CN206873487U - A kind of rib stake formula peg board retaining wall - Google Patents
A kind of rib stake formula peg board retaining wall Download PDFInfo
- Publication number
- CN206873487U CN206873487U CN201621101301.4U CN201621101301U CN206873487U CN 206873487 U CN206873487 U CN 206873487U CN 201621101301 U CN201621101301 U CN 201621101301U CN 206873487 U CN206873487 U CN 206873487U
- Authority
- CN
- China
- Prior art keywords
- pile body
- retaining wall
- stake
- peg board
- cantilever segment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses a kind of rib stake formula peg board retaining wall.The rib stake formula peg board retaining wall includes pile body anchoring section (1a), pile body cantilever segment (1b), breast boards (2) longitudinally disposed between adjacent pile body cantilever segment (1b), it is characterised in that:The inner side of described pile body cantilever segment (1b) is fixedly connected with the floor (3) laterally set.The rib stake formula peg board retaining wall is applied to the retaining engineering of Steep Slope Embankment, has the characteristics of pile body deformation is small, supporting and retaining system effect is good, easy construction, construction costs are relatively low, good endurance;And the anchorage depth of stake can be reduced, optimize the Cross section Design of stake.
Description
Technical field
It the utility model is related to a kind of rib stake formula peg board retaining wall.
Background technology
Retaining structure, including the structure type such as retaining wall, antiskid (anchoring) stake, anchor cable (bar), are filled out for supporting, reinforcing
Soil or slope soil, prevent from collapsing and slide to keep a kind of its stable building.Retaining wall is supporting and retaining system the most frequently used in engineering construction
Structure, it is mainly used in supporting embankment filled soil or slope soil, prevents from banketing or soil deformation unstability, bears the lateral soil pressure of the soil body
Power.Its purposes mainly includes:Execavated rockmass height is reduced, excavation quantity is reduced, avoids natural slope failure slump;Shrink embankment slope
Pin, fill yard and floor space are reduced, ensure roadbed reclamation;Avoid roadbed along river from squeezing contracting riverbed, prevent current scour roadbed.
For Steep Slope Embankment location, side slope is high and precipitous, and embankment fill material is difficult in slope stability, it is necessary to first set supporting and retaining system knot
Structure is filling roadbed again, and current stake plate type retaining wall is the supporting and retaining system pattern commonly used during Steep Slope Embankment fills.
Free arm formula peg board retaining wall by the pile body anchoring section being anchored in ground, the pile body cantilever segment to basset and
The breast boards between adjacent pile body cantilever segment and on the inside of stake is placed in form.The height of pile body free arm section can reach
15m or so, but after the height of free arm section is more than 15m, stake will produce excessive lateral displacement, in some instances it may even be possible to stake can occur
The engineering accident that body fractures.
In order to solve the problems to be solved of Steep Slope Embankment retaining wall of the filled height more than 15m, occur in engineering practice
Prestressed anchor pull-type peg board retaining wall.It is between stable massif on the inside of the stake and stake of above-mentioned cantilevered peg board retaining wall
Horizontal prestress anchorage cable is set, to reduce the lateral displacement of stake so that the pull-type peg board retaining wall of prestressed anchor is more than ground
Height can reach 20~25m.But in engineering practice, there is also problems with for the pull-type peg board retaining wall of prestressed anchor:In advance
The work progress of the pull-type peg board retaining wall of stress anchor is complicated, and technical difficulty is high, quality control difficulties;Massif on the inside of stake and stake
Between it is filling roadbed when, Highway Embankment Compaction and prestressed anchor draw the installation of facility to interfere with each other, and easily cause Highway Embankment Compaction degree and anchor
Rope prestressing force is not up to standard;Prestressed anchor draws the long-term reliability of facility and durability to be difficult to be guaranteed.
Utility model content
The purpose of this utility model is to provide a kind of rib stake formula peg board retaining wall.The rib stake formula peg board retaining wall is applied to steep
The retaining engineering of slope embankment, has that pile body deformation is small, supporting and retaining system effect is good, easy construction, construction costs are relatively low, good endurance
The characteristics of;And the anchorage depth of stake can be reduced, optimize the Cross section Design of stake.
The utility model is to realize that the technical scheme that its purpose of utility model uses is:A kind of rib stake formula peg board retaining wall,
Including pile body anchoring section, pile body cantilever segment, breast boards longitudinally disposed between adjacent pile body cantilever segment, it is characterised in that:Institute
The inner side for the pile body cantilever segment stated is fixedly connected with the floor laterally set.
Compared with prior art, the beneficial effects of the utility model are:
First, the utility model can be effectively improved the bending rigidity of stake, be subtracted significantly using being reliably connected between stake and floor
The lateral displacement of stake under small high cantilever state, further improves the jib-length of stake, and can reduce the anchorage depth of stake, optimizes stake
Sectional dimension.Floor in the utility model can substitute the effect of prestress anchorage cable, and due to being one between floor and stake
Act pour reliable to be fixedly connected, the defects of prestressd anchor cable loses as caused by becoming Xu can be overcome, ensure structure long-term work
Stability and durability.
2nd, the pull-type peg board retaining wall of existing prestressed anchor, its construct in need carry out anchor cable pore-creating, make anchor, apply anchor,
The anchor of a series of complex such as slip casting, construction anchor plate, tensioning, sealing off and covering anchorage draws process, and anchor draws process and embankment process phase
Mutually interference is big, and difficulty of construction is higher.And floor of the present utility model only need to be in concreting by connecting reinforcing bar by floor
It is connected with pile body cantilever segment, you can realize that the integration of the two is fixedly connected, its work progress is simple, the construction to embankment
Disturb small, integral construction difficulty is lower, and construction quality is high.
In a word, more traditional peg board retaining wall, the deformation of the utility model rib stake formula peg board retaining wall are reduced, work progress
Simplify, supporting and retaining system effect enhancing, the long-term work performance and durability of structure improve.When engineering-environment is not suitable for cast in situs,
Also prefabricated components can be used to carry out assembling construction so that the utility model is applied widely, is also promoted the use of beneficial to it.
Construction method of the present utility model is
A) stake holes of pile body anchoring section is excavated, then the steel reinforcement cage of pile body anchoring section is hung in stake holes, and pours pile body anchor
Gu the concrete of section;
B) after the shaping of pile body anchoring section, horizontal floor groove is excavated on the inside of pile body anchoring section, and set up pile body cantilever
The template of section and the template of floor;
C) in b the steps template of pile body cantilever segment and the template of floor set up respectively the reinforcing bar of colligation pile body cantilever segment and
The reinforcing bar of floor, and connection reinforcing bar is set between pile body cantilever segment and floor;
D) concrete of pile body cantilever segment and the concrete of floor are poured, pile body cantilever segment is removed after reaching curing requirements
The template of template and floor;
E) longitudinally disposed prefabricated breast boards is layered between pile body cantilever segment, until wall top.
The utility model is described in further detail with reference to the accompanying drawings and detailed description.
Brief description of the drawings
Fig. 1 is the overlooking the structure diagram of the utility model embodiment.
Fig. 2 is the horizontal cross section structure diagram (Fig. 1 A-A sectional views) of the utility model embodiment.
Fig. 3 is the left view structural representation of the utility model embodiment.
In figure:1a-pile body anchoring section, 1b-pile body cantilever segment, 2-breast boards, 3-floor, 4-road bed, 5-mountain
Body.
Embodiment
Embodiment
Fig. 1, Fig. 2, Fig. 3 show that a kind of embodiment of the present utility model is a kind of rib stake formula peg board retaining wall,
Including pile body anchoring section 1a, pile body cantilever segment 1b, breast boards 2 longitudinally disposed between adjacent pile body cantilever segment 1b, its feature
It is:Described pile body cantilever segment 1b inner side is fixedly connected with the floor 3 laterally set.
The construction method of the rib stake formula peg board retaining wall of this example, its step are:
A) pile body anchoring section 1a stake holes is excavated, then pile body anchoring section 1a steel reinforcement cage is hung in stake holes, and pours stake
Body anchoring section 1a concrete;
B) after pile body anchoring section 1a shapings, horizontal floor groove is excavated on the inside of pile body anchoring section 1a, and set up pile body
Cantilever segment 1b template and the template of floor 3;
C) distinguish colligation pile body cantilever segment 1b's in the pile body cantilever segment 1b template and the template of floor 3 that b steps are set up
The reinforcing bar of reinforcing bar and floor 3, and connection reinforcing bar is set between pile body cantilever segment 1b and floor 3;
D) pile body cantilever segment 1b concrete and the concrete of floor 3 are poured, pile body cantilever is removed after reaching curing requirements
Section 1b template and the template of floor 3;
E) longitudinally disposed prefabricated breast boards 2 is layered between pile body cantilever segment 1b, until wall top.
Claims (1)
1. a kind of rib stake formula peg board retaining wall, including pile body anchoring section (1a), pile body cantilever segment (1b), in adjacent pile body cantilever segment
Longitudinally disposed breast boards (2) between (1b), it is characterised in that:The inner side of described pile body cantilever segment (1b) and laterally set
Floor (3) is fixedly connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621101301.4U CN206873487U (en) | 2016-10-08 | 2016-10-08 | A kind of rib stake formula peg board retaining wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621101301.4U CN206873487U (en) | 2016-10-08 | 2016-10-08 | A kind of rib stake formula peg board retaining wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206873487U true CN206873487U (en) | 2018-01-12 |
Family
ID=61325466
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621101301.4U Expired - Fee Related CN206873487U (en) | 2016-10-08 | 2016-10-08 | A kind of rib stake formula peg board retaining wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206873487U (en) |
-
2016
- 2016-10-08 CN CN201621101301.4U patent/CN206873487U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107313431B (en) | Close on not contour foundation pit method for synchronously constructing | |
CN203741868U (en) | Reinforced concrete retaining wall structure with combined anchor wire | |
CN105201011B (en) | A kind of compound anchored plate retaining wall and its construction method | |
CN109356173A (en) | A kind of pin-connected panel anchor bolt frame girder construction and its construction method | |
CN106930277A (en) | A kind of construction of manual-excavation cast-in-place pile method | |
CN107246015A (en) | A kind of super-sized foundation pit subregion adds inner supporting structure and construction method after excavating | |
CN111236258A (en) | Prefabricated pile wall supporting structure with stiffening rib wall and unloading platform and construction method thereof | |
CN109024721B (en) | Reinforced foundation and method for improving bending and shearing resistance of existing building rigid foundation | |
CN106245673A (en) | A kind of rib stake formula peg board retaining wall and construction method thereof | |
CN111980050A (en) | Small foundation bearing platform formwork and construction method thereof | |
CN105369799A (en) | Concrete precast pile of precast pile underground diaphragm wall and construction method of precast pile underground diaphragm wall | |
CN204919602U (en) | Compound anchored retaining wall by tie rods | |
CN105484270B (en) | Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit | |
CN106917358A (en) | A kind of cable-stayed bridge main-beam combination constructing method thereof and its counter weight construction system | |
CN101545255B (en) | Method for manufacturing a PHC tubular pile in soft soil region through chambering and grouting | |
CN206873487U (en) | A kind of rib stake formula peg board retaining wall | |
CN201296932Y (en) | Segmentation prefabricating sunken outer wall and guide wall thereof | |
CN109024657A (en) | The construction method of Super High Core Walls Structure dell side complex conditions tower crane | |
CN213867907U (en) | Prefabricated expanded packing key type digging foundation for power transmission line | |
CN108330986A (en) | Back-pressure de-bowed type pile slab supporting structure and construction method after stake | |
CN211447000U (en) | Foundation pit backfill area construction elevator foundation | |
CN209620049U (en) | A kind of pin-connected panel anchor bolt frame girder construction | |
CN109371901B (en) | Pile bearing type retaining wall of cofferdam in dry period and construction method | |
CN203684236U (en) | Deep foundation pit support retaining wall | |
CN206956738U (en) | A kind of super-sized foundation pit subregion adds inner supporting structure after excavating |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180112 Termination date: 20181008 |
|
CF01 | Termination of patent right due to non-payment of annual fee |