CN207003636U - Steel structure integration pit structure - Google Patents
Steel structure integration pit structure Download PDFInfo
- Publication number
- CN207003636U CN207003636U CN201720842410.XU CN201720842410U CN207003636U CN 207003636 U CN207003636 U CN 207003636U CN 201720842410 U CN201720842410 U CN 201720842410U CN 207003636 U CN207003636 U CN 207003636U
- Authority
- CN
- China
- Prior art keywords
- reinforced concrete
- concrete prefabricated
- steel plate
- pit
- prefabricated shear
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
本实用新型涉及一种钢构一体化底坑结构,包括安装在基坑底部的钢筋混凝土预制底板与四个分别安装在基坑四个侧壁的钢筋混凝土预制剪力墙,所有所述钢筋混凝土预制剪力墙均置于钢筋混凝土预制底板之上,所述钢筋混凝土预制底板的上表面设置有上连接钢板,所述钢筋混凝土预制剪力墙的下表面设置有用以与上连接钢板对焊的下连接钢板。本实用新型结构设计简单、合理,基坑开挖后不需现场安装模板,直接采用钢筋混凝土预制底板与钢筋混凝土预制剪力墙,减少现场施工时间,降低成本和工时,具有广阔的应用前景。
The utility model relates to a steel structure integrated bottom pit structure, comprising a reinforced concrete prefabricated bottom plate installed at the bottom of the foundation pit and four reinforced concrete prefabricated shear walls respectively installed on the four side walls of the foundation pit, all the reinforced concrete The prefabricated shear walls are all placed on the reinforced concrete prefabricated bottom slab, the upper surface of the reinforced concrete prefabricated bottom slab is provided with an upper connecting steel plate, and the lower surface of the reinforced concrete prefabricated shear wall is provided with butt-welded with the upper connecting steel plate Lower connection plate. The structure design of the utility model is simple and reasonable. After the excavation of the foundation pit, no formwork needs to be installed on site, and the reinforced concrete prefabricated bottom plate and reinforced concrete prefabricated shear wall are directly used to reduce the on-site construction time, cost and man-hours, and has broad application prospects.
Description
技术领域technical field
本实用新型涉及一种钢构一体化底坑结构。The utility model relates to a steel structure integrated bottom pit structure.
背景技术Background technique
电梯的底坑是电梯井道中的一个重要组成部分,现有的底坑一般是现场进行钢管焊接、并现场浇筑,施工的时间长、困难大,对施工人员的要求高,具有一定的局限性。The elevator pit is an important part of the elevator shaft. The existing pits are generally welded and poured on-site with steel pipes. The construction time is long and difficult, and the requirements for construction personnel are high, which has certain limitations. .
实用新型内容Utility model content
鉴于现有技术的不足,本实用新型所要解决的技术问题是提供一种钢构一体化底坑结构,不仅结构设计合理,而且高效便捷。In view of the deficiencies of the prior art, the technical problem to be solved by the utility model is to provide a steel structure integrated pit structure, which is not only reasonable in structure design, but also efficient and convenient.
为了解决上述技术问题,本实用新型的技术方案是:一种钢构一体化底坑结构,包括安装在基坑底部的钢筋混凝土预制底板与四个分别安装在基坑四个侧壁的钢筋混凝土预制剪力墙,所有所述钢筋混凝土预制剪力墙均置于钢筋混凝土预制底板之上,所述钢筋混凝土预制底板的上表面设置有上连接钢板,所述钢筋混凝土预制剪力墙的下表面设置有用以与上连接钢板对焊的下连接钢板。In order to solve the above technical problems, the technical solution of the present utility model is: a steel structure integrated bottom pit structure, including a reinforced concrete prefabricated bottom plate installed at the bottom of the foundation pit and four reinforced concrete bottom plates respectively installed on the four side walls of the foundation pit. Prefabricated shear walls, all of the reinforced concrete prefabricated shear walls are placed on the reinforced concrete prefabricated bottom slab, the upper surface of the reinforced concrete prefabricated bottom slab is provided with upper connecting steel plates, and the lower surface of the reinforced concrete prefabricated shear walls A lower connecting steel plate for butt welding with the upper connecting steel plate is provided.
优选的,任意两个相邻所述钢筋混凝土预制剪力墙之间的拐角处设置有连接两者的内L形钢板与外L形钢板,所述钢筋混凝土预制剪力墙、内L形钢板以及外L形钢板围成的空间内浇筑有混凝土。Preferably, the corner between any two adjacent reinforced concrete prefabricated shear walls is provided with an inner L-shaped steel plate and an outer L-shaped steel plate connecting the two, the reinforced concrete prefabricated shear wall, the inner L-shaped steel plate And concrete is poured in the space surrounded by the outer L-shaped steel plate.
优选的,所述基坑内预留有用以与钢筋混凝土预制底板、钢筋混凝土预制剪力墙分别对接的对接钢筋。Preferably, butt joint reinforcement bars are reserved in the foundation pit for respectively butt joint with the reinforced concrete prefabricated floor and the reinforced concrete prefabricated shear wall.
优选的,所述钢筋混凝土预制底板与安钢筋混凝土预制剪力墙的内表面设置有防水涂料层。Preferably, the inner surface of the reinforced concrete prefabricated base plate and the reinforced concrete prefabricated shear wall is provided with a waterproof coating layer.
与现有技术相比,本实用新型具有以下有益效果:本实用新型结构设计简单、合理,基坑开挖后不需现场安装模板,直接采用钢筋混凝土预制底板与钢筋混凝土预制剪力墙,减少现场施工时间,降低成本和工时,具有广阔的应用前景。Compared with the prior art, the utility model has the following beneficial effects: the structure design of the utility model is simple and reasonable. After the excavation of the foundation pit, no formwork needs to be installed on site, and the reinforced concrete prefabricated floor and the reinforced concrete prefabricated shear wall are directly used, reducing On-site construction time is reduced, costs and man-hours are reduced, and it has broad application prospects.
下面结合附图和具体实施方式对本实用新型做进一步详细的说明。Below in conjunction with accompanying drawing and specific embodiment, the utility model is described in further detail.
附图说明Description of drawings
图1为本实用新型实施例构造的分解示意图。Fig. 1 is an exploded schematic view of the structure of the embodiment of the utility model.
图2为本实用新型实施例构造的装配示意图。Fig. 2 is an assembly diagram of the structure of the embodiment of the utility model.
图3为本实用新型实施例构造的俯视示意图。Fig. 3 is a schematic top view of the structure of the embodiment of the utility model.
图4为本实用新型实施例缓冲器的构造示意图。Fig. 4 is a schematic structural view of the buffer of the embodiment of the present utility model.
图中:1-基坑,2-钢筋混凝土预制底板,3-钢筋混凝土预制剪力墙,4-上连接钢板,5-下连接钢板,6-内L形钢板,7-外L形钢板,8-防水涂料层,9-缓冲器,901-缸体,902-活塞套,903-承重板,904-压紧板,905-导向柱,906-第一弹簧,907-第二弹簧。In the figure: 1- foundation pit, 2- reinforced concrete prefabricated floor, 3- reinforced concrete prefabricated shear wall, 4- upper connecting steel plate, 5- lower connecting steel plate, 6- inner L-shaped steel plate, 7- outer L-shaped steel plate, 8-waterproof paint layer, 9-buffer, 901-cylinder body, 902-piston sleeve, 903-bearing plate, 904-pressing plate, 905-guide column, 906-first spring, 907-second spring.
具体实施方式detailed description
为让本实用新型的上述特征和优点能更明显易懂,下文特举实施例,并配合附图,作详细说明如下。In order to make the above-mentioned features and advantages of the present invention more comprehensible, the following specific examples are given together with the accompanying drawings and described in detail as follows.
如图1~4所示,一种钢构一体化底坑结构,包括安装在基坑1底部的钢筋混凝土预制底板2与四个分别安装在基坑1四个侧壁的钢筋混凝土预制剪力墙5,所有所述钢筋混凝土预制剪力墙5均置于钢筋混凝土预制底板2之上,所述钢筋混凝土预制底板2的上表面设置有上连接钢板4,所述钢筋混凝土预制剪力墙5的下表面设置有用以与上连接钢板4对焊的下连接钢板5。As shown in Figures 1 to 4, a steel structure integrated pit structure includes a reinforced concrete prefabricated bottom plate 2 installed at the bottom of the foundation pit 1 and four reinforced concrete prefabricated shear force plates respectively installed on the four side walls of the foundation pit 1. Wall 5, all of the reinforced concrete prefabricated shear walls 5 are placed on the reinforced concrete prefabricated floor 2, the upper surface of the reinforced concrete prefabricated floor 2 is provided with an upper connecting steel plate 4, and the reinforced concrete prefabricated shear walls 5 The lower surface is provided with a lower connecting steel plate 5 for butt welding with the upper connecting steel plate 4 .
在本实用新型实施例中,任意两个相邻所述钢筋混凝土预制剪力墙5之间的拐角处设置有连接两者的内L形钢板6与外L形钢板7,所述钢筋混凝土预制剪力墙5、内L形钢板6以及外L形钢板7围成的空间内浇筑有混凝土。In the embodiment of the present utility model, an inner L-shaped steel plate 6 and an outer L-shaped steel plate 7 connecting the two are arranged at the corners between any two adjacent reinforced concrete prefabricated shear walls 5, and the reinforced concrete prefabricated Concrete is poured in the space enclosed by the shear wall 5 , the inner L-shaped steel plate 6 and the outer L-shaped steel plate 7 .
在本实用新型实施例中,所述基坑1内预留有用以与钢筋混凝土预制底板2、钢筋混凝土预制剪力墙5分别对接的对接钢筋。In the embodiment of the present utility model, butt joint steel bars are reserved in the foundation pit 1 for respectively butt joint with the reinforced concrete prefabricated bottom plate 2 and the reinforced concrete prefabricated shear wall 5 .
在本实用新型实施例中,所述钢筋混凝土预制底板2与安钢筋混凝土预制剪力墙5的内表面设置有防水涂料层8。In the embodiment of the present utility model, the inner surface of the reinforced concrete prefabricated bottom plate 2 and the reinforced concrete prefabricated shear wall 5 is provided with a waterproof coating layer 8 .
在本实用新型实施例中,所述基坑1的四边中点均设置有缓冲器9,所述缓冲器9包含缸体901,所述缸体901上穿设有可上下活动的活塞套902,所述活塞套902伸出缸体901的顶端设置有承重板903,所述活塞套902伸入缸体901的底端设置有压紧板904,所述缸体901内设置有穿设在活塞套902内并与活塞套902滑动配合的导向柱905,所述活塞套902上套设有第一弹簧906,所述第一弹簧906置于承重板903与缸体901之间,所述导向柱905上套设有第二弹簧907,所述第二弹簧907置于压紧板904与缸体901之间,所述承重板903、活塞套902以及压紧板904为一体制成。In the embodiment of the present utility model, buffers 9 are provided at the midpoints of the four sides of the foundation pit 1, and the buffers 9 include a cylinder 901, and a piston sleeve 902 that can move up and down is worn on the cylinder 901. The top end of the piston sleeve 902 protruding from the cylinder body 901 is provided with a bearing plate 903, the bottom end of the piston sleeve 902 extending into the cylinder body 901 is provided with a pressing plate 904, and the cylinder body 901 is provided with a threaded The guide column 905 in the piston sleeve 902 and slidingly matched with the piston sleeve 902, the first spring 906 is set on the piston sleeve 902, and the first spring 906 is placed between the bearing plate 903 and the cylinder body 901. A second spring 907 is sheathed on the guide column 905, and the second spring 907 is placed between the pressing plate 904 and the cylinder body 901. The bearing plate 903, the piston sleeve 902 and the pressing plate 904 are integrally made.
在本实用新型实施例中,所述活塞套902与缸体901之间、压紧板904与缸体901之间均具有间隙,所述活塞套902在上下运动压缩空气的过程中,缸体901处于开放状态,压缩空气产生的热量能够很快地散发出去,在此过程中,缓冲器9利用第一弹簧906、第二弹簧907进行缓冲。In the embodiment of the present utility model, there are gaps between the piston sleeve 902 and the cylinder body 901, and between the pressing plate 904 and the cylinder body 901. When the piston sleeve 902 moves up and down to compress the air, the cylinder body 901 is in an open state, and the heat generated by the compressed air can be dissipated quickly. During this process, the buffer 9 utilizes the first spring 906 and the second spring 907 for buffering.
本实用新型不局限于上述最佳实施方式,任何人在本实用新型的启示下都可以得出其他各种形式的钢构一体化底坑结构。凡依本实用新型申请专利范围所做的均等变化与修饰,皆应属本实用新型的涵盖范围。The utility model is not limited to the above-mentioned best implementation mode, anyone can draw other various forms of steel structure integrated pit structures under the enlightenment of the utility model. All equivalent changes and modifications made according to the patent scope of the utility model should belong to the scope of the utility model.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720842410.XU CN207003636U (en) | 2017-07-12 | 2017-07-12 | Steel structure integration pit structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720842410.XU CN207003636U (en) | 2017-07-12 | 2017-07-12 | Steel structure integration pit structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207003636U true CN207003636U (en) | 2018-02-13 |
Family
ID=61453903
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720842410.XU Expired - Fee Related CN207003636U (en) | 2017-07-12 | 2017-07-12 | Steel structure integration pit structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207003636U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112523386A (en) * | 2020-12-15 | 2021-03-19 | 浙江华临建设集团有限公司 | Assembly type PC building structure and construction method thereof |
-
2017
- 2017-07-12 CN CN201720842410.XU patent/CN207003636U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112523386A (en) * | 2020-12-15 | 2021-03-19 | 浙江华临建设集团有限公司 | Assembly type PC building structure and construction method thereof |
| CN112523386B (en) * | 2020-12-15 | 2024-12-31 | 浙江华临建设集团有限公司 | A prefabricated PC building structure and construction method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108589986B (en) | A prefabricated composite wall structure based on bolt connection and its construction method | |
| CN1298946C (en) | Steel-steel concrete fully prefabricated assembling structure | |
| CN105155734B (en) | Mortise and tenon connection assembled self-insulation and heat insulation hollow shear wall system and its hoisting method | |
| CN104594561A (en) | Prefabricated reinforced concrete column with high-performance concrete frame and construction method | |
| CN104912196A (en) | Connection joint of concrete filled steel tubular column and enclosed U-shaped steel concrete composite beam | |
| CN205024882U (en) | Prefabricated assembled shaped steel concrete shear force wall | |
| CN106948533A (en) | A kind of assembled floor | |
| CN110984224A (en) | A prefabricated rail-top air duct of a subway station and its hoisting and installation method | |
| CN104179249A (en) | Assembled composite-structure earthquake-resistant wall and assembly method thereof | |
| CN104912197A (en) | Connecting node for steel pipe concrete post and outside U-shaped steel and concrete composite beam | |
| CN106481090A (en) | A kind of Shockproof reinforcing method of existing reinforced concrete concrete frame joint | |
| CN106869386A (en) | A kind of recycled concrete superposed beam of high-strength construction waste and its construction method | |
| CN208251372U (en) | A kind of assembled steel reinforced concrete shear force wall | |
| CN204476416U (en) | The simple and easy sliding form apparatus of a kind of vertical shaft concrete lining | |
| CN109667376A (en) | Novel superposed superstructure and its construction method suitable for steel construction H profile steel beam | |
| CN106088657A (en) | Reinforcing structure of empty bucket wall and construction method thereof | |
| CN105951985A (en) | Precast concrete frame beam joint | |
| CN207003636U (en) | Steel structure integration pit structure | |
| CN204781356U (en) | Steel core concrete column and outsourcing U -shaped steel -concrete composite beam connected node | |
| CN202500249U (en) | Profiled steel sheet composite floor | |
| CN211773695U (en) | New and old structure multi-storey basement replacement support force transmission structure | |
| CN203429655U (en) | Assembly type steel reinforced concrete single-double column foundation for container prefabricated house | |
| CN207633568U (en) | It cuts hot-rolled angle steel and combines cross buckling restrained brace | |
| CN207646939U (en) | A kind of double-layered precast facade structure of basement | |
| CN206090823U (en) | Precast concrete frame girder segment point |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Steel structure integrated pit structure Effective date of registration: 20220606 Granted publication date: 20180213 Pledgee: Bank of Xiamen Co.,Ltd. Fuzhou branch Pledgor: FUJIAN KUAIKE URBAN CONSTRUCTION ADDITIONAL ELEVATOR CO.,LTD. Registration number: Y2022980005652 |
|
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180213 |