CN206986975U - A kind of high-building construction fire-fighting watering equipment - Google Patents

A kind of high-building construction fire-fighting watering equipment Download PDF

Info

Publication number
CN206986975U
CN206986975U CN201720702943.8U CN201720702943U CN206986975U CN 206986975 U CN206986975 U CN 206986975U CN 201720702943 U CN201720702943 U CN 201720702943U CN 206986975 U CN206986975 U CN 206986975U
Authority
CN
China
Prior art keywords
fire
pipeline
water box
pump
main pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720702943.8U
Other languages
Chinese (zh)
Inventor
朱作兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Xing Chau Construction Co Ltd
Original Assignee
Jiangsu Xing Chau Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Xing Chau Construction Co Ltd filed Critical Jiangsu Xing Chau Construction Co Ltd
Priority to CN201720702943.8U priority Critical patent/CN206986975U/en
Application granted granted Critical
Publication of CN206986975U publication Critical patent/CN206986975U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

A kind of high-building construction fire-fighting watering equipment of the utility model, including raintank, fire water box, fire pump, stabilized pressure pump, fire main pipe, relief tube and cigarette propagated sensation sensor;It is connected between the raintank and fire water box by pipeline;The side of the fire water box is connected with two groups of fire pumps by pipeline, and is provided with magnetic valve on the pipeline;It is connected between the fire pump and fire main pipe by pipeline, and non-return valve and magnetic valve is connected with turn on the pipeline;The air pressure tank is connected to the top of fire main pipe by pipeline;The relief tube is connected between fire water box and fire main pipe, and two groups of magnetic valves are provided with relief tube.The setting of the utility model relief tube, pressure release, the setting of the utility model raintank are carried out when pressure is excessive in fire main pipe in time, rainwater inside raintank is transported to the inside of fire water box, effective using water wisely, multigroup cigarette propagated sensation sensor is installed, put out a fire in time when fire occurs.

Description

A kind of high-building construction fire-fighting watering equipment
Technical field
High building fire fighting technical field is the utility model is related to, more particularly to a kind of high-building construction fire fighting supply is set It is standby.
Background technology
At present, as the development of urban economy, skyscraper are on the increase, in high-building construction, construction is used The supply problem of water, is the fire demand water in building side's urgent problem to be solved, especially skyscraper, is to ensure that skyscraper One of safeguard of safety.
The inventors discovered that in existing high building fire fighting supply equipment, fire pump needs frequent start and stop to ensure to disappear Pressure inside anti-pipeline, causes the lost of life of fire pump, at the same the pressure inside fire protection pipeline it is excessive when easily by fire-fighting Pipeline rises brokenly, and water-saving result is poor, and function is single.
Then, inventor in view of this, adhere to the relevant industries for many years it is abundant design and develop and the experience of actual fabrication, Improvement is studied for existing structure and missing, there is provided a kind of high-building construction fire-fighting watering equipment, to reach more Purpose with more practical value.
Utility model content
The purpose of this utility model is to provide a kind of high-building construction fire-fighting watering equipment, to solve above-mentioned background skill The fire pump proposed in art needs frequent start and stop to ensure the pressure inside fire protection pipeline, causes the lost of life of fire pump, together When fire protection pipeline inside pressure it is excessive when easily fire protection pipeline is risen brokenly, the problem of water-saving result is poor, and function is single.
The purpose and effect of the utility model high-building construction fire-fighting watering equipment, are reached by technological means in detail below Into:
A kind of high-building construction fire-fighting watering equipment, it is characterised in that:Described high-building construction fire fighting supply is set It is standby to include:
Raintank, delivery pump, non-return valve, fire water box, fire pump, stabilized pressure pump, switch board, air pressure tank, pressure gauge, fire-fighting House steward, magnetic valve, relief tube, cigarette propagated sensation sensor and PLC;
It is connected between the raintank and fire water box by pipeline, and delivery pump and check is connected with the pipeline Valve;The side of the fire water box is connected with two groups of fire pumps by pipeline, and is provided with magnetic valve on the pipeline;The fire-fighting It is connected between pump and fire main pipe by pipeline, and non-return valve and magnetic valve is connected with turn on the pipeline;The stabilized pressure pump The side of fire water box is connected to by pipeline, and non-return valve and magnetic valve are connected with turn on the pipeline;The air pressure tank leads to Piping is connected to the top of fire main pipe, and is provided with hand control valve on the pipeline;The relief tube is connected to fire water Two groups of magnetic valves are installed between case and fire main pipe, and on relief tube.
Further, the stabilized pressure pump is provided with two groups, and the both sides of two groups of stabilized pressure pumps be connected to magnetic valve with Non-return valve, magnetic valve.
Further, the side of the relief tube is connected with pressure release branch pipe, and is connected with hand-operated valve on the pressure release branch pipe.
Further, the inner chamber of the fire water box is inlaid with level sensor, and level sensor and PLC it Between be common electric connection.
With existing structure in comparison, the utility model has the following advantages that:
1. the setting of two groups of stabilized pressure pumps of the utility model, the pressure inside fire main pipe can be kept by stabilized pressure pump, is avoided Frequent start and stop fire pump, shorten the life-span of fire pump.
2. the setting of the utility model relief tube, carry out pressure release in time when pressure is excessive in fire main pipe, avoid pipeline It is split up.
3. the setting of the utility model raintank, it is less than ordinary water level in fire water box water level inside, will by delivery pump Rainwater inside raintank is transported to the inside of fire water box, can effective using water wisely.
4. being provided with multigroup cigarette propagated sensation sensor in the utility model skyscraper, signal is fed back to when fire occurs In PLC, the magnetic valve on fire main pipe and startup fire pump are opened in time and the electromagnetism at both ends is put out a fire, simultaneously Two groups of fire pumps can be standby each other, avoids fire pump from influenceing to use when breaking down.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the utility model structure diagram.
In figure:1st, raintank, 2, delivery pump, 3, non-return valve, 4, fire water box, 5, fire pump, 6, stabilized pressure pump, 7, control Cabinet, 8, air pressure tank, 9, pressure gauge, 10, fire main pipe, 11, magnetic valve, 12, relief tube, 13, cigarette propagated sensation sensor, 14, PLC controls Device.
Embodiment
Below, embodiment of the present utility model is will be explained in, the example is shown in the accompanying drawings and the description below.Although will The utility model is described with reference to exemplary embodiment, it is to be understood that the description does not really want the utility model to be limited to this to show The embodiment of example property.On the contrary, the utility model will not only cover the exemplary embodiment, but also cover various replacements, Change, equivalent and other embodiment, it can be included in spirit of the present utility model and the model that appended claims are limited In enclosing.
Such as accompanying drawing 1 to accompanying drawing 2, a kind of high-building construction fire-fighting watering equipment, include:
Raintank 1, delivery pump 2, non-return valve 3, fire water box 4, fire pump 5, stabilized pressure pump 6, switch board 7, air pressure tank 8, pressure Power table 9, fire main pipe 10, magnetic valve 11, relief tube 12, cigarette propagated sensation sensor 13 and PLC 14;
It is connected between raintank 1 and fire water box 4 by pipeline, and delivery pump 2 and non-return valve is connected with the pipeline 3;The side of fire water box 4 is connected with two groups of fire pumps 5 by pipeline, and magnetic valve 11 is provided with the pipeline;Fire pump 5 with It is connected between fire main pipe 10 by pipeline, and is connected with non-return valve 3 and magnetic valve 11 on the pipeline in turn;Stabilized pressure pump 6 is logical Piping is connected to the side of fire water box 4, and is connected with non-return valve 3 and magnetic valve 11 on the pipeline in turn;Air pressure tank 8 is logical Piping is connected to the top of fire main pipe 10, and is provided with hand control valve on the pipeline;Relief tube 12 is connected to fire water Two groups of magnetic valves 11 are installed between case 4 and fire main pipe 10, and on relief tube 12.
PLC 14 is embedded in the inner chamber of switch board 7, and PLC 14 and delivery pump 2, fire pump 5, stabilized pressure pump 6th, connected between magnetic valve 11, cigarette propagated sensation sensor 13 for moderate electrical, physical circuit is configured to existing mature technology, do not done herein Tired to state, PLC 14 has the digital electronic device of microprocessor, can for the digital logic controller of Automated condtrol Stored so that control instruction is loaded at any time in internal memory with performing, it is necessary to which explanation, the PLC 14 is programmable monolithic Machine controller, its specific operation principle and structure are prior art, do not do to tire out and state, the model of cigarette propagated sensation sensor 13: JCJ120, when a fire, signal is fed back in PLC 14 in time.
The preferred embodiment of high-building construction fire-fighting watering equipment as described above, wherein, stabilized pressure pump 6 is provided with two Group, and the both sides of two groups of stabilized pressure pumps 6 are connected to magnetic valve 11 and non-return valve 3, magnetic valve 11, can be protected by stabilized pressure pump 6 The pressure inside fire main pipe 10 is held, avoids frequent start and stop fire pump 5, shortens the life-span of fire pump 5, while two groups of stabilized pressure pumps 6 Can be standby each other;
The preferred embodiment of high-building construction fire-fighting watering equipment as described above, wherein, the side of relief tube 12 Pressure release branch pipe is connected with, and hand-operated valve is connected with the pressure release branch pipe, can be by relief tube 12 to the water inside fire main pipe 10 Pressure is unloaded, and the hydraulic pressure inside fire main pipe 10 can also be unloaded by pressure release branch pipe;
The preferred embodiment of high-building construction fire-fighting watering equipment as described above, wherein, the inner chamber of fire water box 4 Level sensor is inlaid with, and is common electric connection between level sensor and PLC 14, the type of level sensor Number it is:TYX-CSW1 type level sensors, the water level inside fire water box 4 can be detected, and the result detected is anti- It is fed in PLC 14, when the water level inside fire water box 4 reaches lowest water level, PLC 14 starts delivery pump 2 Water inside raintank 1 is sent in fire water box 4, when the water level inside fire water box 4 reaches peak level, PLC controls Device 14 processed closes delivery pump 2.
The operation principle of the present embodiment:
The high building fire fighting supply equipment is connected into external power source first, and opens the manual control of the bottom of air pressure tank 8 Valve, the level sensor being embedded in inside fire water box 4, the water level inside fire water box 4 can be detected, and will detected Result feed back in PLC 14, when the water level inside fire water box 4 reaches lowest water level, PLC 14 starts Water inside raintank 1 is sent in fire water box 4 by delivery pump 2, and the water level inside fire water box 4 reaches peak level When, PLC 14 closes delivery pump 2, and when fire not occurring, pressure gauge 9 on fire main pipe 10 is by the pressure of fire main pipe 10 Force feedback is into PLC 14, when the hydraulic pressure inside fire main pipe 10 and air pressure tank 8 is less than minimum standard, PLC controls Device 14 opens the magnetic valve 11 at the both ends of stabilized pressure pump 6 and starts stabilized pressure pump 6 to being mended inside fire main pipe 10 and air pressure tank 8 Water, when the hydraulic pressure inside fire main pipe 10 and air pressure tank 8 is higher than highest standard, PLC 14 close stabilized pressure pump 6 and The magnetic valve 11 at both ends, when a fire, cigarette propagated sensation sensor 13 feed back to signal in PLC 14, PLC 14 The magnetic valve 11 opened on fire main pipe 10 carries out fire-fighting fire extinguishing, while opens the magnetic valve 11 at the both ends of fire pump 5 and start Fire pump 5, improve the pressure of fire main pipe 10, in practical application experiment, the design relative to market this area other products, The performance higher than its 90% or so.
It should be noted that the standardized element that uses of the utility model can commercially, shaped piece according to Specification and accompanying drawing record can carry out customized, and the specific connected mode of each part is using ripe in the prior art Bolt, the conventional meanses such as welding, machinery, part and equipment are using in the prior art, conventional model, and inventor is herein not It is described in detail again.
In summary, although the utility model is described in detail with reference to the foregoing embodiments, for this area For technical staff, it can still modify to the technical scheme described in foregoing embodiments, or to which part Technical characteristic carries out equivalent substitution, all within the spirit and principles of the utility model, any modification for being made, equivalent substitution, Improve etc., it should be included within the scope of protection of the utility model.

Claims (4)

  1. A kind of 1. high-building construction fire-fighting watering equipment, it is characterised in that:Described high-building construction fire-fighting watering equipment Include:
    Raintank, delivery pump, non-return valve, fire water box, fire pump, stabilized pressure pump, switch board, air pressure tank, pressure gauge, fire-fighting are total Pipe, magnetic valve, relief tube, cigarette propagated sensation sensor and PLC;
    It is connected between the raintank and fire water box by pipeline, and delivery pump and non-return valve is connected with the pipeline;Institute The side for stating fire water box is connected with two groups of fire pumps by pipeline, and is provided with magnetic valve on the pipeline;The fire pump with It is connected between fire main pipe by pipeline, and non-return valve and magnetic valve is connected with turn on the pipeline;The stabilized pressure pump passes through Pipeline is connected to the side of fire water box, and is connected with non-return valve and magnetic valve in turn on the pipeline;The air pressure tank passes through pipe Road is connected to the top of fire main pipe, and is provided with hand control valve on the pipeline;The relief tube be connected to fire water box with Two groups of magnetic valves are installed between fire main pipe, and on relief tube.
  2. 2. high-building construction fire-fighting watering equipment according to claim 1, it is characterised in that:The stabilized pressure pump is provided with Two groups, and the both sides of two groups of stabilized pressure pumps are connected to magnetic valve and non-return valve, magnetic valve.
  3. 3. high-building construction fire-fighting watering equipment according to claim 1, it is characterised in that:The side of the relief tube Pressure release branch pipe is connected with, and hand-operated valve is connected with the pressure release branch pipe.
  4. 4. high-building construction fire-fighting watering equipment according to claim 1, it is characterised in that:The fire water box it is interior Chamber is inlaid with level sensor, and is common electric connection between level sensor and PLC.
CN201720702943.8U 2017-06-16 2017-06-16 A kind of high-building construction fire-fighting watering equipment Expired - Fee Related CN206986975U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720702943.8U CN206986975U (en) 2017-06-16 2017-06-16 A kind of high-building construction fire-fighting watering equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720702943.8U CN206986975U (en) 2017-06-16 2017-06-16 A kind of high-building construction fire-fighting watering equipment

Publications (1)

Publication Number Publication Date
CN206986975U true CN206986975U (en) 2018-02-09

Family

ID=61395745

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720702943.8U Expired - Fee Related CN206986975U (en) 2017-06-16 2017-06-16 A kind of high-building construction fire-fighting watering equipment

Country Status (1)

Country Link
CN (1) CN206986975U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113653126A (en) * 2021-08-19 2021-11-16 苏州正大宏业不锈钢制品有限公司 Fire-fighting pressure-boosting and pressure-stabilizing water supply system
CN116263151A (en) * 2021-12-13 2023-06-16 长庆工程设计有限公司 A start-up control system and control method for fire pumps in large oil and gas field stations

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113653126A (en) * 2021-08-19 2021-11-16 苏州正大宏业不锈钢制品有限公司 Fire-fighting pressure-boosting and pressure-stabilizing water supply system
CN116263151A (en) * 2021-12-13 2023-06-16 长庆工程设计有限公司 A start-up control system and control method for fire pumps in large oil and gas field stations

Similar Documents

Publication Publication Date Title
CN104197187A (en) Device and method for filling and unloading liquid ammonia
CN202302714U (en) An automatic pressure relief device for low-pressure storage tanks
CN104100235B (en) A kind of skid device and process method for gas injection and production gas collection and transportation in salt cavern gas storage
CN111022227A (en) An anti-pump-down fuel supply system
CN201681319U (en) Intelligent control unit of compressed air foam system
CN106400882A (en) Water hammer protection device for long-distance pumping water supply system
CN204034106U (en) Nuclear power station fire water distribution system
CN205360343U (en) Intensive fire -fighting water pump room that can wholly move
CN203230404U (en) A gas collection and transportation skid device for injection and production of salt cavern gas storage
CN202300948U (en) Air supply system of air compressor
CN205299081U (en) Recovery system of gas gathering station unloading natural gas
CN105369927A (en) Automatic cooling fireproof steel structure
CN207484568U (en) A kind of water supply overpressure protection system
CN207943866U (en) A safety protection interlock device based on quantitative loading control system
CN212430457U (en) Workshop compressed air stratification control system
CN105477814A (en) Intensive fire pump room capable of being overall carried
CN205371117U (en) Fuel oil supply unit with two pressure boost oil tanks
CN204530859U (en) Nuclear power plant's emergency feedwater supply system flow control device
CN202152475U (en) A stabilized water supply equipment
CN201581443U (en) A gas top pressure fire water supply equipment
CN106705505A (en) Efficient combined type flash drum pump unit
CN204140548U (en) A kind of novel hydraulic Emergeny Cutoff Valves
CN209585161U (en) A ladder water supply system
CN206328804U (en) A kind of device for long range water supplying pump system protecting water hammer
CN205592205U (en) Automatic oil returning device of daily oil tank

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180209

Termination date: 20180616

CF01 Termination of patent right due to non-payment of annual fee