CN206754617U - The prefabricated natural gas line of concrete outer cladding - Google Patents

The prefabricated natural gas line of concrete outer cladding Download PDF

Info

Publication number
CN206754617U
CN206754617U CN201720600754.XU CN201720600754U CN206754617U CN 206754617 U CN206754617 U CN 206754617U CN 201720600754 U CN201720600754 U CN 201720600754U CN 206754617 U CN206754617 U CN 206754617U
Authority
CN
China
Prior art keywords
natural gas
thickness
gas line
outer cladding
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720600754.XU
Other languages
Chinese (zh)
Inventor
杨伟胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Huanyu Construction Engineering Co Ltd
Original Assignee
Jiangsu Huanyu Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Huanyu Construction Engineering Co Ltd filed Critical Jiangsu Huanyu Construction Engineering Co Ltd
Priority to CN201720600754.XU priority Critical patent/CN206754617U/en
Application granted granted Critical
Publication of CN206754617U publication Critical patent/CN206754617U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rigid Pipes And Flexible Pipes (AREA)

Abstract

This application discloses the natural gas line that a kind of concrete outer cladding is prefabricated; including rubber slab, web, quartz sand layer, resin concrete layer, compressor wire, cement mortar protective course and the epoxy coal tar pitch coating being coated on successively on the outside of natural gas line; the thickness of the resin concrete layer is in 90~120mm; the thickness of the rubber slab is in 20~30mm; the thickness of the quartz sand layer is in 1~3mm; the thickness of the cement mortar protective course is in 1~2mm, and the thickness of the epoxy coal tar pitch coating is in 1~2mm.Originally new that concrete is all coated on the outside of pipeline anticorrosion coating, concrete layer had both been used as counterweight or pipeline is protected simultaneously.In addition, this novel pipeline structure resting period is grown, efficiency of construction can be improved and reduce cost.

Description

The prefabricated natural gas line of concrete outer cladding
Technical field
The application is related to Construction Technology field, more particularly to the natural gas tube that a kind of concrete outer cladding is prefabricated Road.
Background technology
It is regular to want heavy excavation to pass through river course in Gao Long-distance Transmission Pipeline construction;Especially in southern area, most of river Deposit thick mud in road;When pipe excavation is laid, because roughing-in is by the buoyancy of mud and acting on for other external force, make Lay the pipeline finished to float again, do not reach the buried depth requirement of pipeline laying, leave accident potential:It is light then construction period send out This existing situation, excavation laying is re-started, increases construction cost;In the case of more serious, this hidden danger is found when natural gas is gone into operation, And operation of doing over again is carried out, integrated cost is very big;In the case of most serious, natural gas tube is washed away by current and displacement deformation occurs, Until fracture and blast, may lead to the loss that can not be estimated.
Utility model content
The purpose of this utility model is to provide a kind of concrete outer cladding prefabricated natural gas line, to overcome existing skill Deficiency in art.
To achieve the above object, the utility model provides following technical scheme:
The embodiment of the present application discloses a kind of prefabricated natural gas line of concrete outer cladding, including is coated on natural gas successively Rubber slab, web, quartz sand layer, resin concrete layer, compressor wire, cement mortar protective course and epoxy on the outside of pipeline Coal tar pitch anticorrosive coat, the thickness of the resin concrete layer is in 90~120mm, and the thickness of the rubber slab is in 20~30mm, institute The thickness of quartz sand layer is stated in 1~3mm, the thickness of the cement mortar protective course is in 1~2mm, the epoxide coal bituminous anti-corrosion The thickness of layer is in 1~2mm.
Preferably, in the prefabricated natural gas line of above-mentioned concrete outer cladding, the rubber slab and resin concrete Tank is gone back filled with binding agent between layer.
Preferably, in the prefabricated natural gas line of above-mentioned concrete outer cladding, the compressor wire intertexture networking Shape.
Preferably, in the prefabricated natural gas line of above-mentioned concrete outer cladding, the compressor wire it is a diameter of 0.5~0.8mm.
Preferably, in the prefabricated natural gas line of above-mentioned concrete outer cladding, the rubber slab is two layers of rubber peel, Two layers of rubber skin thickness is identical.
Preferably, in the prefabricated natural gas line of above-mentioned concrete outer cladding, quartz sand layer and the resin coagulation Formed with bamboo cage between soil layer.
Compared with prior art, the utility model has the advantage of:This is new, and all cladding is mixed on the outside of pipeline anticorrosion coating Solidifying soil, concrete layer had both been used as counterweight or pipeline is protected simultaneously.In addition, this novel pipeline structure resting period is grown, can be with Improve efficiency of construction and reduce cost.
Brief description of the drawings
, below will be to embodiment or existing in order to illustrate more clearly of the embodiment of the present application or technical scheme of the prior art There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments described in application, for those of ordinary skill in the art, on the premise of not paying creative work, Other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 show the sectional view of the natural gas line that concrete outer cladding is prefabricated in the utility model specific embodiment.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Detailed description, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole implementation Example.Based on the embodiment in the utility model, those of ordinary skill in the art institute on the premise of creative work is not made The every other embodiment obtained, belong to the scope of the utility model protection.
With reference to shown in Fig. 1, the prefabricated natural gas line of concrete outer cladding, including natural gas line 101 is coated on successively The rubber slab 102 in outside, web 103, quartz sand layer 104, resin concrete layer 105, compressor wire 106, cement mortar Protective layer 107 and epoxy coal tar pitch coating 108, the thickness of resin concrete layer 105 is in 90~120mm, the thickness of rubber slab 102 Degree is in 20~30mm, and the thickness of quartz sand layer 104 is in 1~3mm, and the thickness of cement mortar protective course 107 is in 1~2mm, Epoxy coal The thickness of asphalt corrosion resistant layer 108 is in 1~2mm.
In the technical scheme, pass through web and quartz sand layer so that coarse outer wall, Ke Yishi are formed on the outside of rubber slab Existing rubber slab is combined closely with resin concrete layer.
In the technical scheme, the intensity of resin concrete layer can be improved by compressor wire, improves its service life, The conjugation between resin concrete layer and cement mortar can also be improved simultaneously.
In the technical scheme, by cement mortar protective course and epoxy coal tar pitch coating, depositing for prefabricated component can be improved Put the time, improve efficiency of construction and reduce cost.
In one embodiment, tank is gone back between rubber slab 102 and resin concrete layer 105 filled with binding agent (not shown).
Further, compressor wire 106 interweaves and reticulated.
Preferably, a diameter of 0.5~0.8mm of compressor wire 106.
Preferably, rubber slab is two layers of rubber peel, and two layers of rubber skin thickness is identical.
In the technical scheme, antisepsis can be played to pipeline by rubber peel.
In one embodiment, formed with bamboo cage (not shown) between quartz sand layer 104 and resin concrete layer 105.
In the technical scheme, concrete strength and plasticity can be increased by bamboo cage, and ensure the whole of concrete weighted coating Body.
The preparation method of the prefabricated natural gas line of concrete outer cladding includes:
(1), the rubber-coated plate on the outside of natural gas line;
(2), covered fiber layer on the outside of rubber slab;
(3) a certain amount of quartz sand layer, is coated in fiber layer surface, to improve its surface roughness and conjugation;
(4), bottom mould is installed and locked, using the opening of mould, concrete is gradually poured into, vibrated in batches, First cast on quartz sand layer surface lower-layer concrete, realize the casting of lower half circular surfaces;
(5), top mould is installed and locked, using the opening of mould, concrete is gradually poured into, vibrated in batches, Realize the concrete casting of upper half circular surfaces;
(6), after the concreting of levels, and 24 hours or so are spent, dismantles mould;
(7), compressor wire is wound in resin concrete layer surface;
(8), cladding makes cement mortar protective course and epoxy coal tar pitch coating successively;
(9), handling is installed.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality Body or operation make a distinction with another entity or operation, and not necessarily require or imply and deposited between these entities or operation In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to Nonexcludability includes, so that process, method, article or equipment including a series of elements not only will including those Element, but also the other element including being not expressly set out, or it is this process, method, article or equipment also to include Intrinsic key element.In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that Other identical element also be present in process, method, article or equipment including the key element.
Described above is only the embodiment of the application, it is noted that for the ordinary skill people of the art For member, on the premise of the application principle is not departed from, some improvements and modifications can also be made, these improvements and modifications also should It is considered as the protection domain of the application.

Claims (6)

1. the prefabricated natural gas line of a kind of concrete outer cladding, it is characterised in that including being coated on successively outside natural gas line The rubber slab of side, web, quartz sand layer, resin concrete layer, compressor wire, cement mortar protective course and epoxide coal bituminous Anticorrosive coat, the thickness of the resin concrete layer is in 90~120mm, and the thickness of the rubber slab is in 20~30mm, the quartz The thickness of layer of sand is in 1~3mm, and the thickness of the cement mortar protective course is in 1~2mm, the thickness of the epoxy coal tar pitch coating Degree is in 1~2mm.
2. the prefabricated natural gas line of concrete outer cladding according to claim 1, it is characterised in that:The rubber slab and Tank is gone back between resin concrete layer filled with binding agent.
3. the prefabricated natural gas line of concrete outer cladding according to claim 1, it is characterised in that:The prestress steel Silk, which interweaves, to be reticulated.
4. the prefabricated natural gas line of concrete outer cladding according to claim 1, it is characterised in that:The prestress steel A diameter of 0.5~0.8mm of silk.
5. the prefabricated natural gas line of concrete outer cladding according to claim 1, it is characterised in that:The rubber slab is Two layers of rubber peel, two layers of rubber skin thickness are identical.
6. the prefabricated natural gas line of concrete outer cladding according to claim 1, it is characterised in that:The quartz sand layer Formed with bamboo cage between resin concrete layer.
CN201720600754.XU 2017-05-26 2017-05-26 The prefabricated natural gas line of concrete outer cladding Expired - Fee Related CN206754617U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720600754.XU CN206754617U (en) 2017-05-26 2017-05-26 The prefabricated natural gas line of concrete outer cladding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720600754.XU CN206754617U (en) 2017-05-26 2017-05-26 The prefabricated natural gas line of concrete outer cladding

Publications (1)

Publication Number Publication Date
CN206754617U true CN206754617U (en) 2017-12-15

Family

ID=60620784

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720600754.XU Expired - Fee Related CN206754617U (en) 2017-05-26 2017-05-26 The prefabricated natural gas line of concrete outer cladding

Country Status (1)

Country Link
CN (1) CN206754617U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108758104A (en) * 2018-06-14 2018-11-06 江苏环宇建设工程有限公司 Concrete clad structure of natural gas line and preparation method thereof
CN109263153A (en) * 2018-09-26 2019-01-25 江苏清源管道技术有限公司 A kind of the pipeline corrosion protection structure and method of wet environment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108758104A (en) * 2018-06-14 2018-11-06 江苏环宇建设工程有限公司 Concrete clad structure of natural gas line and preparation method thereof
CN109263153A (en) * 2018-09-26 2019-01-25 江苏清源管道技术有限公司 A kind of the pipeline corrosion protection structure and method of wet environment

Similar Documents

Publication Publication Date Title
CN106013086A (en) Construction method for processing underground continuous wall joint through boss type I-steel joint box
CN109162298B (en) A construction method of a comprehensive pipe gallery in a water-rich area
CN206754617U (en) The prefabricated natural gas line of concrete outer cladding
CN204040026U (en) Prefabricated sleeve-cast-in-place combined pile for strong corrosion environment
CN112228631B (en) Pipe reinforcement system
CN104790425A (en) Corrosion-resistant pole tower foundation for power transmission tower
CN110645411B (en) Pipeline laying method
WO2016064324A1 (en) Concrete mixture and applications of the concrete mixture
CN209163073U (en) A waterproof structure for a sunken toilet
CN106122616A (en) A kind of long-effective corrosion etching method of lined Prestressed concrete cylinder pipe
CN204254073U (en) A kind of pre-stress steel cylinder RPC tubing
CN206844132U (en) Superelevation light supporting structure
CN1888393B (en) A functionally graded shield segment and its preparation method
CN207582508U (en) A kind of permeable inspection well cover of eco-filtration
CN109235439B (en) A pressure-maintaining pouring method for outsourcing large-volume concrete below the waistline of a volute of a hydropower project
CN208280179U (en) Precast assembling concrete manhole
CN204608759U (en) A kind of anti-corrosion precast pile
CN201534965U (en) Abrasion-resisting metal bellows culvert
CN209482372U (en) Anti-floating and anti-corrosion structure at bottom of pool structure
CN115012451A (en) Underground structure induced joint
CN106287008A (en) A kind of long-effective corrosion etching method of embed-type Prestressed concrete cylinder pipe
CN206018048U (en) The embed-type Prestressed concrete cylinder pipe of long life anti corrosion
CN209114502U (en) A kind of prefabricated composite cable ditch piping lane of assembled plastic film
CN208105317U (en) Corrugated steel outer lining concrete structure for underground pipe gallery
CN108218345B (en) A kind of salt-soda soil anti-corrosion foundation and preparation method possessing amelification protective layer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171215

Termination date: 20210526

CF01 Termination of patent right due to non-payment of annual fee