CN206894349U - Generator self-starting control circuit and power distribution device - Google Patents

Generator self-starting control circuit and power distribution device Download PDF

Info

Publication number
CN206894349U
CN206894349U CN201720436410.XU CN201720436410U CN206894349U CN 206894349 U CN206894349 U CN 206894349U CN 201720436410 U CN201720436410 U CN 201720436410U CN 206894349 U CN206894349 U CN 206894349U
Authority
CN
China
Prior art keywords
generator
circuit breaker
switch
power supply
incoming
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720436410.XU
Other languages
Chinese (zh)
Inventor
钟厚龙
李梅
戴发安
胡强
胡名亮
黄学亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tellhow Sci Tech Co Ltd
Original Assignee
Tellhow Sci Tech Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tellhow Sci Tech Co Ltd filed Critical Tellhow Sci Tech Co Ltd
Priority to CN201720436410.XU priority Critical patent/CN206894349U/en
Application granted granted Critical
Publication of CN206894349U publication Critical patent/CN206894349U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control Of Eletrric Generators (AREA)

Abstract

本实用新型提供了一种发电机自启动控制电路和配电装置,发电机自启动控制电路与发电机组件连接,所述发电机组件包括用于接入发电机启动信号的触发线路,所述发电机自启动控制电路包括双电源切换开关,所述电机组件的电源输出端与所述双电源切换开关的第一输入端连接,所述双电源切换开关的第二输入端与市电母线连接,所述双电源切换开关的输出端与需常供电的应急母线连接,所述市电母线通过可控开关与电源装置连接,所述触发线路上设有与所述可控开关状态保持相反的触发开关。当两路市电电源供电均故障时,启动发电机供电。解决双母线(配一路发电机组)供电系统中,电源故障时,合理触发发电机自启动。

The utility model provides a generator self-starting control circuit and a power distribution device. The generator self-starting control circuit is connected with a generator assembly, and the generator assembly includes a trigger circuit for connecting a generator start signal. The generator self-starting control circuit includes a dual power switch, the power output end of the motor assembly is connected to the first input end of the dual power switch, and the second input end of the dual power switch is connected to the mains bus , the output end of the dual power supply switch is connected to the emergency bus that needs constant power supply, the mains bus is connected to the power supply device through a controllable switch, and the trigger circuit is provided with a switch that maintains the opposite state of the controllable switch. Trigger the switch. When the power supply of the two mains power supply fails, the generator is started to supply power. Solve the problem of reasonably triggering the self-starting of the generator when the power supply fails in the power supply system of double busbars (with one generator set).

Description

发电机自启动控制电路及配电装置Generator self-starting control circuit and power distribution device

技术领域technical field

本实用新型涉及配电装置,特别是涉及一种发电机自启动控制电路及配电装置。The utility model relates to a power distribution device, in particular to a generator self-starting control circuit and a power distribution device.

背景技术Background technique

目前在很多供配电方案中,重要用电负荷除了两路市电电源供电外,另配置一路发电机组应急供电。目前的发电机控制方案中,停电后由人为手动启动发电机,存在供电可靠性不高,时效低的问题。At present, in many power supply and distribution schemes, in addition to two mains power supplies for important power loads, an emergency power supply of a generator set is also configured. In the current generator control scheme, the generator is started manually after a power failure, which has the problems of low power supply reliability and low time efficiency.

实用新型内容Utility model content

本实用新型目的在于提供一种发电机自启动控制电路及配电装置,旨在解决停电后由人为手动启动发电机,存在供电可靠性不高,时效低的问题。The purpose of the utility model is to provide a generator self-starting control circuit and power distribution device, aiming to solve the problems of low power supply reliability and low time efficiency when the generator is started manually after a power failure.

本实用新型提供了一种发电机自启动控制电路,与发电机组件连接,所述发电机组件包括用于接入发电机启动信号的触发线路,所述发电机自启动控制电路包括双电源切换开关,所述电机组件的电源输出端与所述双电源切换开关的第一输入端连接,所述双电源切换开关的第二输入端与市电母线连接,所述双电源切换开关的输出端与需常供电的应急母线连接,所述市电母线通过可控开关与电源装置连接,所述触发线路上设有与所述可控开关状态保持相反的触发开关。The utility model provides a generator self-starting control circuit, which is connected with a generator component. The generator component includes a trigger circuit for connecting a generator starting signal. The generator self-starting control circuit includes a dual power supply switching switch, the power output end of the motor assembly is connected to the first input end of the dual power switch, the second input end of the dual power switch is connected to the mains bus, and the output end of the dual power switch It is connected to the emergency bus bar that needs constant power supply, and the mains bus bar is connected to the power supply device through a controllable switch. The trigger circuit is provided with a trigger switch whose state is opposite to that of the controllable switch.

优选地,所述可控开关包括第一进线断路器的常开触点和第二进线断路器的常开触点,所述市电母线包括第一母线和第二母线,所述电源装置包括第一变压器和第二变压器;Preferably, the controllable switch includes a normally open contact of a first incoming circuit breaker and a normally open contact of a second incoming circuit breaker, the mains bus includes a first bus and a second bus, and the power supply The apparatus includes a first transformer and a second transformer;

所述第一母线与第二母线通过一联络断路器的常开触点连接,所述第一母线通过所述第一进线断路器的常开触点与所述第一变压器连接,所述第二母线通过所述第二进线断路器的常开触点与所述第二变压器连接。The first busbar is connected to the second busbar through a normally open contact of a tie circuit breaker, the first busbar is connected to the first transformer through a normally open contact of the first incoming circuit breaker, and the The second bus bar is connected to the second transformer through the normally open contact of the second incoming circuit breaker.

优选地,所述触发开关包括所述第一进线断路器的常闭触点和第二进线断路器的常闭触点。Preferably, the trigger switch includes a normally closed contact of the first incoming circuit breaker and a normally closed contact of the second incoming circuit breaker.

优选地,所述第一进线断路器、第二进线断路器和联络断路器各具有一把合闸锁,三把所述合闸锁包括两把匹配的钥匙。Preferably, each of the first incoming circuit breaker, the second incoming circuit breaker and the tie circuit breaker has one closing lock, and the three closing locks include two matched keys.

具体地,第一进线断路器、第二进线断路器和联络断路器为延时关闭继电器。Specifically, the first incoming circuit breaker, the second incoming circuit breaker and the tie circuit breaker are delay closing relays.

本实用新型还提供了一种配电装置,包括发电机组件,所述发电机组件包括用于接入发电机启动信号的触发线路,还包括上述的发电机自启动控制电路。The utility model also provides a power distribution device, which includes a generator assembly, the generator assembly includes a trigger circuit for connecting a generator start signal, and also includes the above-mentioned generator self-start control circuit.

上述发电机自启动控制电路的当其中一路市电电源供电故障时,将联络柜合闸,由另外一路正常的市电电源通过联络柜送电至故障电源侧。当两路市电电源供电均故障时,启动发电机供电。解决双母线(配一路发电机组)供电系统中,电源故障时,合理触发发电机自启动。When one of the mains power supply of the above-mentioned generator self-starting control circuit fails, the contact cabinet is closed, and the other normal mains power supply is sent to the faulty power supply side through the contact cabinet. When the power supply of the two mains power supply fails, the generator is started to supply power. Solve the problem of reasonably triggering the self-starting of the generator when the power supply fails in the power supply system of double busbars (with one generator set).

附图说明Description of drawings

图1为本实用新型较佳实施例中发电机自启动控制电路的原理示意图;Fig. 1 is the schematic diagram of the principle of the self-starting control circuit of the generator in the preferred embodiment of the utility model;

图2A为本实用新型较佳实施例中发电机自启动控制电路的电气原理图;Fig. 2A is the electrical schematic diagram of the generator self-starting control circuit in a preferred embodiment of the present invention;

图2B为图1所示发电机自启动控制电路中触发线路的原理示意图。FIG. 2B is a schematic diagram of the principle of the trigger circuit in the generator self-starting control circuit shown in FIG. 1 .

具体实施方式detailed description

为了使本实用新型要解决的技术问题、技术方案及有益效果更加清楚明白,以下结合附图及实施例,对本实用新型进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本实用新型,并不用于限定本实用新型。In order to make the technical problems, technical solutions and beneficial effects to be solved by the utility model clearer, the utility model will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model, and are not intended to limit the utility model.

请参阅图1、2A和2B,本实用新型较佳实施例中发电机自启动控制电路与发电机组件10连接,发电机组件10包括用于接入发电机启动信号的触发线路11。其中,触发线路11具有两个端口FQ1和FQ5,连接在发电机启动信号的传输回来上,请参阅图2B。Please refer to Fig. 1, 2A and 2B, in the preferred embodiment of the utility model, the generator self-start control circuit is connected with the generator assembly 10, and the generator assembly 10 includes a trigger circuit 11 for connecting the generator start signal. Wherein, the trigger circuit 11 has two ports FQ1 and FQ5, which are connected to the transmission back of the starting signal of the generator, please refer to FIG. 2B .

发电机自启动控制电路包括双电源切换开关20,发电机组件10的电源输出端与双电源切换开关20的第一输入端连接,双电源切换开关20的第二输入端与市电母线30连接,双电源切换开关20的输出端与需常供电的应急母线40连接,市电母线30通过可控开关51与电源装置60连接,触发线路11上设有与可控开关51状态保持相反的触发开关52。The generator self-starting control circuit includes a dual power supply switch 20, the power output terminal of the generator assembly 10 is connected to the first input terminal of the dual power supply switch 20, and the second input terminal of the dual power supply switch 20 is connected to the mains bus 30 , the output end of the dual power switch 20 is connected to the emergency bus 40 that needs constant power supply, the mains bus 30 is connected to the power supply device 60 through the controllable switch 51, and the trigger circuit 11 is provided with a trigger that is opposite to the state of the controllable switch 51. Switch 52.

需要说明的是,本实施例中的应急母线40上的负载的重要需常供电负载;市电母线30上的负载是一般性可不需供电负载。双电源切换开关20可检测市电母线30上的电源状态,当市电母线30正常供电时,双电源切换开关20的输出端接通第二输入端,市电母线30给应急母线40供电。当市电母线30供电故障时,双电源切换开关20的输出端接通第一输入端,发电机组件10给应急母线40供电。It should be noted that the important loads on the emergency bus 40 in this embodiment require constant power supply; the loads on the mains bus 30 are generally loads that do not need power supply. The dual power switch 20 can detect the power state on the mains bus 30. When the mains 30 supplies power normally, the output of the dual power switch 20 is connected to the second input, and the mains 30 supplies power to the emergency bus 40. When the mains bus 30 fails, the output terminal of the dual power switch 20 is connected to the first input terminal, and the generator assembly 10 supplies power to the emergency bus 40 .

请参阅图2A,可控开关51包括第一进线断路器1QF的常开触点511和第二进线断路器2QF的常开触点512,市电母线30包括第一母线31和第二母线32,电源装置60包括第一变压器61和第二变压器62。Please refer to Fig. 2A, the controllable switch 51 includes the normally open contact 511 of the first incoming line circuit breaker 1QF and the normally open contact 512 of the second incoming line circuit breaker 2QF, the mains bus 30 includes the first bus 31 and the second The bus bar 32 and the power supply device 60 include a first transformer 61 and a second transformer 62 .

第一母线31与第二母线32通过一联络断路器3QF的常开触点511连接,第一母线31通过第一进线断路器1QF的常开触点511与第一变压器61连接,第二母线32通过第二进线断路器2QF的常开触点512与第二变压器62连接。The first bus bar 31 and the second bus bar 32 are connected through a normally open contact 511 of a tie circuit breaker 3QF, the first bus bar 31 is connected with the first transformer 61 through a normally open contact 511 of the first incoming circuit breaker 1QF, and the second The bus bar 32 is connected to the second transformer 62 through the normally open contact 512 of the second incoming circuit breaker 2QF.

请参阅图2B,触发开关52包括第一进线断路器1QF的常闭触点521和第二进线断路器2QF的常闭触点522。Referring to FIG. 2B , the trigger switch 52 includes a normally closed contact 521 of the first incoming circuit breaker 1QF and a normally closed contact 522 of the second incoming circuit breaker 2QF.

第一进线断路器1QF、第二进线断路器2QF和联络断路器3QF各具有一把合闸锁,三把合闸锁包括两把匹配的钥匙。第一进线断路器1QF、第二进线断路器2QF和联络断路器3QF为延时关闭继电器。The first incoming circuit breaker 1QF, the second incoming circuit breaker 2QF and the tie circuit breaker 3QF each have a closing lock, and the three closing locks include two matching keys. The first incoming circuit breaker 1QF, the second incoming circuit breaker 2QF and the tie circuit breaker 3QF are delay closing relays.

还提供了一种配电装置,包括发电机组件10,发电机组件10包括用于接入发电机启动信号的触发线路11,还包括上述的发电机自启动控制电路。A power distribution device is also provided, including a generator assembly 10, the generator assembly 10 includes a trigger circuit 11 for connecting a generator start signal, and also includes the above-mentioned generator self-start control circuit.

本供电方案含有两进线一联络三台断路器1QF/2QF/3QF,三台断路器1QF/2QF/3QF各安装一把合闸锁,三把锁有且只有两把钥匙。只有将钥匙插入断路器合闸锁时,该断路器才允许合闸。确保两进线一联络三台断路器1QF/2QF/3QF最多只有两台合闸,防止两个变压器61、62短接。同时本系统还有一台市电-发电双电源转换柜,双电源转换开关20市电进线侧连接市电母线(市电母线30的第二母线32),双电源切换开关20发电进线侧连接发电机组,双电源切换开关20出线侧连接应急母线段(即应急母线40)。This power supply scheme includes two incoming lines and one connection, three circuit breakers 1QF/2QF/3QF, each of the three circuit breakers 1QF/2QF/3QF is equipped with a closing lock, and the three locks have only two keys. The circuit breaker is only allowed to close when the key is inserted into the circuit breaker closing lock. Ensure that two incoming lines and one contact three circuit breakers 1QF/2QF/3QF have at most two closed switches to prevent the two transformers 61 and 62 from being short-circuited. At the same time, the system also has a mains-generation dual power supply conversion cabinet, the mains incoming line side of the dual power supply switch 20 is connected to the mains bus (the second bus 32 of the mains bus 30), and the dual power supply switch 20 is connected to the mains incoming line side. The generator set is connected, and the outlet side of the dual power switch 20 is connected to the emergency bus section (ie, the emergency bus 40).

1#进线柜中第一进线断路器1QF和2#进线柜中第二进线断路器2QF配置延时失压线圈,当1#进线柜进线端电源故障时,1QF延时自动跳闸;当2#进线柜进线端电源故障时,2QF延时自动跳闸,延时时间可按实际需要设定。The first incoming line circuit breaker 1QF in 1# incoming line cabinet and the second incoming line circuit breaker 2QF in 2# incoming line cabinet are equipped with time-delay voltage loss coils. When the power supply at the incoming line end of 1# incoming line cabinet fails, 1QF delay Automatic tripping; when the power supply at the incoming line end of the 2# incoming line cabinet fails, the 2QF delays automatic tripping, and the delay time can be set according to actual needs.

具体送电顺序:Specific power delivery sequence:

1、当两路电源(第一变压器61和第二变压器62)供电均正常时,1#进线柜第一进线断路器1QF和2#进线柜第二进线断路器2QF均合闸,同时双电源切换开关20转换至第一输入端和输出端接通合闸。此时第一母线31由第一变压器61供电;第二母线32由第二变压器62供电,应急母线40也由第二变压器62供电。1. When the power supply of the two power sources (the first transformer 61 and the second transformer 62) is normal, the first incoming line circuit breaker 1QF of the 1# incoming line cabinet and the second incoming line circuit breaker 2QF of the 2# incoming line cabinet are closed , and at the same time, the dual power supply switching switch 20 is switched to the first input end and the output end are switched on and closed. At this time, the first bus 31 is powered by the first transformer 61 ; the second bus 32 is powered by the second transformer 62 , and the emergency bus 40 is also powered by the second transformer 62 .

2、当第一变压器61供电故障时,1#进线柜第一进线断路器1QF自动延时跳闸,此时合上联络柜3QF断路器,同时双电源切换开关20转换至第一输入端和输出端接通合闸。此时第一母线31由第二变压器62供电;第二母线32由第二变压器62供电,应急母线段也由第二变压器62供电。2. When the power supply of the first transformer 61 fails, the first incoming line circuit breaker 1QF of the 1# incoming line cabinet automatically delays tripping. At this time, close the 3QF circuit breaker of the connection cabinet, and at the same time, the dual power supply switch 20 is switched to the first input terminal. And the output terminal is turned on and closed. At this time, the first bus 31 is powered by the second transformer 62 ; the second bus 32 is powered by the second transformer 62 , and the emergency bus section is also powered by the second transformer 62 .

3、当第二变压器62供电故障时,2#进线柜第二进线断路器2QF自动延时跳闸,此时合上联络柜3QF断路器,同时双电源切换开关20转换至第一输入端和输出端合闸。此时第一母线31由第一变压器61供电;第二母线32由第一变压器61供电,应急母线段也由第一变压器61供电。3. When the power supply of the second transformer 62 fails, the second incoming line circuit breaker 2QF of the 2# incoming line cabinet will trip automatically with a delay. and output closed. At this time, the first bus 31 is powered by the first transformer 61 ; the second bus 32 is powered by the first transformer 61 , and the emergency bus section is also powered by the first transformer 61 .

4、当第一变压器61和第二变压器62均供电故障时,1#进线柜第一进线断路器1QF自动延时跳闸,2#进线柜第二进线断路器2QF也自动延时跳闸。此时触发线路11上串联的1QF和2QF常闭辅助触点均闭合,即F01与F05之间导通,此时发出发电机启动信号至发电机控制屏驱动发电机启动,同时双电源切换开关20转换至发电进线端合闸,应急母线段由发电机供电。从而很好的实现发电机自启动控制。4. When both the first transformer 61 and the second transformer 62 fail to supply power, the first incoming circuit breaker 1QF of 1# incoming line cabinet will automatically delay tripping, and the second incoming line circuit breaker 2QF of 2# incoming line cabinet will also automatically delay trip. At this time, the 1QF and 2QF normally closed auxiliary contacts connected in series on the trigger line 11 are closed, that is, the connection between F01 and F05 is conducted. At this time, a generator start signal is sent to the generator control panel to drive the generator to start, and at the same time, the dual power supply switches 20 is switched to the power generation inlet end and the switch is closed, and the emergency bus section is powered by the generator. Thus, the self-starting control of the generator can be well realized.

以上仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本实用新型的保护范围之内。The above are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present utility model should be included in the utility model. within the scope of protection.

Claims (6)

1.一种发电机自启动控制电路,与发电机组件连接,所述发电机组件包括用于接入发电机启动信号的触发线路,其特征在于,所述发电机自启动控制电路包括双电源切换开关,所述电机组件的电源输出端与所述双电源切换开关的第一输入端连接,所述双电源切换开关的第二输入端与市电母线连接,所述双电源切换开关的输出端与需常供电的应急母线连接,所述市电母线通过可控开关与电源装置连接,所述触发线路上设有与所述可控开关状态保持相反的触发开关。1. A generator self-starting control circuit, connected to a generator assembly, the generator assembly including a trigger circuit for accessing a generator starting signal, characterized in that the generator self-starting control circuit includes a dual power supply A switch, the power output end of the motor assembly is connected to the first input end of the dual power switch, the second input end of the dual power switch is connected to the mains bus, and the output of the dual power switch is The mains bus is connected to the power supply device through a controllable switch, and the trigger circuit is provided with a trigger switch that keeps the state of the controllable switch opposite to that of the controllable switch. 2.如权利要求1所述的发电机自启动控制电路,其特征在于,所述可控开关包括第一进线断路器的常开触点和第二进线断路器的常开触点,所述市电母线包括第一母线和第二母线,所述电源装置包括第一变压器和第二变压器;2. The generator self-starting control circuit according to claim 1, wherein the controllable switch comprises a normally open contact of the first incoming circuit breaker and a normally open contact of the second incoming circuit breaker, The mains bus includes a first bus and a second bus, and the power supply device includes a first transformer and a second transformer; 所述第一母线与第二母线通过一联络断路器的常开触点连接,所述第一母线通过所述第一进线断路器的常开触点与所述第一变压器连接,所述第二母线通过所述第二进线断路器的常开触点与所述第二变压器连接。The first busbar is connected to the second busbar through a normally open contact of a tie circuit breaker, the first busbar is connected to the first transformer through a normally open contact of the first incoming circuit breaker, and the The second bus bar is connected to the second transformer through the normally open contact of the second incoming circuit breaker. 3.如权利要求2所述的发电机自启动控制电路,其特征在于,所述触发开关包括所述第一进线断路器的常闭触点和第二进线断路器的常闭触点。3. The generator self-starting control circuit according to claim 2, wherein the trigger switch comprises a normally closed contact of the first incoming circuit breaker and a normally closed contact of the second incoming circuit breaker . 4.如权利要求2所述的发电机自启动控制电路,其特征在于,所述第一进线断路器、第二进线断路器和联络断路器各具有一把合闸锁,三把所述合闸锁包括两把匹配的钥匙。4. The generator self-starting control circuit as claimed in claim 2, characterized in that, each of the first incoming circuit breaker, the second incoming circuit breaker and the tie circuit breaker has a closing lock, and three The closing lock described above includes two matching keys. 5.如权利要求2所述的发电机自启动控制电路,其特征在于,第一进线断路器、第二进线断路器和联络断路器为延时关闭继电器。5. The generator self-starting control circuit according to claim 2, characterized in that, the first incoming line circuit breaker, the second incoming line circuit breaker and the tie circuit breaker are delay closing relays. 6.一种配电装置,包括发电机组件,其特征在于,所述发电机组件包括用于接入发电机启动信号的触发线路,还包括权利要求1至5任一项所述的发电机自启动控制电路。6. A power distribution device, comprising a generator assembly, characterized in that the generator assembly includes a trigger circuit for accessing a generator start signal, and further includes the generator according to any one of claims 1 to 5 Self-starting control circuit.
CN201720436410.XU 2017-04-24 2017-04-24 Generator self-starting control circuit and power distribution device Expired - Fee Related CN206894349U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720436410.XU CN206894349U (en) 2017-04-24 2017-04-24 Generator self-starting control circuit and power distribution device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720436410.XU CN206894349U (en) 2017-04-24 2017-04-24 Generator self-starting control circuit and power distribution device

Publications (1)

Publication Number Publication Date
CN206894349U true CN206894349U (en) 2018-01-16

Family

ID=61324641

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720436410.XU Expired - Fee Related CN206894349U (en) 2017-04-24 2017-04-24 Generator self-starting control circuit and power distribution device

Country Status (1)

Country Link
CN (1) CN206894349U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111313539A (en) * 2020-02-26 2020-06-19 安徽中电兴发与鑫龙科技股份有限公司 A kind of automatic switching device and method for PLC standby automatic switching bus tie fault
CN108447713B (en) * 2018-05-18 2023-09-29 浙江临高电气实业有限公司 Lock of mechanical interlocking device, mechanical interlocking device and power supply system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108447713B (en) * 2018-05-18 2023-09-29 浙江临高电气实业有限公司 Lock of mechanical interlocking device, mechanical interlocking device and power supply system
CN111313539A (en) * 2020-02-26 2020-06-19 安徽中电兴发与鑫龙科技股份有限公司 A kind of automatic switching device and method for PLC standby automatic switching bus tie fault

Similar Documents

Publication Publication Date Title
CN105006806A (en) Circuit breaker series connection type electrical trip prevention circuit
CN206894349U (en) Generator self-starting control circuit and power distribution device
CN208046224U (en) A kind of protective device preventing circuit-breaker switching on-off coil burnout
CN107086667A (en) A kind of outlet breaker closing circuit structure and its method of work
CN109510301B (en) Mixed type dual power supply conversion circuit and dual power supply system
CN203278385U (en) A control locking circuit for self-switching protection device of high-voltage power distribution system
CN211377696U (en) Dual power automatic transfer switch and dual power supply system
CN206481103U (en) The control circuit of double-bus distribution
CN210724305U (en) Fault guiding safety device, power utilization safety system, multi-path power utilization safety system and automatic bus transfer interlocking control system
CN205070179U (en) Electric blocking device of electric power low -voltage switchgear
CN207705890U (en) A kind of outlet breaker closing circuit structure
CN206907721U (en) A kind of breaker electric spring operating mechanism separating brake control loop
CN202268739U (en) Dual power supply transfer system
CN203788052U (en) Relay protection voltage switching monitoring circuit
CN205304391U (en) Voltage switches return circuit
CN105703476B (en) A kind of automatic throw-in equipment of emergency power supply
CN212012252U (en) A switching circuit and power distribution system for mains power generation
CN105356585A (en) Breaker closing and blocking loop
CN210780201U (en) Low-voltage power distribution cabinet secondary control power supply circuit and low-voltage power distribution cabinet
CN211296296U (en) Emergency power supply device of box-type substation
CN103337903A (en) Three-incoming-line and two-bus-coupler power supply system
CN210744593U (en) Electrical interlocking circuit of inlet wire cabinet, electrical interlocking device of inlet wire cabinet and PT cabinet
CN208001183U (en) Backup auto-activating device and system
CN211017992U (en) Multiport direct current breaker maintenance system that does not have a power failure
CN103311921A (en) Double-power-supply incoming line switch and bus coupler switch interlocking wiring circuit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180116