CN206859058U - A kind of component for main rope of suspension bridge pretension - Google Patents

A kind of component for main rope of suspension bridge pretension Download PDF

Info

Publication number
CN206859058U
CN206859058U CN201720274738.6U CN201720274738U CN206859058U CN 206859058 U CN206859058 U CN 206859058U CN 201720274738 U CN201720274738 U CN 201720274738U CN 206859058 U CN206859058 U CN 206859058U
Authority
CN
China
Prior art keywords
steel
main
suspension bridge
steel plate
component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720274738.6U
Other languages
Chinese (zh)
Inventor
田国印
黎人亮
汪学省
呙佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
China State Construction Bridge Corp Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Engineering Division Bridge Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd, China Construction Sixth Engineering Division Bridge Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201720274738.6U priority Critical patent/CN206859058U/en
Application granted granted Critical
Publication of CN206859058U publication Critical patent/CN206859058U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of component for main rope of suspension bridge pretension, including the rectangular steel plates being made up of symmetrical two halves steel plate, two semicircle orifices are symmetrically provided with two halves steel plate, two described semicircle orifices form a horizontally disposed circular hole of an axis, described circular hole is used for through main rope of suspension bridge, two steel columns are vertically respectively welded at the outer wall of two halves steel plate, hole is had at the top of two steel columns, a piece screw rod is passed through out of two steel columns perforate and is fixedly linked by bolt and steel column, bottom otic placode is welded with the bottom of each steel column, connecting hole is provided with described bottom otic placode, described connecting hole is used to connect chain block.This component can ensure that main cable alignment is smooth, main push-towing rope does not rouse silk, ensure that the construction quality of main push-towing rope before main push-towing rope formally tight cable.

Description

A kind of component for main rope of suspension bridge pretension
Technical field
It the utility model is related to the construction of main rope of suspension bridge pretension, more particularly to a kind of structure for main rope of suspension bridge pretension Part.
Background technology
In the construction of suspension bridge, main cable erection is most important, and the wherein tight cable construction of main push-towing rope is to ensure that main push-towing rope diameter reaches to set Meter requires, main cable strand does not rouse silk, reaches the important step of force request, when tight cable is directly carried out using cable compacting machine, can cause Main push-towing rope diameter does not meet phenomena such as design requirement, main push-towing rope drum silk, has a strong impact on main cable construction quality, is applied so that influenceing main cable erection Work or even whole suspension bridge construction quality, schedule delays, cost increase.
The content of the invention
The shortcomings that the purpose of this utility model is to overcome prior art, there is provided one kind can guarantee that main cable construction quality and Improve the component for main rope of suspension bridge pretension of efficiency of construction.
To solve prior art problem, technical solution adopted in the utility model is:
A kind of component for main rope of suspension bridge pretension, including the rectangular steel plates being made up of symmetrical two halves steel plate, two Two semicircle orifices are symmetrically provided with half steel plate, described two semicircle orifices form horizontally disposed one of an axis Circular hole, described circular hole are used for through main rope of suspension bridge, and two steel columns are vertically respectively welded at the outer of two halves steel plate At wall, hole is had at the top of two steel columns, a screw rod passes through out of two steel columns perforate and passes through spiral shell Bolt is fixedly linked with steel column, and bottom otic placode is welded with the bottom of each steel column, is provided with described bottom otic placode Connecting hole, described connecting hole are used to connect chain block.
The utility model has advantages below:
1. component can ensure that main cable alignment is smooth, main push-towing rope does not rouse silk, ensure that applying for main push-towing rope before main push-towing rope formally tight cable Working medium amount;
2. component can repeatedly, in circulation use, improve efficiency of construction, reduce construction cost;
3. component is gathered materials on the spot, preparation method is simple.
Brief description of the drawings
Fig. 1 is the structural representation of the component of main push-towing rope pretension cable of the present utility model;
Fig. 2 is the A-A sectional drawings of the structure shown in Fig. 1;
Fig. 3 is that the structure shown in Fig. 1 uses schematic diagram.
Embodiment
In order to further appreciate that invention, features and effects of the present utility model, following examples are hereby enumerated, and match somebody with somebody It is as follows to close accompanying drawing detailed description:
Refering to Fig. 1~Fig. 3, a kind of component for main rope of suspension bridge pretension, including be made up of symmetrical two halves steel plate Rectangular steel plates 1, are symmetrically provided with two semicircle orifices on two halves steel plate, and described two semicircle orifices form an axis along level The circular hole that direction is set, described circular hole are used to vertically weld respectively through main rope of suspension bridge 6, two steel columns 2 It is connected at the outer wall of two halves steel plate, has hole at the top of two steel columns 2, a screw rod 5 is opened from two steel columns 2 Pass through in hole and be fixedly linked by bolt 4 with steel column, bottom otic placode 3 is welded with the bottom of each steel column 2, Connecting hole is provided with described bottom otic placode 3, described connecting hole is used to connect chain block 7.
As shown in figure 3, during pretension cable, main rope of suspension bridge 6 is passed through into component circular hole, according to main push-towing rope actual conditions adjusting screw rod 5, chain block 7 is passed through to the connection hole of bottom otic placode 3, now screw rod is loose that two halves steel plate can be inside along screw rod Slide, using manual adjustment chain block 7, you can carry out the pretension of main push-towing rope 6, steel disc can be used by rousing silk such as appearance during pretension cable Combed and be aided with gavel and beaten, ensure pretension cable construction quality.
After the completion of pretension cable, fixed using stainless steel band at pretension cable.
Depending on device actual size of the present utility model is with job site actual conditions.
Main push-towing rope pretension cable component of the present utility model, it is that pretension cable is carried out to main push-towing rope before the tight cable of main push-towing rope in suspension bridge construction A kind of component, structure manufacture is convenient, using simple, in practical application can repeatedly, recycle, both ensured that the tight cable of main push-towing rope was constructed Quality, construction cost is reduced again, there is good practicality.
Above by reference to drawings and examples, component of the present utility model is schematically described, the description does not limit Property processed.The construction technical staff of this area is understood that use, in actual applications, the making side of each part in the utility model Some changes may occur for formula, and other staff may also make similar Design under its enlightenment.As long as it is pointed out that Design aim of the present utility model, all obvious changes and its similar Design are not departed from, is all contained in the utility model Protection domain within.

Claims (1)

  1. A kind of 1. component for main rope of suspension bridge pretension, it is characterised in that:Including the rectangle being made up of symmetrical two halves steel plate Steel plate, is symmetrically provided with two semicircle orifices on two halves steel plate, and described two semicircle orifices form an axis in the horizontal direction The circular hole set, described circular hole are used to vertically be respectively welded at two through main rope of suspension bridge, two steel columns At the outer wall of half steel plate, hole is had at the top of two steel columns, a screw rod passes through out of two steel columns perforate And it is fixedly linked by bolt and steel column, bottom otic placode is welded with the bottom of each steel column, in described bottom Connecting hole is provided with otic placode, described connecting hole is used to connect chain block.
CN201720274738.6U 2017-03-21 2017-03-21 A kind of component for main rope of suspension bridge pretension Expired - Fee Related CN206859058U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720274738.6U CN206859058U (en) 2017-03-21 2017-03-21 A kind of component for main rope of suspension bridge pretension

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720274738.6U CN206859058U (en) 2017-03-21 2017-03-21 A kind of component for main rope of suspension bridge pretension

Publications (1)

Publication Number Publication Date
CN206859058U true CN206859058U (en) 2018-01-09

Family

ID=60815559

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720274738.6U Expired - Fee Related CN206859058U (en) 2017-03-21 2017-03-21 A kind of component for main rope of suspension bridge pretension

Country Status (1)

Country Link
CN (1) CN206859058U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109338888A (en) * 2018-11-12 2019-02-15 中国十七冶集团有限公司 A kind of main rope of suspension bridge pre-tightens cable device and application method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109338888A (en) * 2018-11-12 2019-02-15 中国十七冶集团有限公司 A kind of main rope of suspension bridge pre-tightens cable device and application method

Similar Documents

Publication Publication Date Title
CN100999913B (en) Node of steel tube concrete pole and steel reinforced concrete beam and processing method thereof
CN206408836U (en) Weld stirrup steel rib beam column
CN204781970U (en) Template fixing device with adjustable
CN206859058U (en) A kind of component for main rope of suspension bridge pretension
CN209723690U (en) Node for connecting newly-added concrete column and original concrete column
CN107795040A (en) Build double steel plate concrete structure double steel plate connecting elements
CN209279343U (en) A kind of reusable built-in type stand column pile
CN208379585U (en) A kind of architectural engineering anchor-rod positioner
CN200999389Y (en) Panel point for steel pipe concrete column and reinforced concrete beam
CN204974856U (en) Curved equipment is cooked over a slow fire to mill formula band steel
CN204510792U (en) A kind of steel form
CN209323688U (en) Prefabricated assembling type reinforced concrete column splices node structure
CN208105673U (en) Reinforcing bar grout sleeve connection structure
CN203361642U (en) Cast-in-place stair steel formwork of assembled structure
CN209356278U (en) Assembled bridge pouring parameter research device
CN208267373U (en) A kind of construction joint inner side template support device
CN209228033U (en) Regularization template external corner reinforcing device
CN209211630U (en) Prefabricated assembled profile steel concrete column splices node structure
CN206957060U (en) A kind of embedded water stop band and its stirrup
CN207176510U (en) A kind of convenient working bracket component of bridge
CN207513167U (en) Convex template component and concave template component of arc building and template system formed by convex template component and concave template component
CN202055180U (en) Rack unloading sand box of cast-in-site bridge
CN107642181A (en) Vertical baffle beam-column connection suitable for steel plate combined shear wall newel post and its use engineering method
CN206513513U (en) Mix triangle segmentation lattice blower fan pylon
CN206952875U (en) A kind of hydraulic means for being used to take out steady pin

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 300451 Tanggu District, Tianjin, 72 Tanggu Hangzhou Road, Tianjin

Co-patentee after: CHINA STATE CONSTRUCTION BRIDGE Corp.,Ltd.

Patentee after: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd.

Address before: 300451 Tanggu District, Tianjin, 72 Tanggu Hangzhou Road, Tianjin

Co-patentee before: China Construction Sixth Engineering Co.,Ltd.

Patentee before: CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION Corp.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180109