speed rail and construction; The problem of long length and low embedded precision, its main structure includes fixed cover, anti-grouting gasket, hexagon socket flat end set screw, embedded channel, segment mold, double-headed fastening bolt and anchor rod, vertically arranged The fixed cover of the upper and lower structures is connected with the pre-buried channel through the anti-grouting gasket. The top of the fixed cover is provided with an anchor rod for anchoring. The bottom of the fixed cover is fixedly connected with the double-headed fastening bolt by the hexagon socket flat-end fastening screw. The double-headed fastening bolts are fixedly connected with the segment mold by threads. Its structure is simple, easy to disassemble and assemble, and it is economical and practical. It improves construction efficiency, saves engineering costs, and ensures construction quality. It has good economic benefits and broad market application prospects. .

Description

一种塑料制预埋槽道定位固定装置A plastic pre-buried channel positioning and fixing device

技术领域:Technical field:

本实用新型属于建筑施工技术领域,涉及一种塑料制预埋槽道定位固定装置,用于地铁、高铁、建筑领域预埋槽道施工场合。The utility model belongs to the technical field of building construction, and relates to a positioning and fixing device for a pre-buried channel made of plastic, which is used for the construction occasions of the pre-buried channel in the field of subway, high-speed rail and construction.

背景技术:Background technique:

预埋槽道应用广泛,可以应用在地铁、高铁、建筑等场合,而预埋槽道需要提前固定在管片上,所以需要进行预埋槽道在管片模具的固定。目前多采用焊接方式进行固定,因为地铁、高铁等施工对预埋槽道的防腐要求较高,预埋槽道表面都进行了表面防腐处理,采用焊接方式进行固定容易破坏表面防腐涂层,同时存在预埋槽道的预埋位置精度不能保证、预埋槽道与管片模具不能有效贴合等问题,不仅影响预埋槽道预埋质量,而且给后期隧道支架安装等带来困难。The pre-embedded channel is widely used and can be used in subways, high-speed rail, construction and other occasions, but the pre-embedded channel needs to be fixed on the segment in advance, so it is necessary to fix the pre-embedded channel on the segment mold. At present, welding is often used for fixing, because the construction of subways and high-speed rails has high anti-corrosion requirements for pre-embedded channels. There are problems such as that the pre-embedded position accuracy of the pre-embedded channel cannot be guaranteed, and the pre-embedded channel and the segment mold cannot be effectively bonded, which not only affects the pre-embedded quality of the pre-embedded channel, but also brings difficulties to the installation of tunnel supports in the later stage.

现有技术中,中国专利CN204646255U公开了一种塑料制预埋槽道定位固定装置,包括固定盖、垫片、预埋槽道、内六角平端紧定螺钉、固定轴、管片模具,所述预埋槽道为中空结构,下面有纵向开口,上面设有定位基准孔,所述固定盖是一体成型的,固定盖的上端截面为十字形,固定盖与预埋槽道之间有防灌浆垫片,固定盖下端内部有螺纹,固定盖下端穿过预埋槽道的定位基准孔,所述内六角平端紧定螺钉为国家标准件,内六角一端与固定盖下端连接,另一端与固定轴连接,所述固定轴,一端是内螺纹,连接内六角平端紧定螺钉,另一端是外螺纹,与管片模具上的螺纹孔连接固定。所述固定盖的上端截面为十字形,便于固定盖的拧紧。所述固定轴圆柱位置端部两侧铣槽,便于用安装工具进行固定轴在管片模具上的安装固定。所述管片模具上的螺纹孔为通孔,当定位位置变更时,可以在管片模具外部拧入螺栓进行封堵,但预埋螺栓预埋安装时间过长,导致基础施工工期长,且预埋精度低。中国专利CN204646260U公开了预埋槽道与管片模具连接构件,组成依次为:固定螺母、防灌浆垫片、内六角平端紧定螺钉、中间连接件、内六角平端紧定螺钉、管片模具。所述固定螺母是一体成型的,上端截面形状为十字形,下端内部有螺纹。所述预埋槽道上端有定位基准孔,下端有纵向开口,固定螺母与预埋槽道之间有防灌浆垫片。所述内六角平端紧定螺钉均为国家标准件。所述中间连接件两端均有内螺纹,用来连接两端的内六角平端紧定螺钉。所述内六角平端紧定螺钉带内六角的一端均朝上,下端的内六角平端紧定螺钉与管片模具连接,但预埋螺栓预埋安装时间过长,导致基础施工工期长,且预埋精度低。In the prior art, Chinese patent CN204646255U discloses a plastic pre-buried channel positioning and fixing device, including a fixed cover, a gasket, a pre-buried channel, a hexagon socket flat-end set screw, a fixed shaft, and a segment mold. The pre-embedded channel is a hollow structure with a longitudinal opening on the bottom and a positioning reference hole on the top. The fixed cover is integrally formed. The upper end section of the fixed cover is cross-shaped, and there is an anti-grouting Gasket, there are threads inside the lower end of the fixed cover, and the lower end of the fixed cover passes through the positioning reference hole of the embedded channel. The set screw with flat end of the hexagon socket is a national standard part. Shaft connection, the fixed shaft, one end is an internal thread, connected to the hexagon socket flat end set screw, and the other end is an external thread, connected and fixed with the threaded hole on the segment mold. The upper end section of the fixed cover is cross-shaped, which is convenient for tightening the fixed cover. The two sides of the end of the cylindrical position of the fixed shaft are milled to facilitate the installation and fixation of the fixed shaft on the segment mold with an installation tool. The threaded holes on the segment mold are through holes. When the positioning position is changed, bolts can be screwed into the outside of the segment mold for sealing. However, the pre-embedded bolts take too long to install, resulting in a long foundation construction period, and Embedding accuracy is low. Chinese patent CN204646260U discloses the connecting member between the pre-embedded channel and the segment mold, which consists of a fixed nut, an anti-grouting gasket, a hexagon socket flat end set screw, an intermediate connector, a hexagon socket flat end set screw, and a segment mold. The fixing nut is integrally formed, the cross-sectional shape of the upper end is cross-shaped, and there are threads inside the lower end. There is a positioning reference hole at the upper end of the embedded channel, a longitudinal opening at the lower end, and an anti-grouting gasket between the fixing nut and the embedded channel. The hexagon socket flat end set screws are all national standard parts. Both ends of the intermediate connector have internal threads, which are used to connect the hexagon socket flat end set screws at both ends. One end of the hexagon socket flat end set screw with the internal hexagon is facing upwards, and the lower end of the hexagon socket flat end set screw is connected to the segment mold, but the pre-embedded installation time of the pre-embedded bolts is too long, resulting in a long foundation construction period and pre-installation. The buried accuracy is low.

发明内容:Invention content:

本实用新型的目的在于克服现有技术的不足,寻求提供一种塑料制预埋槽道定位固定装置,解决构架基础施工中预埋螺栓预埋安装时间过长且预埋精度低的难题,其组装简便、加固耗时短、安装精度高和可重复拆装利用。The purpose of this utility model is to overcome the deficiencies of the prior art, seek to provide a plastic pre-embedded channel positioning and fixing device, and solve the problems of long pre-embedded installation time of pre-embedded bolts and low pre-embedded precision in the construction of the frame foundation. Easy assembly, short time-consuming reinforcement, high installation accuracy and repeatable disassembly and assembly.

为实现上述目的,本实用新型涉及的塑料制预埋槽道定位固定装置的主体结构包括塑料制预埋槽道定位固定装置的主体结构包含固定盖、防灌浆垫片、内六角平端紧定螺钉、预埋槽道、管片模具、双头紧固螺栓和锚杆,其中,固定盖上设有扇形孔,双头紧固螺栓上设有铣槽,竖直设置的上下结构的固定盖通过防灌浆垫片与预埋槽道相连,固定盖顶部设有用于锚固的锚杆,固定盖的底部通过内六角平端紧定螺钉与双头紧固螺栓螺纹式固定连接,双头紧固螺栓与管片模具螺纹式固定连接。In order to achieve the above object, the main structure of the positioning and fixing device for the plastic pre-buried channel involved in the utility model includes the main structure of the positioning and fixing device for the plastic pre-buried channel, which includes a fixed cover, an anti-grouting gasket, and a hexagon socket flat-end set screw , pre-buried channels, segment molds, double-headed fastening bolts and anchor rods, wherein fan-shaped holes are provided on the fixed cover, milling grooves are provided on the double-ended fastening bolts, and the vertically arranged fixed covers of the upper and lower structures pass through The anti-grouting gasket is connected with the embedded channel, and the top of the fixed cover is provided with an anchor rod for anchoring. Segment mold threaded fixed connection.

