CN206859329U - A settling tank structure for toilets - Google Patents

A settling tank structure for toilets Download PDF

Info

Publication number
CN206859329U
CN206859329U CN201720674945.0U CN201720674945U CN206859329U CN 206859329 U CN206859329 U CN 206859329U CN 201720674945 U CN201720674945 U CN 201720674945U CN 206859329 U CN206859329 U CN 206859329U
Authority
CN
China
Prior art keywords
layer
water
floor drain
leveling
settling tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720674945.0U
Other languages
Chinese (zh)
Inventor
何池平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongguan Huameile Building Material Supermarket Co ltd
Original Assignee
Dongguan Huameile Building Material Supermarket Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongguan Huameile Building Material Supermarket Co ltd filed Critical Dongguan Huameile Building Material Supermarket Co ltd
Priority to CN201720674945.0U priority Critical patent/CN206859329U/en
Application granted granted Critical
Publication of CN206859329U publication Critical patent/CN206859329U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Sanitary Device For Flush Toilet (AREA)

Abstract

The utility model discloses a sink structure for a toilet, which solves the problems that the leveling layer of the sink has no gradient, causes unfavorable drainage and easy water accumulation, causes the toilet to smell and breed bacteria to smell; the reverse side of the filling layer facing the original base layer is sequentially attached with a tension layer, a backfill layer, a leveling waterproof layer, a mortar layer and a floor tile layer; a water running pipeline is arranged in the filling layer and is provided with a water running pipe communicated with the floor brick layer; walk to be provided with in proper order on the water pipe and alternate in filling layer, tension layer and screed-coat and communicate in the floor drain pipeline of the waterproof layer of making level, through the multiple drainage design of the drainage group of arranging the screed-coat in to reach the effect of walking water that improves the screed-coat, with the water that reduces to be detained at the screed-coat, the effectual environmental dryness degree that improves the bathroom.

Description

一种用于卫生间的沉池结构A settling tank structure for toilets

技术领域technical field

本实用新型涉及装修技术领域,更具体地说,它涉及一种用于卫生间的沉池结构。The utility model relates to the technical field of decoration, more specifically, it relates to a sinking pool structure used for toilets.

背景技术Background technique

目前,对于高层楼房的卫生间设计,为防止上层卫生间在使用过 程中因地面和管道渗漏问题或维修问题而干扰下层住户,采用下沉式 卫生间的沉池结构已经在建筑装修行业普遍推广开来。At present, for the design of toilets in high-rise buildings, in order to prevent the upper toilets from disturbing the lower residents due to ground and pipeline leakage or maintenance problems during use, sinking tank structures for sinking toilets have been widely promoted in the construction and decoration industry. .

如附图1所示的沉池结构,最底层为原基础层1,在原基础层1涂刷有基础防水层2,基础防水层2上铺设有填充层3,填充层3为陶粒填充层,填充层3的上表面上铺设有钢丝网层51,以提高沉池整体的张力;钢丝网层51上表面填充有回填层6,回填层6的表面贴合有地砖层91,在填充层3中预埋有走水管道4,走水管道4连接有走水管41,且走水管41连通于地砖层91,使得废水通过走水管道4流出;回填层6中间设置有将回填层6分割成上、下两层的找平防水层8,找平防水层8设置有用于连通走水管道4的二次地漏34,且二次地漏34与找平防水层8处于同一平面,以使得通过地砖渗透的水,通过回填层6以及找平防水层8流入二次地漏34中,使得进入二次地漏34的废水流入走水管道4中。As shown in the sinking tank structure shown in Figure 1, the bottom layer is the original base layer 1, the base waterproof layer 2 is painted on the original base layer 1, and the base waterproof layer 2 is laid with a filling layer 3, which is a ceramsite filling layer , the upper surface of the filling layer 3 is laid with a steel mesh layer 51 to improve the overall tension of the settling tank; the upper surface of the steel mesh layer 51 is filled with a backfill layer 6, and the surface of the backfill layer 6 is bonded with a floor tile layer 91. 3 is pre-embedded with a water pipe 4, the water pipe 4 is connected with a water pipe 41, and the water pipe 41 is connected to the floor tile layer 91, so that the waste water flows out through the water pipe 4; A leveling waterproof layer 8 with upper and lower layers, the leveling waterproof layer 8 is provided with a secondary floor drain 34 for communicating with the water pipeline 4, and the secondary floor drain 34 is on the same plane as the leveling waterproof layer 8, so that the water that penetrates through the floor tiles Water flows into the secondary floor drain 34 through the backfill layer 6 and the leveling waterproof layer 8 , so that the waste water entering the secondary floor drain 34 flows into the water conduit 4 .

现有的下沉式卫生间沉池的结构常见的缺陷在于,沉池的找平防水层8没有坡度,造成排水不利,容易积水,导致卫生间发臭,滋生细菌。The common defect of the structure of the existing sunken toilet sink is that the leveling and waterproof layer 8 of the sink has no slope, which causes unfavorable drainage and easy water accumulation, which causes the toilet to stink and breed bacteria.

实用新型内容Utility model content

本实用新型的目的是提供一种用于卫生间的沉池结构,达到有效提高找平层的走水效果,以减少滞留在找平层的水,有效的提高卫生间的环境干燥程度。The purpose of this utility model is to provide a settling tank structure for toilets, which can effectively improve the water flow effect of the leveling layer, reduce the water trapped in the leveling layer, and effectively improve the environmental dryness of the toilet.

本实用新型的上述技术目的是通过以下技术方案得以实现的:一种用于卫生间的沉池结构,包括原基础层、贴合于所述原基础层的填充层,原基础层与填充层之间设置有基础防水层;所述填充层朝向原基础层的反面依次贴合有张力层、回填层、找平层、找平防水层、砂浆层、地砖层;所述填充层内设有走水管道,走水管道设置有连通于所述地砖层的走水管;所述走水管道上设置有依次穿插于填充层、张力层以及找平层且连通于找平防水层的地漏管道。The above-mentioned technical purpose of the utility model is achieved through the following technical solutions: a settling tank structure for toilets, including the original base layer, the filling layer attached to the original base layer, and the gap between the original base layer and the filling layer. There is a basic waterproof layer in between; the filling layer facing the back of the original base layer is sequentially pasted with a tension layer, a backfill layer, a leveling layer, a leveling waterproof layer, a mortar layer, and a floor tile layer; the filling layer is provided with a water pipeline , the water pipeline is provided with a water pipeline connected to the floor tile layer; the water pipeline is provided with a floor drain pipeline that is sequentially interspersed with the filling layer, the tension layer and the leveling layer and communicated with the leveling waterproof layer.

采用上述技术方案,原基础层与填充层之间设置的基础防水层,有效避免渗透至原基础层的水流出,以有效减少原基础层的漏水情况发生;在填充层朝向原基础层方面依次贴合有的张力层、回填层、找平层、找平防水层、砂浆层以及地砖层,以构成完整的卫生间地面,并在填充层内设置的走水管道以及连通于地砖层的走水管,使得流通于地砖的水通过走水管流向至走水管道,走水管道上设置有用于连接找平防水层的地漏管道,使得地砖渗透至找平防水层的水流入地漏管道,以避免渗透在回填层以及找平防水层中滞留的水发臭,从而使得卫生间地面经常保持干燥卫生,以有效的提高使用者的居住环境干净程度;设置的找平防水层,以有效的阻止了水继续往填充层渗透,以避免水滞留在填充层。By adopting the above technical scheme, the basic waterproof layer set between the original base layer and the filling layer can effectively avoid the outflow of water penetrating into the original base layer, so as to effectively reduce the occurrence of water leakage in the original base layer; Lay the existing tension layer, backfill layer, leveling layer, leveling waterproof layer, mortar layer and floor tile layer to form a complete bathroom floor, and the water pipes set in the filling layer and the water pipes connected to the floor tile layer make The water circulating in the floor tiles flows to the water pipe through the water pipe, and the water pipe is provided with a floor drain pipe for connecting the leveling waterproof layer, so that the water that penetrates from the floor tiles to the leveling waterproof layer flows into the floor drain pipe to avoid penetration in the backfill layer and leveling The stagnant water in the waterproof layer stinks, so that the bathroom floor is often kept dry and hygienic, so as to effectively improve the cleanliness of the user's living environment; the leveling waterproof layer is set to effectively prevent the water from continuing to penetrate into the filling layer, so as to avoid Water is trapped in the fill layer.

进一步,所述地漏管道管口处设有置于砂浆层的透水组件。Further, the mouth of the floor drain pipeline is provided with a water-permeable component placed in the mortar layer.

采用上述技术方案,地漏管道管口设置的透水组件,使得覆盖在找平防水层的砂浆层不容易将地漏管道的管口填实封闭,通过透水组件,以使得地砖向砂浆层渗透至找平防水层的水,一部分通过砂浆层以及透水组件渗透至地漏管道流出,另一部分通过找平防水层流至透水组件再流至地漏管道。With the above technical solution, the permeable component installed at the mouth of the floor drain pipe makes it difficult for the mortar layer covering the leveling waterproof layer to fill and seal the nozzle of the floor drain pipe, and the permeable component allows the floor tiles to penetrate the mortar layer to the leveling waterproof layer Part of the water penetrates through the mortar layer and the permeable component to flow out of the floor drain pipe, and the other part flows through the leveling waterproof layer to the permeable component and then to the floor drain pipe.

进一步,所述透水组件包括置于地漏管道管口处的多个陶粒,以及将陶粒包裹且置于地漏管道管口处的透水网。Further, the water-permeable component includes a plurality of ceramsites placed at the mouth of the floor drain pipe, and a water-permeable net that wraps the ceramsite and places it at the mouth of the floor drain pipe.

采用上述技术方案,置于地漏管道管口处的多个陶粒以及将陶粒包括的透水网,使得多个陶粒被透水网包裹成整体置于地漏管道管口处,通过多个陶粒容置在透水网中,相互之间的陶粒产生的间隙,以使得砂浆层渗透的水流入通过透水组件流至地漏管道中。Using the above technical scheme, the multiple ceramsites placed at the mouth of the floor drain pipeline and the permeable net including the ceramsite make the multiple ceramsites wrapped by the permeable net and placed at the nozzle of the floor drain pipeline as a whole, through the multiple ceramsites Accommodated in the permeable net, the gaps between the ceramsites make the water permeated by the mortar layer flow into the floor drain through the permeable component.

进一步,所述地漏管道管口处设置有用于隔档透水组件的地漏网盖,且地漏网盖低于找平层。Further, the nozzle of the floor drain pipeline is provided with a floor drain net cover for blocking the permeable components, and the floor drain net cover is lower than the leveling layer.

采用上述技术方案,设置的地漏网盖,使得放置在地漏管道管口的透水组件在地漏网盖的支撑下,不掉落至地漏管道中;地漏网盖低于找平层,以避免水滞留在找平层与地漏管道管口连接处,以有效避免水滞留发臭。With the above technical scheme, the floor drain net cover is set so that the permeable components placed at the mouth of the floor drain pipe will not fall into the floor drain pipe under the support of the floor drain net cover; the floor drain net cover is lower than the leveling layer to avoid water stagnation in The connection between the leveling layer and the nozzle of the floor drain pipe can effectively avoid water stagnation and odor.

进一步,所述找平层设有用于将水引流至地漏管道管口的引流组。Further, the leveling layer is provided with a drainage group for diverting water to the nozzle of the floor drain pipe.

采用上述技术方案,设置在找平层上的引流组,以使得渗透在找平层上水,通过引流组将渗透在找平层各个位置的水,引流至地漏管道的管口汇合流向主管道;通过引流组的设置有效的避免了水滞留在找平防水层,以降低水因滞留的原因而发臭的几率。Adopt the above-mentioned technical scheme, set the drainage group on the leveling layer, so that the water infiltrated on the leveling layer, through the drainage group, the water infiltrated in each position of the leveling layer will be drained to the mouth of the floor drain pipeline and flow to the main pipeline; through the drainage group The setting of the group effectively prevents water from stagnating in the leveling waterproof layer, so as to reduce the chance of water stink due to stagnation.

进一步,所述引流组包括置于找平层且以地漏管道为中心分布的中心引流网,以及连通所述中心引流网将水引流至地漏管道管口的多个主引流道。Further, the drainage group includes a central drainage network placed on the leveling layer and centered on the floor drain pipe, and a plurality of main drainage channels connected to the central drainage network to divert water to the nozzle of the floor drain pipe.

采用上述技术方案,设置的以地漏管道为中心分布的中心引流网,以及连通中心引流网,且将水引流至地漏管道管口的多个主引流道,以使得整个引流组以地漏管道管口为中心向四周扩散,以大面积将渗透至找平层的水引流至地漏管道流出。Adopting the above-mentioned technical scheme, the central drainage network distributed with the floor drain pipeline as the center, and the multiple main drainage channels connected to the central drainage network and diverting water to the nozzle of the floor drain pipeline are set, so that the entire drainage group is centered around the nozzle of the floor drain pipeline. It spreads around the center and diverts the water that seeps into the leveling layer to the floor drain pipe in a large area.

进一步,多个所述主引流道之间相互连通有副引流道。Further, a plurality of the main drainage channels communicate with each other with auxiliary drainage channels.

采用上述技术方案,通过在主引流道之间设置的相互连通的副引流道,以增大引流组在找平层上的覆盖范围,以有效的提高渗透至找平防水层的水引流至地漏管道的效率。By adopting the above-mentioned technical scheme, through the interconnected sub-drainage channels set between the main drainage channels, the coverage of the drainage group on the leveling layer can be increased, so as to effectively improve the drainage rate of the water penetrating into the leveling waterproof layer to the floor drain pipe. efficiency.

进一步,所述主引流道和副引流道以及中心引流网至地漏管道管口处由浅至深的开设。Further, the main drainage channel, the auxiliary drainage channel and the central drainage network are opened from shallow to deep at the mouth of the floor drain pipe.

采用上述技术方案,主引流道、副引流道以及中心引流网至地漏管道管口处,由浅至深开设,以使得渗透至找平防水层水在倾斜朝向地漏管道管口的引流组的引流下,有效的汇合至地漏管道中,以有效的降低水滞留发臭的情况发生。Using the above technical scheme, the main drainage channel, the auxiliary drainage channel and the central drainage network are opened from shallow to deep at the mouth of the floor drain pipeline, so that the water penetrating into the leveling waterproof layer is drained by the drainage group inclined towards the nozzle of the floor drain pipeline. It can be effectively merged into the floor drain pipe to effectively reduce the occurrence of water stagnation and odor.

进一步,所述找平层于地漏管道管口处向四周放坡。Further, the leveling layer slopes around at the mouth of the floor drain pipeline.

采用上述技术方案,找平层在地漏管道管口处朝向四周放坡处理,以使得涂刷在找平层的找平防水层的聚水能力,以使得渗透至找平层的水,最大程度上朝向地漏管道汇合流至走水管道。With the above technical solution, the leveling layer is sloped towards the surroundings at the mouth of the floor drain pipe, so that the water gathering capacity of the leveling and waterproof layer painted on the leveling layer is made, so that the water penetrating into the leveling layer is directed towards the floor drain pipe to the greatest extent Combined flow to the water pipe.

进一步,所述地漏管道置于走水管直线距离为1m。Further, the floor drain pipe is placed at a linear distance of 1 m from the water pipe.

采用上述技术方案,地漏管道至走水管的直线距离为1m,以使得置于找平层的地漏管道管口进入的水能够迅速的进入走水管道,并从走水管道流出。With the above technical solution, the linear distance from the floor drain pipe to the water pipe is 1m, so that the water entering the mouth of the floor drain pipe placed on the leveling layer can quickly enter the water pipe and flow out from the water pipe.

附图说明Description of drawings

图1是现有技术中的沉池结构;Fig. 1 is the sedimentation tank structure in the prior art;

图2是本实用新型实施例中的城池结构;Fig. 2 is the city pool structure in the utility model embodiment;

图3是图2中的A处放大图;Figure 3 is an enlarged view of A in Figure 2;

图4是本实用新型实施例中引流组布置于找平层的结构示意图;Fig. 4 is a structural schematic diagram of the drainage group arranged on the leveling layer in the embodiment of the utility model;

图5是图4中的B-B处剖面图。Fig. 5 is a cross-sectional view along line B-B in Fig. 4 .

图中:1、原基础层;2、基础防水层;3、填充层;31、地漏管道;311、地漏网盖;32、陶粒;33、透水网;34、二次地漏;4、走水管道;41、走水管;5、张力层;51、钢丝网层;6、回填层;7、找平层;71、主引流道;72、副引流道;73、中心引流网;8、找平防水层;9、砂浆层;91、地砖层。In the figure: 1. Original base layer; 2. Basic waterproof layer; 3. Filling layer; 31. Floor drain pipe; 311. Floor drain net cover; 32. Ceramsite; 33. Permeable net; 34. Secondary floor drain; 4. Walking Water pipeline; 41. Water pipe; 5. Tension layer; 51. Steel mesh layer; 6. Backfill layer; 7. Leveling layer; 71. Main drainage channel; 72. Secondary drainage channel; 73. Central drainage network; Waterproof layer; 9, mortar layer; 91, floor tile layer.

具体实施方式detailed description

以下结合附图对本实用新型作进一步详细说明。Below in conjunction with accompanying drawing, the utility model is described in further detail.

本具体实施例仅仅是对本实用新型的解释,其并不是对本实用新型的限制,本领域技术人员在阅读完本说明书后可以根据需要对本实施例做出没有创造性贡献的修改,但只要在本实用新型的权利要求范围内都受到专利法的保护。This specific embodiment is only an explanation of the utility model, and it is not a limitation of the utility model. After reading this description, those skilled in the art can make modifications to the embodiment without creative contribution according to needs, but as long as it is within the utility model All new claims are protected by patent law.

实施例:一种用于卫生间的沉池结构,如附图2和附图3所示,包括原基础层1、贴合于所述原基础层1的填充层3,原基础层1与填充层3之间设置有基础防水层2,减少原基础层1的漏水情况发生;填充层3朝上依次贴合有张力层5、回填层6、找平层7、找平防水层8、砂浆层9、地砖层91,以构成完整的卫生间地面,使得卫生间的整体性提升,张力层5为玻璃纤维网,填充层3与回填层6均为陶粒填充;填充层3预埋走水管道4,走水管道4采用PVC管,走水管道4热熔连接有走水管41,走水管41采用PVC管,且走水管41的另一端连通于卫生间的地砖层91,地砖层91由防滑地砖通过砂浆铺设于卫生间地表面而形成的,通过防滑地砖以预防使用者在使用过程滑到;走水管道4平行于原基础层1预埋,走水管41垂直于走水管道4连接,使得流通于地砖层91的水通过走水管41流向至走水管道4;基础防水层2和找平防水层8均采用防水卷材,防水卷材为将沥青类或高分子类防水材料浸渍在胎体上,制作成的防水材料产品,以卷材形式提供,防水卷材具有良好的耐水性,对温度变化的稳定性(高温下不流淌、不起泡、不淆动;低温下不脆裂),一定的机械强度、延伸性和抗断裂性,要有一定的韧性和抗老化性等。Embodiment: a sinking tank structure for toilet, as shown in accompanying drawing 2 and accompanying drawing 3, comprises original base layer 1, the filling layer 3 that is attached to described original base layer 1, original base layer 1 and filling A foundation waterproof layer 2 is set between the layers 3 to reduce the occurrence of water leakage from the original foundation layer 1; the filling layer 3 is sequentially attached with a tension layer 5, a backfill layer 6, a leveling layer 7, a leveling waterproof layer 8, and a mortar layer 9 , floor tile layer 91, to form a complete bathroom floor, so that the integrity of the bathroom is improved, the tension layer 5 is a glass fiber mesh, the filling layer 3 and the backfilling layer 6 are filled with ceramsite; the filling layer 3 pre-embeds the water pipeline 4, The water pipe 4 is made of a PVC pipe, and the water pipe 4 is hot-melt connected with a water pipe 41. The water pipe 41 is made of a PVC pipe, and the other end of the water pipe 41 is connected to the floor tile layer 91 of the toilet. The floor tile layer 91 is made of non-slip floor tiles through mortar. It is formed by laying on the surface of the bathroom floor, and the anti-slip floor tiles are used to prevent users from slipping during use; the water pipe 4 is pre-buried parallel to the original base layer 1, and the water pipe 41 is connected perpendicular to the water pipe 4, so that it can flow through the floor tiles The water in the layer 91 flows to the water pipe 4 through the water pipe 41; the basic waterproof layer 2 and the leveling waterproof layer 8 are all made of waterproof rolls, and the waterproof rolls are made by impregnating asphalt or polymer waterproof materials on the carcass. The finished waterproof material products are provided in the form of coils. The waterproof coils have good water resistance and stability to temperature changes (no flow, no bubbles, no confusion at high temperatures; no brittle cracks at low temperatures), certain Mechanical strength, elongation and fracture resistance must have certain toughness and aging resistance.

找平层7以地漏管道31管口处为中心向四周进行放坡处理,使得涂刷在找平层7的找平防水层8的聚水能力,使得渗透至找平层7的水,最大程度上朝向地漏管道31汇合流至走水管道4。The leveling layer 7 is sloped around the mouth of the floor drain pipe 31, so that the water-collecting ability of the leveling waterproof layer 8 painted on the leveling layer 7 is applied, so that the water that penetrates into the leveling layer 7 is directed towards the floor drain to the greatest extent. The pipelines 31 are confluent and flow to the water pipeline 4 .

走水管道4上垂直连接有地漏管道31,地漏管道31依次穿插于填充层3、张力层5以及找平层7,且地漏管道31管口连通于找平防水层8,使得地砖渗透至找平防水层8的水流入地漏管道31;地漏管道31距离走水管411m设置,使得置于找平层7的地漏管道31管口进入的水能够迅速的进入走水管道4,并从走水管道4流出。The drain pipe 4 is vertically connected with a floor drain pipe 31. The floor drain pipe 31 is sequentially inserted into the filling layer 3, the tension layer 5 and the leveling layer 7, and the mouth of the floor drain pipe 31 is connected to the leveling waterproof layer 8, so that the floor tiles penetrate to the leveling waterproof layer. The water of 8 flows into the floor drain pipe 31; the floor drain pipe 31 is set apart from the water pipe 411m, so that the water that is placed in the floor drain pipe 31 nozzle of the leveling layer 7 can quickly enter the water pipe 4, and flow out from the water pipe 4.

地漏管道31管口覆盖有地漏网盖311,地漏网盖311为PVC材料制作的圆形带有网状结构的盖子,地漏网盖311的内径大于地漏管道31管口内径1mm,使得地漏网盖311卡接固定在地漏管道31管口处,不会往走水管41内掉落;地漏网盖311低于找平层7设置,地漏网盖311低于找平层7,以避免水滞留在找平层7与地漏管道31管口连接处,以有效避免水滞留发臭。The mouth of the floor drain pipe 31 is covered with a floor drain net cover 311. The floor drain net cover 311 is a circular cover made of PVC material with a mesh structure. 311 is clamped and fixed at the nozzle of the floor drain pipe 31, and will not fall into the water pipe 41; the floor drain net cover 311 is set lower than the leveling layer 7, and the floor drain net cover 311 is lower than the leveling layer 7, so as to avoid water stagnation in the leveling layer 7 and floor drain pipeline 31 spout joints, to effectively avoid water stagnation and stink.

地漏管道31管口处预埋有置于砂浆层9中的透水组件,使得地砖向砂浆层9渗透至找平防水层8的水,一部分通过砂浆层9以及透水组件渗透至地漏管道31流出,另一部分通过找平防水层8流至透水组件再流至地漏管道31;透水组件包括放置在地漏管道31管口处的20个陶粒32,以及将陶粒32包裹呈球状的透水网33,透水网33为玻璃纤维网,玻璃纤维网不容易被水腐蚀,使用寿命更长,20个陶粒32容置在透水网33中,相互之间的陶粒32产生的间隙,使得砂浆层9渗透的水流入通过透水组件流至地漏管道31中。The water permeable assembly placed in the mortar layer 9 is pre-embedded at the mouth of the floor drain pipe 31, so that the water from the floor tiles penetrates to the mortar layer 9 to the leveling waterproof layer 8, and a part penetrates through the mortar layer 9 and the water permeable assembly to flow out of the floor drain pipe 31, and the other A part flows through the leveling waterproof layer 8 to the water-permeable assembly and then to the floor drain pipe 31; the water-permeable assembly includes 20 ceramsites 32 placed at the mouth of the floor drain pipe 31, and a spherical water-permeable net 33 wrapping the ceramsite 32, the water-permeable net 33 is a glass fiber net, which is not easily corroded by water and has a longer service life. 20 ceramsites 32 are accommodated in the permeable net 33, and the gaps between the ceramsites 32 make the mortar layer 9 infiltrate The water flows into the floor drain pipe 31 through the water permeable assembly.

如附图4所示,找平层7上表面开有布满于找平层7的引流组,引流组将水引流至地漏管道31管口汇合流向走水管道4;引流组包括以地漏管道31管口为中心开设的中心引流网73和连通于中心引流网73的主引流道71,中心引流网73为两个五角星轮廓形状堆叠形成,且两个五角星轮廓以五角星中心旋转36度堆叠布置,主引流道71为以沿地漏管道31管口外径圆周布置,且直线连通两个堆叠的五角星的对角;且在10个主引流道71之间相互连通有形成两个五角星的副引流道72,两个五角星轮廓以五角星中心旋转36度堆叠布置,且副引流道72置于中心引流网73的外围布置, 使得整个引流组以地漏管道31管口为中心向四周扩散,以大面积将渗透至找平层7的水引流至地漏管道31流出。As shown in Figure 4, the upper surface of the leveling layer 7 is provided with a drainage group that is covered with the leveling layer 7, and the drainage group diverts water to the floor drain pipeline 31 nozzles to converge and flow to the water pipeline 4; the drainage group includes a floor drain pipeline 31 pipes The central drainage network 73 opened at the center and the main drainage channel 71 connected to the central drainage network 73, the central drainage network 73 is formed by stacking two five-pointed star outlines, and the two five-pointed star outlines are stacked by rotating 36 degrees at the center of the five-pointed star Arrangement, the main flow channel 71 is arranged along the outer diameter circumference of the floor drain pipeline 31, and straightly connects the opposite corners of two stacked five-pointed stars; The auxiliary drainage channel 72, the two five-pointed star outlines are stacked and arranged with the center of the five-pointed star rotated 36 degrees, and the auxiliary drainage channel 72 is placed on the periphery of the central drainage network 73, so that the entire drainage group spreads around the center of the floor drain pipe 31 nozzle , the water permeating to the leveling layer 7 is diverted to the floor drain pipe 31 to flow out with a large area.

如附图4和附图5所示,主引流道71、副引流道72、中心引流网73朝向地漏管道31管口处由浅至深的开设于找平防水层8,以形成倾斜的通道,使得渗透至找平防水层8水在倾斜朝向地漏管道31管口的引流组的引流下,有效的汇合至地漏管道31中,以有效的降低水滞留发臭的情况发生。As shown in accompanying drawing 4 and accompanying drawing 5, main drainage channel 71, secondary drainage channel 72, central drainage net 73 are opened in leveling waterproof layer 8 from shallow to deep toward floor drain pipe 31 nozzles, to form inclined passages, make The water penetrating into the leveling waterproof layer 8 is effectively merged into the floor drain pipe 31 under the drainage of the drainage group inclined towards the mouth of the floor drain pipe 31, so as to effectively reduce the occurrence of water stagnation and odor.

Claims (10)

1.一种用于卫生间的沉池结构,其特征在于:包括原基础层(1)、贴合于所述原基础层(1)的填充层(3),原基础层(1)与填充层(3)之间设置有基础防水层(2);所述填充层(3)朝向原基础层(1)的反面依次贴合有张力层(5)、回填层(6)、找平层(7)、找平防水层(8)、砂浆层(9)、地砖层(91);所述填充层(3)内设有走水管道(4),走水管道(4)设置有连通于所述地砖层(91)的走水管;所述走水管道(4)上设置有依次穿插于填充层(3)、张力层(5)以及找平层(7)且连通于找平防水层(8)的地漏管道(31)。1. A settling tank structure for toilet, characterized in that: comprise former foundation layer (1), be fitted in the filling layer (3) of described former foundation layer (1), former foundation layer (1) and filling A basic waterproof layer (2) is arranged between the layers (3); the filling layer (3) is sequentially laminated with a tension layer (5), a backfill layer (6), and a leveling layer ( 7), leveling the waterproof layer (8), mortar layer (9), and floor tile layer (91); the filling layer (3) is provided with a water conduit (4), and the water conduit (4) is provided with a The water pipe of the floor tile layer (91); the water pipe (4) is provided with the filling layer (3), the tension layer (5) and the leveling layer (7) sequentially interspersed and connected to the leveling waterproof layer (8) floor drain pipe(31). 2.根据权利要求1所述的一种用于卫生间的沉池结构,其特征在于:所述地漏管道(31)管口处设有置于砂浆层(9)的透水组件。2. A settling tank structure for toilets according to claim 1, characterized in that: the mouth of the floor drain pipe (31) is provided with a permeable component placed in the mortar layer (9). 3.根据权利要求2所述的一种用于卫生间的沉池结构,其特征在于:所述透水组件包括置于地漏管道(31)管口处的多个陶粒(32),以及将陶粒(32)包裹且置于地漏管道(31)管口处的透水网(33)。3. A settling tank structure for toilets according to claim 2, characterized in that: the permeable component includes a plurality of ceramsite (32) placed at the mouth of the floor drain pipe (31), and the ceramsite The water-permeable net (33) wrapped by grains (32) and placed at the mouth of the floor drain pipe (31). 4.根据权利要求3所述的一种用于卫生间的沉池结构,其特征在于:所述地漏管道(31)管口处设置有用于隔档透水组件的地漏网盖(311),且地漏网盖(311)低于找平层(7)。4. A settling tank structure for toilet according to claim 3, characterized in that: the mouth of the floor drain pipe (31) is provided with a floor drain net cover (311) for separating the permeable components, and the floor drain The net cover (311) is lower than the leveling layer (7). 5.根据权利要求4所述的一种用于卫生间的沉池结构,其特征在于:所述找平层(7)设有用于将水引流至地漏管道(31)管口的引流组。5. A settling tank structure for toilet according to claim 4, characterized in that: said leveling layer (7) is provided with a drainage group for diverting water to the mouth of the floor drain pipe (31). 6.根据权利要求5所述的一种用于卫生间的沉池结构,其特征在于:所述引流组包括置于找平层(7)且以地漏管道(31)为中心分布的中心引流网(73),以及连通所述中心引流网(73)将水引流至地漏管道(31)管口的多个主引流道(71)。6. A settling tank structure for toilet according to claim 5, characterized in that: said drainage group comprises a central drainage network ( 73), and a plurality of main drainage channels (71) that communicate with the central drainage network (73) to divert water to the mouth of the floor drain pipeline (31). 7.根据权利要求6所述的一种用于卫生间的沉池结构,其特征在于:多个所述主引流道(71)之间相互连通有副引流道(72)。7. A settling tank structure for toilet according to claim 6, characterized in that: a plurality of said main drainage channels (71) are connected with auxiliary drainage channels (72). 8.根据权利要求7所述的一种用于卫生间的沉池结构,其特征在于:所述主引流道(71)和副引流道(72)以及中心引流网(73)至地漏管道(31)管口处由浅至深的开设。8. A settling tank structure for toilets according to claim 7, characterized in that: the main drainage channel (71), the auxiliary drainage channel (72) and the central drainage network (73) to the floor drain pipe (31 ) The opening of the nozzle is from shallow to deep. 9.根据权利要求8所述的一种用于卫生间的沉池结构,其特征是:所述找平层(7)于地漏管道(31)管口处向四周放坡。9. A settling tank structure for toilets according to claim 8, characterized in that: said leveling layer (7) slopes around at the mouth of the floor drain pipeline (31). 10.根据权利要求9所述的一种用于卫生间的沉池结构,其特征是:所述地漏管道(31)置于走水管(41)直线距离为1m。10. A settling tank structure for toilet according to claim 9, characterized in that: the floor drain pipe (31) is placed at a linear distance of 1 m from the water pipe (41).
CN201720674945.0U 2017-06-10 2017-06-10 A settling tank structure for toilets Active CN206859329U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720674945.0U CN206859329U (en) 2017-06-10 2017-06-10 A settling tank structure for toilets

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720674945.0U CN206859329U (en) 2017-06-10 2017-06-10 A settling tank structure for toilets

Publications (1)

Publication Number Publication Date
CN206859329U true CN206859329U (en) 2018-01-09

Family

ID=60831597

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720674945.0U Active CN206859329U (en) 2017-06-10 2017-06-10 A settling tank structure for toilets

Country Status (1)

Country Link
CN (1) CN206859329U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867896A (en) * 2018-06-08 2018-11-23 程顺发 A kind of gap water pipe for keeping floor dry
CN109183960A (en) * 2018-10-22 2019-01-11 庄凤仪 A kind of no ponding drainage system and its construction method
CN111076389A (en) * 2019-12-18 2020-04-28 珠海格力电器股份有限公司 Heat abstractor and have its air conditioner
CN112064734A (en) * 2020-09-28 2020-12-11 四川生活家家居集团有限公司 Anti-leakage submerged floor drain pipeline structure
CN112240045A (en) * 2020-08-26 2021-01-19 蓝城乐居建设管理集团有限公司 A subside flexible structure for going out wall drainage system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867896A (en) * 2018-06-08 2018-11-23 程顺发 A kind of gap water pipe for keeping floor dry
CN109183960A (en) * 2018-10-22 2019-01-11 庄凤仪 A kind of no ponding drainage system and its construction method
CN111076389A (en) * 2019-12-18 2020-04-28 珠海格力电器股份有限公司 Heat abstractor and have its air conditioner
CN112240045A (en) * 2020-08-26 2021-01-19 蓝城乐居建设管理集团有限公司 A subside flexible structure for going out wall drainage system
CN112064734A (en) * 2020-09-28 2020-12-11 四川生活家家居集团有限公司 Anti-leakage submerged floor drain pipeline structure

Similar Documents

Publication Publication Date Title
CN206859329U (en) A settling tank structure for toilets
CN202745335U (en) A sunken toilet waterproof and deodorant sedimentation tank structure
CN109488371B (en) Waterproof system of full-enclosed waterproof station and dynamic setting and quantity-limiting drainage method
CN104831873A (en) Compound drainage intelligence inversion formula rigid roof that holds
CN107012893A (en) A kind of basement bottom wall board post poured band waterproof construction and its construction method
CN111877410A (en) Basement anti-seepage structure and basement anti-seepage treatment method
CN103572808A (en) Building toilet caisson waterproof device and construction method
CN102912945B (en) Roof compound seepage-proofing steam exhausting hole detail treatment technology
CN103938679A (en) Drainage riser connector of caisson-type toilet
CN114592574B (en) Intelligent landscape drainage method and drainage device
CN107023146A (en) Toilet warterproof plate and its manufacture method
CN206220190U (en) A kind of toilet co-layer draining structure
CN210395598U (en) Secondary drainage floor drain
CN106351310B (en) A kind of installation method that greening structure soil is used as to rainwater accumulator
CN102900144A (en) Undermining floor drain automatic drainage structure capable of preventing leakage of toilet
CN210712967U (en) Impervious anti structure that floats of basement
CN202882098U (en) In-pit floor drain automatic drainage structure capable of preventing toilet from leaking
CN214497230U (en) A salt erosion repair structure at the root of a concrete bridge guardrail
CN211665866U (en) A caisson type toilet secondary drainage pipeline
CN211665970U (en) Toilet waterproof structure
CN212104215U (en) Post-cast strip for bottom plate of underground chamber
CN203821521U (en) Soil stack connection piece for caisson type toilet
CN206090736U (en) Secondary drainage structures is maked somebody a mere figurehead to bathroom
CN209227915U (en) A kind of vertical water pipe of roofing falls the waterproof construction of mouth
CN217128851U (en) Waterproof construction in bathroom

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant