CN207007956U - Wind power plant power quality data acquisition system - Google Patents

Wind power plant power quality data acquisition system Download PDF

Info

Publication number
CN207007956U
CN207007956U CN201720650334.2U CN201720650334U CN207007956U CN 207007956 U CN207007956 U CN 207007956U CN 201720650334 U CN201720650334 U CN 201720650334U CN 207007956 U CN207007956 U CN 207007956U
Authority
CN
China
Prior art keywords
power quality
voltage
setting value
test
tester
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720650334.2U
Other languages
Chinese (zh)
Inventor
张敏
雷达
王金浩
李胜文
李慧蓬
常潇
张世锋
杨赟磊
肖莹
宋述勇
罗佳
张茜
门国维
吕瑞
王皑
王英涛
王春明
张健康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of State Grid Shanxi Electric Power Co Ltd
Original Assignee
Electric Power Research Institute of State Grid Shanxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Shanxi Electric Power Co Ltd filed Critical Electric Power Research Institute of State Grid Shanxi Electric Power Co Ltd
Priority to CN201720650334.2U priority Critical patent/CN207007956U/en
Application granted granted Critical
Publication of CN207007956U publication Critical patent/CN207007956U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

本实用新型公开了一种风电场电能质量数据采集系统,解决了电能质量测试过程中容易出现的数据采集长时间失真而不被发现的问题。包括在电网母线(1)上分别设置有电流互感器(2)和电压互感器(3),电流互感器(2)通过电流测试线(4)与电能质量测试仪(5)的电流输入端连接在一起,电压互感器(3)通过电压测试线(6)与电能质量测试仪(5)的电压输入端连接在一起,电能质量测试仪(5)与直流供电电源(7)连接在一起,在电能质量测试仪(5)上连接有双向无线通讯单元(8),在中控室上位机(9)上连接有另一双向无线通讯单元(10)。提高电能质量测试的数据采集质量,避免了长时间采集数据的失败。

The utility model discloses an electric energy quality data acquisition system of a wind farm, which solves the problem that the data acquisition is easily distorted for a long time without being discovered during the electric energy quality test process. A current transformer (2) and a voltage transformer (3) are respectively arranged on the grid busbar (1), and the current transformer (2) passes through the current test line (4) and the current input terminal of the power quality tester (5) Connected together, the voltage transformer (3) is connected together with the voltage input terminal of the power quality tester (5) through the voltage test line (6), and the power quality tester (5) is connected together with the DC power supply (7) A two-way wireless communication unit (8) is connected to the power quality tester (5), and another two-way wireless communication unit (10) is connected to the host computer (9) in the central control room. Improve the data collection quality of the power quality test, and avoid the failure of collecting data for a long time.

Description

风电场电能质量数据采集系统Wind Farm Power Quality Data Acquisition System

技术领域technical field

本发明涉及一种风电场电能质量数据采集系统,特别涉及一种风电场电能质量数据采集系统及实时比对方法。The invention relates to a wind farm power quality data collection system, in particular to a wind farm power quality data collection system and a real-time comparison method.

背景技术Background technique

在对风电场进行电能质量测试时,是先将便携式电能质量测试仪连接到风电场的主控室测控屏柜上,对风电场的对应测点进行电能质量数据采集,在数据采集过程中,需要对测点进行24小时以上的连续采集数据;数据采集结束后,拆除电能质量测试仪,随后对采集到的数据进行处理分析,以判定风电场的电能质量是否符合相关标准。在将电能质量测试仪连接到风电场主控室的测控屏柜上时,经常会发生以下几种情况:(1)由于电能质量测试仪上没有显示屏,经常会发生对应测点错接的现象,当数据采集完成进入到后期分析时才发现数据异常,导致发生长时间采集的数据无效,大大降低了数据采集效率。(2)在电能质量测试过程中,有时还会发生电能质量测试仪的电流接线钳及电压接线头松动的现象,也会导致数据采集失真。(3)由于数据采集时间较长,采集地点环境复杂,且主控室内其他操作频繁,有时会发生因人为原因而引起的数据采集中断的情况,由于电能质量测试仪无法显示和预警,导致长时间的数据采集无法利用。(4)在数据采集前,根据测试要求,要对电能质量测试仪内的测试参数进行事先设定,现有技术是用一台PC机通过数据线与电能质量测试仪连接在一起,来完成事先参数设定的,由于测试现场空间狭小,环境复杂,存在现场参数设定不方便的缺陷;另外,在测试过程中,没有实现电能质量测试的实时数据与风电场主控屏的已有监控数据的进行交汇比对,浪费了现有的资源。When testing the power quality of a wind farm, the portable power quality tester is first connected to the measurement and control panel cabinet in the main control room of the wind farm, and the power quality data is collected from the corresponding measuring points of the wind farm. During the data collection process, it is necessary Continuously collect data for more than 24 hours at the measuring point; after the data collection is completed, remove the power quality tester, and then process and analyze the collected data to determine whether the power quality of the wind farm meets the relevant standards. When connecting the power quality tester to the measurement and control panel cabinet of the main control room of the wind farm, the following situations often occur: (1) Since there is no display screen on the power quality tester, the phenomenon of wrong connection of the corresponding measurement points often occurs , When the data collection is completed and enters the later analysis, the data abnormality is discovered, which leads to invalid data collected for a long time and greatly reduces the efficiency of data collection. (2) In the process of power quality testing, sometimes the current clamp and voltage terminal of the power quality tester are loose, which will also lead to data collection distortion. (3) Due to the long time of data collection, the complex environment of the collection site, and frequent other operations in the main control room, sometimes data collection interruptions caused by human factors may occur, and the power quality tester cannot display and warn, resulting in long-term Time data acquisition is not available. (4) Before data collection, according to the test requirements, the test parameters in the power quality tester should be set in advance. The existing technology is to use a PC to connect with the power quality tester through a data line to complete Pre-set parameters, due to the small space and complex environment of the test site, there is a defect that the site parameter setting is inconvenient; in addition, during the test process, the real-time data of the power quality test and the existing monitoring of the main control panel of the wind farm have not been realized. The cross-comparison of data wastes existing resources.

发明内容Contents of the invention

本发明提供了一种风电场电能质量数据采集系统及实时比对方法,解决了电能质量测试过程中容易出现的数据采集长时间失真而不被发现的技术问题。The invention provides a wind farm electric energy quality data collection system and a real-time comparison method, which solves the technical problem that the data collection is easily distorted for a long time without being discovered during the electric energy quality test process.

本发明是通过以下技术方案解决以上技术问题的:The present invention solves the above technical problems through the following technical solutions:

一种风电场电能质量数据采集系统,包括电网母线和中控室上位机,在电网母线上分别设置有电流互感器和电压互感器,电流互感器通过电流测试线与电能质量测试仪的电流输入端连接在一起,电压互感器通过电压测试线与电能质量测试仪的电压输入端连接在一起,电能质量测试仪与直流供电电源连接在一起,在电能质量测试仪上连接有双向无线通讯单元,在中控室上位机上连接有另一双向无线通讯单元。A power quality data acquisition system for a wind farm, including a power grid bus and a central control room host computer. A current transformer and a voltage transformer are respectively arranged on the power grid bus. Connected together, the voltage transformer is connected with the voltage input terminal of the power quality tester through the voltage test line, the power quality tester is connected with the DC power supply, and a two-way wireless communication unit is connected to the power quality tester. Another two-way wireless communication unit is connected to the host computer in the central control room.

在中控室上位机中设置有电能质量测试的电压等级设置值、电压电流互感器变比设置值和测试参数设置值。The upper computer in the central control room is provided with the voltage level setting value of the power quality test, the voltage and current transformer transformation ratio setting value and the test parameter setting value.

一种风电场电能质量数据采集实时比对方法,其特征在于包括以下步骤:A real-time comparison method for wind farm power quality data acquisition, characterized in that it comprises the following steps:

第一步、通过双向无线通讯单元和另一双向无线通讯单元,将现场测试的电能质量测试仪与中控室上位机电连接在一起;The first step is to connect the on-site power quality tester with the upper electromechanical unit in the central control room through a two-way wireless communication unit and another two-way wireless communication unit;

第二步、在中控室上位机上选择电压等级设置值、电压电流互感器变比设置值和测试参数设置值,通过双向无线通讯单元和另一双向无线通讯单元将电压等级设置值、电压电流互感器变比设置值和测试参数设置值传输到电能质量测试仪中,进行参数设置;The second step is to select the voltage level setting value, the voltage and current transformer ratio setting value and the test parameter setting value on the host computer in the central control room, and set the voltage level setting value, voltage and current mutual inductance through the two-way wireless communication unit and another two-way wireless communication unit. Transformer ratio setting value and test parameter setting value are transmitted to the power quality tester for parameter setting;

第三步、通过电能质量测试仪实时采集电网母线上的电流、电压和功率值的测试数据;The third step is to collect the test data of the current, voltage and power values on the grid bus in real time through the power quality tester;

第四步、并将该测试数据通过双向无线通讯单元和另一双向无线通讯单元传输到中控室上位机上进行实时显示;The fourth step is to transmit the test data to the upper computer in the central control room through the two-way wireless communication unit and another two-way wireless communication unit for real-time display;

第五步、选定风电场主控屏上预测试母线的实时电流、电压和功率值,并将该选定的实时电流、电压和功率值与第三步电能质量测试仪采集到的实时电流、电压和功率值分别进行比对;若比对相同,则电压等级设置值、电压电流互感器变比设置值和测试参数设置值正确,电能质量测试仪接线正确,且不存在虚接、断接现象,进行第七步,若比对值不同,进行第六步;The fifth step is to select the real-time current, voltage and power values of the pre-test bus on the main control screen of the wind farm, and compare the selected real-time current, voltage and power values with the real-time current collected by the power quality tester in the third step , voltage and power values are compared separately; if the comparison is the same, the voltage level setting value, voltage and current transformer ratio setting value and test parameter setting value are correct, the power quality tester is connected correctly, and there is no virtual connection or disconnection. If the connection phenomenon is not detected, proceed to the seventh step; if the comparison values are different, proceed to the sixth step;

第六步、检查中控室上位机上电压等级设置值、电压电流互感器变比设置值和测试参数设置值是否正确,若不正确,则重复进行第二步到第五步,若正确,则检查电能质量测试仪的接线是否错误,或者存在虚接、断接的现象,重新进行电能质量测试仪接线,纠正后,重复进行第三步到第五步;Step 6. Check whether the voltage level setting value, voltage and current transformer ratio setting value and test parameter setting value on the host computer in the central control room are correct. If not, repeat steps 2 to 5. If correct, check Whether the wiring of the power quality tester is wrong, or there is a phenomenon of false connection or disconnection, reconnect the power quality tester, and after correction, repeat steps 3 to 5;

第七步,开始进行电能质量数据采集。The seventh step is to start power quality data collection.

本发明通过配置双向无线通讯单元,实现了电能质量测试仪与上位机的实时数据传输,解决了现场测试时有线传输方式的距离及移动受限的问题;通过采用实时比对方法,可在试验前通过无线连接实时比对测试数据与实际数据的一致性,确保电能质量测试仪接线及参数设置的准确无误,提高了测试效率,保证了测试数据的真实有效,同时,提高电能质量测试的数据采集质量,避免了长时间采集数据的失败,提高了风电场的电能质量评估效率。The present invention realizes the real-time data transmission between the power quality tester and the upper computer by configuring a two-way wireless communication unit, and solves the problem of limited distance and movement of the wired transmission mode during on-site testing; by adopting a real-time comparison method, it can The consistency of the test data and the actual data is compared in real time through the wireless connection to ensure the accuracy of the wiring and parameter settings of the power quality tester, which improves the test efficiency and ensures the authenticity of the test data. At the same time, it improves the power quality test data. Acquisition quality avoids the failure of collecting data for a long time, and improves the efficiency of power quality assessment of wind farms.

附图说明Description of drawings

图1是本发明的风电场电能质量数据采集系统结构示意图;Fig. 1 is a schematic structural diagram of a wind farm power quality data acquisition system of the present invention;

图2是本发明的风电场电能质量数据实时比对方法流程图。Fig. 2 is a flow chart of the real-time comparison method for wind farm power quality data according to the present invention.

具体实施方式detailed description

下面根据附图对本发明进行详细说明:The present invention is described in detail below according to accompanying drawing:

一种风电场电能质量数据采集系统,包括电网母线1和中控室上位机9,在电网母线1上分别设置有电流互感器2和电压互感器3,电流互感器2通过电流测试线4与电能质量测试仪5的电流输入端连接在一起,电压互感器3通过电压测试线6与电能质量测试仪5的电压输入端连接在一起,电能质量测试仪5与直流供电电源7连接在一起,在电能质量测试仪5上连接有双向无线通讯单元8,在中控室上位机9上连接有另一双向无线通讯单元10。A wind farm power quality data acquisition system, including a grid bus 1 and a central control room host computer 9, a current transformer 2 and a voltage transformer 3 are respectively arranged on the grid bus 1, and the current transformer 2 communicates with the electric energy through the current test line 4 The current input terminals of the quality tester 5 are connected together, the voltage transformer 3 is connected together with the voltage input terminals of the power quality tester 5 through the voltage test line 6, and the power quality tester 5 is connected together with the DC power supply 7. A two-way wireless communication unit 8 is connected to the power quality tester 5, and another two-way wireless communication unit 10 is connected to the host computer 9 in the central control room.

在中控室上位机9中设置有电能质量测试的电压等级设置值、电压电流互感器变比设置值和测试参数设置值。电能质量测试仪中的电压等级设置值、电压电流互感器变比设置值和测试参数设置值是通过双向无线通讯单元8接收另一双向无线通讯单元10所传输的中控室上位机9中的电压等级设置值、电压电流互感器变比设置值和测试参数设置值获得的。The upper computer 9 in the central control room is provided with the voltage level setting value of the power quality test, the voltage and current transformer transformation ratio setting value and the test parameter setting value. The voltage level setting value, voltage and current transformer transformation ratio setting value and test parameter setting value in the power quality tester are the voltage in the central control room host computer 9 transmitted by another two-way wireless communication unit 10 through the two-way wireless communication unit 8 Level setting value, voltage and current transformer transformation ratio setting value and test parameter setting value are obtained.

一种风电场电能质量数据采集实时比对方法,包括以下步骤:A real-time comparison method for wind farm power quality data acquisition, comprising the following steps:

第一步、通过双向无线通讯单元8和另一双向无线通讯单元10,将现场测试的电能质量测试仪5与中控室上位机9电连接在一起;The first step, through the two-way wireless communication unit 8 and another two-way wireless communication unit 10, the power quality tester 5 of the on-site test is electrically connected with the upper computer 9 in the central control room;

第二步、在中控室上位机9上选择电压等级设置值、电压电流互感器变比设置值和测试参数设置值,通过双向无线通讯单元8和另一双向无线通讯单元10将电压等级设置值、电压电流互感器变比设置值和测试参数设置值传输到电能质量测试仪5中,进行参数设置;The second step, select the voltage level setting value, the voltage and current transformer transformation ratio setting value and the test parameter setting value on the upper computer 9 in the central control room, and set the voltage level setting value through the two-way wireless communication unit 8 and another two-way wireless communication unit 10 , The voltage and current transformer transformation ratio setting value and the test parameter setting value are transmitted to the power quality tester 5 for parameter setting;

第三步、通过电能质量测试仪5实时采集电网母线1上的电流、电压和功率值的测试数据;The third step is to collect the test data of the current, voltage and power value on the grid bus 1 in real time through the power quality tester 5;

第四步、并将该测试数据通过双向无线通讯单元8和另一双向无线通讯单元10传输到中控室上位机9上进行实时显示;The fourth step, and transmit the test data to the host computer 9 in the central control room through the two-way wireless communication unit 8 and another two-way wireless communication unit 10 for real-time display;

第五步、选定风电场主控屏上预测试母线的实时电流、电压和功率值,并将该选定的实时电流、电压和功率值与第三步电能质量测试仪采集到的实时电流、电压和功率值分别进行比对;若比对相同,则电压等级设置值、电压电流互感器变比设置值和测试参数设置值正确,电能质量测试仪5接线正确,且不存在虚接、断接现象,进行第七步,若比对值不同,进行第六步;The fifth step is to select the real-time current, voltage and power values of the pre-test bus on the main control screen of the wind farm, and compare the selected real-time current, voltage and power values with the real-time current collected by the power quality tester in the third step , voltage and power values are compared separately; if the comparison is the same, the voltage level setting value, the voltage and current transformer ratio setting value and the test parameter setting value are correct, the power quality tester 5 is connected correctly, and there is no virtual connection, Disconnection phenomenon, go to the seventh step, if the comparison value is different, go to the sixth step;

第六步、检查中控室上位机9上电压等级设置值、电压电流互感器变比设置值和测试参数设置值是否正确,若不正确,则重复进行第二步到第五步,若正确,则检查电能质量测试仪5的接线是否错误,或者存在虚接、断接的现象,重新进行电能质量测试仪5接线,纠正后,重复进行第三步到第五步;Step 6. Check whether the voltage level setting value, voltage and current transformer transformation ratio setting value and test parameter setting value on the upper computer 9 in the central control room are correct. If not, repeat steps 2 to 5. If correct, Then check whether the wiring of the power quality tester 5 is wrong, or there is a phenomenon of virtual connection or disconnection, and reconnect the power quality tester 5. After correction, repeat steps 3 to 5;

第七步,开始进行电能质量数据采集。The seventh step is to start power quality data collection.

Claims (2)

1.一种风电场电能质量数据采集系统,包括电网母线(1)和中控室上位机(9),在电网母线(1)上分别设置有电流互感器(2)和电压互感器(3),电流互感器(2)通过电流测试线(4)与电能质量测试仪(5)的电流输入端连接在一起,电压互感器(3)通过电压测试线(6)与电能质量测试仪(5)的电压输入端连接在一起,电能质量测试仪(5)与直流供电电源(7)连接在一起,其特征在于,在电能质量测试仪(5)上连接有双向无线通讯单元(8),在中控室上位机(9)上连接有另一双向无线通讯单元(10)。1. A wind farm power quality data acquisition system, including a grid bus (1) and a central control room host computer (9), and a current transformer (2) and a voltage transformer (3) are respectively installed on the grid bus (1) , the current transformer (2) is connected to the current input terminal of the power quality tester (5) through the current test line (4), and the voltage transformer (3) is connected to the power quality tester (5) through the voltage test line (6) ), the voltage input terminals of the power quality tester (5) and the DC power supply (7) are connected together, and it is characterized in that a two-way wireless communication unit (8) is connected to the power quality tester (5), Another two-way wireless communication unit (10) is connected to the upper computer (9) in the central control room. 2.根据权利要求1所述的一种风电场电能质量数据采集系统,其特征在于,在中控室上位机(9)中设置有电能质量测试的电压等级设置值、电压电流互感器变比设置值和测试参数设置值。2. A wind farm power quality data acquisition system according to claim 1, characterized in that the upper computer (9) in the central control room is provided with the voltage level setting value of the power quality test and the voltage and current transformer transformation ratio setting value and test parameter setting value.
CN201720650334.2U 2017-06-07 2017-06-07 Wind power plant power quality data acquisition system Active CN207007956U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720650334.2U CN207007956U (en) 2017-06-07 2017-06-07 Wind power plant power quality data acquisition system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720650334.2U CN207007956U (en) 2017-06-07 2017-06-07 Wind power plant power quality data acquisition system

Publications (1)

Publication Number Publication Date
CN207007956U true CN207007956U (en) 2018-02-13

Family

ID=61446022

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720650334.2U Active CN207007956U (en) 2017-06-07 2017-06-07 Wind power plant power quality data acquisition system

Country Status (1)

Country Link
CN (1) CN207007956U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107085157A (en) * 2017-06-07 2017-08-22 国网山西省电力公司电力科学研究院 Wind power plant power quality data acquisition system and real-time comparison method
CN108387801A (en) * 2018-03-28 2018-08-10 华电电力科学研究院有限公司 A kind of wind power station electric energy quality test device and test method
CN112394248A (en) * 2020-11-20 2021-02-23 南方电网数字电网研究院有限公司 Power quality measurement device, system and method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107085157A (en) * 2017-06-07 2017-08-22 国网山西省电力公司电力科学研究院 Wind power plant power quality data acquisition system and real-time comparison method
CN108387801A (en) * 2018-03-28 2018-08-10 华电电力科学研究院有限公司 A kind of wind power station electric energy quality test device and test method
CN108387801B (en) * 2018-03-28 2024-05-17 华电电力科学研究院有限公司 Wind power station electric energy quality testing device and testing method
CN112394248A (en) * 2020-11-20 2021-02-23 南方电网数字电网研究院有限公司 Power quality measurement device, system and method

Similar Documents

Publication Publication Date Title
CN105445691B (en) A kind of power information collecting device synthetic fault diagnosis system
CN104569688A (en) Automatic testing system and method for power distribution terminal
CN106556761A (en) A kind of direct-current charging post detecting system and method for being applied to scene
CN105447247A (en) Method and system for checking regulation and control information
CN106226653A (en) The transfer law assessment system of the voltage dip of multistage power grid and appraisal procedure
CN207782829U (en) The diagnostic device of PROFIBUS-DP communication networks
CN103777169A (en) Electric energy metering transformer simulation verification system
CN110942400A (en) An automatic point-to-point method and device for an intelligent substation monitoring system
CN203870199U (en) GIS lossless monitoring apparatus based on full-life management
CN105785118A (en) Simulated intelligent electric energy meter
CN107085157A (en) Wind power plant power quality data acquisition system and real-time comparison method
CN106530653B (en) Electricity information collection method
CN106569165A (en) Remote online detection system for metering performance of electronic electric energy meter
CN204694835U (en) Connection box of electric energy meter emulation cabinet wiring portable testing system
CN115420968A (en) A distribution network terminal testing system and method based on channel switching
CN203838331U (en) Binding post box and connector of electric energy meter
CN104464253A (en) Intelligent diagnosis method for field electricity information acquisition equipment
CN106597134A (en) Intelligent distribution network secondary system phase sequence automatic check apparatus
CN203502510U (en) Automatic detection device of power distribution feeder terminal
CN207573313U (en) A photovoltaic string fault diagnosis and monitoring device based on resistance calculation
CN103499969A (en) Control system common-mode and series-mode rejection ratio testing method
CN204241679U (en) An on-site calibrator for power quality monitoring devices
CN106597358A (en) Traceability verification method for networked electric energy meter
CN204594613U (en) For the online pressure monitoring device of transformer
CN206193228U (en) Remote online detection system for metering performance of electronic electric energy meter

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: No.6 Qingnian Road, Yingze Street, Yingze District, Taiyuan City, Shanxi Province, 030000

Patentee after: State Grid Shanxi Electric Power Co., Ltd. Electric Power Science Research Institute

Country or region after: China

Address before: 030001 Qingnian Road, Shanxi, No. 6,

Patentee before: STATE GRID ELECTRIC POWER Research Institute OF SEPC

Country or region before: China