CN207079707U - A kind of early-stage rainwater is collected and shunting processing unit - Google Patents

A kind of early-stage rainwater is collected and shunting processing unit Download PDF

Info

Publication number
CN207079707U
CN207079707U CN201720877442.3U CN201720877442U CN207079707U CN 207079707 U CN207079707 U CN 207079707U CN 201720877442 U CN201720877442 U CN 201720877442U CN 207079707 U CN207079707 U CN 207079707U
Authority
CN
China
Prior art keywords
pond
early
supernatant
turbid
gate valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720877442.3U
Other languages
Chinese (zh)
Inventor
吴斯文
黄志华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central and Southern China Municipal Engineering Design and Research Institute Co Ltd
Original Assignee
Central and Southern China Municipal Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central and Southern China Municipal Engineering Design and Research Institute Co Ltd filed Critical Central and Southern China Municipal Engineering Design and Research Institute Co Ltd
Priority to CN201720877442.3U priority Critical patent/CN207079707U/en
Application granted granted Critical
Publication of CN207079707U publication Critical patent/CN207079707U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of early-stage rainwater is collected and shunting processing unit, including distribution well, first rain processing pond and bypass channel, the just rain processing pond and bypass channel are connected positioned at distribution well homonymy and with distribution well, water inlet electric gate valve and bypass electric gate valve are provided with the distribution well, it is communicated with canal and connects to be provided with grid in canal between the water inlet electric gate valve and first rain processing pond, the bypass electric gate valve is located at bypass channel porch;The just rain processing pond includes pond body, liquid level sensor, supernatant elevator pump and turbid elevator pump, the supernatant elevator pump is connected in the middle part of pond body and by supernatant drainpipe with bypass channel, and the turbid elevator pump with bilge well is connected located at pond body bottom and by turbid drainpipe.The utility model is simple in construction, and automaticity is high, can alleviate the pressure of sewage disposal, avoid causing the excessive construction of sewage network and sewage treatment plant's scale, effectively reduces the processing cost of early-stage rainwater.

Description

A kind of early-stage rainwater is collected and shunting processing unit
Technical field
Early-stage rainwater processing technology field is the utility model is related to, more particularly to a kind of early-stage rainwater is collected to be handled with shunting Device.
Background technology
As atmosphere pollution and ground pollution are increasingly serious, rainwater runoff pollution is also further serious, especially pollutant compared with More early-stage rainwater, wherein containing the polluters such as substantial amounts of organic matter, pathogen, heavy metal, grease.Dirt in early-stage rainwater It is high to contaminate thing content, with continuing for runoff, the surface of rainfall runoff is constantly washed, and pollutant load is gradually reduced.At present, certain The initial rainwater pollutant index peak in a little areas is even higher than typical urban sanitary sewage, it is therefore necessary to early-stage rainwater Processing is collected, avoids causing natural water serious pollution.
Because early-stage rainwater has the characteristics that water is big, pollution level is high, sediment charge is high, and one developed at present A little early-stage rainwater processing units, some are to be directly discharged into Storm Sewer Network by simple sand setting or filtering, not to pollution Thing is effectively removed, and still suffers from the pollutant of higher concentration, will cause the pollution to discharging water body;Some devices then directly will Early-stage rainwater is discharged into municipal sewage pipe network, and into municipal sewage plant, because early-stage rainwater amount is larger, being directly discharged into sewage plant will Greater impact is caused to the load of sewage treatment plant, influences wastewater treatment efficiency, while because the scale of construction is larger, to sewage network and dirt Water factory's disposal ability is proposed higher requirement, causes larger economic pressures.
Therefore, how science progress early-stage rainwater shunting and processing, both accomplished not contaminated rain water discharge water body, and can Enough avoid causing the impact larger to follow-up sewage treatment plant, be those skilled in the art's urgent problem to be solved.
Utility model content
The purpose of this utility model is to propose that one kind is simple in construction, can effectively alleviate treatment pressure of sewage and reduce cost Early-stage rainwater collect with shunting processing unit.
A kind of early-stage rainwater is collected with shunting processing unit, including distribution well, first rain processing pond and bypass channel, described first Rain processing pond and bypass channel are connected positioned at distribution well homonymy and with distribution well, be provided with the distribution well water inlet electric gate valve and Electric gate valve is bypassed, is communicated with canal and connects to be provided with grid, institute in canal between the water inlet electric gate valve and first rain processing pond State bypass electric gate valve and be located at bypass channel porch;The just rain processing pond includes pond body, liquid level sensor, supernatant lifting Pump and turbid elevator pump, the supernatant elevator pump are connected in the middle part of pond body and by supernatant drainpipe with bypass channel, The turbid elevator pump with bilge well is connected located at pond body bottom and by turbid drainpipe.
Preferably, the just rain processing pond pond body bottom centre is arranged side by side provided with two and vertical section is the mud of inverted trapezoidal Slag collection bucket, the inclination angle of the body refuse collection bucket inwall and horizontal plane are more than 50 °, and the body refuse collection bucket side is provided with spoil disposal Pipe.
Preferably, at least 2 supernatant elevator pumps and at least 3 turbid elevator pumps are provided with the just rain processing pond.
Preferably, the width of the grid is 16~25mm.
The utility model is simple in construction, and automaticity is high, after carrying out intercept process to early-stage rainwater, by supernatant and bottom Portion's turbid is separated, and is discharged into Storm Sewer Network and waste pipe network system respectively.Both early-stage rainwater had been reduced and water body is discharged to rainwater Pollution, while compare all first rain and enter in short-term for sewage treatment plant, only the first rainfall of half or so enters sewage disposal Factory's system, and by automated setting, turbid is uniformly discharged into sewage network using the long period, sewage disposal can be alleviated Pressure, avoid causing the excessive construction of sewage network and sewage treatment plant's scale, effectively reduce early-stage rainwater processing cost.
Brief description of the drawings
Fig. 1 is the top view that processing unit was collected and shunted to early-stage rainwater described in the utility model;
Fig. 2 is the structural representation of just rain processing pond described in the utility model.
Embodiment
With reference to embodiment and accompanying drawing, the utility model is described in further detail.
As shown in Figure 1-2, after rainwater landing, municipal catch-basin is entered by Storm Sewer Network first, municipal catch-basin passes through Storm Sewer Network enters distribution well 1, rainfall initial stage, and water inlet electric gate valve 11 be in opening, and bypass electric gate valve 12 is in pass Closed state, early-stage rainwater enter just rain processing pond 2 all by grid 31, then by connection canal 3, set in first rain processing pond 2 Liquid level sensor 5, with the increase for flowing into amount of rainfall, the water level in first rain processing pond 2 gradually rises, when the first rain for reaching design During water level, water level signal is passed into water electric gate valve 11 and bypass electric gate valve 12 by liquid level sensor 5, is closed into water power Dynamic gate 11, while bypass gate 12 is opened, now design just amount of rainfall and be collected completely and entered first rain processing pond 2. The later stage rainwater of cleaning into bypass channel 4, will eventually pass through municipal rain pipe, into Storm Sewer Network by bypass gate 12.
Into the early-stage rainwater of early-stage rainwater processing pond 2, by the interception function of grid 31, larger floating object is eliminated And debris.After early-stage rainwater enters just rain processing pond 2, into precipitate phase, sedimentation time control is in 2-4 hours, precipitation load Control is in 2-3m3/m2.h;Inorganic sand grain and organic matter gradually sink, and supernatant is formed on the first top of rain processing pond 2;Supernatant The BOD of liquid5, COD and SS significantly removed, pollution level substantially reduces.
In the middle part of first rain processing pond, the half right position of liquid level sets supernatant elevator pump 6, and supernatant carries Rise pump 6 to be positioned in support platform, supernatant elevator pump 6 by water pump lifting, into supernatant drainpipe 61, arranges supernatant Enter bypass channel 4, eventually pass through municipal rain pipe, into Storm Sewer Network.Supernatant elevator pump 6 is no less than 2, and by supernatant In being discharged into bypass channel 4 in 1 hour.
In the first bottom of rain processing pond 2, turbid elevator pump 7 is set, after supernatant elevator pump 6 is run, starts turbid Elevator pump 7.Bottom turbid by water pump lifting, into turbid delivery pipe 71, is discharged into municipal wastewater well 8, most by turbid elevator pump 7 Pass through municipal wastewater pipe 8 eventually, into sewage treatment plant.Turbid elevator pump 7 is no less than 3, by 12-24 hours, equably will Bottom turbid is discharged into sewage network.
In area of Chu Yu processing ponds bottom centre, two body refuse collection buckets 9 of setting, the equal slope aspect body refuse collection bucket 9 of surrounding is described The inclination angle of the inwall of body refuse collection bucket 9 and horizontal plane is more than 50 °, and base sludge and inorganic sand grain enter body refuse collection bucket 9, adopt With gravity sludge discharge way, into discharge pipeline 91, body refuse unified disposal after collection.
Emptied in first rain processing pond 2, and after a rainfall cycle terminates, water inlet electric gate valve 11 is recovered into opening state State, bypass electric gate valve 12 recover closed mode.
The utility model is simple in construction, and automaticity is high, after carrying out intercept process to early-stage rainwater, by supernatant and bottom Portion's turbid is separated, and is discharged into Storm Sewer Network and waste pipe network system respectively.Both early-stage rainwater had been reduced and water body is discharged to rainwater Pollution, while compare all first rain and enter in short-term for sewage treatment plant, only the first rainfall of half or so enters sewage disposal Factory's system, and by automated setting, turbid is uniformly discharged into sewage network using the long period, sewage disposal can be alleviated Pressure, avoid causing the excessive construction of sewage network and sewage treatment plant's scale, effectively reduce early-stage rainwater processing cost.
Preferred embodiments of the present utility model are the foregoing is only, it is all new in this practicality not to limit the utility model Within the spirit and principle of type, any modification, equivalent substitution and improvements made etc., protection model of the present utility model is all contained in Within enclosing.

Claims (4)

1. a kind of early-stage rainwater is collected and shunting processing unit, including distribution well (1), first rain processing pond (2) and bypass channel (4), it is characterised in that:The just rain processing pond (2) and bypass channel (4) are positioned at distribution well (1) homonymy and with distributing well (1) phase Even, water inlet electric gate valve (11) and bypass electric gate valve (12), the water inlet electric gate valve (11) are provided with the distribution well (1) Canal (3) is communicated between first rain processing pond (2) and connected to be provided with grid (31), the bypass electric gate valve in canal (3) (12) it is located at bypass channel (4) porch;The just rain processing pond (2) includes pond body, liquid level sensor (5), supernatant lifting Pump (6) and turbid elevator pump (7), the supernatant elevator pump (6) in the middle part of the pond body and by supernatant drainpipe (61) with Bypass channel (4) is connected, and the turbid elevator pump (7) is located at pond body bottom and passes through turbid drainpipe (71) and bilge well (8) It is connected.
2. early-stage rainwater according to claim 1 is collected and shunting processing unit, it is characterised in that:The just rain processing pond (2) it is arranged side by side among pond body bottom provided with two and vertical section is the body refuse collection bucket (9) of inverted trapezoidal, the body refuse collection bucket (9) inclination angle of inwall and horizontal plane is more than 50 °, and body refuse collection bucket (9) side is provided with discharge pipeline (91).
3. early-stage rainwater according to claim 1 is collected and shunting processing unit, it is characterised in that:The just rain processing pond (2) at least 2 supernatant elevator pumps (6) and at least 3 turbid elevator pumps (7) are provided with.
4. early-stage rainwater according to claim 1 is collected and shunting processing unit, it is characterised in that:The grid (31) Width is 16~25mm.
CN201720877442.3U 2017-07-19 2017-07-19 A kind of early-stage rainwater is collected and shunting processing unit Active CN207079707U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720877442.3U CN207079707U (en) 2017-07-19 2017-07-19 A kind of early-stage rainwater is collected and shunting processing unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720877442.3U CN207079707U (en) 2017-07-19 2017-07-19 A kind of early-stage rainwater is collected and shunting processing unit

Publications (1)

Publication Number Publication Date
CN207079707U true CN207079707U (en) 2018-03-09

Family

ID=61423836

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720877442.3U Active CN207079707U (en) 2017-07-19 2017-07-19 A kind of early-stage rainwater is collected and shunting processing unit

Country Status (1)

Country Link
CN (1) CN207079707U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109354215A (en) * 2018-11-20 2019-02-19 南昌大学 A kind of distributing domestic sewage in rural areas and initial rainwater combination collection device
CN111197346A (en) * 2020-02-21 2020-05-26 中建一局集团安装工程有限公司 Novel rainwater quality-based improvement comprehensive pump station system and construction method thereof
CN114033024A (en) * 2021-11-12 2022-02-11 中冶南方城市建设工程技术有限公司 Realize regulation pond layering drainage system based on rainwater quality of water and water level

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109354215A (en) * 2018-11-20 2019-02-19 南昌大学 A kind of distributing domestic sewage in rural areas and initial rainwater combination collection device
CN111197346A (en) * 2020-02-21 2020-05-26 中建一局集团安装工程有限公司 Novel rainwater quality-based improvement comprehensive pump station system and construction method thereof
CN111197346B (en) * 2020-02-21 2020-12-29 中建一局集团安装工程有限公司 Rainwater quality-based lifting comprehensive pump station system and construction method thereof
CN114033024A (en) * 2021-11-12 2022-02-11 中冶南方城市建设工程技术有限公司 Realize regulation pond layering drainage system based on rainwater quality of water and water level

Similar Documents

Publication Publication Date Title
CN102182242B (en) Rainwater treatment system and rainwater treatment method
CN104174191B (en) Integral grit chamber for treating rainwater and treating method
CN102774896B (en) Integral purification device and method for particles in rain and sewage
CN104631610B (en) A kind of rainwater granule separates and system of regulating and storing
CN207079707U (en) A kind of early-stage rainwater is collected and shunting processing unit
CN202594806U (en) Integrated purification device for particulate matters in rainwater and sewage
CN203475587U (en) Road rainwater collecting and utilizing device
CN101982622A (en) Quality-graded collecting and purifying process and system for rainfall runoff
CN207079708U (en) It is a kind of that there is the early-stage rainwater collection system for blocking dirty function
CN110318442A (en) Construction site rainwater recycle utilizes system
CN105709465B (en) The rainwater and carwash water treatment system of spiral vertical sedimentation tank and the application sedimentation basin
CN204590230U (en) A kind of rainwater particle separation and system of regulating and storing
CN112227501A (en) Initial rainwater intelligent collecting and distributing gutter inlet and distributing method
CN105672460A (en) Initial rainwater interception and self-purification type sand settling device
CN203095806U (en) Multifunctional rainwater collecting, treating and recycling device
CN208072577U (en) Construction site rainwater recycle utilizes system
CN209482439U (en) A kind of rainwater automatic steady current mechanism
CN207436209U (en) A kind of municipal works multiple filtration gutter inlet device
CN203878648U (en) Multifunctional rainwater collecting system
CN207429843U (en) A kind of low water damage dmp filter pond
CN203989972U (en) A kind of integrated setting pot of processing rainwater
CN202762147U (en) Underground coal slime water sedimentation device
CN106522354A (en) Water-intercepting type drainage pumping station provided with oblique plates or oblique tubes for separation
CN207376783U (en) A kind of non-buried rainwater treatment device
CN109836017A (en) A kind of residential area rainwater-collecting and the system of utilizing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant