CN206966715U - It is a kind of to be applied to decoration, the suspension rod fixation drilling simple rack of installing engineering - Google Patents
It is a kind of to be applied to decoration, the suspension rod fixation drilling simple rack of installing engineering Download PDFInfo
- Publication number
- CN206966715U CN206966715U CN201720706943.5U CN201720706943U CN206966715U CN 206966715 U CN206966715 U CN 206966715U CN 201720706943 U CN201720706943 U CN 201720706943U CN 206966715 U CN206966715 U CN 206966715U
- Authority
- CN
- China
- Prior art keywords
- vertical rod
- activity vertical
- decoration
- installing engineering
- simple rack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Processing Of Stones Or Stones Resemblance Materials (AREA)
Abstract
The utility model discloses a kind of suspension rod suitable for decoration, installing engineering to fix drilling simple rack, it is characterized in that, including fixed vertical rod and activity vertical rod, activity vertical rod is connected and composed by upper activity vertical rod and lower activity vertical rod, the side of lower activity vertical rod is provided with a pair of height adjusting holes, be provided with a guide-localization bolt in each height adjusting holes, connecting plate is corresponding is connected for two guide-localization bolts and two guiding in fixation vertical rod;The top of upper activity vertical rod is provided with impact drill fixing device.The utility model, in earth boring operations, the traditional landing stage of scaffold or Mobile operating platform is set up without repetition by the use of flooring or other platforms as support, support light and flexible, make simply, a people is operable, both can largely save material, reduce labour's input, reduce labor strength, again can accelerating construction progress, improve production efficiency, and it is safe and reliable, so as to reach the purpose for reducing construction cost, ensureing construction safety.
Description
Technical field
It the utility model is related to a kind of suspension rod suitable for decoration, installing engineering and fix drilling simple rack, and in particular to
The suspension rod that a kind of decorative ceiling, installing engineering airduct, crane span structure etc. use fixes the design and application of drilling simple rack, belongs to and builds
Build technical field of construction.
Background technology
As the improvement of people's living standards, to the intelligence degree more and more higher of architectural engineering, installing engineering is decorated
The contents of a project and quantities are more and more, decorate the quality requirement more and more higher of installing engineering, and construction speed requires faster, and
The features such as floor height of floor is high, and high-rise working is dangerous big, and difficulty of construction is big, it is usual that traditional suspension rod fixes punching construction method
Using movable operation platform or set up the fixed landing stage of scaffold and constructed.
Above-mentioned traditional construction method needs to consume substantial amounts of circulation material and security protection material, repeatedly sets up dismounting pin
Hand cradle, floor conversion construction need dismounting to set up Mobile operating platform, it is necessary to put into substantial amounts of labour, labor strength
The shortcomings of height, construction speed is slow, low production efficiency, larger high-rise working potential safety hazard be present, and construction cost is high.
The content of the invention
Technical problem to be solved in the utility model is to provide a kind of fixed suitable for decoration, installing engineering suspension rod and drilled
Construction, drillhole height depth is adjustable, and stiffness of support large deformation is small, and borehole accuracy is high, and construction operation readiness is simple,
Light and flexible is easy to remove, safe and reliable, can be used in turn, and the operation support of low manufacture cost.
In order to solve the above-mentioned technical problem, the technical solution of the utility model is to provide a kind of suitable for decoration, erector
The suspension rod of journey fixes drilling simple rack, it is characterised in that including fixed vertical rod and activity vertical rod, activity vertical rod is vertical by upper activity
Bar connects and composes with lower activity vertical rod, and the side of lower activity vertical rod is provided with a pair of height adjusting holes, is set in each height adjusting holes
There is a guide-localization bolt, two guide-localization bolts are oriented to that connecting plate is corresponding to be connected with two in fixed vertical rod;
The top of upper activity vertical rod is provided with impact drill fixing device.
Preferably, the upper activity vertical rod is connected with lower activity vertical rod by activity vertical rod connector, activity vertical rod connection
Device is connected by an activity vertical rod connecting bolt respectively with upper activity vertical rod, lower activity vertical rod.
It is highly preferred that each other 90 ° in the horizontal direction of described two activity vertical rod connecting bolts.
Preferably, the impact drill fixing device is included for supporting the impact drill Auxiliary support supporting plate of impact drill and being used for
The impact drill retainer ring on spacing impact drill top.
It is highly preferred that the impact drill Auxiliary support supporting plate is bolted to connection.
Preferably, the side of one of height adjusting holes in the lower activity vertical rod is provided with drilling depth control chi.
Preferably, drilling depth control and operating handle are additionally provided with the lower activity vertical rod.
Preferably, the distance between two described height adjusting holes centers are not less than 500m.
Preferably, two described the distance between connecting plates that are oriented to are not less than 0.5m.
Preferably, the width of the height adjusting holes is bigger 2mm than the diameter of guide-localization bolt.
Fixed vertical rod, lower activity vertical rod, upper activity vertical rod are made using the preferable square steel tube of rigidity, the specification of square tube according to
Working depth determines, fixing vertical rod low side typically from 50mm × 2.5mm square steel tubes, during work is placed in flooring, operating platform
Or in other hard basic units;Activity vertical rod connector, activity vertical rod is convenient for changing to be adapted to different height drilling needs;Annular
Fixing card and Auxiliary support supporting plate can be changed at any time according to the electric impact drill of different size model;Connecting plate is oriented to, using weldering
The form connect is fixed in fixed vertical rod.During making, being oriented to connecting plate needs to carry out positioning welding on jig frame special, after welding
Put down again through milling machine milling, so both can ensure that fixed vertical rod was connected with lower activity vertical rod and do not rocked reliably, and can ensures operation drilling
When, lower activity vertical rod slides up and down freely, and borehole accuracy is high, and rapid operation.
Height adjusting holes, two guide-localization bolts and fixed vertical rod use the company of being hinged at two above and below lower activity vertical rod utilization
Connect, electric impact drill or other electric tool drilling depths are adjusted by the up and down motion of lower activity vertical rod, reach drilling mesh
's.Drilling depth is controlled and operating handle is fixed in lower activity vertical rod using welding manner, and setting height(from bottom) can be according to operator
Member's comfort level determines.Drilling depth control chi in lower activity vertical rod is that display electric impact drill directly perceived or other electric tools bore
Enter the graduated scale of depth, setting height(from bottom) is easy to the accurate keyhole depth of accurate reading apart from ground about 1700m.
For height adjusting holes in lower activity vertical rod, it is to be used to determine maximum drilling depth and connect that it, which is acted on, at upper and lower two
Connect fixed fixed vertical rod, limitation drilling horizontal displacement, ensure that lower activity vertical rod can only be moved up and down vertically, hole length according to
Depth is punched to determine.
The connection of activity vertical rod (activity vertical rod and a upper activity vertical rod under one), is to use special up and down vertical rod
Connector connects, and up and down vertical rod connector is welded on the top of lower activity vertical rod, then passes through upper and lower two mutual work in 90 °
The dynamic upper activity vertical rod of vertical rod connecting bolt connection, avoid caused by bouncing of drilling tool or drilling resistance increase make drill bit crooked broken drill or
Inclined hole.The length of upper activity vertical rod can be according to processing and fabricating be actually needed, by selecting the upper activity for changing different length vertical
Bar, the requirement of different drillhole heights can be met.
The annular fixing card of fixed electric impact drill is to be enclosed on by sleeve in upper activity vertical rod, and two mutual sides in 90 °
Face is respectively fixed with a dormant bolt and upper activity vertical rod, and length sleeve is not less than 50mm, annular fixing card and electric impact drill
Connection and the connected mode for stepping up fixing bolt using the collar, the collar is connected with the cylinder of electric impact drill front end, to ensure to rush
Electric drill rotating shaft is hit with the axially in parallel of upper activity vertical rod and in a plane, ensures borehole accuracy.Can be by changing at any time
The annular fixing card of different size adapts to the electric impact drill installation of different size model.
Auxiliary support supporting plate is to be connected using bolt with upper activity vertical rod, and the setting height(from bottom) of Auxiliary support supporting plate can be random
Regulation, the setting height(from bottom) by adjusting supporting plate up and down are adapted to the electric impact drill installation of different size model.
The utility model, in earth boring operations, is set up by the use of flooring or other platforms as support without repetition
The traditional landing stage of scaffold or Mobile operating platform, support light and flexible, make simply, a people is operable, both can largely be saved
Material saving, reduce labour input, reduce labor strength, again can accelerating construction progress, improve production efficiency, and safety
Reliably, so as to the purpose for reaching reduction construction cost, ensureing construction safety.
Brief description of the drawings
Fig. 1 is that a kind of suspension rod suitable for decoration, installing engineering provided by the utility model fixes drilling simple rack
Front view;
Fig. 2 is Fig. 1 side view;
Fig. 3 is Fig. 1 top view.
Embodiment
To become apparent the utility model, hereby with preferred embodiment, and accompanying drawing is coordinated to be described in detail below.
Embodiment
Fig. 1-3 is that a kind of suspension rod suitable for decoration, installing engineering provided by the utility model fixes drilling simple rack
Structural representation, be mainly oriented to connection by 8, two pieces of the upper activity vertical rods of activity vertical rod under a fixed vertical rod 1, one 2, one
3, up and down vertical rod connectors 6 of plate;The annular fixing card 11, one of one fixed impact drill is used to prop up impact drill
12, drilling depth control chis, 9, the drilling depth controls of Auxiliary support supporting plate and 10, two guide-localizations of operating handle
Bolt 4 and two activity vertical rod connecting bolts 7 form.Wherein, upper and lower two pieces of guiding connecting plate 3 is weldingly fixed on fixed vertical rod 1
On, it is provided with lower activity vertical rod 2 at drilling depth control chi 9, drilling depth control and operating handle 10 and two and highly adjusts
Hole 5, the length of height adjusting holes 5 are made according to drilling depth needs, and fixed vertical rod 1 is adjusted with lower activity vertical rod 2 by height
Knothole 5 uses upper and lower two guide-localization bolts 4 to connect, and lower activity vertical rod 2 and upper activity vertical rod 8 are connected using up and down vertical rod
Connecing device 6 uses the activity vertical rod connecting bolt 7 in upper and lower two mutual directions in 90 ° to connect, and is provided with the top of upper activity vertical rod 8 special
The impact drill retainer ring 11 of fixed impact drill and the impact drill Auxiliary support supporting plate 12 for propping up support impact drill, impact drill is auxiliary
Helping support supporting plate 12, impact drill Auxiliary support supporting plate 12, impact drill retainer ring 11 can be according to installations using the connection fastening of bolt 13
The electric impact drill 14 of different size model is changed.
Preparing good simple rack of flooring over-assemble of drilling layer first, fixed vertical rod 1 is being adopted with lower activity vertical rod 2
Connected with upper and lower two guide-localization bolts 4, then connect lower activity vertical rod 2 and upper activity vertical rod 8 using up and down vertical rod
Connect device 6 to be connected, finally on the top of upper activity vertical rod 8, installation fixes impact drill 14.
According to the drill hole line put well, support is moved to bore position, make to fix the low side of vertical rod 1 stand on vertically flooring or its
On his platform, the observational record drilling depth control initial value of chi 9, final drilling depth control chi reading, alignment drilling are calculated
Point, the fixed vertical state of vertical rod 1 is kept, is turned on the power, by pushing up drilling depth control and operating handle 10, with reference to sight
The drilling depth control reading of chi 9 is surveyed, controls drilling depth, completes to drill at one.
Claims (10)
1. a kind of be applied to decoration, the suspension rod fixation drilling simple rack of installing engineering, it is characterised in that including fixed vertical rod
(1) and activity vertical rod, activity vertical rod are connected and composed by upper activity vertical rod (8) and lower activity vertical rod (2), lower activity vertical rod (2)
Side is provided with a pair of height adjusting holes (5), and a guide-localization bolt (4), two guiding are provided with each height adjusting holes (5)
Bolt (4) is corresponding with two guiding connecting plates (3) on fixed vertical rod (1) to be connected;The top of upper activity vertical rod (8)
Provided with impact drill fixing device.
2. as claimed in claim 1 be applied to decoration, the suspension rod fixation drilling simple rack of installing engineering, it is characterised in that
The upper activity vertical rod (8) is connected with lower activity vertical rod (2) by activity vertical rod connector (6), activity vertical rod connector (6) with
Upper activity vertical rod (8), lower activity vertical rod (2) are connected by an activity vertical rod connecting bolt (7) respectively.
3. as claimed in claim 2 be applied to decoration, the suspension rod fixation drilling simple rack of installing engineering, it is characterised in that
Each other 90 ° in the horizontal direction of described two activity vertical rod connecting bolts (7).
4. as claimed in claim 1 be applied to decoration, the suspension rod fixation drilling simple rack of installing engineering, it is characterised in that
The impact drill fixing device includes being used to support the impact drill Auxiliary support supporting plate (12) of impact drill (14) and for spacing punching
Hit the impact drill retainer ring (11) on brill (14) top.
5. as claimed in claim 4 be applied to decoration, the suspension rod fixation drilling simple rack of installing engineering, it is characterised in that
The impact drill Auxiliary support supporting plate (12) is fixedly connected by bolt (13).
6. as claimed in claim 1 be applied to decoration, the suspension rod fixation drilling simple rack of installing engineering, it is characterised in that
The side of one of height adjusting holes (5) on the lower activity vertical rod (2) is provided with drilling depth control chi (9).
7. being applied to decoration, the suspension rod fixation drilling simple rack of installing engineering as described in claim 1 or 5, its feature exists
In being additionally provided with drilling depth control and operating handle (10) on the lower activity vertical rod (2).
8. as claimed in claim 1 be applied to decoration, the suspension rod fixation drilling simple rack of installing engineering, it is characterised in that
The distance between two described height adjusting holes (5) centers are not less than 500m.
9. as claimed in claim 1 be applied to decoration, the suspension rod fixation drilling simple rack of installing engineering, it is characterised in that
Two described the distance between connecting plates (3) that are oriented to are not less than 0.5m.
10. as claimed in claim 1 be applied to decoration, the suspension rod fixation drilling simple rack of installing engineering, it is characterised in that
The width of the height adjusting holes (5) is bigger 2mm than the diameter of guide-localization bolt (4).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720706943.5U CN206966715U (en) | 2017-06-16 | 2017-06-16 | It is a kind of to be applied to decoration, the suspension rod fixation drilling simple rack of installing engineering |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720706943.5U CN206966715U (en) | 2017-06-16 | 2017-06-16 | It is a kind of to be applied to decoration, the suspension rod fixation drilling simple rack of installing engineering |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206966715U true CN206966715U (en) | 2018-02-06 |
Family
ID=61407859
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720706943.5U Expired - Fee Related CN206966715U (en) | 2017-06-16 | 2017-06-16 | It is a kind of to be applied to decoration, the suspension rod fixation drilling simple rack of installing engineering |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206966715U (en) |
-
2017
- 2017-06-16 CN CN201720706943.5U patent/CN206966715U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201231532Y (en) | Mobile boring device for building top board | |
| CN210705391U (en) | Assembled water drilling equipment | |
| CN107790787A (en) | The lengthening support that a kind of packaged type electric drill drills vertically upward | |
| CN207863871U (en) | A kind of derrick for repairing equipment for petroleum drilling | |
| CN105672880A (en) | Improved long spiral drilling machine | |
| CN203875382U (en) | Bonded rebar drilling device | |
| CN204525381U (en) | A kind of lifting electric hammer combination pressure rod member for boring ceiling furred ceiling muscle hole | |
| CN202467649U (en) | Telescopic support leg and vehicle-mounted coal seam pneumatic drilling machine using telescopic support legs | |
| CN203403414U (en) | Rapid ground anchor pile laying device for line operation | |
| CN203081321U (en) | Mechanical device capable of being used for carrying out ceiling drilling operations on ground | |
| CN206539054U (en) | A kind of masonry constructional column bar planting device | |
| CN211874385U (en) | Mechanical arm for intelligent remote control drill carriage for deep hole | |
| CN202528152U (en) | Vertical operation rack | |
| CN102296594A (en) | Multifunctional remote control pile driver of motor-driven caterpillar band | |
| CN202401964U (en) | Long spiral long-hole drilling machine | |
| CN201883934U (en) | Hydraulic lifting type roof punching machine | |
| CN101806065B (en) | High-rise and superhigh-rise large-size building pile driver and pile pressing method | |
| CN202673191U (en) | Multi-functional maintenance service device for petroleum drilling machine | |
| CN214463935U (en) | Raise boring machine with hoisting function | |
| CN202483438U (en) | Anchor rod drill rig | |
| CN219864876U (en) | Building construction drilling appurtenance | |
| CN204002596U (en) | One rig swing leg mechanism | |
| CN204148563U (en) | A kind of top plate drilling servicing unit | |
| CN209738024U (en) | Screw rod transmission high-altitude horizontal drilling auxiliary device | |
| CN203201479U (en) | Electric device for performing ceiling drilling operation from ground |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180206 |