CN207092224U - A kind of transformer station's system for reclaiming rainwater - Google Patents
A kind of transformer station's system for reclaiming rainwater Download PDFInfo
- Publication number
- CN207092224U CN207092224U CN201720986596.6U CN201720986596U CN207092224U CN 207092224 U CN207092224 U CN 207092224U CN 201720986596 U CN201720986596 U CN 201720986596U CN 207092224 U CN207092224 U CN 207092224U
- Authority
- CN
- China
- Prior art keywords
- rainwater
- substation
- water storage
- pump
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Road Paving Structures (AREA)
- Sewage (AREA)
Abstract
本实用新型公开了一种变电站雨水回收系统,属于雨水高效收集与利用技术领域,包括雨水的收集单元、处理单元、用水终端和控制器。本实用新型的一种变电站雨水回收系统,一方面增加了变电站内水资源承载力,大大缓解了变电站的缺水局面,增加了变电站的生态用水;另一方面雨水或者进入自然环境,产生渗透补充地下水,或者进入人工环境,通过循环利用,补充地下水源,维护地下水及土壤的神态平衡,同时还能减少因过度开采地下水而引起路基下沉的作用。
The utility model discloses a substation rainwater recovery system, which belongs to the technical field of efficient collection and utilization of rainwater, and comprises a rainwater collection unit, a processing unit, a water use terminal and a controller. A substation rainwater recovery system of the present utility model, on the one hand, increases the carrying capacity of water resources in the substation, greatly alleviates the water shortage situation of the substation, and increases the ecological water of the substation; Groundwater, or enters the artificial environment, through recycling, replenishes groundwater sources, maintains the balance of groundwater and soil, and at the same time reduces the effect of roadbed subsidence caused by excessive exploitation of groundwater.
Description
技术领域technical field
本实用新型属于雨水高效收集与利用技术领域,更具体地说,它涉及一种变电站雨水回收系统。The utility model belongs to the technical field of efficient collection and utilization of rainwater, and more specifically relates to a rainwater recovery system for a substation.
背景技术Background technique
我国是一个缺水国家,人均水资源占有量不足世界平均水平的1/4。全国669座城市中有400座供水不足,110座严重缺水;在32个百万人口以上的特大城市中,有30个长期受缺水困扰;在14个沿海开放城市中,有9个严重缺水。缺水已经成为制约我国城市经济社会发展的一个瓶颈因素。my country is a water-scarce country, with per capita water resources less than 1/4 of the world average. Of the 669 cities in the country, 400 have insufficient water supply, and 110 have severe water shortages; among the 32 megacities with a population of more than one million, 30 have suffered from water shortage for a long time; among the 14 open coastal cities, 9 have serious water shortages. lack of water. Water shortage has become a bottleneck factor restricting my country's urban economic and social development.
为了缓解城市水资源供给极度紧张的状况,我们一方面采用调水措施或尝试农用水资源向城市用水的转换,以求增加城市水资源的供给总量,另一方面则积极鼓励城市居民和企事业单位节约用水,所有这些措施都在实践中发挥了非常重要的作用。In order to alleviate the extremely tight supply of urban water resources, on the one hand, we adopt water diversion measures or try to convert agricultural water resources to urban water resources in order to increase the total supply of urban water resources; on the other hand, we actively encourage urban residents and enterprises to All these measures have played a very important role in practice.
但是,就在我们努力找水、节水的同时,几乎每个城市都大量拥有的一种水资源——雨水,却普遍性地没有得到很好的利用,而是直接进入城市地下管网,白白地流走了,有的时候还要花费巨大费用人工排水。However, while we are working hard to find water and save water, rainwater, a kind of water resource that almost every city has in abundance, is generally not well utilized, but directly enters the urban underground pipe network. It flows away in vain, and sometimes it costs a lot of money to manually drain water.
因此需要提出一种新的技术方案来解决上述问题。Therefore need to propose a kind of new technical scheme to solve the above problems.
实用新型内容Utility model content
针对现有技术存在的不足,本实用新型的目的在于提供一种变电站雨水回收系统,提高了雨水资源的利用率。Aiming at the deficiencies in the prior art, the purpose of the utility model is to provide a substation rainwater recovery system, which improves the utilization rate of rainwater resources.
为实现上述目的,本实用新型提供了如下技术方案:一种变电站雨水回收系统,包括雨水的收集单元、处理单元、用水终端和控制器,In order to achieve the above purpose, the utility model provides the following technical solutions: a substation rainwater recovery system, including a rainwater collection unit, a processing unit, a water terminal and a controller,
所述收集单元包括设置在变电站内的透水路面、设置在透水路面两侧的向下凹陷的排水明沟、与所述排水明沟相连通的渗水管网以及与所述排水明沟相连通的储水井;The collection unit includes a permeable road surface arranged in the substation, a downwardly recessed drainage ditch arranged on both sides of the permeable road surface, a seepage pipe network connected with the drainage ditch, and a water storage well connected with the drainage ditch;
所述处理单元包括与所述储水井通过管道连通的提升泵、与所述提升泵通过管道连通的硅砂过滤池、与所述硅砂过滤池连通的净水处理装置以及与所述净水处理装置连通的储水箱;The treatment unit includes a lift pump communicated with the water storage well through pipelines, a silica sand filter tank communicated with the lift pump through pipelines, a water purification treatment device communicated with the silica sand filter tank, and a water purification treatment device communicated with the water purification treatment device Connected storage tanks;
所述用水终端包括与所述储水箱通过浇灌泵连通的浇灌管网、与所述储水箱通过反冲泵连通的反冲管网、用于连通所述储水箱和所述储水井的溢流管道以及与所述储水井通过排水管道连通的雨水泵以及与所述雨水泵相连通的市政雨水管;The water terminal includes an irrigation pipe network communicated with the water storage tank through an irrigation pump, a recoil pipe network communicated with the water storage tank through a recoil pump, and an overflow pipe network used to communicate with the water storage tank and the water storage well. pipelines, a rainwater pump communicating with the water storage well through a drainage pipeline, and a municipal rainwater pipe communicating with the rainwater pump;
所述控制器分别与提升泵、浇灌泵、反冲泵和雨水泵电信号连接。The controller is respectively connected with electric signals of the lifting pump, the irrigation pump, the recoil pump and the rainwater pump.
通过采用上述技术方案,将路面的雨水通过透水路面向下渗透到路基的土壤内,而多余的水分经由渗水管网和排水明沟汇聚在储水井内进行储存;由于路面雨水中存在大量的灰尘、杂质以及细菌等物质,直接使用会对不仅会对人体健康造成影响,同时也会造成洁净的水源的二次或多次污染;因此需要对储存的雨水进行沉降、消毒、杀菌和过滤等一系列的净化处理,以此提高上述雨水资源的质量,以便于用作后期变电站内景观植被灌溉、路面的降温冲洗、生活洗车以及雨水回收系统内部自清洁等方面的用水;由此不仅能够减少路面积水的现象,而且还能及时补充了地下水,保护了地下生态环境,同时还进一步提高了雨水资源的利用率。By adopting the above-mentioned technical scheme, the rainwater on the road surface penetrates downward into the soil of the roadbed through the permeable road surface, and the excess water is collected in the water storage well through the seepage pipe network and the open drainage ditch for storage; due to the large amount of dust, Direct use of impurities, bacteria and other substances will not only affect human health, but also cause secondary or multiple pollution of clean water sources; therefore, it is necessary to conduct a series of sedimentation, disinfection, sterilization and filtration of stored rainwater Purification treatment, in order to improve the quality of the above-mentioned rainwater resources, so that it can be used for landscape vegetation irrigation in the substation, cooling and washing of the road surface, daily car washing, and self-cleaning of the rainwater recovery system; this can not only reduce the road area It can not only replenish the groundwater in time, protect the underground ecological environment, but also further improve the utilization rate of rainwater resources.
本实用新型进一步设置为:所述雨水收集单元还包括设置在变电站屋顶上的排水沟、间隔设置在排水沟内的雨水漏斗以及竖直设置并与雨水漏斗相连通的下排管道,所述下排管道与渗水管网相连通。The utility model is further configured as follows: the rainwater collection unit also includes a drainage ditch arranged on the roof of the substation, rainwater funnels arranged at intervals in the drainage ditch, and a lower pipeline arranged vertically and connected with the rainwater funnel. The drainage pipe is connected with the seepage pipe network.
通过采用上述技术方案,由于变电站内存在较多的大型建筑物,在下雨天,上述大型建筑物的屋顶上存在较多屋面雨水,绝大多数的情况下,直接经由市政雨水管排出,使得对于屋面的雨水的利用较低,而将其通过雨水漏斗和下排管道并从渗水管网内汇流到雨水回收系统内,由此即可实现对变电站内屋面雨水的回收利用,同时也进一步增加了储水井内的雨水量。By adopting the above-mentioned technical scheme, since there are many large buildings in the substation, there is a lot of roof rainwater on the roofs of the above-mentioned large buildings in rainy days. The use of rainwater is relatively low, and it is passed through the rainwater funnel and the downpipe and then converged from the seepage pipe network to the rainwater recovery system, thereby realizing the recycling of rainwater on the roof of the substation and further increasing the number of water storage wells the amount of rainfall within.
本实用新型进一步设置为:相邻两个所述储水井之间通过调节管道相连通,所述调节管道上均设有电控阀门,所述控制器与电控阀门电信号连接。The utility model is further configured as follows: two adjacent water storage wells are connected through regulating pipes, and electric control valves are arranged on the regulating pipes, and the controller is connected with electric signals of the electric control valves.
通过采用上述技术方案,可以有效减少一个储水井中含水量过多而另一个储水井空置,没有或只含有少量的雨水的情况,使得变电站内所有的储水井都能得到良好的使用,由此有效的提高了整个系统中对储水井的利用率。另外在调节管道上设置电控阀门,操作者可以通过控制器控制电控阀门的开关,当操作者在需要清洗某一储水井时,可以及时的将该储水井相关联的电控阀门闭合,此时就能停止其他储水井内的雨水向该储水井排水,由此能够有效的减少雨水资源的浪费现象。By adopting the above technical scheme, it can effectively reduce the situation that one water storage well contains too much water while the other water storage well is vacant and contains no or only a small amount of rainwater, so that all the water storage wells in the substation can be used well, thus Effectively improve the utilization rate of the water storage well in the whole system. In addition, an electric control valve is set on the regulating pipeline, and the operator can control the switch of the electric control valve through the controller. When the operator needs to clean a certain water storage well, the electric control valve associated with the water storage well can be closed in time. At this time, the rainwater in other water storage wells can be stopped from draining to the water storage well, thereby effectively reducing the waste of rainwater resources.
