CN207092544U - New civil engineering formwork connection device - Google Patents

New civil engineering formwork connection device Download PDF

Info

Publication number
CN207092544U
CN207092544U CN201721007502.2U CN201721007502U CN207092544U CN 207092544 U CN207092544 U CN 207092544U CN 201721007502 U CN201721007502 U CN 201721007502U CN 207092544 U CN207092544 U CN 207092544U
Authority
CN
China
Prior art keywords
grafting
steel plate
connection
trip bolt
firm banking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721007502.2U
Other languages
Chinese (zh)
Inventor
李明宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721007502.2U priority Critical patent/CN207092544U/en
Application granted granted Critical
Publication of CN207092544U publication Critical patent/CN207092544U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

New civil engineering formwork connection device, including formwork-support, splice steel plate, grafting is raised, grafting base, slide protrusion, firm banking, template, the formwork-support top connection splicing steel plate, the splicing steel plate has grafting raised, the splicing steel plate top connection grafting base, the grafting base bottom has inserting groove, connection grafting is raised inside the inserting groove, the inserting groove is raised adaptable with grafting, the grafting base top has slide protrusion, the grafting base top is connected base, the firm banking has multiple trip bolt holes, the trip bolt hole has internal thread, the firm banking both sides have fixed arm, the fixed arm both sides connect template, there are multiple fixing screw holes inside the fixed arm, the fixing screw hole has internal thread.

Description

New civil engineering formwork connection device
Technical field
It the utility model is related to field of civil engineering, more particularly to a kind of new civil engineering formwork connection device.
Background technology
Existing civil engineering template is during splicing, due to there is no reliable attachment means between two pieces of templates, It is generally only that the frictional force between master plate and support frame below remains stable, the connection of this mode after being docked It is very not close, it is easy to make gap occur between two pieces of templates.
Utility model content
The utility model is directed to deficiencies of the prior art, there is provided the more close new civil engineering of one kind connection Formwork connection device.
The purpose of this utility model is to be achieved through the following technical solutions:
A kind of new civil engineering formwork connection device, including formwork-support, splicing steel plate, grafting projection, grafting bottom Seat, slide protrusion, firm banking, template, the formwork-support top connection splicing steel plate, the splicing steel plate have grafting Projection, the splicing steel plate top connection grafting base, the grafting base bottom has inserting groove, connected inside the inserting groove Projection is patched, the inserting groove is raised adaptable with grafting, and the grafting base top has slide protrusion, the grafting bottom Seat top is connected base, and the firm banking has multiple trip bolt holes, and the trip bolt hole has internal thread, institute Stating firm banking both sides has fixed arm, and the fixed arm both sides connect template, have multiple fixed spiral shells inside the fixed arm Nail, the fixing screw hole have internal thread, and be connected screw inside the fixing screw hole, the fixing screw hole with Fixing screws are meshed, the fixing screws connection splicing steel plate.
The grafting base both sides have fastening projection, and the fastening lobed interior connects multiple trip bolts, described tight Gu in screw insertion trip bolt hole, the trip bolt is meshed with trip bolt hole.
The firm banking bottom has sliding groove, and slide protrusion, the sliding groove and cunning are connected inside the sliding groove It is dynamic raised adaptable.
Beneficial effect:
By the mutual cooperation of slide protrusion, sliding groove, grafting base can enter line slip relative to firm banking, when slotting Connect base it is corresponding with the position of firm banking after, grafting base is fixed on firm banking with trip bolt so that grafting Connection between base and firm banking is more close, and grafting is raised, inserting groove cooperates, and is easy to fixing screws, fixed spiral shell The position of nail is determined, so as to be reinforced, template fixes to be complemented each other to form in splicing steel plate, firm banking, fixing screws Integrated connection in so that the connection between adjacent template is more close, is acted on by the mutual cooperation of each component so that The connection of this new civil engineering formwork connection device is closer.
Brief description of the drawings
Fig. 1 is new civil engineering formwork connection device structural representation described in the utility model.
Embodiment
The utility model is described in further detail below according to drawings and examples:
A kind of new civil engineering formwork connection device, including formwork-support 1, splicing steel plate 2, grafting projection 3, grafting Base 4, slide protrusion 6, firm banking 8, template 14, the top of the formwork-support 1 connection splicing steel plate 2, the splicing steel Plate 2 has grafting projection 3, and the splicing steel plate 2 top connection grafting base 4, the bottom of grafting base 4 has inserting groove 5, The inside of the inserting groove 5 connection grafting projection 3, the inserting groove 5 is adapted with grafting projection 3, the top of grafting base 4 tool There is a slide protrusion 6, the top of grafting base 4 is connected base 8, and the firm banking 8 has multiple trip bolt holes 9, The trip bolt hole 9 has internal thread, and the both sides of firm banking 8 have fixed arm 12, the both sides of fixed arm 12 connection Template 14, the inside of fixed arm 12 have multiple fixing screw holes 13, and the fixing screw hole 13 has internal thread, described solid Determine the screw 15 that is connected inside screw hole 13, the fixing screw hole 13 is meshed with fixing screws 15, the fixing screws 15 connection splicing steel plates 2.
The both sides of grafting base 4 have fastening projection 11, and the inside of fastening projection 11 connects multiple trip bolts 10, The trip bolt 10 is inserted in trip bolt hole 9, and the trip bolt 10 is meshed with trip bolt hole 9.
The bottom of firm banking 8 has sliding groove 7, the inside of the sliding groove 7 connection slide protrusion 6, the sliding groove 7 It is adapted with slide protrusion 6, by the mutual cooperation of slide protrusion 6, sliding groove 7, grafting base 4 can be relative to firm banking 8 enter line slip, after grafting base 4 is corresponding with the position of firm banking 8, are fixed on grafting base 4 with trip bolt 10 On firm banking 8 so that the connection between grafting base 4 and firm banking 8 is more close, and grafting projection 3, inserting groove 5 are mutual Coordinate, be easy to the position of fixing screws 15, fixing screw hole 13 to determine, so as to be reinforced, template 14 is fixed in splicing steel plate 2nd, in the integrated connection that firm banking 8, fixing screws 15 complement each other to form so that the connection between adjacent template 14 is more Closely, acted on by the mutual cooperation of each component so that the connection of this new civil engineering formwork connection device is closer.

Claims (3)

1. a kind of new civil engineering formwork connection device, it is characterized in that:It is convex including formwork-support, splicing steel plate, grafting Rise, grafting base, slide protrusion, firm banking, template, the formwork-support top connection splicing steel plate, the splicing steel Plate has grafting projection, and the splicing steel plate top connection grafting base, the grafting base bottom has inserting groove, described to insert Connection grafting is raised inside access slot, and the inserting groove is adapted with grafting projection, and the grafting base top has slide protrusion, The grafting base top is connected base, and the firm banking has multiple trip bolt holes, the trip bolt hole tool There is internal thread, the firm banking both sides have fixed arm, and the fixed arm both sides connect template, had inside the fixed arm Multiple fixing screw holes, the fixing screw hole have internal thread, and be connected screw inside the fixing screw hole, described solid Determine screw hole to be meshed with fixing screws, the fixing screws connection splicing steel plate.
2. new civil engineering formwork connection device according to claim 1, it is characterized in that:The grafting base both sides Raised with fastening, the fastening lobed interior connects multiple trip bolts, and the trip bolt is inserted in trip bolt hole, institute Trip bolt is stated to be meshed with trip bolt hole.
3. new civil engineering formwork connection device according to claim 2, it is characterized in that:The firm banking bottom With sliding groove, connection slide protrusion, the sliding groove are adapted with slide protrusion inside the sliding groove.
CN201721007502.2U 2017-08-14 2017-08-14 New civil engineering formwork connection device Expired - Fee Related CN207092544U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721007502.2U CN207092544U (en) 2017-08-14 2017-08-14 New civil engineering formwork connection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721007502.2U CN207092544U (en) 2017-08-14 2017-08-14 New civil engineering formwork connection device

Publications (1)

Publication Number Publication Date
CN207092544U true CN207092544U (en) 2018-03-13

Family

ID=61541265

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721007502.2U Expired - Fee Related CN207092544U (en) 2017-08-14 2017-08-14 New civil engineering formwork connection device

Country Status (1)

Country Link
CN (1) CN207092544U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236622A (en) * 2020-03-27 2020-06-05 曹小爱 Building template and assembly of building template and layering

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236622A (en) * 2020-03-27 2020-06-05 曹小爱 Building template and assembly of building template and layering

Similar Documents

Publication Publication Date Title
CN203947633U (en) Aluminium sheet adjustable angle hanger system
CN203320865U (en) Stand column for aluminium material protective fence
CN207092544U (en) New civil engineering formwork connection device
CN203373883U (en) Plug-type curtain wall beam connecting system
CN206770335U (en) A kind of bus duct stationary fixture
CN206400428U (en) The new computer cabinet for being easy to assemble
CN207003671U (en) Architectural engineering support beam and stand column pile attachment structure
CN203967870U (en) Electric motor end cap and motor
CN203957104U (en) A kind of concrete blinding connects pipe close
CN104295104B (en) Box-section crane girder high-strength bolt field installation process
CN203589644U (en) Bus duct plugging box
CN203740803U (en) Adjustable guide rail connecting support
CN203146504U (en) Fast connecting plate of sectional materials
CN207463975U (en) A kind of mold is with pulling and pushing harden structure
CN103991130B (en) A kind of concrete blinding connects pipe close
CN207436482U (en) A kind of build concrete Combinated shuttering for shaping
CN204040770U (en) A kind of timber reinforcement assembly
CN204531272U (en) Architectural decoration panel primary-secondary type anchoring piece
CN204626938U (en) Shaped metal frame structure
CN203404195U (en) Expansion bolt
CN203783309U (en) Hardware connecting piece convenient for adjusting distance between lock holes
CN204185080U (en) A stainless steel elevator door sill with built-in screw auxiliary joint installation structure
CN203081145U (en) Adjustable door pocket device of steel wooden door
CN206376546U (en) A kind of template for constructional engineering construction fixing device
CN207590276U (en) A kind of cabinet of no hardware structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180313

Termination date: 20180814