CN207142695U - A kind of mould bases platform can multistage dig tower crane passage - Google Patents

A kind of mould bases platform can multistage dig tower crane passage Download PDF

Info

Publication number
CN207142695U
CN207142695U CN201721032271.0U CN201721032271U CN207142695U CN 207142695 U CN207142695 U CN 207142695U CN 201721032271 U CN201721032271 U CN 201721032271U CN 207142695 U CN207142695 U CN 207142695U
Authority
CN
China
Prior art keywords
tower crane
passage
framework
truss
panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721032271.0U
Other languages
Chinese (zh)
Inventor
柯子平
邢鹤遥
王东
刘飞
亓立刚
周洪涛
闫煜东
高志明
王润清
段虎林
陈力泗
崔爱珍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201721032271.0U priority Critical patent/CN207142695U/en
Application granted granted Critical
Publication of CN207142695U publication Critical patent/CN207142695U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model provide a kind of mould bases platform can multistage dig tower crane passage, including:Platform truss, back segment passage and leading portion passage.Platform truss includes the first truss and the second truss located at the reserved construction mouth both sides of agent structure;Leading portion passage includes the first framework and first panel, and first panel is located at the top of the first framework;Back segment passage includes the second framework and second panel, second panel is located at the top of the second framework, side of second framework away from tower crane is articulated with the second truss by first axle mechanism, and second panel is articulated with side of the first panel away from tower crane close to the side of tower crane by the second linkwork.The utility model can both realize Common passageway function, can ensure to dig in hoisting steel plate again and be easy to hoisting steel plate, simple in construction, easy to use.

Description

A kind of mould bases platform can multistage dig tower crane passage
Technical field
The utility model is related to the realm of building construction, relate in particular to a kind of mould bases platform can multistage dig tower crane and lead to Road.
Background technology
In Super High work progress, vertical structure construction is often carried out using the construction platform that can climb certainly, construction is flat Wall construction reserved opening is reserved on platform, hole length allows for meeting steel plate wall hoisting steel plate, while needs to tower crane Safe distance is reserved between steel plate wall, needs to prevent reserved opening side when needs reach tower crane position across reserved opening Sheath is removed, and sets up passage, but passage often influences the lifting of steel plate shear force wall steel plate across reserved opening, therefore logical Road needs to move in hoisting steel plate, troublesome in poeration, improves use cost.
Utility model content
In view of the foregoing, the utility model provide a kind of mould bases platform can multistage dig tower crane passage, leading portion leads to Road and back segment passage can be dug, and can both realize Common passageway function, can be ensured to dig in hoisting steel plate again and are easy to Hoisting steel plate.
To achieve the above object, the utility model adopts the technical scheme that:A kind of mould bases platform can multistage dig tower Passage is hung, including:
Platform truss, including the first truss and the second truss located at the reserved construction mouth both sides of agent structure;
Leading portion passage, the leading portion passage include the first framework and first panel, and the first panel is located at described first The top of framework;
Back segment passage, the back segment passage include the second framework and second panel, and the second panel is located at described second The top of framework, the side of the remote tower crane of second framework are articulated with second truss, institute by the first linkwork The side for stating the close tower crane of second panel is articulated with the remote tower of the first panel by the second linkwork The side hung.
The beneficial effects of the utility model are, by setting turnover leading portion passage and back segment to lead on mould bases platform Road, realize and cross over the function that reserved construction mouth reaches tower crane, and in the lifting for needing to carry out shear wall steel plate, it is only necessary to by before Duan Tongdao and back segment passage are dug.
Further improvement of the utility model is that first linkwork is included located at the remote of second framework The first sleeve on the side of the tower crane, the second sleeve on second truss, and it is inserted in the first set The rotating shaft of cylinder and the second sleeve.
Further improvement of the utility model is that second linkwork is included located at the remote of the first panel First hinged seat of the side of the tower crane, located at the second panel the close tower crane side the second hinged seat, And it is inserted in the bearing pin of first hinged seat and second hinged seat.
Further improvement of the utility model is that the both sides of the back segment passage are provided with guard rail.
Further improvement of the utility model is, in addition to supporting plate, and the supporting plate is placed in second truss On, the supporting plate is provided with through hole, and first linkwork is located in the through hole, the remote tower of the supporting plate The side hung exposes to second truss.
Further improvement of the utility model is that first framework and second framework are by transverse steel respectively The rectangular frame being welded to each other with longitudinal reinforcement.
Further improvement of the utility model is, second base of frame is provided with limiting plate, the limiting plate against In the side of the remote tower crane of first truss.
Of the present utility model further improve is that the section of the limiting plate is in L fonts.
Brief description of the drawings
Fig. 1 is the structural representation that multistage can be dug when tower crane passage opens of the utility model mould bases platform.
Fig. 2 be the utility model mould bases platform can multistage dig tower crane passage applying working condition schematic diagram.
Fig. 3 be the utility model mould bases platform can multistage dig tower crane passage posterior segment channel design schematic diagram.
Fig. 4 be the utility model mould bases platform can multistage dig leading portion channel design schematic diagram in tower crane passage.
Fig. 5 is the connection that multistage can dig tower crane passage posterior segment passage and the first truss of the utility model mould bases platform Schematic diagram.
Fig. 6 is that the utility model mould bases platform multistage can dig the structural representation after tower crane passage is dug.
Embodiment
For the benefit of to understanding of the present utility model, illustrated below in conjunction with drawings and Examples.
Refer to Fig. 1 to Fig. 6, the utility model provide a kind of mould bases platform can multistage dig tower crane passage, it is wrapped Include platform truss 1, leading portion passage 2 and back segment passage 3.Wherein:Platform truss 1 includes the reserved construction mouth two located at agent structure Reserved construction mouth between the first truss 11 and the truss 11 of the second truss 12 first and the second truss 12 of side is when being used to construct The lifting of steel plate;One section of safe distance is reserved between back segment passage 3 and tower crane 6, tower crane is reached when reserved construction mouth need to be crossed over Position, it is only necessary to back segment passage 3 and leading portion passage 2 are opened, are the position of reachable tower crane 6 along back segment passage 3 and leading portion passage 2 Put.
From Fig. 1, Fig. 5 and Fig. 6, back segment passage 3 is connected with the second truss 12 by the first be hinged linkwork;Specifically , back segment passage 3 includes the second framework and second panel, and second panel is arranged at the top of the second framework, the second framework it is remote Side from the tower crane 6 is articulated with the second truss 12 by the first linkwork, by leaning on for the second framework in back segment passage 3 The side of nearly tower crane 6 is positioned over 11 on the first truss;First be hinged linkwork includes the remote tower crane 6 located at the second framework The first sleeve 31 on side, the second sleeve 121 on the second truss 12, and it is inserted in the first sleeve 31 and second set The rotating shaft 5 of cylinder 121.
It is preferred that the first sleeve 31 is provided with first through hole, second sleeve 121 is provided with the second through hole, by by rotating shaft 5 First through hole and the second through hole are inserted in, realizes that back segment passage 3 is articulated and connected with the second truss 12.
It is preferred that the second framework is the rectangular frame being welded to each other by transverse steel and longitudinal reinforcement.Specifically may be used To be welded to each other and form from transverse channel steels and longitudinal channel-section steel.
From Fig. 1, Fig. 3 to Fig. 6, connected between leading portion passage 2 and back segment passage 3 by the second linkwork;Wherein, Leading portion passage 2 includes the first framework and first panel, and first panel is arranged at the top of the first framework, the remote tower of first panel The side for hanging 6 side and the close tower crane of second panel is hinged by the second linkwork;Specifically, the second linkwork bag Include the first hinged seat 21 located at the side of remote tower crane 6 of first panel, second located at the side of close tower crane 6 of second panel Hinged seat 32, and it is inserted in the bearing pin of the first hinged seat 21 and second hinged seat 32.Leading portion passage 2 can be relative along bearing pin 180 ° are carried out in back segment passage 3 and turns over conjunction, and when front end rigion passage 2 opens completely relative to back segment passage 3, front end turnover panel 2 is with after The section keep level of turnover panel 3, the side of the remote tower crane 6 of the first framework is resisted against the side of the close tower crane 6 of the second framework, passed through The support force of second linkwork and the second framework to the first framework, it is ensured that using the utility model mould bases platform can be more When level digs tower crane passage, the maximum of leading portion passage 2 opens angle as 180 °, and it is when leading portion passage 2 opens to open angle The angle between position (as shown in Figure 6) when position (as shown in Figure 1) and leading portion passage 2 are dug.
It is preferred that the first hinged seat 21 is provided with third through-hole, the second hinged seat 32 is provided with fourth hole, by by pin Axle, which is inserted in, to be realized in third through-hole and fourth hole between the first panel of leading portion passage 2 and the second panel of back segment passage 3 It is be hinged.
It is preferred that the first framework is the rectangular frame being welded to each other by transverse steel and longitudinal reinforcement.Specifically may be used To be welded to each other and form from horizontal angle steel and longitudinal band steel.
As shown in Figure 1, the both sides of back segment passage 3 are additionally provided with guard rail 33, improve using the utility model mould bases platform Security during tower crane passage multistage can be dug, while is easy to digging and opening for back segment passage 3.
It is preferred that guard rail 33 is the rectangular frame that horizontal square steel and longitudinal square steel are welded to each other.Guard rail 33 with Back segment passage 3 is fixedly connected.
From Fig. 1, Fig. 2, Fig. 5 and Fig. 6, supporting plate 4, the truss 12 of supporting plate 4 and second are additionally provided with the second truss 12 Between be that the second truss 12 is exposed to by spot welded together, wherein side of the supporting plate 4 away from tower crane 6.Second It is to place back segment passage 3 after being dug for the ease of back segment passage 3 and be supported in supporting plate that a supporting plate 4 is set on truss 12 On 4, increase support width when being dug to back segment passage 3, improve safety in utilization.
It is preferred that supporting plate 4 is provided with a through hole 41, through hole 41 is set along the axis direction of second sleeve 121 Bar hole, the position of the first linkwork are located in through hole 41;Specifically, second sleeve 121 is placed in through hole 41 and with second Truss 12 is connected, and second sleeve 121 is hinged with the first sleeve 31 by rotating shaft.
It is preferred that before leading portion passage 2 opens, i.e. the first panel of leading portion passage 2 fits in the second face of back segment passage 3 During plate, can on the second framework on set a fixed leading portion passage 2 fixture, prevent need progress hoisting steel plate when, Leading portion passage 2 rotates during back segment passage 3 is dug, and improves safety in utilization.
From Fig. 3 and Fig. 6, the bottom of the second framework is provided with a limiting plate 7, and when opening back segment passage 3, back segment leads to Road 3 is positioned on the first truss 11 close to the side of tower crane 6, and now limiting plate 7 is resisted against one of the first truss 11 away from tower crane 6 Side.The integral rigidity of the second framework can be improved and position-limiting action can be played, during preventing use, back segment passage 3 is forward Play, improve safety in utilization.
Sedan-chair is good, and the section of limiting plate 7 is in L fonts, is easy to limiting plate 7 to be fixedly connected with the second framework, further improves The integral rigidity of second framework, while ensure the spacing width of limiting plate 7.
In the present embodiment, reserved construction mouth during wall construction is reserved between the first truss 11 and the second truss 12, is applied The length of work mouth meets the lifting of steel plate wall steel plate, the utility model mould bases platform can multistage dig tower crane passage combination tower crane 6 use, and tower crane 6 is located in building core cylinder;One section of safe distance is reserved between back segment passage 3 and tower crane 6;Leading portion passage 2 The selection of length can meet to reach tower crane 6 by leading portion passage 2 according to actual conditions.
In the present embodiment, accompanying drawing 1 corresponds to structural representation when leading portion passage 2 and back segment passage 3 open, and accompanying drawing 6 is right Structural representation that should be when leading portion passage 2 and back segment passage 3 are dug.
The application method that multistage can dig tower crane passage of the utility model mould bases platform:
1st, side of the second framework of back segment passage away from tower crane is hinged with the second truss, the first panel of leading portion passage Side and the side of the close tower crane of the second panel of back segment passage away from tower crane are hinged, can need to use mould bases platform When multistage digs tower crane passage across reserved construction mouth arrival tower crane position, need first open back segment passage, the back segment passage made The second framework be supported on the first truss, then leading portion passage is opened, leading portion passage can along bearing pin rotate 180 °, open Afterwards, side of first framework away from tower crane of leading portion passage against and fit in the second framework of back segment passage close to the one of tower crane Side, positioning supporting role is played to leading portion passage, so as to ensure the security used.
2nd, need to need first to dig leading portion passage, then by after using tower crane in the intraoral progress hoisting steel plate of reserved construction Duan Tongdao, which is dug, to be placed in supporting plate.
The utility model is simple in construction, easy to use and flexible, can both realize the function of Common passageway, can ensure again Dug during hoisting steel plate and be easy to hoisting steel plate.
The utility model is described in detail above in association with drawings and Examples, those skilled in the art can Many variations example is made to the utility model according to the above description.Thus, some details in embodiment should not be formed to this reality With new restriction, the utility model will be used as the scope of protection of the utility model using the scope that appended claims define.

Claims (8)

1. a kind of mould bases platform can multistage dig tower crane passage, it is characterised in that including:
Platform truss, including the first truss and the second truss located at the reserved construction mouth both sides of agent structure;
Leading portion passage, the leading portion passage include the first framework and first panel, and the first panel is located at first framework Top;
Back segment passage, the back segment passage include the second framework and second panel, and the second panel is located at second framework Top, the side of the remote tower crane of second framework is articulated with second truss by the first linkwork, described The side of the close tower crane of two panels is articulated with the remote tower crane of the first panel by the second linkwork Side.
2. mould bases platform according to claim 1 can multistage dig tower crane passage, it is characterised in that:Described first is be hinged Mechanism include located at second framework the remote tower crane side on the first sleeve, on second truss Second sleeve, and it is inserted in the rotating shaft of first sleeve and the second sleeve.
3. mould bases platform according to claim 1 can multistage dig tower crane passage, it is characterised in that:Described second is be hinged Mechanism includes the first hinged seat of the side of the remote tower crane located at the first panel, leaning on located at the second panel Second hinged seat of the side of the nearly tower crane, and it is inserted in the bearing pin of first hinged seat and second hinged seat.
4. mould bases platform according to claim 1 can multistage dig tower crane passage, it is characterised in that:The back segment passage Both sides be provided with guard rail.
5. mould bases platform according to claim 1 can multistage dig tower crane passage, it is characterised in that:Also include support Plate, the supporting plate are placed on second truss, and the supporting plate is provided with through hole, and first linkwork is located at institute State in through hole, the side of the remote tower crane of the supporting plate exposes to second truss.
6. mould bases platform according to claim 1 can multistage dig tower crane passage, it is characterised in that:First framework It is the rectangular frame that is welded to each other by transverse steel and longitudinal reinforcement respectively with second framework.
7. mould bases platform according to claim 1 can multistage dig tower crane passage, it is characterised in that:Second framework Bottom is provided with limiting plate, and the limiting plate is resisted against the side of the remote tower crane of first truss.
8. mould bases platform according to claim 7 can multistage dig tower crane passage, it is characterised in that:The limiting plate Section is in L fonts.
CN201721032271.0U 2017-08-17 2017-08-17 A kind of mould bases platform can multistage dig tower crane passage Expired - Fee Related CN207142695U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721032271.0U CN207142695U (en) 2017-08-17 2017-08-17 A kind of mould bases platform can multistage dig tower crane passage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721032271.0U CN207142695U (en) 2017-08-17 2017-08-17 A kind of mould bases platform can multistage dig tower crane passage

Publications (1)

Publication Number Publication Date
CN207142695U true CN207142695U (en) 2018-03-27

Family

ID=61666618

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721032271.0U Expired - Fee Related CN207142695U (en) 2017-08-17 2017-08-17 A kind of mould bases platform can multistage dig tower crane passage

Country Status (1)

Country Link
CN (1) CN207142695U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108502753A (en) * 2018-06-06 2018-09-07 福建建工集团有限责任公司 A kind of channel of connection building body and tower crane
CN111648583A (en) * 2020-05-13 2020-09-11 中国十七冶集团有限公司 Walkway platform of tower crane connected with all-steel attached lifting scaffold

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108502753A (en) * 2018-06-06 2018-09-07 福建建工集团有限责任公司 A kind of channel of connection building body and tower crane
CN111648583A (en) * 2020-05-13 2020-09-11 中国十七冶集团有限公司 Walkway platform of tower crane connected with all-steel attached lifting scaffold
CN111648583B (en) * 2020-05-13 2022-07-26 中国十七冶集团有限公司 Walkway platform of tower crane connected with all-steel attached lifting scaffold

Similar Documents

Publication Publication Date Title
CN207144449U (en) A kind of hoistway operation platform
CN205804991U (en) A kind of light cellular partition board riser device
CN207142695U (en) A kind of mould bases platform can multistage dig tower crane passage
CN107720575B (en) A kind of towing type construction method for hanging of tower crane support system
CN206448820U (en) A kind of tunnel construction trolley
CN207776408U (en) High-altitude operation platform for steel column
CN207296360U (en) A kind of climbing frame falling proof mechanism and the climbing frame falling proof seat in the plane lock based on the mechanism
CN205954482U (en) Construction structures of " people " style of calligraphy cable tower entablature support
CN104847108A (en) Hydraulic climbing formwork structure and construction method of hydraulic climbing formwork structure
CN207827621U (en) Movable type super high-rise construction elevator guide rail frame attachment device
CN209509544U (en) Protective device with shaped at a kind of assembled architecture work layer stair transformation platform
CN210975799U (en) Double-spraying double-shaft oblique cement-soil stirring and profile steel inserting integrated equipment
CN206033090U (en) Group hoist device
CN206769796U (en) One kind can the multi-functional middle pick agitation driller of tuning
CN206553111U (en) One kind balance arm brace installs auxiliary body
CN207296365U (en) Attached wall structure for PC component exterior wall cranes
CN203320922U (en) Supporting device for forming of elevator shaft template
CN202672694U (en) Circulating operation platform for hoistway construction
CN207003446U (en) Supporting device for steel split heads through cutting and support removing structure of supporting device
CN206368367U (en) A kind of pattern foundation pit supporting structure soil nailing
CN207144444U (en) A kind of Super High scaffold used for outwall construction
CN202508770U (en) Front portion anchoring device used for climbing crane
CN207296350U (en) Detachable operating platform for steel pipe column
CN207092071U (en) It is a kind of to be applied to filling pile cage of reinforcement and the tool platform of catheter positioning
CN212957548U (en) Steel construction scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180327

CF01 Termination of patent right due to non-payment of annual fee