本实用新型进一步设置为:所述透水路面从下往上依次包括设置在路基上的土工布、级配碎石层、陶瓷玻璃骨料层以及多孔透水混凝土层。The utility model is further configured as follows: the permeable pavement sequentially includes a geotextile, a graded crushed stone layer, a ceramic glass aggregate layer and a porous permeable concrete layer arranged on the roadbed from bottom to top.
通过采用上述技术方案,可以使得路面的雨水依次通过多孔凝土层、陶瓷玻璃骨料层、级配碎石层以及土工布向下渗透到路基的土壤层内,使雨水能够迅速的渗入到地下,有利于还原地下水、保持土壤湿度、维护地下水及土壤的神态平衡,同时还能减少因过度开采地下水而引起路基下沉的作用。By adopting the above technical scheme, the rainwater on the pavement can infiltrate down into the soil layer of the roadbed through the porous concrete layer, the ceramic glass aggregate layer, the graded crushed stone layer and the geotextile in turn, so that the rainwater can quickly infiltrate into the ground It is beneficial to restore groundwater, maintain soil moisture, maintain the balance of groundwater and soil, and at the same time reduce the effect of subgrade subsidence caused by excessive exploitation of groundwater.
本实用新型进一步设置为:所述多孔透水混凝土层由若干预制件多孔透水混凝土块填铺而成,相邻两块预制件多孔透水混凝土块之间涂刷有耐高温硅酸盐粘接密封胶。The utility model is further set as follows: the porous permeable concrete layer is filled and paved by several prefabricated porous permeable concrete blocks, and a high temperature resistant silicate bonding sealant is painted between two adjacent prefabricated porous permeable concrete blocks .
通过采用上述技术方案,因为耐高温硅酸盐粘接密封胶具有良好的耐水性、耐热性、粘接性、隔热性和高低温循环性能,同时还具有较好的韧性、致密性和拉剪强度,所以能够使得相邻两块预制件多孔透水混凝土块的连接更加的稳定牢固,方便了透水路面的安装,同时还提高了该透水路面的使用寿命。By adopting the above technical scheme, because the high temperature resistant silicate adhesive sealant has good water resistance, heat resistance, adhesion, heat insulation and high and low temperature cycle performance, it also has good toughness, compactness and Tensile-shear strength, so the connection between two adjacent prefabricated porous permeable concrete blocks can be made more stable and firm, which facilitates the installation of the permeable pavement and improves the service life of the permeable pavement.
本实用新型进一步设置为:所述渗水管网设置在级配碎石层与陶瓷玻璃骨料层之间。The utility model is further configured as follows: the seepage pipe network is arranged between the graded crushed stone layer and the ceramic glass aggregate layer.
通过采用上述技术方案,将渗水管网设置在级配碎石层与陶瓷玻璃骨料层之间而非设置在路基内,可以有效的减少路基内的土壤进入到渗水管网的小孔内造成渗水管网的堵塞的现象,相对而言,碎石子和骨料等物料不易完全堵塞小孔,由此提高了该渗水管网的渗水效果。By adopting the above technical scheme, the water seepage pipe network is arranged between the graded crushed stone layer and the ceramic glass aggregate layer instead of in the roadbed, which can effectively reduce the soil in the roadbed entering the small holes of the water seepage pipe network. The phenomenon of blockage of the seepage pipe network, relatively speaking, materials such as gravel and aggregate are not easy to completely block the small holes, thus improving the seepage effect of the seepage pipe network.
本实用新型进一步设置为:相邻两个渗水管网之间设有支撑块,所述支撑块为钢筋混凝土预制件。The utility model is further configured as follows: a support block is provided between two adjacent seepage pipe networks, and the support block is a reinforced concrete prefabricated part.
通过采用上述技术方案,能够进一步增加透水路面的承载重量,使得变电站内的重载车辆能够顺利通过的同时也不会对路面造成影响,因此保护了透水路面,提高了透水路面的使用寿命。By adopting the above technical solution, the bearing weight of the permeable pavement can be further increased, so that the heavy-duty vehicles in the substation can pass smoothly without affecting the pavement, thus protecting the permeable pavement and improving the service life of the permeable pavement.
本实用新型进一步设置为:所述提升泵与硅砂过滤池之间设有螺旋增压器,所述螺旋增压器上方设有加药箱。The utility model is further configured as follows: a screw booster is provided between the lifting pump and the silica sand filter tank, and a dosing box is provided above the screw booster.
通过采用上述技术方案,在提升泵工作的过程中,位于储水井内的雨水经提升泵流入到螺旋增压器内,此时启动螺旋增压器,在螺旋增压器的作用下将外界空气吸入到该螺旋增压器内,由此能够增加雨水中的氧气含量,以便于为满足好氧微生物分解水体中的有害物质的过程中提供充足的氧气,同时在螺旋增压器的螺旋桨的作用下,能够使得雨水处理系统内的雨水与净化雨水的药品充分混合均匀,从而使得对雨水的净化处理更加的充分、高效和快捷。By adopting the above-mentioned technical scheme, during the working process of the lift pump, the rainwater in the water storage well flows into the screw booster through the lift pump, at this time, the screw booster is started, and the outside air is pumped under the action of the screw booster. Inhaled into the screw supercharger, thereby increasing the oxygen content in the rainwater, so as to provide sufficient oxygen for the process of satisfying the process of aerobic microorganisms decomposing harmful substances in the water body, and at the same time, the role of the propeller of the screw supercharger Under this condition, the rainwater in the rainwater treatment system can be fully mixed with the medicine for purifying rainwater, so that the purification treatment of rainwater is more sufficient, efficient and fast.
本实用新型进一步设置为:所述加药箱上设有加药管道,所述加药管道的下端向下延伸至所述提升泵和螺旋增压器之间的管道内。The utility model is further configured as follows: the dosing box is provided with a dosing pipeline, and the lower end of the dosing pipeline extends downwards into the pipeline between the lifting pump and the screw booster.
通过采用上述技术方案,当提升泵工作时,螺旋增压器通过吸收空气,增加了管道内的压强,此时由于螺旋增压器内雨水液封了管道,在上述压力的作用下,螺旋增压器内的雨水会反向涌入到加药管道内并和位于加药管道内的雨水处理药品充分混合,从而使得雨水处理系统内的雨水与净化雨水的药品充分混合均匀,使得雨水的净化处理更加的充分和高效。By adopting the above technical scheme, when the lift pump is working, the screw booster absorbs air to increase the pressure in the pipeline. At this time, because the rainwater in the screw booster seals the pipeline, the screw booster The rainwater in the pressurizer will flow back into the dosing pipeline and fully mix with the rainwater treatment medicine in the dosing pipeline, so that the rainwater in the rainwater treatment system and the medicine for purifying rainwater will be fully mixed evenly, so that the rainwater can be purified Processing is more adequate and efficient.
本实用新型进一步设置为:所述螺旋增压器和硅砂过滤池之间的管道上设有泄压阀,所述泄压阀与控制器电信号连接。The utility model is further configured as follows: a pressure relief valve is provided on the pipeline between the screw booster and the silica sand filter tank, and the pressure relief valve is connected to the controller with an electrical signal.
通过采用上述技术方案,当上述螺旋增压器内的压力达到泄压阀的额定设置值时,泄压阀打开,由此可以减少雨水从加药箱上端开口处涌出的机率,使得经过加药处理后的雨水能够经泄压阀流入到硅砂过滤池内进行后续雨水处理。By adopting the above-mentioned technical scheme, when the pressure in the above-mentioned screw supercharger reaches the rated setting value of the pressure relief valve, the pressure relief valve will be opened, thereby reducing the probability of rainwater gushing out from the opening at the upper end of the dosing box, so that after adding The rainwater after chemical treatment can flow into the silica sand filter tank through the pressure relief valve for subsequent rainwater treatment.
综上所述,本实用新型具有以下有益效果:本实用新型的一种变电站雨水回收系统,一方面增加了变电站内水资源承载力,大大缓解了变电站的缺水局面,增加了变电站的生态用水;另一方面雨水或者进入自然环境,产生渗透补充地下水,或者进入人工环境,通过循环利用,补充地下水源,维护地下水及土壤的神态平衡,同时还能减少因过度开采地下水而引起路基下沉的作用。In summary, the utility model has the following beneficial effects: a substation rainwater recovery system of the utility model, on the one hand, increases the carrying capacity of water resources in the substation, greatly alleviates the water shortage situation of the substation, and increases the ecological water consumption of the substation On the other hand, the rainwater either enters the natural environment to infiltrate and supplement the groundwater, or enters the artificial environment to supplement the groundwater source through recycling, maintain the balance of groundwater and soil, and at the same time reduce the subsidence of the roadbed caused by excessive exploitation of groundwater. effect.
附图说明Description of drawings
图1为本实施例的流程示意图;Fig. 1 is the schematic flow chart of the present embodiment;
图2为本实施例的结构示意图;Fig. 2 is the structural representation of present embodiment;
图3为本实施例中透水路面、排水明沟和储水井的结构示意图,主要用于体现路面雨水收集单元的内相互关系;Fig. 3 is a schematic structural view of the permeable pavement, drainage ditches and water storage wells in this embodiment, which is mainly used to reflect the internal relationship of the pavement rainwater collection units;
图4为本实施例中储水井和排水明沟的结构示意图,主要用于体现调节管道。Fig. 4 is a schematic structural diagram of the water storage well and the drainage ditch in this embodiment, which is mainly used to reflect the regulating pipeline.
附图说明:1、收集单元;10、路基;11、透水路面;111、土工布;112、级配碎石层;113、陶瓷玻璃骨料层;114、多孔透水混凝土层;115、耐高温硅酸盐粘接密封胶;116、支撑块;12、排水明沟;13、渗水管网;14、储水井;15、排水沟;16、雨水漏斗;17、下排管道;18、调节管道;2、处理单元;19、电控阀门;20、螺旋增压器;200、加药箱;201、加药管道;202、泄压阀;21、提升泵;22、硅砂过滤池;23、净水处理装置;24、储水箱;25、管道;3、用水终端;31、浇灌泵;32、浇灌管网;33、反冲泵;34、反冲管网;35、溢流管道;36、污泥池;37、排水管道;38、雨水泵;4、控制器;5、市政雨水管;6、排污泵;7、排污管道。Description of drawings: 1. Collection unit; 10. Subgrade; 11. Permeable pavement; 111. Geotextile; 112. Graded gravel layer; 113. Ceramic glass aggregate layer; 114. Porous permeable concrete layer; 115. High temperature resistance Silicate adhesive sealant; 116. Support block; 12. Drainage open ditch; 13. Seepage pipe network; 14. Water storage well; 15. Drainage ditch; 16. Rainwater funnel; 2. Processing unit; 19. Electric control valve; 20. Screw booster; 200. Dosing box; 201. Dosing pipeline; 202. Pressure relief valve; 21. Lifting pump; 22. Silica sand filter tank; 23. Net Water treatment device; 24. Water storage tank; 25. Pipeline; 3. Water terminal; 31. Irrigation pump; 32. Irrigation pipe network; 33. Recoil pump; 34. Recoil pipe network; 35. Overflow pipe; 36. Sludge tank; 37. Drainage pipe; 38. Rainwater pump; 4. Controller; 5. Municipal rainwater pipe; 6. Sewage pump; 7. Sewage pipe.
具体实施方式Detailed ways
以下结合附图对本实用新型作进一步详细说明。Below in conjunction with accompanying drawing, the utility model is described in further detail.
其中相同的零部件用相同的附图标记表示。需要说明的是,下面描述中使用的词语“前”、“后”、“左”、“右”、“上”和“下”指的是附图中的方向,词语“底面”和“顶面”、“内”和“外”分别指的是朝向或远离特定部件几何中心的方向。Wherein the same components are denoted by the same reference numerals. It should be noted that the words "front", "rear", "left", "right", "upper" and "lower" used in the following description refer to the directions in the drawings, and the words "bottom" and "top "Face", "inner" and "outer" refer to directions toward or away from, respectively, the geometric center of a particular component.
一种变电站雨水回收系统,如图1和图2所示,包括雨水的收集单元1、处理单元2、用水终端3和控制器4。如图3和图4所示,收集单元1包括设置在变电站内的透水路面11、设置在透水路面11两侧的向下凹陷的排水明沟12、与排水明沟12相连通的渗水管网13以及与排水明沟12相连通的储水井14。A substation rainwater recovery system, as shown in FIG. 1 and FIG. 2 , includes a rainwater collection unit 1 , a processing unit 2 , a water use terminal 3 and a controller 4 . As shown in Figure 3 and Figure 4, the collection unit 1 includes a permeable road surface 11 arranged in the substation, a downwardly recessed drainage ditch 12 arranged on both sides of the water permeable road surface 11, a seepage pipe network 13 connected with the drainage ditch 12 and A water storage well 14 communicating with the drainage ditch 12.
为了提高透水路面11的雨水下渗的能力,如图3和图4所示,透水路面11从下往上依次包括土工布111、级配碎石层112、陶瓷玻璃骨料层113以及多孔透水混凝土层114;其中土工布111采用水刺无纺布土工布,并且该土工布111均匀铺设在路基10上表面,并且相邻两块土工布111上下重叠放置铺设;其中多孔透水混凝土层114是由若干块预制件多孔透水混凝土块填铺而成,并且在相邻两块预制件多孔透水混凝土块之间的缝隙内涂刷有耐高温硅酸盐粘接密封胶115,该耐高温硅酸盐粘接密封胶115具有良好了粘接性、耐水性以及耐高温性能,能够使得预制件多孔透水混凝土块之间的连接更加的稳定和牢固,进一步提高了上述透水路面11的使用寿命。In order to improve the rainwater infiltration capacity of the permeable pavement 11, as shown in Fig. 3 and Fig. 4, the permeable pavement 11 includes a geotextile 111, a graded crushed stone layer 112, a ceramic glass aggregate layer 113 and a porous permeable layer from bottom to top. Concrete layer 114; wherein the geotextile 111 adopts spunlace non-woven geotextile, and the geotextile 111 is evenly laid on the upper surface of the roadbed 10, and two adjacent geotextiles 111 are laid on top of each other; wherein the porous permeable concrete layer 114 is It is filled with several prefabricated porous permeable concrete blocks, and the gap between two adjacent prefabricated porous permeable concrete blocks is painted with high temperature resistant silicate adhesive sealant 115, the high temperature resistant silicate The salt bonding sealant 115 has good adhesion, water resistance and high temperature resistance, which can make the connection between the prefabricated porous permeable concrete blocks more stable and firm, and further improve the service life of the above-mentioned permeable pavement 11 .
如图2和图3所示,为了减少泥土或浇筑时多孔透水混凝土层114时混凝土堵塞渗水管网13的通孔,因此将渗水管网13安装在级配碎石层112与陶瓷玻璃骨料层113之间,此时渗水管网13的通孔处外侧设有外径小于通孔的挡板,其中挡板与渗水管网13之间存在空隙,该空隙内设置有若干支撑杆(图中未标记),由此进一步提高了该渗水管网13的透水以及防堵塞性能。As shown in Figure 2 and Figure 3, in order to reduce the through holes of the seepage pipe network 13 blocked by concrete when the porous permeable concrete layer 114 is poured, the seepage pipe network 13 is installed on the graded crushed stone layer 112 and ceramic glass aggregate Between the layers 113, at this time, a baffle with an outer diameter smaller than the through hole is provided on the outside of the through hole of the seepage pipe network 13, wherein there is a gap between the baffle and the seepage pipe network 13, and a number of support rods are arranged in the gap (Fig. Not marked in ), thus further improving the water permeability and anti-clogging performance of the seepage pipe network 13 .
为了提高透水路面11的承重能力,如图1和图2所示,在相邻两个渗水管网13之间设有支撑块116,支撑块116为钢筋混凝土预制件,其中该钢筋混凝土预制件呈长方体状,钢筋混凝土预制件的上端与多孔透水混凝土层114相抵触,其下端放置在土工布111上,而钢筋混凝土预制件的周围堆设有大量的级配碎石层112与陶瓷玻璃骨料层113。In order to improve the load-bearing capacity of the permeable pavement 11, as shown in Figure 1 and Figure 2, a support block 116 is provided between two adjacent permeable pipe networks 13, and the support block 116 is a reinforced concrete prefabricated part, wherein the reinforced concrete prefabricated part In the shape of a cuboid, the upper end of the reinforced concrete prefabricated part is in conflict with the porous permeable concrete layer 114, and its lower end is placed on the geotextile 111, while a large number of graded gravel layers 112 and ceramic glass bone are piled up around the reinforced concrete prefabricated part. Material layer 113.
为了使得变电站内所有的储水井14都能得到良好的使用,如图3和图4所示,在相邻两个储水井14之间水平设置有调节管道18,调节管道18的两端分别与储水井14相连通,并且调节管道18上均设有电控阀门19,由此能给通过控制器控制两个储水井14之间的水体输送,有利于平衡相邻两个储水井14内的储水量。In order to make all the water storage wells 14 in the substation can be used well, as shown in Figure 3 and Figure 4, an adjustment pipe 18 is arranged horizontally between two adjacent water storage wells 14, and the two ends of the adjustment pipe 18 are respectively connected to the The water storage wells 14 are connected, and the regulating pipes 18 are provided with electronically controlled valves 19, so that the water delivery between the two water storage wells 14 can be controlled by the controller, which is conducive to balancing the water in the two adjacent water storage wells 14. water storage capacity.
如图1和图2所示,雨水收集单元1还包括设置在变电站屋顶上的排水沟15、间隔设置在排水沟15内的雨水漏斗16以及竖直设置并与雨水漏斗16相连通的下排管道17,其中下排管道17的排入口向下延伸至渗水管网13内并与该渗水管网13相连通,由此屋面的雨水能够经由排水沟15、雨水漏斗16以及下排管道17流入到雨水回收系统内,由此能够增加储水井14内雨水的收集量。As shown in Figures 1 and 2, the rainwater collection unit 1 also includes a drainage ditch 15 arranged on the roof of the substation, rainwater funnels 16 arranged at intervals in the drainage ditch 15, and a lower row arranged vertically and communicated with the rainwater funnel 16. Pipeline 17, wherein the outlet of the downpipe 17 extends downwards into the seepage pipe network 13 and communicates with the seepage pipe network 13, so that the rainwater on the roof can flow in through the gutter 15, the rainwater funnel 16 and the downpipe 17 into the rainwater recovery system, thereby increasing the amount of rainwater collected in the water storage well 14 .
为了净化雨水,减少雨水二次或多次污染的可能性,同时扩大雨水的适用范围,如图1和图2所示,处理单元2包括通过管道25与储水井14连通的提升泵21、通过管道25与提升泵21连通的硅砂过滤池22、与硅砂过滤池22连通的净水处理装置23以及与净水处理装置23连通的储水箱24,该储水箱24设置在底面上,净水处理装置23通过泵将雨水提升到储水箱24内,而储水箱24内雨水过多会通过溢流管道35回流到储水井14内,从而减少了雨水的浪费,保证该雨水回收系统能够持续得到使用。In order to purify rainwater, reduce the possibility of secondary or multiple pollution of rainwater, and expand the scope of application of rainwater, as shown in Figures 1 and 2, the treatment unit 2 includes a lift pump 21 communicated with the water storage well 14 through a pipeline 25, through Pipeline 25 communicates with the silica sand filter tank 22 of the lifting pump 21, the water purification treatment device 23 communicated with the silica sand filter tank 22, and the water storage tank 24 communicated with the water purification treatment device 23, the water storage tank 24 is arranged on the bottom surface, and the water purification treatment The device 23 lifts the rainwater into the water storage tank 24 through the pump, and the excessive rainwater in the water storage tank 24 will flow back into the water storage well 14 through the overflow pipe 35, thereby reducing the waste of rainwater and ensuring that the rainwater recovery system can be continuously used .
为了使雨水与药品充分混合均匀,同时增加雨水中氧气含量,如图1和图2所示,在提升泵21与硅砂过滤池22之间设有螺旋增压器20,螺旋增压器20上方设有加药箱200,加药箱200内设有微生物水处理剂,其中该微生物水处理剂为天然微生物活性菌种等常用的微生物水处理剂,加药箱200下表面设有加药管道201,并且加药管道201的下端向下延伸至提升泵21和螺旋增压器20之间的管道25内,并且加药管道201与上述管道25相连通;为了有效的控制雨水回收系统内的压力,在螺旋增压器20和硅砂过滤池22之间的管道上设有泄压阀202。In order to fully mix the rainwater and the medicine and increase the oxygen content in the rainwater, as shown in Figure 1 and Figure 2, a screw booster 20 is provided between the lift pump 21 and the silica sand filter tank 22, and the screw booster 20 is A dosing box 200 is provided, and a microbial water treatment agent is provided in the dosing box 200, wherein the microbial water treatment agent is a commonly used microbial water treatment agent such as natural microbial active strains, and the lower surface of the dosing box 200 is provided with a dosing pipeline 201, and the lower end of the dosing pipeline 201 extends downwards into the pipeline 25 between the lift pump 21 and the screw supercharger 20, and the dosing pipeline 201 communicates with the above-mentioned pipeline 25; in order to effectively control the rainwater recovery system pressure, a pressure relief valve 202 is provided on the pipeline between the screw booster 20 and the silica sand filter tank 22 .
当提升泵21工作的过程中,启动螺旋增压器20,螺旋增压器20通过吸收空气增加了螺旋增压器20和相应管道25内的压强,此时由于螺旋增压器20内雨水液封了上述管道25,在上述压力的作用下,螺旋增压器20内的雨水会反向涌入到加药管道201内并和位于加药管道201内的天然微生物活性菌种充分混合;而当上述压力继续上升并达到泄压阀202的额定设置值时,泄压阀202打开,经过消毒处理后的雨水经泄压阀202流入到硅砂过滤池22内进行后续雨水处理。When the lifting pump 21 is working, the screw booster 20 is started, and the screw booster 20 increases the pressure in the screw booster 20 and the corresponding pipeline 25 by absorbing air. Sealed above-mentioned pipeline 25, under the effect of above-mentioned pressure, the rainwater in the screw booster 20 can pour into the dosing pipeline 201 in reverse and fully mix with the natural microbial activity bacterial classification that is positioned at the dosing pipeline 201; And When the pressure continues to rise and reaches the rated setting value of the pressure relief valve 202, the pressure relief valve 202 is opened, and the sterilized rainwater flows into the silica sand filter tank 22 through the pressure relief valve 202 for subsequent rainwater treatment.
为了减少储水井14内雨水的二次或多次污染,在储水井14底部通排污泵6控制的排污管道7连接污泥池36,在污泥池36内进行污泥进行浓缩处理。In order to reduce secondary or multiple pollution of rainwater in the water storage well 14, the sewage pipeline 7 controlled by the sewage pump 6 at the bottom of the water storage well 14 is connected to the sludge pool 36, and the sludge is concentrated in the sludge pool 36.
如图1和图2所示,用水终端3包括与储水箱24通过浇灌泵31连通的浇灌管网32、与储水箱24通过反冲泵33连通的反冲管网34、用于连通储水箱24和储水井14的溢流管道35以及与储水井14通过排水管道37连通的雨水泵38以及与雨水泵38相连通的市政雨水管5。另外,上述用水终端3还包括消防用水单元、生活用水单元以及其他的景观用水单元,将通过雨水回收系统得到的雨水运用到消防、景观以及洗车、冲洗路面和排水明沟等生活用水中,可以进一步提高雨水资源的利用率,从而节约了水资源,保护了环境。As shown in Figures 1 and 2, the water terminal 3 includes an irrigation pipe network 32 communicated with the water storage tank 24 through an irrigation pump 31, a recoil pipe network 34 communicated with the water storage tank 24 through a recoil pump 33, and a water tank 34 for communicating with the water storage tank. 24 and the overflow pipe 35 of the water storage well 14 and the rainwater pump 38 that communicates with the water storage well 14 through the drainage pipe 37 and the municipal rainwater pipe 5 that communicates with the rainwater pump 38. In addition, the above-mentioned water terminal 3 also includes a fire-fighting water unit, a domestic water unit, and other landscape water units, and the rainwater obtained through the rainwater recovery system is used in domestic water such as fire-fighting, landscape, car washing, road surface flushing, and drainage ditches. Improve the utilization rate of rainwater resources, thereby saving water resources and protecting the environment.
如图1和图2所示,控制器4分别与提升泵21、浇灌泵31、反冲泵33、雨水泵38、电控阀门19、泄压阀202以及排污泵6电信号连接。As shown in FIGS. 1 and 2 , the controller 4 is electrically connected to the lift pump 21 , irrigation pump 31 , recoil pump 33 , rainwater pump 38 , electric control valve 19 , pressure relief valve 202 and sewage pump 6 .
雨水的流到路线:一方面路面雨水下渗下透水路面11内,依次经过多孔透水混凝土层114、陶瓷玻璃骨料层113、级配碎石层112以及土工布111后,进一步向下渗流到路基10内,由此能够快速的补充地下水,同时多余的雨水流入到渗水管网13内;另一方面,屋面雨水从雨水漏斗16和排水沟15经下排管道17汇流到渗水管网13内,此时渗水管网13内的雨水经渗水管网13的小孔下渗到路基10内。The route of rainwater flow: On the one hand, rainwater seeps down into the permeable pavement 11, passes through the porous permeable concrete layer 114, the ceramic glass aggregate layer 113, the graded crushed stone layer 112 and the geotextile 111 in turn, and further seeps down to the In the subgrade 10, the groundwater can be quickly replenished, and the excess rainwater flows into the seepage pipe network 13; At this time, the rainwater in the seepage pipe network 13 infiltrated into the subgrade 10 through the apertures of the seepage pipe network 13 .
此时在渗水管网13内多余的雨水则会经渗水管网13和排水明沟12汇流到储水井14内,在调节管道18的作用下能够保持每个储水井14内水量的平衡,此时储水井14内的雨水会经过一定时间的沉淀后进行上下分层,下层雨水经排污泵6从排污管道7内流入到污泥池36内进行统一浓缩处理;而其上层雨水则会经提升泵21流入到螺旋增压器20内进行加氧处理,同时在加药箱200内天然微生物活性菌种的作用下进行杀菌消毒处理;随后当螺旋增压器20内的压力达到泄压阀202的额定设置值时,雨水经泄压阀202依次流入到硅砂过滤池22和净水处理装置23内进行雨水净化处理。随后在经泵提升至储水箱24内进行储存,在储水箱24内的雨水能够经反冲泵33进入到反冲管网34内对上述雨水回收系统内的储水井14、硅砂过滤池22和净水处理装置23等进行清洗或经浇灌泵31流入到浇灌管网32内对变电站内的景观植被进行浇灌,从而提高了雨水的利用率。At this time, the excess rainwater in the seepage pipe network 13 will flow into the water storage well 14 through the seepage pipe network 13 and the open drainage ditch 12, and the balance of the water volume in each water storage well 14 can be maintained under the action of the regulating pipeline 18. The rainwater in the water storage well 14 will be stratified up and down after a certain period of precipitation, and the rainwater in the lower layer will flow from the sewage pipe 7 to the sludge pool 36 for unified concentration treatment through the sewage pump 6; 21 flows into the screw booster 20 for oxygenation treatment, and at the same time sterilizes and disinfects under the action of natural microbial active strains in the dosing box 200; then when the pressure in the screw booster 20 reaches the pressure relief valve 202 When the rated value is set, the rainwater flows into the silica sand filter tank 22 and the water purification treatment device 23 through the pressure relief valve 202 in sequence for rainwater purification treatment. Then it is stored in the water storage tank 24 through the pump, and the rainwater in the water storage tank 24 can enter the backwash pipe network 34 through the backwash pump 33 to the water storage well 14, the silica sand filter tank 22 and the above-mentioned rainwater recovery system. The water purification treatment device 23 etc. cleans or flows into the irrigation pipe network 32 through the irrigation pump 31 to irrigate the landscape vegetation in the substation, thereby improving the utilization rate of rainwater.
具体实施例仅仅是对本实用新型的解释,其并不是对本实用新型的限制,本领域技术人员在阅读完本说明书后可以根据需要对本实施例做出没有创造性贡献的修改,但只要在本实用新型的权利要求范围内都受到专利法的保护。The specific embodiment is only an explanation of the utility model, and it is not a limitation of the utility model. Those skilled in the art can make modifications to the embodiment without creative contribution as required after reading this description, but as long as the utility model All claims are protected by patent law.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720986596.6U CN207092224U (en) | 2017-08-08 | 2017-08-08 | A kind of transformer station's system for reclaiming rainwater |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720986596.6U CN207092224U (en) | 2017-08-08 | 2017-08-08 | A kind of transformer station's system for reclaiming rainwater |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207092224U true CN207092224U (en) | 2018-03-13 |
Family
ID=61544469
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720986596.6U Expired - Fee Related CN207092224U (en) | 2017-08-08 | 2017-08-08 | A kind of transformer station's system for reclaiming rainwater |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207092224U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110593389A (en) * | 2019-08-07 | 2019-12-20 | 国家电网有限公司 | Rainwater recycling system |
| WO2025167393A1 (en) * | 2024-02-07 | 2025-08-14 | 黄广信 | Water circulation device and water circulation system |
-
2017
- 2017-08-08 CN CN201720986596.6U patent/CN207092224U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110593389A (en) * | 2019-08-07 | 2019-12-20 | 国家电网有限公司 | Rainwater recycling system |
| WO2025167393A1 (en) * | 2024-02-07 | 2025-08-14 | 黄广信 | Water circulation device and water circulation system |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN207862013U (en) | A kind of mixed fillers biology for solving collapsibility of loess is detained facility | |
| CN102418426B (en) | Double-layer undercurrent artificial wetland landscape pond and method thereof for recovering and treating urban roof rainwater | |
| CN103395930A (en) | Ecological slope protection type sewage land infiltration system and ecological slope protection type sewage land infiltration method | |
| CN101781060A (en) | Composite artificial wetland sewage treatment system | |
| CN112144633A (en) | An anti-clogging sponge city construction rain garden system | |
| CN204185336U (en) | For the stereo ecological gallery system of river water body in-situ immobilization | |
| CN101880105A (en) | Composite flow manual-rapid infiltration ecological field | |
| CN209907525U (en) | Urban road rainwater collection, purification and utilization system | |
| CN208104958U (en) | A kind of ecostagnation band applied to town road | |
| CN105220597A (en) | Urban water-through road structure and the Rainwater collection system based on this porous pavement | |
| CN107905331A (en) | Stagnant system is oozed in a kind of self-cleaning of sponge city | |
| CN209509056U (en) | A kind of water storage reclamation set of rain water on roof disconnecting | |
| CN118727661A (en) | Ecological river slope protection device and method | |
| CN203256980U (en) | Roof rainwater collection and resource utilization system | |
| CN109626764A (en) | A kind of biological treatment system for sponge urban rainwater purification | |
| CN203741704U (en) | Rainwater collecting and recycling system for overpass | |
| CN109629601A (en) | A kind of pipe gallery waterproof construction of sponge urban ecology system | |
| CN111962630A (en) | A device for rainwater collection and energy wave treatment in sponge city | |
| CN205662803U (en) | Structure is used multipurposely to ground rainwater | |
| CN202148222U (en) | Processing device for denitrification and phosphorous removal of high-load reciprocating type undercurrent artificial wetland | |
| CN207760992U (en) | A kind of sponge urban cells rainwater-collecting purifies ecological utilization system of regulating and storing | |
| CN213836915U (en) | Sponge city waterfront footpath regulation and control system | |
| CN211897679U (en) | Novel sponge urban road system | |
| CN202380515U (en) | Multi-purpose rainwater utilization system | |
| CN201648119U (en) | Composite artificial wetland sewage treatment system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180313 Termination date: 20180808 |