所述固定盖为一体式结构,上端为方形结构,下端为圆柱状结构,下端内部的内螺纹与内六角平端紧定螺钉一端的外螺纹相匹配;方形结构与圆柱状结构的连接处径向均匀设有一个以上的扇形孔,以利于脱模;The fixed cover has an integrated structure, the upper end is a square structure, the lower end is a cylindrical structure, and the internal thread inside the lower end matches the external thread at one end of the hexagon socket flat end set screw; the connection between the square structure and the cylindrical structure is radial Evenly set more than one fan-shaped hole to facilitate demoulding;

所述内六角平端紧定螺钉为国家标准件;The set screw with flat end of the hexagon socket is a national standard;

所述预埋槽道为两个尺寸结构相同的中空结构的U型钢;The pre-buried channel is two U-shaped steels with the same size and structure;

所述双头紧固螺栓一端的内六角平端紧固螺栓与内六角平端紧定螺钉的轴截面尺寸相同;双头紧固螺栓另一端的内六角平端紧固螺栓的外螺纹与管片模具上的螺纹孔相匹配;双头紧固螺栓的中上部两侧设有铣槽,便于安装固定。The hexagon socket flat-end fastening bolt at one end of the double-headed fastening bolt has the same axial cross-section size as the hexagon socket flat-end fastening bolt; The threaded holes are matched; there are milling grooves on both sides of the middle and upper parts of the double-headed fastening bolts, which is convenient for installation and fixing.

本实用新型涉及的塑料制预埋槽道定位固定装置的工作原理为:所述固定盖的上端形状为长方形,相较于现在的技术,加工简单,便于安装工具安装固定;所述固定盖与预埋槽道之间有防灌浆的垫片,有效提高密封性能,防止管片浇筑时混凝土及泥浆进入槽道内部;所述固定盖与双头螺栓配合使用,能方便、精准的进行预埋螺栓位置调节,有效防止预埋槽道的滑动,保证长时间的定位准确。The working principle of the plastic pre-buried channel positioning and fixing device involved in the utility model is as follows: the upper end of the fixed cover is rectangular in shape, compared with the current technology, the processing is simple, and the installation tool is convenient for installation and fixing; the fixed cover and There are anti-grouting gaskets between the pre-embedded channels, which can effectively improve the sealing performance and prevent concrete and mud from entering the channel when the segments are poured; the fixed cover is used in conjunction with the stud bolts, which can be conveniently and accurately pre-embedded The position adjustment of the bolts can effectively prevent the sliding of the embedded channel and ensure accurate positioning for a long time.

本实用新型涉及的塑料制预埋槽道定位固定装置的具体操作步骤为:The specific operation steps of the plastic pre-buried channel positioning and fixing device involved in the utility model are as follows:

1.选材:首先根据施工现场槽道预埋位置及定位孔确定安装用的双头螺栓,双头螺栓的数量需根据槽道长度确定,采用2个以上安装用双头螺栓;1. Material selection: First, determine the stud bolts for installation according to the pre-embedded position of the channel on the construction site and the positioning holes. The number of stud bolts must be determined according to the length of the channel, and more than 2 stud bolts for installation are used;

2.加工管片模板:接着在管片模板上开安装孔,将双头螺栓拧紧固定在管片模板上,以便不使用预埋槽道安装方案时,可将安装用固定螺栓换成普通圆头螺栓,将管片模板恢复成未开孔状态,降低对管片模板的损坏;2. Process the segment formwork: Then open the installation holes on the segment formwork, tighten the stud bolts and fix them on the segment formwork, so that when the installation plan of the embedded channel is not used, the fixing bolts for installation can be replaced with ordinary round Head bolts to restore the segment formwork to the unopened state, reducing damage to the segment formwork;

3.固定预埋槽道:然后对应管片模板上安装双头螺栓的位置,在预埋槽道的背面开有相应的孔,用内六角平端紧定螺钉将固定盖与双头螺栓连接,以便于将预埋槽道紧压在管片模具上;3. Fix the pre-embedded channel: Then corresponding to the position where the stud bolts are installed on the segment template, there are corresponding holes on the back of the pre-embedded channel, and the fixed cover is connected with the stud bolts with the hexagon socket flat-end set screw. In order to press the embedded channel tightly on the segment mold;

4.吊入钢筋笼:再将绑好的钢筋笼吊入管片模板,入模过程中避免钢筋笼与锚杆相碰,以免发生预埋槽道松动,防止迷流。若发现预埋槽道固定松动,应立即调整。预埋槽道表面进行热镀锌加封闭涂层处理,除了能达到防腐的效果,封闭涂层能够使预埋槽道绝缘,安装时背身锚杆与结构钢筋不发生电气接触,防止预埋槽道与结构钢筋接触时杂散电流从中导出,对预埋槽道和外部支架及管线造成电腐蚀,尽量保护预埋槽道的涂层不被破坏;4. Hoisting into the reinforcement cage: Then hoist the tied reinforcement cage into the segment formwork, and avoid the collision between the reinforcement cage and the anchor rod during the mold entry process, so as to avoid loosening of the pre-embedded channel and prevent flow loss. If the pre-embedded channel is found to be loose, it should be adjusted immediately. The surface of the pre-embedded channel is treated with hot-dip galvanizing and sealing coating. In addition to achieving anti-corrosion effects, the sealing coating can insulate the pre-embedded channel. When the channel is in contact with the structural steel bars, the stray current is derived from it, causing electrical corrosion to the embedded channel, external brackets and pipelines, and trying to protect the coating of the embedded channel from being damaged;

5.浇筑混凝土:接着管片模板浇筑,过程中若采用整体震动方式,则不需要专人看护,若采用振捣棒振捣,则需要专人看护,严禁碰到预埋槽道和管片模板,以免预埋槽道发生松动;5. Concrete pouring: Then the segment formwork is poured. If the overall vibration method is used during the process, no special care is required. If a vibrator is used to vibrate, special care is required. It is strictly forbidden to touch the embedded channel and segment formwork. To avoid loosening of the pre-buried channel;

6.脱模成型:最后脱模时增加管片脱模的总力,使固定盖的上端与下端的扇形镂空断开,即完成脱模;6. Mold demoulding: increase the total force of the segment demoulding during the final demoulding, so that the fan-shaped hollows at the upper end and the lower end of the fixed cover are disconnected, and the demoulding is completed;

7.清理并记录:清理预埋槽道表面附着的水泥及内部发泡填充物,并检测槽道间距误差和嵌入差等各项技术指标,做好记录,以便积累施工经验。7. Clean up and record: Clean up the cement attached to the surface of the pre-embedded channel and the internal foam filler, and check various technical indicators such as channel spacing error and embedding difference, and make records to accumulate construction experience.

本次实用新型与现有技术相比:安装方便,安装位置精度高,预埋槽道与管片模具贴合度好,提高了预埋质量,同时安装时不会破坏槽道表面涂层,保证了预埋槽道的防腐能力,双头螺栓更适合管片和槽道的安装。固顶盖为塑料制品,有效减轻重量,其结构简单,拆装方便且经济实用性强,提高施工效率,节约工程成本,保证施工质量,具有良好的经济效益和广阔的市场应用前景。Compared with the existing technology, this utility model has the advantages of convenient installation, high installation position accuracy, good fit between the pre-embedded channel and the segment mold, which improves the pre-embedded quality, and at the same time, the surface coating of the channel will not be damaged during installation. The anti-corrosion ability of the embedded channel is guaranteed, and the stud bolts are more suitable for the installation of segments and channels. The solid top cover is made of plastic, which can effectively reduce weight. Its structure is simple, easy to disassemble and assemble, and it is economical and practical. It improves construction efficiency, saves engineering costs, ensures construction quality, and has good economic benefits and broad market application prospects.

附图说明:Description of drawings:

图1为本实用新型涉及的塑料制预埋槽道定位固定装置的主体结构原理示意图。Fig. 1 is a schematic diagram of the main structure of the plastic pre-embedded channel positioning and fixing device involved in the present invention.

图2为本实用新型涉及的固定盖的结构原理示意图。Fig. 2 is a schematic diagram of the structure and principle of the fixed cover involved in the present invention.

图3为本实用新型涉及的双头螺栓的结构原理示意图。Fig. 3 is a schematic diagram of the structure and principle of the stud bolt involved in the present invention.

具体实施方式:Detailed ways:

下面结合附图对本实用新型进一步说明。Below in conjunction with accompanying drawing, the utility model is further described.

实施例1:Example 1:

本实施例涉及的塑料制预埋槽道定位固定装置的主体结构包含固定盖1、防灌浆垫片2、内六角平端紧定螺钉3、预埋槽道4、管片模具5、双头紧固螺栓6和锚杆9,其中,固定盖1上设有扇形孔7,双头紧固螺栓6上设有铣槽8,竖直设置的上下结构的固定盖1通过防灌浆垫片2与预埋槽道4相连,固定盖1顶部设有用于锚固的锚杆9,固定盖1的底部通过内六角平端紧定螺钉3与双头紧固螺栓6螺纹式固定连接,双头紧固螺栓6与管片模具5螺纹式固定连接。The main structure of the plastic pre-embedded channel positioning and fixing device involved in this embodiment includes a fixed cover 1, an anti-grouting gasket 2, a hexagon socket flat-end set screw 3, a pre-embedded channel 4, a segment mold 5, a double-headed clamp Fastening bolts 6 and anchor rods 9, wherein, the fixed cover 1 is provided with fan-shaped holes 7, the double-headed fastening bolts 6 are provided with milling grooves 8, and the vertically arranged fixed cover 1 of the upper and lower structure passes through the anti-grouting gasket 2 and The pre-buried channel 4 is connected, the top of the fixed cover 1 is provided with an anchor rod 9 for anchoring, the bottom of the fixed cover 1 is fixedly connected with the double-headed fastening bolt 6 through the hexagon socket flat-end fastening screw 3, and the double-headed fastening bolt 6 is fixedly connected with the segment mold 5 in a threaded manner.

所述固定盖1为一体式结构,上端为方形结构,下端为圆柱状结构,下端内部的内螺纹与内六角平端紧定螺钉3一端的外螺纹相匹配;方形结构与圆柱状结构的连接处径向均匀设有一个以上的扇形孔7,以利于脱模。The fixed cover 1 has an integrated structure, the upper end is a square structure, the lower end is a cylindrical structure, and the internal thread inside the lower end matches the external thread at one end of the hexagon socket flat-end set screw 3; the connection between the square structure and the cylindrical structure More than one fan-shaped hole 7 is uniformly arranged in the radial direction to facilitate demoulding.

所述内六角平端紧定螺钉3为国家标准件;The set screw 3 with flat end of the hexagon socket is a national standard part;

所述预埋槽道4为两个尺寸结构相同的中空结构的U型钢;The embedded channel 4 is two hollow U-shaped steels with the same size and structure;

所述双头紧固螺栓6一端的内六角平端紧固螺栓与内六角平端紧定螺钉3的轴截面尺寸相同;双头紧固螺栓6另一端的内六角平端紧固螺栓的外螺纹与管片模具5上的螺纹孔相匹配;双头紧固螺栓6的中上部两侧设有铣槽8,便于安装固定。The hexagon socket flat-end fastening bolt at one end of the double-headed fastening bolt 6 has the same axial cross-sectional size as the hexagon socket flat-end fastening bolt 3; The threaded holes on the sheet mold 5 match; the two sides of the middle and upper parts of the double-headed fastening bolt 6 are provided with milling grooves 8, which are convenient for installation and fixing.

Claims (5)

