CN206890042U - Three-phase imbalance adjusting means - Google Patents

Three-phase imbalance adjusting means Download PDF

Info

Publication number
CN206890042U
CN206890042U CN201720763738.2U CN201720763738U CN206890042U CN 206890042 U CN206890042 U CN 206890042U CN 201720763738 U CN201720763738 U CN 201720763738U CN 206890042 U CN206890042 U CN 206890042U
Authority
CN
China
Prior art keywords
arc
casing
plate
adjusting means
phase imbalance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720763738.2U
Other languages
Chinese (zh)
Inventor
黄颖博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Baigu Electrical Technology Co Ltd
Original Assignee
Zhejiang Baigu Electrical Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Baigu Electrical Technology Co Ltd filed Critical Zhejiang Baigu Electrical Technology Co Ltd
Priority to CN201720763738.2U priority Critical patent/CN206890042U/en
Application granted granted Critical
Publication of CN206890042U publication Critical patent/CN206890042U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Patch Boards (AREA)

Abstract

The utility model discloses a kind of three-phase imbalance adjusting means, including multiple side plates, more mounting rods, multiple first arcs, the second arc, screw mandrel, each second arc is provided with the card entry slot being caught in for screw mandrel, and each wire rod thread is connected with nut.During staff's installation casing, first casing is placed in the height of needs, then the first arc is stuck on wire column, the second arc is rotated and allows the first arc and the second arc to form a circle.Now rotary screw rod, it is caught in card entry slot, now the first arc, the second arc and screw mandrel form closing space.Rotating nuts allow nut to be moved towards the direction of the second arc, and nut extrudes the second arc and then allows the first arc and the second arc to cooperate and extrude the fixation that electric pole realizes casing during this.And to allow casing to fix more stable for the fixation of multiple first arcs and the second arc.

Description

Three-phase imbalance adjusting means
Technical field
It the utility model is related to power system adjusting means and bear device, more particularly to a kind of three-phase imbalance adjusting means.
Background technology
In China's power distribution network Distribution network system, there is substantial amounts of unidirectional, asymmetric, non-linear, impact Meet, the problem of three-phase load system changes at random, and these loads can make distribution system produce three-phase imbalance, it is current to supply The method that electric department uses is to realize that continuous, dynamic compensates using three uneven adjusting meanss.
During daily use, people need three-phase imbalance device being fixedly mounted on wire column, installation Need to carry other accessories when process, it has not been convenient to install, have much room for improvement.
Utility model content
The purpose of this utility model is to provide a kind of three-phase imbalance adjusting means, and it is connected with for being fixed on electricity Fixing device on terminal.
Above-mentioned technical purpose of the present utility model technical scheme is that:
A kind of three-phase imbalance adjusting means, including casing, the casing include multiple side plates, and the side plate is fixedly connected There are more mounting rods, the one end of each mounting rod away from side plate is fixedly connected with multiple first arcs, each first arc Shape plate is hinged with the second arc, and one end of each first arc is hinged with screw mandrel, and each second arc is set The card entry slot being caught in for screw mandrel is equipped with, each wire rod thread is connected with nut.
By using above-mentioned technical proposal, during staff's installation casing, first casing is placed in the height of needs, so The first arc is stuck on wire column afterwards, the second arc is rotated and allows the first arc and the second arc to form a circle Shape.Now rotary screw rod, it is caught in card entry slot, now the first arc, the second arc and screw mandrel form closing space.Rotation Nut moves by nut towards the direction of the second arc, and nut extrudes the second arc and then allows the first arc during this Cooperated with the second arc and extrude the fixation that electric pole realizes casing.And multiple first arcs and the second arc Fixation to allow casing to fix more stable.
The utility model is further arranged to:The casing includes bottom plate, and the bottom plate is fixedly connected with multiple standing grooves, Each standing groove is hinged with brace, and one end that the every brace is located remote from groove is connected with clip, the bottom plate It is provided with the fixture for the fixed brace of activity.
By using above-mentioned technical proposal, supporting role of the brace to bottom plate, casing is allowed to have vertical direction Support force, reduce the load effect to electric pole.
The utility model is further arranged to:The fixture includes the bolt through brace, the bolt and bottom plate spiral shell Line connects.
By using above-mentioned technical proposal, during casing is shifted, the brace being hinged with bottom plate can be rocked arbitrarily, shadow Ring the carrying of casing.Now need that brace is fixed, swivel bolt be connected by bolt with base thread so that allow brace with Bottom plate is relatively fixed, and does not allow transfer of the brace to casing to impact.
The utility model is further arranged to:The casing is provided with a storage tank being connected with side wall, the storing Case is provided with the lock for opening and closing storage tank.
By using above-mentioned technical proposal, when people overhaul to three-phase imbalance adjusting means, it is often necessary to carry Some instruments, and when these instruments allow staff to take with oneself and take eminence to, the danger of staff can be increased.People Essential tool can be placed in storage tank, and realize the closing of storage tank using lock.
The utility model is further arranged to:The casing includes top plate, and the top plate is arranged to triangular shape, the top plate Integrally connected drainage plate.
By using above-mentioned technical proposal, at rainy day, the rainwater being accumulated on top plate can be drained to by drainage plate Ground, rainwater is not allowed to be accumulated on top plate.
The utility model is further arranged to:Multiple side plates are provided with notch plate, the opening direction direction of the notch plate Bottom plate.
By using above-mentioned technical proposal, when carrying casing, hand can be stretched into notch plate by people along opening direction It is interior, so as to which easily casing be lifted.
In summary, the utility model has the advantages that:
During staff's installation casing, first casing is placed in the height of needs, the first arc is then stuck in electricity On terminal, rotate the second arc and allow the first arc and the second arc to form a circle.Now rotary screw rod, it is caught in card Enter in groove, now the first arc, the second arc and screw mandrel form closing space.Rotating nuts allow nut towards the second arc Direction movement, nut extrudes the second arc and then allows the first arc and the second arc to cooperate and squeezes during this Piezoelectricity line bar realizes the fixation of casing.And the fixation of multiple first arcs and the second arc allows what casing was fixed It is more stable.
Brief description of the drawings
Fig. 1 is the structural representation of embodiment;
Fig. 2 is the structural representation at another visual angle of embodiment;
Fig. 3 is the structural representation of relation between the first arc, the second arc, screw mandrel, card entry slot and nut.
Reference:1st, casing;2nd, side plate;3rd, mounting rod;4th, the first arc;5th, the second arc;6th, screw mandrel;7th, block Enter groove;8th, nut;9th, standing groove;10th, bottom plate;11st, brace;12nd, clip;13rd, storage tank;14th, latch;15th, top plate;16th, draw Flowing plate;17th, notch plate;18th, it is open;19th, bolt.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
This specific embodiment is only that it is not to limitation of the present utility model, ability to explanation of the present utility model Field technique personnel can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but As long as all protected in right of the present utility model by Patent Law.
A kind of three-phase imbalance adjusting means, as depicted in figs. 1 and 2, including casing 1 and three in casing 1 are not Balance adjustment equipment.Casing 1 includes top plate 15 and four side plates 2.Top plate 15 is arranged to triangular shape.The design of top plate 15 allows rainwater It will not be accumulated on top plate 15.Top plate 15 is connected with drainage plate 16.Drainage plate 16, which exists, allows rainwater along the gravity of itself After flowing, directly drippage will not flow down along side plate 2 on the ground, reduce corrosion of the rainwater to side plate 2.
As depicted in figs. 1 and 2, casing 1 is provided with the storage tank 13 being fixedly connected with one of side plate 2.Storage tank 13 It is provided with the lock 14 opened and closed with air storage tank 13.Some necessary instruments can be placed in storage tank 13 by people, convenient Object in casing 1 is overhauled.
As shown in figures 1 and 3, one of side plate 2 is fixedly connected with three mounting rods 3.Three mounting rods 3 are along vertical Directional spreding and perpendicular to mounting rod 3 connect side plate 2 on.The other end of each mounting rod 3 is fixedly connected with the first arc 4.Each first arc 4 is hinged with the second arc 5.Each second arc 5 can be around the connection with the first arc 4 Place rotates.When the second arc 5, which turns to, to be abutted with the first arc 4, the first arc 4 and the second arc 5 form circle Shape.First one end of arc 4 away from mounting rod 3 is hinged with screw mandrel 6.Second arc 5 is provided with the card being caught in for screw mandrel 6 Enter groove 7.When the first arc 4 and the second arc 5 abut, rotary screw rod 6 allows screw mandrel 6 to be caught in card entry slot 7.The spiral shell of screw mandrel 6 Line is connected with nut 8.The direction of rotating nut 8 towards the second arc 5 it is mobile so that with the second arc 5 produce squeezing action from And the first arc 4 is allowed to be fixedly connected with the second arc 5.
As depicted in figs. 1 and 2, casing 1 includes bottom plate 10.Side of the bottom plate 10 away from top plate 15 is provided with standing groove 9.Put Put groove 9 and be hinged with brace 11.One end that each brace 11 is located remote from groove 9 is connected with clip 12.In order to carry casing 1 when Time does not allow brace 11 to rock.Brace 11 is provided through brace 11 and the bolt 19 being threadedly coupled with bottom plate 10.
As depicted in figs. 1 and 2, two of which side plate 2 is provided with notch plate 17.The direction court of opening 18 of each notch plate 17 To bottom plate 10.
The course of work:
During staff's installation casing 1, first casing 1 is placed in the height of needs, is then stuck in the first arc 4 On wire column, rotate the second arc 5 and allow the first arc 4 and the second arc 5 to form a circle.Now rotary screw rod 6, It is caught in card entry slot 7, now the first arc 4, the second arc 5 and screw mandrel 6 form closing space.Rotating nuts 8 allow nut 8 Moved towards the direction of the second arc 5, nut 8 extrudes the second arc 5 and then allows the first arc 4 and second during this Arc 5, which cooperates, extrudes the fixation that electric pole realizes casing 1.And multiple arcs 5 of first arc 4 and second It is more stable that fixation allows casing 1 to fix.Then brace 11 can be rotated for swivel bolt 19, allows brace 11 to turn to card When hoop 12 aligns with electric pole, clip 12 is allowed to be achieved a fixed connection with electric pole.The now interaction of brace 11 and mounting rod 3 Realize the fixation of casing 1.

Claims (6)

1. a kind of three-phase imbalance adjusting means, including casing (1), the casing (1) includes multiple side plates (2), it is characterized in that: The side plate (2) is fixedly connected with more mounting rods (3), and the one end of each mounting rod (3) away from side plate (2) is fixedly connected with more Individual first arc (4), each first arc (4) are hinged with the second arc (5), each first arc (4) one end is hinged with screw mandrel (6), and each second arc (5) is provided with the card entry slot (7) being caught in for screw mandrel (6), Each screw mandrel (6) is threaded with nut (8).
2. three-phase imbalance adjusting means according to claim 1, it is characterized in that:The casing (1) includes bottom plate (10), The bottom plate (10) is fixedly connected with multiple standing grooves (9), and each standing groove (9) is hinged with brace (11), described in every One end that brace (11) is located remote from groove (9) is connected with clip (12), and the bottom plate (10) is provided with fixed for activity The fixture of brace (11).
3. three-phase imbalance adjusting means according to claim 2, it is characterized in that:The fixture includes running through brace (11) bolt (19), the bolt (19) are threadedly coupled with bottom plate (10).
4. three-phase imbalance adjusting means according to claim 1, it is characterized in that:The casing (1) be provided with one with The storage tank (13) of side wall connection, the storage tank (13) are provided with the lock (14) for opening and closing storage tank (13).
5. three-phase imbalance adjusting means according to claim 1, it is characterized in that:The casing (1) includes top plate (15), The top plate (15) is arranged to triangular shape, top plate (15) the integrally connected drainage plate (16).
6. three-phase imbalance adjusting means according to claim 2, it is characterized in that:Multiple side plates (2) are provided with notch plate (17), opening (18) direction of the notch plate (17) is towards bottom plate (10).
CN201720763738.2U 2017-06-28 2017-06-28 Three-phase imbalance adjusting means Active CN206890042U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720763738.2U CN206890042U (en) 2017-06-28 2017-06-28 Three-phase imbalance adjusting means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720763738.2U CN206890042U (en) 2017-06-28 2017-06-28 Three-phase imbalance adjusting means

Publications (1)

Publication Number Publication Date
CN206890042U true CN206890042U (en) 2018-01-16

Family

ID=61298396

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720763738.2U Active CN206890042U (en) 2017-06-28 2017-06-28 Three-phase imbalance adjusting means

Country Status (1)

Country Link
CN (1) CN206890042U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108518558A (en) * 2018-05-05 2018-09-11 武汉京天鼎承科技有限公司 A kind of router pole attachment device convenient for adjusting
CN112601403A (en) * 2020-12-26 2021-04-02 山东云尚信息科技股份有限公司 Communication cabinet capable of being quickly installed on telegraph pole

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108518558A (en) * 2018-05-05 2018-09-11 武汉京天鼎承科技有限公司 A kind of router pole attachment device convenient for adjusting
CN112601403A (en) * 2020-12-26 2021-04-02 山东云尚信息科技股份有限公司 Communication cabinet capable of being quickly installed on telegraph pole
CN112601403B (en) * 2020-12-26 2021-11-09 山东云尚信息科技股份有限公司 Communication cabinet capable of being quickly installed on telegraph pole

Similar Documents

Publication Publication Date Title
CN206136803U (en) Farming solar protection devices with illumination function
CN206890042U (en) Three-phase imbalance adjusting means
CN203747342U (en) Adjustable mobile cable overhead supporting device
CN107623261A (en) A kind of pre-embedded device of High-low voltage switch cabinet
CN207053057U (en) One kind is used for power equipment maintenance rush repair equipment
CN207268357U (en) A kind of engineering mapping rotary type tripod
CN108483143A (en) A kind of multi-functional copper-clad aluminum conductor winding wire-unfolding rack
CN204549919U (en) Spiral manhole cover lifting machine
CN204277336U (en) The vertical bracing frame of herringbone bar group
CN207051365U (en) A kind of ammeter box with function of auto-lift
CN202379647U (en) Hanger for mounting hardware fitting of line rod
CN106241681A (en) A kind of removable portable load dispatcher well well cover opening device
CN206785074U (en) A kind of four post communication iron towers
CN206742800U (en) Electrical cables stringer is faced in a kind of job site
CN206496165U (en) Wall-mounted charging pile mounting bracket
CN210577392U (en) Overhead device for cable maintenance
CN209071625U (en) Portable ion grounding device
CN204343778U (en) A kind of line bar
CN208794289U (en) It is easy to fixed solar lighting column
CN206395738U (en) Tower crane cab seat
CN205955343U (en) Adjustable stay wire tower who acts as go -between height and distance
CN208280712U (en) A kind of liftable electric pole
CN207303844U (en) A kind of tractor of power line cable
CN206706608U (en) A kind of construction stopper
CN206553082U (en) A kind of adjustable for height crane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant