CN207048291U - A kind of construction scaffolding for being easy to assembly and disassembly - Google Patents
A kind of construction scaffolding for being easy to assembly and disassembly Download PDFInfo
- Publication number
- CN207048291U CN207048291U CN201720099059.XU CN201720099059U CN207048291U CN 207048291 U CN207048291 U CN 207048291U CN 201720099059 U CN201720099059 U CN 201720099059U CN 207048291 U CN207048291 U CN 207048291U
- Authority
- CN
- China
- Prior art keywords
- construction
- screw rod
- nut
- cross bar
- easy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 26
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 10
- 239000010959 steel Substances 0.000 claims abstract description 10
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 6
- 229910052742 iron Inorganic materials 0.000 claims description 3
- 230000007306 turnover Effects 0.000 abstract description 2
- 239000000463 material Substances 0.000 description 4
- 239000002699 waste material Substances 0.000 description 3
- 230000007547 defect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000008439 repair process Effects 0.000 description 2
- 238000009435 building construction Methods 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及建筑技术领域,特别是用于建筑施工现场的施工脚手架。The utility model relates to the technical field of construction, in particular to a construction scaffold used on a construction site.
背景技术Background technique
建筑施工过程中,为保障操作人员的安全施工环境,通常搭设施工脚手架。按照施工规范要求每两步三跨或两步两跨设置一道连墙件,以达到整体稳定。常采用混凝土中预埋钢管作为连墙件,进行脚手架架体与建筑物主体的连接。这种连墙件在施工完成后需要进行预埋钢管的割除,这会造成材料的浪费。此外,因割除不及时,在后期的二次结构墙体砌筑时会留有较大脚手眼,直至脚手架全部拆除方可进行修补、抹灰以及外墙保温等系列工作,带来较大修补工程量。因此,业内迫切需要一种既能够避免材料浪费,又能够为后期施工带来便利的施工脚手架。During the construction process, in order to ensure the safe construction environment of the operators, construction scaffolding is usually erected. According to the requirements of the construction code, set up a connecting wall piece every two steps and three spans or two steps and two spans to achieve overall stability. Pre-embedded steel pipes in concrete are often used as connecting wall parts to connect the scaffolding frame with the main body of the building. After the completion of construction, such wall-connecting parts need to be cut off of the embedded steel pipes, which will cause waste of materials. In addition, due to the untimely removal, large scaffolding holes will be left during the secondary structure wall masonry in the later stage. Repairs, plastering and external wall insulation can only be carried out after the scaffolding is completely removed, which will bring large repairs. Work volume. Therefore, the industry is in urgent need of a construction scaffold that can avoid material waste and bring convenience to later construction.
实用新型内容Utility model content
本实用新型用于解决已有技术之缺陷,提供一种便于装拆的施工脚手架。所述设计方案既能够节约成本,又能够为后期施工提供方便。The utility model is used to solve the defects of the prior art, and provides a construction scaffold which is convenient for assembly and disassembly. The design scheme can not only save cost, but also provide convenience for later construction.
解决上述问题所采用的技术方案如下:The technical solution adopted to solve the above problems is as follows:
一种便于装拆的施工脚手架,包括脚手架架体及与建筑物主体结构连接的连墙件。所述脚手架架体由扣件和钢管等构成;所述连墙件包括挡板、螺杆、螺帽及横杆。横杆一端焊接与螺杆相应直径的螺帽,横杆通过螺帽与螺杆连接,螺杆焊接在挡板中心部位。螺杆外套相应墙体厚度的套管,在混凝土浇筑前预埋套管至建筑物主体内。设置套管可便于装拆,周转多次使用。A construction scaffold that is easy to assemble and disassemble includes a scaffold body and a wall connecting piece connected with the main structure of a building. The scaffold frame body is composed of fasteners and steel pipes, etc.; the wall connecting parts include baffles, screws, nuts and cross bars. One end of the cross bar is welded with a nut corresponding to the diameter of the screw, the cross bar is connected with the screw through the nut, and the screw is welded at the center of the baffle. The casing of the corresponding wall thickness of the screw jacket is pre-embedded into the main body of the building before concrete pouring. Setting the casing can be convenient for assembly and disassembly, and it can be used repeatedly in turnover.
本实用新型针对解决已有技术之缺陷而设计了一种便于装拆的施工脚手架。所述脚手架架体与建筑物主体结构通过连墙件可靠连接。连墙件结构中的螺杆设置了套管,施工完成后,螺杆从建筑物主体内拆卸下来,可周转多次使用,避免了割除预埋钢管造成的材料浪费。螺杆与横杆之间为螺纹连接,装拆方便,为后期施工带来便利,避免了二次结构砌体施工时预埋钢管妨碍砌筑。螺杆直径¢20,套管内径¢25,施工完成后套管埋在建筑物主体内,较普通脚手架,建筑物实体留有更小的脚手眼,二次维修的工程量大大减少。材料节约、工程量减少,单体工程成本可节省一至两万余元。本实用新型结构简单、造价低廉、易于实现,适于在建筑施工现场推广使用。The utility model designs a construction scaffold which is easy to assemble and disassemble aiming at solving the defects of the prior art. The scaffold body is reliably connected to the main structure of the building through the wall connecting piece. The screw rod in the wall-connecting structure is provided with a sleeve. After the construction is completed, the screw rod is disassembled from the main body of the building and can be used repeatedly, avoiding the waste of materials caused by cutting off the embedded steel pipe. The threaded connection between the screw rod and the cross bar is convenient for assembly and disassembly, which brings convenience to the later construction and avoids the pre-embedded steel pipes hindering the masonry during the construction of the secondary structure masonry. The diameter of the screw is ¢20, and the inner diameter of the casing is ¢25. After the construction is completed, the casing is buried in the main body of the building. Compared with ordinary scaffolding, the building entity has smaller scaffolding eyes, and the amount of secondary maintenance work is greatly reduced. Materials are saved, the amount of work is reduced, and the cost of a single project can save more than 10,000 to 20,000 yuan. The utility model has the advantages of simple structure, low cost and easy realization, and is suitable for popularization and use in building construction sites.
附图说明Description of drawings
图1是本实用新型提供的便于装拆的施工脚手架结构示意图;Fig. 1 is the construction scaffold structure schematic diagram that is convenient to assemble and disassemble provided by the utility model;
图2是脚手架连墙件结构示意图。Fig. 2 is a schematic diagram of the structure of the scaffold connecting wall parts.
图中各标号分别表示为:The symbols in the figure represent respectively:
1、挡板,2、螺杆,3、建筑物主体,4、螺帽,5、横杆,6、脚手架架体,7、扣件,8、套管。1. Baffle, 2. Screw, 3. Main body of the building, 4. Nut, 5. Crossbar, 6. Scaffold frame, 7. Fastener, 8. Sleeve.
具体实施方式detailed description
参见图1,本实用新型提供了一种便于装拆的施工脚手架,包括脚手架架体及与建筑物主体结构连接的连墙件。所述脚手架架体由扣件和钢管等构成;所述连墙件包括挡板、螺杆、螺帽及横杆。所述挡板为正方形铁板,边长尺寸为8cm-10cm,优选10cm*10cm*0.5cm的铁板;所述螺杆与挡板焊接成一体,螺杆长度依据墙体厚度而定,20cm-40cm之间,优选直径¢20,长25cm的一级钢,其中螺纹长度在5cm-10cm;横杆为外径48mm,壁厚3.5mm的钢管,长度视脚手架与建筑物主体结构距离及内外立杆距离而定,优选尺寸1.5m;横杆一端焊接与螺杆相应直径的螺帽。套管内径¢25,螺杆外套套管,外露5cm螺纹,套管预埋在建筑物主体内。横杆通过螺帽与螺杆连接,横杆与脚手架内外立杆用扣件连接。Referring to Fig. 1, the utility model provides a construction scaffold that is easy to assemble and disassemble, including a scaffold body and a wall connecting piece connected with the main structure of the building. The scaffold frame body is composed of fasteners and steel pipes, etc.; the wall connecting parts include baffles, screws, nuts and cross bars. The baffle is a square iron plate with a side length of 8cm-10cm, preferably an iron plate of 10cm*10cm*0.5cm; the screw and the baffle are welded together, and the length of the screw depends on the thickness of the wall, 20cm-40cm Among them, the first-class steel with a diameter of ¢20 and a length of 25cm is preferred, and the thread length is 5cm-10cm; the crossbar is a steel pipe with an outer diameter of 48mm and a wall thickness of 3.5mm, and the length depends on the distance between the scaffold and the main structure of the building and the inner and outer poles. Depending on the distance, the preferred size is 1.5m; one end of the crossbar is welded with a nut of the corresponding diameter to the screw. The inner diameter of the casing is ¢25, the screw is covered with the casing, and the thread of 5cm is exposed, and the casing is pre-buried in the main body of the building. The cross bar is connected with the screw rod through the nut, and the cross bar is connected with the inner and outer poles of the scaffold with fasteners.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720099059.XU CN207048291U (en) | 2017-01-23 | 2017-01-23 | A kind of construction scaffolding for being easy to assembly and disassembly |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720099059.XU CN207048291U (en) | 2017-01-23 | 2017-01-23 | A kind of construction scaffolding for being easy to assembly and disassembly |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207048291U true CN207048291U (en) | 2018-02-27 |
Family
ID=61488839
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720099059.XU Expired - Fee Related CN207048291U (en) | 2017-01-23 | 2017-01-23 | A kind of construction scaffolding for being easy to assembly and disassembly |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207048291U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112576028A (en) * | 2020-12-05 | 2021-03-30 | 中冶天工集团有限公司 | External scaffold fixing construction method |
-
2017
- 2017-01-23 CN CN201720099059.XU patent/CN207048291U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112576028A (en) * | 2020-12-05 | 2021-03-30 | 中冶天工集团有限公司 | External scaffold fixing construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN207048291U (en) | A kind of construction scaffolding for being easy to assembly and disassembly | |
| CN205444456U (en) | Precast concrete lotus root roof beam rebar positioning board | |
| CN207314829U (en) | A kind of wooden model early tears support device open | |
| CN204139622U (en) | Adjustable segmented column steel bar positioning fixture | |
| CN103556825B (en) | The construction method of preserved pipeline sleeve pipe in a kind of high building structure layer concrete | |
| CN203097263U (en) | Standardized revolving scaffolding connecting tube | |
| CN203067936U (en) | High-altitude pipeline installation safe lifting bracket | |
| CN206091298U (en) | Hole special stand is reserved to brickwork | |
| CN206245709U (en) | A kind of outrigger wall-connecting piece | |
| CN105569092A (en) | Comprehensive formwork construction method for underground comprehensive pipe gallery deformation joint water-stop belt dowel bar | |
| CN214995260U (en) | A kind of positioning steel bar position controller | |
| CN103114725A (en) | Chuck type split bolt formwork erecting method | |
| CN209369334U (en) | A kind of large-span concrete stay in place form support device | |
| CN204826625U (en) | Special template for small-diameter circular column | |
| CN204475822U (en) | A kind of portable wall-connecting piece of scaffold | |
| CN203160666U (en) | Wall-connecting assembly of scaffold | |
| CN206279756U (en) | A kind of scaffold attached wall hold-down support | |
| CN207348447U (en) | A kind of scaffold lifting is early to tear system open | |
| CN206829589U (en) | A kind of recyclable scaffold wall connecting piece | |
| CN104863356A (en) | Tool used for reinforcing beam side formwork | |
| CN219365371U (en) | Recyclable scaffold wall connecting piece device | |
| CN206299115U (en) | A kind of template Quick Release holder device | |
| CN206034950U (en) | A early tear support open for building templates | |
| CN204152187U (en) | One is encorbelmented i iron cuff | |
| CN219219815U (en) | Horizontal tie beam template reinforcing apparatus |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CP01 | Change in the name or title of a patent holder |
Address after: 071070 139 West 54 West Road, Baoding, Hebei Patentee after: HEBEI CONSTRUCTION GROUP Corp.,Ltd. Address before: 071070 139 West 54 West Road, Baoding, Hebei Patentee before: HEBEI CONSTRUCTION GROUP Co.,Ltd. |
|
| CP01 | Change in the name or title of a patent holder | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180227 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |