CN207113284U - A kind of thermoelectric cycle water or industrial wastewater afterheat utilizing system - Google Patents

A kind of thermoelectric cycle water or industrial wastewater afterheat utilizing system Download PDF

Info

Publication number
CN207113284U
CN207113284U CN201721124969.5U CN201721124969U CN207113284U CN 207113284 U CN207113284 U CN 207113284U CN 201721124969 U CN201721124969 U CN 201721124969U CN 207113284 U CN207113284 U CN 207113284U
Authority
CN
China
Prior art keywords
water
user
pipeline
water source
industrial wastewater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721124969.5U
Other languages
Chinese (zh)
Inventor
聂宏国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721124969.5U priority Critical patent/CN207113284U/en
Application granted granted Critical
Publication of CN207113284U publication Critical patent/CN207113284U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/27Relating to heating, ventilation or air conditioning [HVAC] technologies
    • Y02A30/274Relating to heating, ventilation or air conditioning [HVAC] technologies using waste energy, e.g. from internal combustion engine
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/12Hot water central heating systems using heat pumps

Landscapes

  • Heat Treatment Of Water, Waste Water Or Sewage (AREA)

Abstract

The utility model discloses a kind of electric power plant circulating water or industrial wastewater afterheat utilizing system to include water source heat pump units and the water source side supply channel being connected respectively with water source heat pump units,Water source side water return pipeline,User side supply channel and user side water return pipeline,Water source side supply channel connects hot water source's device that electric power plant circulating water or industrial wastewater export by hot water line,Water source side supply channel connects power plant's cold water source pipeline or rivers and lakes water supply line by cold water pipeline,Waste heat using circulating-water in thermal power plant either 20 DEG C or so of other industrial wastewaters is power & light company itself or perimeter heating in the winter time,Freely provide the user domestic hot-water simultaneously,Summer using power plant cooling tower through the air-cooled cold water source pipeline for being stored in pond or nearby rivers and lakes water supply line water freeze,Realize central cooling heat supply,And domestic hot-water is provided throughout the year,Save the energy,Reduce discharge,Reduce the energy expenditure expenditure of user.

Description

A kind of thermoelectric cycle water or industrial wastewater afterheat utilizing system
Technical field
The technical field of waste heat utilization of the industrial wastewater of thermoelectric cycle water or 20 DEG C or so is the utility model is related to, is specifically related to And a kind of thermoelectric cycle water or industrial wastewater afterheat utilizing system.
Background technology
The northern area of China is because coal price is relatively low, and winter temperature is much low compared with Central China, unsuitable a wide range of Waste heat using other industrial wastewaters of circulating-water in thermal power plant or 20 DEG C or so passes through water source heat pump units heat supply, cooling.But In Central China because coal price is higher, and temperature in winter is high compared with northern area, but seems more wet compared with northern area Cold, as the improvement of people's living standards, summer cooling is essential, winter central heating demand is more and more obvious, city Field is increasing.Central China substantially uses electric air-conditioning or natural gas distributing cooling and heat supply at present, consume electricity or Gas quantity remains high, and energy-consuming is more and more, cost also more and more higher.And the circulating water afterheat of Central China's fired power generating unit Utilize the waste heat storage pole for substantially or blank, being available for electric power plant circulating water or 20 DEG C or so of the other industrial wastewaters utilized Greatly.The rivers and lakes water resource summer of watering heat pump refrigerating is especially abundant.So, for Central China, using water source Heat pump is user's central heating using the waste heat and rivers and lakes water of other industrial wastewaters of electric power plant circulating water or 20 DEG C or so Cooling has great advantage.
The content of the invention
The purpose of this utility model is to provide a kind of afterheat utilizing system of thermoelectric cycle water or industrial wastewater, to solve Certainly the circulating water afterheat utilization rate of Central China's fired power generating unit is low, distributing heat supply and cooling consume electricity or gas quantity is high asks Topic.
To achieve the above object, specifically, the thermoelectric cycle water or industrial wastewater afterheat utilizing system include water resource heat pump Unit and the water source side supply channel being connected respectively with water source heat pump units, water source side water return pipeline, user side supply channel With user side water return pipeline, water source side supply channel connects the hot water that electric power plant circulating water or industrial wastewater export by hot water line Water source device, water source side supply channel connect power plant cooling tower through the air-cooled power plant's cold water water for being stored in pond by cold water pipeline Source capsule road or rivers and lakes water supply line, when when water source side, water need not recycle, water source side backwater is discharged into rainwater on the spot Pipeline or ditch, water knockout drum and water tank, water knockout drum and storage are provided between user side supply channel and user side water return pipeline Service pipe, service pipe connection user's indoor coil blower fan or user's hot water water supply installation are connected between water pot.Power plant Cold water source pipeline can select power plant's water pipe, and rivers and lakes water supply line refers to the water for being connected to river, river or lake Source capsule road, is usually connected nearby.
Described service pipe includes user's water supply branch pipe and user's return branch, and user's water supply branch pipe connects water knockout drum, User's return branch connects water tank, short circuit is also associated between water knockout drum and water tank, short circuit is provided with pressure difference Controller.
Described user side water return pipeline is provided with automatic water-replenishing device.
Described automatic water-replenishing device includes constant pressure supply water mechanism and extra feed tank, and extra feed tank is connected certainly by ball-cock assembly Carry out water lines, the top of extra feed tank is provided with overfall, and the bottom of extra feed tank connects constant pressure supply water mechanism, level pressure by pipeline The delivery port connection user side water return pipeline of water compensation mechanism.
It is characterized in that:Described user side water return pipeline is provided with multigroup user side cold-water return pump and multigroup user side Hot water backwater's pump, user side cold-water return pump are arranged in parallel with user side hot water backwater pump.
It is characterized in that:Described user side water return pipeline is provided with electronic hydrotreater.
Hydrocyclone is sequentially provided with along water (flow) direction and Full-automatic self-cleaning filters on described water source side supply channel Device.
Described electric power plant circulating water or hot water source's device of industrial wastewater outlet include condenser, cooling tower and cooling tower Collecting-tank, cooling tower collecting-tank are arranged on the bottom of cooling tower, and cooling tower collecting-tank connects condensing by condenser inlet pipeline Device, condenser connect cooling tower by condenser discharge pipe line, and hot water line connects condenser inlet pipeline, condenser row respectively Water lines and cooling tower collecting-tank, water source side water return pipeline connection cooling tower collecting-tank.
When water source side, water need not recycle, water source side backwater is discharged into rainwater pipeline or ditch on the spot.Cold water pipeline Respectively can be with cooling tower collecting-tank, water source side water return pipeline connection cooling tower.
The utility model has the following advantages that:The utility model utilizes other works of circulating-water in thermal power plant or 20 DEG C or so The waste heat of industry waste water is in the winter time power & light company, factory itself or perimeter heating by water source heat pump units, and summer utilizes electricity The water of factory's cooling tower collecting-tank either rivers and lakes provides refrigeration by water source heat pump units for power & light company itself or periphery, Central cooling heat supply is realized, saves the energy, reduces discharge, reduces the energy cost of user.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model embodiment 1.
Fig. 2 is the structural representation of power plant cycle water installations in Fig. 1.
Fig. 3 is the schematic diagram of automatic water supplement mechanism.
Fig. 4 is water pump scheme of installation in embodiment 2.
Fig. 5 is the structural representation that water pipe runs through floor or partition wall in embodiment 3.
In figure:1- hot water source's device 2- hydrocyclone 3- Full-automatic self-cleaning filter 4- water land source side water pumps 5- Water source side supply channel 6- water sources side water return pipeline 7- water source heat pump units 8- user side supply channel 9- user side backwater Pipeline 10- electronic hydrotreater 11- user side cold-water return pump 12- user side hot water backwater's pump 13- constant pressure supply waters mechanism 14- extra feed tank 15- water knockout drum 16- water tank 17- user's water supply branch pipe 18- user's indoor coil blower fans 19- user returns Water branch pipe 20- hot water line's 21- ball-cock assembly 22- overflow passage 23- motor 24- pump housing 25-Y type filter 26- Slow Closes DRV 27- outlet pipe 28- water inlet pipe 29- hyperbolics disturb rubber soft joint 30- drainpipe 31- spring shock absorption mechanisms 32- body 33- pressing plate 34- fireproof filling material 35- mineral wool 36- sealing sleeve pipe 101- condenser 102- cooling towers 103- cooling tower collecting-tank 104- condenser inlet pipeline 105- condenser discharge pipe lines.
Embodiment
Following examples are used to illustrate the utility model, but are not limited to the scope of the utility model.
Embodiment 1
Referring to Fig. 1, the thermoelectric cycle water afterheat utilizing system include water source heat pump units 7 and respectively with Water source heat pump unit Water source side supply channel 5, water source side water return pipeline 6, user side supply channel 8 and the user side water return pipeline 9 of the connection of group 7, water Source supply channel 5 connects hot water source's device 1 that electric power plant circulating water or industrial wastewater export, water source side by hot water line 20 Supply channel 5 connects power plant's water pipe by cold water pipeline (not shown), when when water source side, water need not recycle, Water source side backwater is discharged into rainwater pipeline or ditch on the spot, is provided with and divides between user side supply channel 8 and user side water return pipeline 9 Hydrophone 15 and water tank 16, user's indoor coil blower fan 18 is connected by multiple service pipes between water knockout drum 15 and water tank 16 Or user's hot water water supply installation, user's hot water water supply installation can be bathing, the water heater or heat-exchanging water tank scrubbed.Profit Waste heat with other industrial wastewaters of circulating-water in thermal power plant or 20 DEG C or so is in the winter time that thermoelectricity is public by water source heat pump units 7 Itself or perimeter heating are taken charge of, summer is heat by water source heat pump units 7 using the water of power plant's moisturizing pipeline or rivers and lakes Electric company itself or periphery provide refrigeration, realize central cooling heat supply, save the energy, reduce discharge, reduce city people's Life expenditure.Hydrocyclone 2 and Full-automatic self-cleaning filter 3 are sequentially provided with along water (flow) direction on water source side supply channel 5, Line clogging is prevented, improves service life.Water source heat pump units 7 include two groups of a preparation and a use.
Water tank includes the water knockout drum 15 of connection user side supply channel 8 and the water tank of connection user side water return pipeline 9 16, service pipe includes user's water supply branch pipe 17 and user's return branch 19, and user's water supply branch pipe 17 connects water knockout drum 15, user Return branch 19 connects water tank 16, and differential pressure controller, user room are provided with the pipeline between water knockout drum 15 and water tank 16 Interior installation inlet and outlet pipe lines, the inlet and outlet pipe lines that the water in water knockout drum 15 is sent into user room by user's water supply branch pipe 17, then The water in room air and inlet and outlet pipe lines is exchanged heat using user's indoor coil blower fan 18, refrigeration or heating are realized, after heat exchange Water be back to by user's return branch 19 in water tank 16, differential pressure controller detection water knockout drum 15 and water tank 16 between Pressure difference, if water knockout drum 15 is more than setting value with the pressure difference of water tank 16, pressure release is realized by water knockout drum 15 and water tank 16, ensured Pressure difference between water knockout drum 15 and water tank 16 is maintained in rational scope, ensures being normally carried out for user side water supply.
User side water return pipeline 9 is provided with multigroup user side cold-water return pump 11 and multigroup user side hot water backwater pump 12, User side cold-water return pump 11 is arranged in parallel with user side hot water backwater pump 12.User side water return pipeline 9 is provided with electronic water Processor 10, the water source of user side is handled by electronic hydrotreater 10, prevent water structure in the duct, improve cooling The service life of heating effect and pipeline.
Referring to Fig. 2, hot water source's device 1 of electric power plant circulating water or industrial wastewater outlet includes condenser 101, cooling tower 102 and cooling tower collecting-tank 103, cooling tower collecting-tank 103 be arranged on the bottom of cooling tower 102, cooling tower collecting-tank 103 passes through Condenser inlet pipeline 104 connects condenser 101, and condenser 101 connects cooling tower 102, heat by condenser discharge pipe line 105 Water lines 20 connect condenser inlet pipeline 104, condenser discharge pipe line 105 and cooling tower collecting-tank 103 respectively, and water source side is returned Water lines 6 connect cooling tower collecting-tank 103.
Referring to Fig. 3, user side water return pipeline 9 is provided with constant pressure supply water mechanism 13 and extra feed tank 14, and extra feed tank 14 is logical Cross ball-cock assembly 21 and connect tap water pipe line, the top of extra feed tank 14 is provided with overfall, and overfall will be overflow by overflow passage 22 Flowing water is discharged into underground sewage or gutter, and the bottom of extra feed tank 14 connects constant pressure supply water mechanism 13 by pipeline, and level pressure is mended The delivery port connection user side water return pipeline 9 of water dispenser structure 13.
Operation principle, power plant are generated electricity using steam drive steam turbine (not shown), and the steam after generating passes through condensing The water of device 101 and cooling tower 102 is exchanged heat, and the water after exchanging heat in the winter time is delivered to by hot water line 20 and water source side supply channel 5 Water source heat pump units 7, with being back to cooling tower by water source side water return pipeline 6 after evaporator heat exchange in water source heat pump units 7 Collecting-tank 103, the condenser heating user side water of water source heat pump units 7 are simultaneously sent to water knockout drum 15 by user side supply channel 8, The inlet and outlet pipe lines that water in water knockout drum 15 is sent into user room by user's water supply branch pipe 17, then utilize user's indoor coil wind Machine 18 exchanges heat the water in room air and inlet and outlet pipe lines, realizes heating, and the water after heat exchange is returned by user's return branch 19 It is back in water tank 16, water source heat pump units 7 is finally back to by user side water return pipeline 9, refrigeration principle is identical, herein no longer Repeat.
The present embodiment energy consumption is specifically introduced explanation, water source heat pump units by taking the power & light company of Huaneng Group Jingmen as an example The second half year in 72014 brings into operation, and there is office building, Hou Banlou and dining room to amount to 16918m2Building cooling and heat supply need Quadrature, in mid-July, 2015 (No. 10-No. 12) refrigerating operaton operating mode actual power consumption situation, by being surveyed in real time for three days to unit Amount record, wherein first day records once per hour, once, be averaged second and third day every 24 hour record daily power consumption 1919.04 Degree, every square metre of 0.113 degree of construction area power consumption, electricity price are calculated by 0.588 yuan of residential electricity consumption electricity price/degree, total 0.066 yuan/ m2My god, a summer is considered for 90 days by operation, counts 5.94 yuan/m2.And by summer 7 in 2015,8,9 three month total electricity consumptions 93464.32 degree of calculating, average daily 1038.49 degree of power consumption, every square metre of 0.062 degree of construction area power consumption, finally only have 0.036 yuan/m2My god, indoor environment temperature is between 20-26 DEG C.
Winter heating's operating condition actual power consumption situation in 2015, by being recorded to unit measurement in real time in three months, wherein 102647 degree of first month (November) power consumption, 126779 degree of second month (December) power consumption, the 3rd month (in January, 2016) of power consumption 84675 degree, 314101 degree of power consumption altogether, average daily 3490 degree of power consumption, every square metre of 0.206 degree of construction area power consumption, electricity price Calculated by 0.588 yuan/degree of residential electricity consumption electricity price, add up to 0.121 yuan/m2My god, a winter is considered for 90 days by operation, meter 10.92 member/m2.Indoor environment temperature is maintained at 18-22 DEG C.
And the 161m of wall-hung boiler heating is used to Yueyang in January, 20172Building carry out warm oneself gas consumption calculate, When indoor temperature is maintained at 18 DEG C or so, the natural gas dosage of 24 hours one day wall-hung boilers is 17 cubes, 0.106 cube of meter/ m2My god, natural gas price calculates by yuan/cube of domestic gas gas price 3.07 is occupied, and adds up to 0.325 yuan/m2My god, a winter is by operation Consider within 90 days, count 29.29 yuan/m2.One winter 100m of northern area at present2Residential heating valency is at 2600 yuan or so, meter 28.89 Member/m2, one winter 100m of Central China2Residential heating valency counts 28.89 yuan/m at 2600 yuan -3200 yuan2- 35.56 yuan/m2
As can be seen here, Huaneng Group Jingmen power & light company office building, Hou Banlou and dining room building utilization recirculated water pass through water source heat The heat supply of pump assembly 7, cooling it was verified that comparing day by the cold and heat supply of water source heat pump units 7 using electric power plant circulating water waste heat Right gas wall-hung boiler and steam direct-furnish heat, more energy efficient, more environmentally friendly, more economical, when supplying thermal condition is run, operation direct cost is only It is the 37.28% of wall-hung boiler heat supply.Therefore, it is suggested that suiting measures to local conditions, widely popularize and pass through water source heat using electric power plant circulating water waste heat Pump assembly 7 gives building cold and heat supply.According to the ground temperature of Central China and the endless complete analysis of environment temperature, 15 kilometers of thermal power plant periphery In the range of urban architecture be contemplated that using circulating water afterheat by water source heat pump units heat supply, by power plant cooling tower or river River Lake Water cooling, and be increased without any generating equipment, do not increase any pollutant emission, additionally it is possible to using water wisely, city Electric power plant circulating water can also be drawn in area's construction, double water source is provided for city or improve urban rivers and lakes environment, change city and only have The way of supplying water at running water water source all the way, city taste is greatly improved, further save the energy, reduce discharge, reduce urban human Life expenditure.
Embodiment 2
Referring to Fig. 4, water land source side water pump 4 and other water pumps in the present embodiment use horizontal mounting structure, specific installation knot Structure is as follows.Motor 23 connects the main shaft of the pump housing 24, and the exit of the pump housing 24 is provided with y-type filter 25, the entrance of y-type filter 25 And the porch of the pump housing 24 disturbs rubber soft joint 29 by hyperbolic respectively and connects outlet pipe 27 and water inlet pipe 28, on outlet pipe 27 It is also equipped with the static check-valves 26 of Slow Close.The bottom of water inlet pipe 28 is provided with drainpipe 30, in the downside of motor 23 and the pump housing 24 Spring shock absorption mechanism 31 is installed.
Referring to Fig. 5, pipeline opens up through hole, in through hole when through floor or partition wall on floor or partition wall One sealing sleeve pipe 36 of interior installation, water pipe pass through sealing sleeve pipe 36, filled respectively containing fire prevention inside the both ends of sealing sleeve pipe 36 Inserts 34, it is close by pressing plate 33 on the outside of the inside middle portion filling glass cotton 35 of sealing sleeve pipe 36, the both ends of sealing sleeve pipe 36 Envelope, pressing plate 33 can select the iron plate that thickness is 0.6mm, and fireproof filling material 34 can select the fire-proof and water-proofs such as perlite filling material Material.Structure in the present embodiment is respectively suitable for embodiment 1.
Embodiment 3
Before power plant goes into operation, water source side supply channel 5 can also connect cooling tower collecting-tank 103 by cold water pipeline.
Although above having made detailed description to the utility model with generality explanation and specific embodiment, On the basis of the utility model, it can be made some modifications or improvements, this is apparent to those skilled in the art 's.Therefore, the these modifications or improvements on the basis of without departing from the utility model spirit, belonging to the utility model will Seek the scope of protection.

