- chamber
- air
- condensation chamber
- main body
- condensation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000005494 condensation Effects 0.000 title claims abstract description 57
- 238000009833 condensation Methods 0.000 title claims abstract description 57
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 51
- 238000005192 partition Methods 0.000 claims abstract description 18
- 238000009434 installation Methods 0.000 claims abstract description 4
- 239000012530 fluid Substances 0.000 claims description 6
- 238000004891 communication Methods 0.000 claims description 5
- 239000003507 refrigerant Substances 0.000 claims description 5
- 230000008901 benefit Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000005057 refrigeration Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Landscapes
- Vaporization, Distillation, Condensation, Sublimation, And Cold Traps (AREA)
- Removal Of Water From Condensation And Defrosting (AREA)
Abstract
The utility model discloses one kind to condense air water fetching device,Including apparatus main body,Condenser,Compressor,Expansion valve,Evaporator,First air exhauster,Second air exhauster and collection water tank,Apparatus main body is upper and lower three layers of tower structure,The orlop inside division of apparatus main body is into accommodating chamber and air draught chamber,Air draught chamber side is provided with inlet scoop,Condenser is built in air draught chamber,A suction opeing is provided with first partition,Suction opeing sets the first air exhauster,The opposite side installation airduct of suction opeing,Compressor is built in accommodating chamber,The superiors of apparatus main body are divided into the first condensation chamber and the second condensation chamber,Expansion valve and evaporator are arranged in the second condensation chamber,Airduct connects with the second condensation chamber,Second air exhauster is arranged at airduct end,Collect water tank and be located at apparatus main body middle level,The utility model can provide water efficiency processed.
Description
Technical field
It the utility model is related to water making device technical field, and in particular to one kind condensation air water fetching device.
Background technology
In recent years, with the sharp increase of people's water consumption, the problem of whole world water is in short supply, is increasingly severe, nowadays
Become a global phenomenon.According to statistics, there is the water shortage of more than 100 national various degrees in the whole world, in the world
There are 28 countries, be listed in water shortage state or serious water shortage state.In the whole world, there are 1,100,000,000 people life water shortage, such as Mexico City at present,
There are about 1,000,000 residents is by truck conveying clean water.In China, situation is equally very urgent, and Northern Part of China generally lacks
Water, especially North China and the Northwest.Wherein, the Northwest is the area of China's most water shortage, and average annual gross amount of water resources is only complete
The 8% of state's total amount, and resident living water is at full stretch.
Although in order to tackle the Arid Problem of northern area, country built " south water to north " engineering eastern line, in
Line engineering, largely alleviate northern area water problem in short supply.But in some areas, due to landform or benefit
Problem, aqueduct fail to reach, so these places still fail to solve with water problem in short supply.It is difficult in order to solve this
Topic is fetched water, to alleviate urbanite water consumption problem it is necessary to design a kind of condensation air water-intaking system from air.
Utility model content
(1) technical problems to be solved
In order to overcome prior art insufficient, it is proposed that a kind of condensation air water fetching device of high efficiency water.
(2) technical scheme
The utility model is achieved through the following technical solutions:The utility model proposes one kind to condense air water fetching device,
Including apparatus main body, condenser, compressor, expansion valve, evaporator, the first air exhauster, the second air exhauster and collect water tank, institute
It is upper and lower three layers of tower structure to state apparatus main body, and the orlop surrounding of apparatus main body forms body structure by shrouding, simultaneously
Internal be divided into accommodating chamber and air draught chamber by first partition, the air draught chamber side is provided with one and is in communication with the outside
Inlet scoop, the condenser are built in air draught chamber and on the inside of inlet scoop, and a suction opeing is provided with the first partition,
The suction opeing is located at air draught chamber side and sets the first air exhauster, the opposite side installation airduct of suction opeing, built in the compressor
In in accommodating chamber, the superiors' surrounding of apparatus main body forms body structure again by shrouding, and it is split by second partition
Into the first condensation chamber and the second condensation chamber, the expansion valve and evaporator are arranged in the second condensation chamber, and the airduct passes through
Connected after first condensation chamber and second partition with the second condensation chamber, second air exhauster is arranged at airduct end, the wind
An escape pipe for being communicated to the first condensation chamber is provided with the middle part of pipe, the side wall of the first condensation chamber is additionally provided with the row being in communication with the outside
Gas port, the collection water tank are located at apparatus main body middle level, and the bottom of the first condensation chamber and the second condensation chamber is provided with outlet pipe
And outlet pipe is connected to collection water tank, leading to for connection the first condensation chamber and the second condensation chamber is additionally provided with the second partition
Hole, the condenser, compressor, evaporator and expansion valve pass sequentially through capillary circulation connection and set in its circulation loop
It is equipped with cycle fluid.
Further, the cycle fluid is R600a refrigerants.
(3) beneficial effect
The utility model has the advantages that relative to prior art:
A kind of condensation air water fetching device that the utility model is mentioned, it utilizes refrigeration principle, when hot-air condenses to the cold
After produce aqueous water, be provided with two condensation chambers, secondary use can be carried out to high temperature air, improve vaporous water to aqueous water
Transformation ratio, improve water efficiency processed.
Brief description of the drawings
Fig. 1 is the utility model structure diagram.
1- apparatus main bodies;2- condensers;3- compressors;4- expansion valves;5- evaporators;The air exhausters of 6- first;7- second takes out
Blower fan;8- collects water tank;9- first partitions;10- inlet scoops;11- suction opeings;12- airducts;13- second partitions;14- escape pipes;
15- exhaust outlets;16- outlet pipes;101- accommodating chambers;102- air draught chambers;The condensation chambers of 103- first;The condensation chambers of 104- second;131-
Through hole.
Embodiment
In order that the purpose of this utility model, technical scheme and advantage are more clearly understood, below in conjunction with accompanying drawing and implementation
Example, the utility model is further elaborated.It should be appreciated that specific embodiment described herein is only explaining
The utility model, it is not used to limit the utility model.
A kind of condensation air water fetching device as shown in Figure 1, including apparatus main body 1, condenser 2, compressor 3, expansion valve
4th, evaporator 5, the first air exhauster 6, the second air exhauster 7 and collection water tank 8, described device main body 1 is upper and lower three layers of frame-type
Structure, the orlop surrounding of apparatus main body 1 forms body structure by shrouding, while inside is split by first partition 9
Into accommodating chamber 101 and air draught chamber 102, the side of air draught chamber 102 is provided with an inlet scoop 10 being in communication with the outside, described cold
Condenser 2 is built in air draught chamber 102 and is provided with a suction opeing 11 on the inner side of inlet scoop 10, the first partition 9, described
Suction opeing 11 is located at the side of air draught chamber 102 and sets the first air exhauster 6, the opposite side installation airduct 12 of suction opeing 11, the compression
Machine 3 is built in accommodating chamber 101, and the superiors' surrounding of apparatus main body 1 forms body structure again by shrouding, and it passes through the
Two dividing plates 13 are divided into the first condensation chamber 103 and the second condensation chamber 104, and it is cold that the expansion valve 4 and evaporator 5 are arranged at second
In solidifying room 104, the airduct 12 connects after passing through the first condensation chamber 103 and second partition 13 with the second condensation chamber 104, described
Second air exhauster 7 is arranged at the end of airduct 12, and the middle part of airduct 12 is provided with an escape pipe for being communicated to the first condensation chamber 103
14, the side wall of the first condensation chamber 103 is additionally provided with the exhaust outlet 15 being in communication with the outside, and the collection water tank 8 is located at apparatus main body 1
The bottom of middle level, the first condensation chamber 103 and the second condensation chamber 104 is provided with outlet pipe 16 and outlet pipe is connected to collection water
Case 8, the through hole 131 of the first condensation chamber 103 of connection and the second condensation chamber 104 is additionally provided with the second partition 13, it is described cold
Condenser 2, compressor 3, evaporator 5 and expansion valve 4 pass sequentially through capillary circulation connection and are provided with its circulation loop
Cycle fluid.
Wherein, the cycle fluid is R600a refrigerants.
As a kind of embodiment, a kind of condensation air water fetching device that the utility model is mentioned, it is when specifically used, pressure
Contracting machine 3, the first air exhauster 6 and the energization work of the second air exhauster 7, R600a refrigerants start heat release when passing through condenser 2,
First air exhauster 6 takes the gas in air draught chamber 102 away, and air draught chamber 102 forms negative pressure, and outside air is entered by inlet scoop 10
Into air draught chamber 102, exemplified by outside air temperature takes 20~25 DEG C, it reaches temperature in air draught chamber 102 after the heating of condenser 2
Spend for 40~45 DEG C, the high-temperature gas passes through airduct 12, and a part of hot-air enters the first condensation chamber by escape pipe 14
103, another part enters the second condensation chamber 104 under the effect of the second air exhauster 7, and R600a refrigerants are when by evaporator 5
Start to absorb heat, 40~45 DEG C of damp-heat airs are cooled to below dew-point temperature in the second condensation chamber 104, in the surface shape of evaporator 5
Into condensed water, the condensed water is entered by its bottom outlet pipe 16 and collected in water tank 8, in the air themperature of the second condensation chamber 104
0~5 DEG C is will decrease to, as the second air exhauster 7 continues exhausting, the air pressure of the second condensation chamber 104 increases, 0~5 DEG C of sky under high pressure
Gas is damp and hot into 40~45 DEG C in the first condensation chamber 103, with the first condensation chamber 103 by the through hole 131 on second partition 13
Air meets again, and the vapor in air is condensed into vapor and entered by the bottom outlet pipe 16 of the first condensation chamber 103 again
Water tank 8 is collected, reaches the maximization of water efficiency processed, the air of outdoor is finally discharged from the exhaust outlet 15 on the first condensation chamber 103
Temperature reaches much the same 20~25 DEG C with ambient temperature, reaches the maximization of cold heat energy utilization.
Embodiment described above is only that preferred embodiment of the present utility model is described, not to this practicality
New spirit and scope are defined.On the premise of the utility model design conception is not departed from, ordinary people in the field couple
The all variations and modifications that the technical solution of the utility model is made, the scope of protection of the utility model, this reality all should be dropped into
With new claimed technology contents, all record in detail in the claims.
Claims (2)
1. one kind condensation air water fetching device, it is characterised in that:Including apparatus main body (1), condenser (2), compressor (3), swollen
Swollen valve (4), evaporator (5), the first air exhauster (6), the second air exhauster (7) and collection water tank (8), described device main body (1)
For upper and lower three layers of tower structure, the orlop surrounding of apparatus main body (1) forms body structure by shrouding, while inside passes through
First partition (9) is divided into accommodating chamber (101) and air draught chamber (102), air draught chamber (102) side be provided with one with
The inlet scoop (10) of external world's connection, the condenser (2) are built in air draught chamber (102) and on the inside of inlet scoop (10), institute
State and a suction opeing (11) is provided with first partition (9), the suction opeing (11) is located at air draught chamber (102) side and sets first to take out
Blower fan (6), the opposite side installation airduct (12) of suction opeing (11), the compressor (3) are built in accommodating chamber (101), device
The superiors' surrounding of main body (1) forms body structure again by shrouding, and its be divided into by second partition (13) it is first cold
Solidifying room (103) and the second condensation chamber (104), the expansion valve (4) and evaporator (5) are arranged in the second condensation chamber (104),
The airduct (12) connects with the second condensation chamber (104) afterwards through the first condensation chamber (103) and second partition (13), and described the
Two air exhausters (7) are arranged at airduct (12) end, and being provided with one in the middle part of the airduct (12) is communicated to the first condensation chamber (103)
Escape pipe (14), the side wall of the first condensation chamber (103) are additionally provided with the exhaust outlet (15) being in communication with the outside, the collection water tank
(8) it is located at apparatus main body (1) middle level, the bottom of the first condensation chamber (103) and the second condensation chamber (104) is provided with outlet pipe
(16) and outlet pipe is connected to and collects water tank (8), and the first condensation chamber of connection (103) is additionally provided with the second partition (13)
With the through hole (131) of the second condensation chamber (104), the condenser (2), compressor (3), evaporator (5) and expansion valve (4) according to
It is secondary to be connected by capillary circulation and be provided with cycle fluid in its circulation loop.
A kind of 2. condensation air water fetching device according to claim 1, it is characterised in that:The cycle fluid is R600a
Refrigerant.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721024695.2U CN207047949U (en) | 2017-08-16 | 2017-08-16 | One kind condensation air water fetching device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721024695.2U CN207047949U (en) | 2017-08-16 | 2017-08-16 | One kind condensation air water fetching device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207047949U true CN207047949U (en) | 2018-02-27 |
Family
ID=61502704
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201721024695.2U Expired - Fee Related CN207047949U (en) | 2017-08-16 | 2017-08-16 | One kind condensation air water fetching device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207047949U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112878428A (en) * | 2021-01-20 | 2021-06-01 | 河海大学 | Frequency conversion air water making device |
| PL446777A1 (en) * | 2023-11-20 | 2025-05-26 | Politechnika Gdańska | Air moisture extraction system |
-
2017
- 2017-08-16 CN CN201721024695.2U patent/CN207047949U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112878428A (en) * | 2021-01-20 | 2021-06-01 | 河海大学 | Frequency conversion air water making device |
| CN112878428B (en) * | 2021-01-20 | 2021-10-22 | 河海大学 | A variable frequency air water making device |
| PL446777A1 (en) * | 2023-11-20 | 2025-05-26 | Politechnika Gdańska | Air moisture extraction system |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201177341Y (en) | Natural energy fresh air ventilating energy-saving air conditioner | |
| CN103574805B (en) | Air-steam condensation system integrating evaporation cooling water chilling unit and evaporation-type condenser | |
| CN202853082U (en) | A split air conditioner with an external condensate system | |
| CN109631393A (en) | The double-effect lithium bromide absorption type refrigerating plant of fume afterheat and solar energy coupling driving | |
| CN105333583A (en) | Rainwater, condensed water and defrosted water utilization device for roof-top unit | |
| CN201892437U (en) | Closed integrated anti-frost heat source tower | |
| CN201497089U (en) | Evaporative condensing computer room air conditioner | |
| CN202885340U (en) | Energy supply device of high-efficiency energy tower | |
| CN103104954B (en) | Two low-temperature receiver cooperation reclaims the air-conditioning system of the cold and hot amount of indoor exhaust wind | |
| CN207047949U (en) | One kind condensation air water fetching device | |
| CN201039641Y (en) | Air conditioner for machine room | |
| CN105402941B (en) | A kind of outer tubine Application way of porous ceramics of air conditioner condensate water and device | |
| CN106969488A (en) | A kind of utilization system of multi-connected machine condensed water | |
| CN206739681U (en) | Big temperature difference Double-head heat pump based on heat source tower Yu underground pipe cooperation | |
| CN210267598U (en) | Energy-saving air conditioner with dual-utilization of evaporative cooling cold air and cold water | |
| CN205690580U (en) | A kind of air energy air conditioner device | |
| CN201138027Y (en) | External energy-saving cyclic hot-water air conditioner of heat exchanger | |
| CN201522137U (en) | Low heat source rotational flow cold-hot water machine set of heat source tower heat pump | |
| CN201497096U (en) | Damp-heat energy negative pressure cooling refrigerator | |
| CN111678356A (en) | An energy tower and its heat pump system | |
| CN205351858U (en) | Outer tubine of porous ceramic of air conditioner comdenstion water utilizes device | |
| CN203501546U (en) | Direct-fired triple-purpose lithium bromide absorption cold and hot water set with dual-energy-saving device | |
| CN202770081U (en) | Solar auxiliary thermal source tower heat pump system | |
| CN102022808A (en) | A system for energy-saving utilization of air-conditioning condensate | |
| CN201259350Y (en) | Heating and cooling air conditioner and sanitary hot water integrated modular refrigerating unit |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180227 Termination date: 20180816 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |