CN207092544U - New civil engineering formwork connection device - Google Patents
New civil engineering formwork connection device Download PDFInfo
- Publication number
- CN207092544U CN207092544U CN201721007502.2U CN201721007502U CN207092544U CN 207092544 U CN207092544 U CN 207092544U CN 201721007502 U CN201721007502 U CN 201721007502U CN 207092544 U CN207092544 U CN 207092544U
- Authority
- CN
- China
- Prior art keywords
- grafting
- steel plate
- connection
- trip bolt
- firm banking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009415 formwork Methods 0.000 title claims abstract description 13
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 21
- 239000010959 steel Substances 0.000 claims abstract description 21
- 239000007787 solid Substances 0.000 claims description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000295 complement effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
New civil engineering formwork connection device, including formwork-support, splice steel plate, grafting is raised, grafting base, slide protrusion, firm banking, template, the formwork-support top connection splicing steel plate, the splicing steel plate has grafting raised, the splicing steel plate top connection grafting base, the grafting base bottom has inserting groove, connection grafting is raised inside the inserting groove, the inserting groove is raised adaptable with grafting, the grafting base top has slide protrusion, the grafting base top is connected base, the firm banking has multiple trip bolt holes, the trip bolt hole has internal thread, the firm banking both sides have fixed arm, the fixed arm both sides connect template, there are multiple fixing screw holes inside the fixed arm, the fixing screw hole has internal thread.
Description
Technical field
It the utility model is related to field of civil engineering, more particularly to a kind of new civil engineering formwork connection device.
Background technology
Existing civil engineering template is during splicing, due to there is no reliable attachment means between two pieces of templates,
It is generally only that the frictional force between master plate and support frame below remains stable, the connection of this mode after being docked
It is very not close, it is easy to make gap occur between two pieces of templates.
Utility model content
The utility model is directed to deficiencies of the prior art, there is provided the more close new civil engineering of one kind connection
Formwork connection device.
The purpose of this utility model is to be achieved through the following technical solutions:
A kind of new civil engineering formwork connection device, including formwork-support, splicing steel plate, grafting projection, grafting bottom
Seat, slide protrusion, firm banking, template, the formwork-support top connection splicing steel plate, the splicing steel plate have grafting
Projection, the splicing steel plate top connection grafting base, the grafting base bottom has inserting groove, connected inside the inserting groove
Projection is patched, the inserting groove is raised adaptable with grafting, and the grafting base top has slide protrusion, the grafting bottom
Seat top is connected base, and the firm banking has multiple trip bolt holes, and the trip bolt hole has internal thread, institute
Stating firm banking both sides has fixed arm, and the fixed arm both sides connect template, have multiple fixed spiral shells inside the fixed arm
Nail, the fixing screw hole have internal thread, and be connected screw inside the fixing screw hole, the fixing screw hole with
Fixing screws are meshed, the fixing screws connection splicing steel plate.
The grafting base both sides have fastening projection, and the fastening lobed interior connects multiple trip bolts, described tight
Gu in screw insertion trip bolt hole, the trip bolt is meshed with trip bolt hole.
The firm banking bottom has sliding groove, and slide protrusion, the sliding groove and cunning are connected inside the sliding groove
It is dynamic raised adaptable.
Beneficial effect:
By the mutual cooperation of slide protrusion, sliding groove, grafting base can enter line slip relative to firm banking, when slotting
Connect base it is corresponding with the position of firm banking after, grafting base is fixed on firm banking with trip bolt so that grafting
Connection between base and firm banking is more close, and grafting is raised, inserting groove cooperates, and is easy to fixing screws, fixed spiral shell
The position of nail is determined, so as to be reinforced, template fixes to be complemented each other to form in splicing steel plate, firm banking, fixing screws
Integrated connection in so that the connection between adjacent template is more close, is acted on by the mutual cooperation of each component so that
The connection of this new civil engineering formwork connection device is closer.
Brief description of the drawings
Fig. 1 is new civil engineering formwork connection device structural representation described in the utility model.
Embodiment
The utility model is described in further detail below according to drawings and examples:
A kind of new civil engineering formwork connection device, including formwork-support 1, splicing steel plate 2, grafting projection 3, grafting
Base 4, slide protrusion 6, firm banking 8, template 14, the top of the formwork-support 1 connection splicing steel plate 2, the splicing steel
Plate 2 has grafting projection 3, and the splicing steel plate 2 top connection grafting base 4, the bottom of grafting base 4 has inserting groove 5,
The inside of the inserting groove 5 connection grafting projection 3, the inserting groove 5 is adapted with grafting projection 3, the top of grafting base 4 tool
There is a slide protrusion 6, the top of grafting base 4 is connected base 8, and the firm banking 8 has multiple trip bolt holes 9,
The trip bolt hole 9 has internal thread, and the both sides of firm banking 8 have fixed arm 12, the both sides of fixed arm 12 connection
Template 14, the inside of fixed arm 12 have multiple fixing screw holes 13, and the fixing screw hole 13 has internal thread, described solid
Determine the screw 15 that is connected inside screw hole 13, the fixing screw hole 13 is meshed with fixing screws 15, the fixing screws
15 connection splicing steel plates 2.
The both sides of grafting base 4 have fastening projection 11, and the inside of fastening projection 11 connects multiple trip bolts 10,
The trip bolt 10 is inserted in trip bolt hole 9, and the trip bolt 10 is meshed with trip bolt hole 9.
The bottom of firm banking 8 has sliding groove 7, the inside of the sliding groove 7 connection slide protrusion 6, the sliding groove 7
It is adapted with slide protrusion 6, by the mutual cooperation of slide protrusion 6, sliding groove 7, grafting base 4 can be relative to firm banking
8 enter line slip, after grafting base 4 is corresponding with the position of firm banking 8, are fixed on grafting base 4 with trip bolt 10
On firm banking 8 so that the connection between grafting base 4 and firm banking 8 is more close, and grafting projection 3, inserting groove 5 are mutual
Coordinate, be easy to the position of fixing screws 15, fixing screw hole 13 to determine, so as to be reinforced, template 14 is fixed in splicing steel plate
2nd, in the integrated connection that firm banking 8, fixing screws 15 complement each other to form so that the connection between adjacent template 14 is more
Closely, acted on by the mutual cooperation of each component so that the connection of this new civil engineering formwork connection device is closer.
Claims (3)
1. a kind of new civil engineering formwork connection device, it is characterized in that:It is convex including formwork-support, splicing steel plate, grafting
Rise, grafting base, slide protrusion, firm banking, template, the formwork-support top connection splicing steel plate, the splicing steel
Plate has grafting projection, and the splicing steel plate top connection grafting base, the grafting base bottom has inserting groove, described to insert
Connection grafting is raised inside access slot, and the inserting groove is adapted with grafting projection, and the grafting base top has slide protrusion,
The grafting base top is connected base, and the firm banking has multiple trip bolt holes, the trip bolt hole tool
There is internal thread, the firm banking both sides have fixed arm, and the fixed arm both sides connect template, had inside the fixed arm
Multiple fixing screw holes, the fixing screw hole have internal thread, and be connected screw inside the fixing screw hole, described solid
Determine screw hole to be meshed with fixing screws, the fixing screws connection splicing steel plate.
2. new civil engineering formwork connection device according to claim 1, it is characterized in that:The grafting base both sides
Raised with fastening, the fastening lobed interior connects multiple trip bolts, and the trip bolt is inserted in trip bolt hole, institute
Trip bolt is stated to be meshed with trip bolt hole.
3. new civil engineering formwork connection device according to claim 2, it is characterized in that:The firm banking bottom
With sliding groove, connection slide protrusion, the sliding groove are adapted with slide protrusion inside the sliding groove.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721007502.2U CN207092544U (en) | 2017-08-14 | 2017-08-14 | New civil engineering formwork connection device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721007502.2U CN207092544U (en) | 2017-08-14 | 2017-08-14 | New civil engineering formwork connection device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207092544U true CN207092544U (en) | 2018-03-13 |
Family
ID=61541265
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201721007502.2U Expired - Fee Related CN207092544U (en) | 2017-08-14 | 2017-08-14 | New civil engineering formwork connection device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207092544U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111236622A (en) * | 2020-03-27 | 2020-06-05 | 曹小爱 | Building template and assembly of building template and layering |
-
2017
- 2017-08-14 CN CN201721007502.2U patent/CN207092544U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111236622A (en) * | 2020-03-27 | 2020-06-05 | 曹小爱 | Building template and assembly of building template and layering |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203947633U (en) | Aluminium sheet adjustable angle hanger system | |
| CN203320865U (en) | Stand column for aluminium material protective fence | |
| CN207092544U (en) | New civil engineering formwork connection device | |
| CN203373883U (en) | Plug-type curtain wall beam connecting system | |
| CN206770335U (en) | A kind of bus duct stationary fixture | |
| CN206400428U (en) | The new computer cabinet for being easy to assemble | |
| CN207003671U (en) | Architectural engineering support beam and stand column pile attachment structure | |
| CN203967870U (en) | Electric motor end cap and motor | |
| CN203957104U (en) | A kind of concrete blinding connects pipe close | |
| CN104295104B (en) | Box-section crane girder high-strength bolt field installation process | |
| CN203589644U (en) | Bus duct plugging box | |
| CN203740803U (en) | Adjustable guide rail connecting support | |
| CN203146504U (en) | Fast connecting plate of sectional materials | |
| CN207463975U (en) | A kind of mold is with pulling and pushing harden structure | |
| CN103991130B (en) | A kind of concrete blinding connects pipe close | |
| CN207436482U (en) | A kind of build concrete Combinated shuttering for shaping | |
| CN204040770U (en) | A kind of timber reinforcement assembly | |
| CN204531272U (en) | Architectural decoration panel primary-secondary type anchoring piece | |
| CN204626938U (en) | Shaped metal frame structure | |
| CN203404195U (en) | Expansion bolt | |
| CN203783309U (en) | Hardware connecting piece convenient for adjusting distance between lock holes | |
| CN204185080U (en) | A stainless steel elevator door sill with built-in screw auxiliary joint installation structure | |
| CN203081145U (en) | Adjustable door pocket device of steel wooden door | |
| CN206376546U (en) | A kind of template for constructional engineering construction fixing device | |
| CN207590276U (en) | A kind of cabinet of no hardware structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180313 Termination date: 20180814 |