1.一种塑料制预埋槽道定位固定装置,其特征在于:主体结构包含固定盖、防灌浆垫片、内六角平端紧定螺钉、预埋槽道、管片模具、双头紧固螺栓和锚杆,其中,固定盖上设有扇形孔,双头紧固螺栓上设有铣槽,竖直设置的上下结构的固定盖通过防灌浆垫片与预埋槽道相连,固定盖顶部设有用于锚固的锚杆,固定盖的底部通过内六角平端紧定螺钉与双头紧固螺栓螺纹式固定连接,双头紧固螺栓与管片模具螺纹式固定连接。1. A plastic pre-embedded channel positioning and fixing device, characterized in that: the main structure includes a fixed cover, an anti-grouting gasket, a hexagon socket flat-end set screw, a pre-embedded channel, a segment mold, and a double-headed fastening bolt and anchor rods, wherein the fixed cover is provided with fan-shaped holes, and the double-headed fastening bolts are provided with milling grooves. There is an anchor rod for anchoring, and the bottom of the fixed cover is fixedly connected with the double-headed fastening bolt through the hexagon socket flat-end set screw, and the double-ended fastened bolt is threaded and fixedly connected with the segment mold. 2.如权利要求1所述的塑料制预埋槽道定位固定装置,其特征在于:所述预埋槽道为两个尺寸结构相同的中空结构的U型钢。2. The plastic embedded channel positioning and fixing device according to claim 1, wherein the embedded channel is two hollow U-shaped steels with the same size and structure. 3.如权利要求1-2中任一项所述的塑料制预埋槽道定位固定装置,其特征在于:所述固定盖为一体式结构,上端为方形结构,下端为圆柱状结构,方形结构与圆柱状结构的连接处径向均匀设有一个以上的扇形孔。3. The plastic pre-buried channel positioning and fixing device according to any one of claims 1-2, characterized in that: the fixed cover is an integral structure, the upper end is a square structure, and the lower end is a cylindrical structure, square More than one fan-shaped hole is evenly arranged in the radial direction at the joint between the structure and the cylindrical structure. 4.如权利要求1-2中任一项所述的塑料制预埋槽道定位固定装置,其特征在于:所述双头紧固螺栓一端的内六角平端紧固螺栓与内六角平端紧定螺钉的轴截面尺寸相同;双头紧固螺栓另一端的内六角平端紧固螺栓的外螺纹与管片模具上的螺纹孔相匹配;双头紧固螺栓的中上部两侧设有铣槽。4. The plastic pre-buried channel positioning and fixing device according to any one of claims 1-2, characterized in that: the hexagon socket flat end fastening bolt at one end of the double-headed fastening bolt is tightly fixed to the internal hexagon flat end The axial cross-section dimensions of the screws are the same; the external thread of the hexagon socket flat-end fastening bolt at the other end of the double-headed fastening bolt matches the threaded hole on the segment mold; milling grooves are provided on both sides of the middle and upper parts of the double-headed fastening bolt. 5.如权利要求3所述的塑料制预埋槽道定位固定装置,其特征在于:所述双头紧固螺栓的中上部两侧设有铣槽。5 . The positioning and fixing device for plastic pre-buried channels according to claim 3 , wherein milling grooves are provided on both sides of the middle and upper parts of the double-headed fastening bolts. 6 .
CN201721053248.XU 2017-08-22 2017-08-22 A kind of plastics pre-buried channel flow device for positioning and securing Expired - Fee Related CN207144959U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721053248.XU CN207144959U (en) 2017-08-22 2017-08-22 A kind of plastics pre-buried channel flow device for positioning and securing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721053248.XU CN207144959U (en) 2017-08-22 2017-08-22 A kind of plastics pre-buried channel flow device for positioning and securing

Publications (1)

Publication Number Publication Date
CN207144959U true CN207144959U (en) 2018-03-27

Family

ID=61666105

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721053248.XU Expired - Fee Related CN207144959U (en) 2017-08-22 2017-08-22 A kind of plastics pre-buried channel flow device for positioning and securing

Country Status (1)

Country Link
CN (1) CN207144959U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756936A (en) * 2018-07-04 2018-11-06 靳世鹤 Metro shield section of jurisdiction externally embedded type conduit connection structure and construction method
CN109578072A (en) * 2018-11-22 2019-04-05 华侨大学 A kind of pre-buried channel flow positioning device and application method for subway segment
CN110513127A (en) * 2019-09-29 2019-11-29 河南经纬电力科技股份有限公司 A kind of embedded replaceable conduit and installation method being easy to formwork erection installation positioning
CN111139865A (en) * 2020-01-09 2020-05-12 河南安诺尼机械设备有限公司 Anti-skid and anti-deformation channel system and backing plate
CN111331711A (en) * 2020-02-17 2020-06-26 江苏大学 A kind of tunnel pre-embedded groove mould locking device
CN112045843A (en) * 2019-06-06 2020-12-08 南通铁建建设构件有限公司 Novel shield segment pre-buried sliding groove installation method
CN112282789A (en) * 2020-11-11 2021-01-29 中铁隆昌铁路器材有限公司 Segment mold for embedded type external hanging channel system and use method thereof
CN115419428A (en) * 2022-07-27 2022-12-02 山东轨道交通勘察设计院有限公司 Full-prefabricated track structure and method for shield tunnel assembly integration
CN115464766A (en) * 2022-10-18 2022-12-13 中铁(广州)投资发展有限公司 Fixing device for embedded groove of segment die

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756936A (en) * 2018-07-04 2018-11-06 靳世鹤 Metro shield section of jurisdiction externally embedded type conduit connection structure and construction method
CN109578072A (en) * 2018-11-22 2019-04-05 华侨大学 A kind of pre-buried channel flow positioning device and application method for subway segment
CN109578072B (en) * 2018-11-22 2024-02-27 华侨大学 Pre-buried channel positioning device for subway segments and use method
CN112045843A (en) * 2019-06-06 2020-12-08 南通铁建建设构件有限公司 Novel shield segment pre-buried sliding groove installation method
CN110513127A (en) * 2019-09-29 2019-11-29 河南经纬电力科技股份有限公司 A kind of embedded replaceable conduit and installation method being easy to formwork erection installation positioning
CN110513127B (en) * 2019-09-29 2024-04-26 河南经纬电力科技股份有限公司 Method for installing embedded replaceable channel easy to install and position by vertical mold
CN111139865A (en) * 2020-01-09 2020-05-12 河南安诺尼机械设备有限公司 Anti-skid and anti-deformation channel system and backing plate
CN111331711A (en) * 2020-02-17 2020-06-26 江苏大学 A kind of tunnel pre-embedded groove mould locking device
CN112282789A (en) * 2020-11-11 2021-01-29 中铁隆昌铁路器材有限公司 Segment mold for embedded type external hanging channel system and use method thereof
CN115419428A (en) * 2022-07-27 2022-12-02 山东轨道交通勘察设计院有限公司 Full-prefabricated track structure and method for shield tunnel assembly integration
CN115464766A (en) * 2022-10-18 2022-12-13 中铁(广州)投资发展有限公司 Fixing device for embedded groove of segment die

Similar Documents

Publication Publication Date Title
CN201981670U (en) Connection piece for composite prefabricated concrete wallboard
CN109930688A (en) A kind of assembled beam-column connecting node and its construction method
CN202141447U (en) Surface strain gauge mounting support and protecting device combination for steel structure
KR100879615B1 (en) Fixture of base plate for crane rail and its fixing method
CN205189136U (en) Removable type embedded anchor
CN203583859U (en) Embedded bolt anchoring device for fixing cantilever I-shaped steel in building construction
CN204920221U (en) A connecting rod for combination of cast -in -place wall form
CN206174487U (en) Pre -cast screw fixing device
CN111734151A (en) Foundation bolt direct-buried installation positioning device and construction method
CN210421927U (en) Cast-in-place linkage segment template strutting arrangement of instrument formula concrete superimposed sheet
CN211473453U (en) Reinforced structure of pre-buried channel
CN204826424U (en) Prefabricated assembled steel bar connection device for concrete member
CN203499017U (en) Wall tie bar pre-embedded positioning device
CN218405951U (en) Slot type built-in fitting mounting structure for unit curtain wall
CN104805910A (en) Embedded part for cast-in-place concrete component and construction method of embedded part
CN106812252A (en) The anti-skidding prestressing force pull end anchorage of one kind sealing
CN205577401U (en) External rectangular cross section concrete column template fastener of pull rod
CN203846836U (en) Cast-in-place concrete pool wall rubber water stop band reinforcing device
CN208763436U (en) A kind of PC component supporting apparatus
CN115681620A (en) Method for installing bearing embedded part of comprehensive support
CN210034108U (en) Bolt lengthening device
CN208168066U (en) Curtain wall unit mounting structure
CN211690800U (en) A vertical power support connection structure
CN214885466U (en) Recyclable template fixing part at concrete outer wall construction joint
CN206655474U (en) Fixative composition pin-connected panel stair template

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 266200 No. 76, four peacock Road, Qingdao garment industrial park, Jimo, Qingdao, Shandong

Patentee after: SHANDONG ANTAIKE ENGINEERING MATERIAL Co.,Ltd.

Address before: 266003 1801 units of 6 units 2, Donghai Road 18, Shinan District, Qingdao, Shandong.

Patentee before: SHANDONG ANTAIKE ENGINEERING MATERIAL Co.,Ltd.

CP02 Change in the address of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180327

CF01 Termination of patent right due to non-payment of annual fee