Claims (8)

1. a kind of thermoelectric cycle water or industrial wastewater afterheat utilizing system, it is characterised in that:Described afterheat utilizing system includes Water source heat pump units and the water source side supply channel being connected respectively with water source heat pump units, water source side water return pipeline, user side Supply channel and user side water return pipeline, water source side supply channel connects electric power plant circulating water by hot water line or industrial wastewater goes out Hot water source's device of mouth, water source side supply channel pass through cold water pipeline and connect power plant's cold water source pipeline or rivers and lakes water Source capsule road, water knockout drum and water tank, water knockout drum and water tank are provided between user side supply channel and user side water return pipeline Between be connected with service pipe, service pipe connection user's indoor coil blower fan or user's hot water water supply installation.
2. thermoelectric cycle water according to claim 1 or industrial wastewater afterheat utilizing system, it is characterised in that:Described use Family branch pipe includes user's water supply branch pipe and user's return branch, user's water supply branch pipe connection water knockout drum, the connection of user's return branch Water tank, is also associated with short circuit between water knockout drum and water tank, short circuit is provided with differential pressure controller.
3. thermoelectric cycle water according to claim 1 or industrial wastewater afterheat utilizing system, it is characterised in that:Described use Family side water return pipeline is provided with automatic water-replenishing device.
4. thermoelectric cycle water according to claim 3 or industrial wastewater afterheat utilizing system, it is characterised in that:It is described from Dynamic water replanishing device includes constant pressure supply water mechanism and extra feed tank, and extra feed tank connects tap water pipe line, make-up water by ball-cock assembly The top of case is provided with overfall, and the bottom of extra feed tank connects constant pressure supply water mechanism, the water outlet of constant pressure supply water mechanism by pipeline Mouth connection user side water return pipeline.
5. thermoelectric cycle water or industrial wastewater afterheat utilizing system according to claim 1 or 3, it is characterised in that:It is described User side water return pipeline be provided with multigroup user side cold-water return pump and multigroup user side hot water backwater pump, user side cold water returns Water pump is arranged in parallel with user side hot water backwater pump.
6. thermoelectric cycle water or industrial wastewater afterheat utilizing system according to claim 1 or 3, it is characterised in that:It is described User side water return pipeline be provided with electronic hydrotreater.
7. thermoelectric cycle water according to claim 1 or industrial wastewater afterheat utilizing system, it is characterised in that:Described water On source supply channel hydrocyclone and Full-automatic self-cleaning filter are sequentially provided with along water (flow) direction.
8. thermoelectric cycle water according to claim 1 or industrial wastewater afterheat utilizing system, it is characterised in that:Described electricity Factory's recirculated water or hot water source's device of industrial wastewater outlet include condenser, cooling tower and cooling tower collecting-tank, cooling tower collection Pond is arranged on the bottom of cooling tower, and cooling tower collecting-tank connects condenser by condenser inlet pipeline, and condenser passes through solidifying Vapour device discharge pipe line connects cooling tower, and hot water line connects condenser inlet pipeline, condenser discharge pipe line and cooling tower respectively Collecting-tank, water source side water return pipeline connection cooling tower collecting-tank.
CN201721124969.5U 2017-09-04 2017-09-04 A kind of thermoelectric cycle water or industrial wastewater afterheat utilizing system Active CN207113284U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721124969.5U CN207113284U (en) 2017-09-04 2017-09-04 A kind of thermoelectric cycle water or industrial wastewater afterheat utilizing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721124969.5U CN207113284U (en) 2017-09-04 2017-09-04 A kind of thermoelectric cycle water or industrial wastewater afterheat utilizing system

Publications (1)

Publication Number Publication Date
CN207113284U true CN207113284U (en) 2018-03-16

Family

ID=61574549

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721124969.5U Active CN207113284U (en) 2017-09-04 2017-09-04 A kind of thermoelectric cycle water or industrial wastewater afterheat utilizing system

Country Status (1)

Country Link
CN (1) CN207113284U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108800661A (en) * 2018-07-10 2018-11-13 华创能源集团股份有限公司 A kind of thermal power plant UTILIZATION OF VESIDUAL HEAT IN heat pump system and method
CN108917228A (en) * 2018-08-10 2018-11-30 青岛艳阳天环保科技有限公司 A kind of refrigeration heating system using low-temperature industrial recirculated cooling water
CN110173735A (en) * 2019-05-20 2019-08-27 上海电力学院 Self-feedback heating system is coupled using the water resource heat pump front and rear of circulating water afterheat
CN111219905A (en) * 2020-02-21 2020-06-02 中国电力工程顾问集团西南电力设计院有限公司 Cold and heat source combined configuration structure and operation method of centralized refrigeration and heating system of power plant
CN112178980A (en) * 2020-09-29 2021-01-05 国电龙源节能技术有限公司上海分公司 Waste heat utilization system and method based on electrically driven water source heat pump unit
CN112944938A (en) * 2021-03-23 2021-06-11 华能青岛热电有限公司 A easily install condenser structure for turbine unit
CN113188289A (en) * 2021-04-12 2021-07-30 河北晟华环保技术工程有限公司 A kind of waste heat power generation circulating water pipeline system and circulating method
CN118375967A (en) * 2024-05-20 2024-07-23 山东中瑞新能源科技有限公司 Energy pile coupled with air energy tower integrated heat pump system for comprehensive energy utilization

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108800661A (en) * 2018-07-10 2018-11-13 华创能源集团股份有限公司 A kind of thermal power plant UTILIZATION OF VESIDUAL HEAT IN heat pump system and method
CN108917228A (en) * 2018-08-10 2018-11-30 青岛艳阳天环保科技有限公司 A kind of refrigeration heating system using low-temperature industrial recirculated cooling water
CN110173735A (en) * 2019-05-20 2019-08-27 上海电力学院 Self-feedback heating system is coupled using the water resource heat pump front and rear of circulating water afterheat
CN111219905A (en) * 2020-02-21 2020-06-02 中国电力工程顾问集团西南电力设计院有限公司 Cold and heat source combined configuration structure and operation method of centralized refrigeration and heating system of power plant
CN111219905B (en) * 2020-02-21 2024-04-16 中国电力工程顾问集团西南电力设计院有限公司 Cold and heat source combined configuration structure and operation method of concentrated refrigeration and heating system of power plant
CN112178980A (en) * 2020-09-29 2021-01-05 国电龙源节能技术有限公司上海分公司 Waste heat utilization system and method based on electrically driven water source heat pump unit
CN112944938A (en) * 2021-03-23 2021-06-11 华能青岛热电有限公司 A easily install condenser structure for turbine unit
CN113188289A (en) * 2021-04-12 2021-07-30 河北晟华环保技术工程有限公司 A kind of waste heat power generation circulating water pipeline system and circulating method
CN118375967A (en) * 2024-05-20 2024-07-23 山东中瑞新能源科技有限公司 Energy pile coupled with air energy tower integrated heat pump system for comprehensive energy utilization

Similar Documents

Publication Publication Date Title
CN207113284U (en) A kind of thermoelectric cycle water or industrial wastewater afterheat utilizing system
CN104930576A (en) Highly-stable anticorrosion complete set heat supply system
CN102379226B (en) Temperature adjustment system for sunlight greenhouses
CN102853603B (en) Multisource heat pump temperature adjusting device and energy-saving control method
CN104456699B (en) A kind of air type solar energy hot water VMC towards passive room
CN109373551A (en) System is utilized with the recuperation of heat of central heating network transmission cooling in summer waste heat
CN201080705Y (en) Ground cooling type temperature-reducing residential building
CN208967880U (en) Wind energy direct drive water conduction heat transfer system
Liu et al. A case study of ground source direct cooling system integrated with water storage tank system
CN101408324A (en) Stack assembling villa residential building solar energy-gas wall hanging furnace hot water system
CN203373815U (en) System utilizing solar water heating system for preventing freezing and preserving heat for fire water tank compartment
CN101566376B (en) Domestic central air-conditioning system controlled by centralized heat exchange households
CN201196508Y (en) A water source heat pump air conditioning system
JP4046687B2 (en) Air-conditioning system using geothermal heat
CN206398895U (en) The composite heating air-conditioning system of air source heat pump and water source heat pump combining
WO2013040731A1 (en) Solar water heating system for tropical region
CN201772636U (en) Solar central heating for unit buildings
RU108561U1 (en) ECOLOGICAL AND ENERGY-SAVING SYSTEM OF COLD AND HEAT SUPPLY OF FAMILY HOUSE
CN204943628U (en) High steady anticorrosion complete heating system
CN208269316U (en) A kind of split type family geothermal heat pump air-conditioning system
CN101126527A (en) Central air conditioning system adopting river water as cold source by siphon principle
CN103884067A (en) Water air conditioner system capable of providing indoor heating and refrigerating
CN210772404U (en) Ground source heat pump pipeline with spare buried pipe
CN103375860A (en) Centralized indoor cooling system for residence communities
CN101592353B (en) Heat supply system and heat supply method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant