CN206720665U - A high-efficiency conveying equipment for cement used in building walls - Google Patents
A high-efficiency conveying equipment for cement used in building walls Download PDFInfo
- Publication number
- CN206720665U CN206720665U CN201720387685.9U CN201720387685U CN206720665U CN 206720665 U CN206720665 U CN 206720665U CN 201720387685 U CN201720387685 U CN 201720387685U CN 206720665 U CN206720665 U CN 206720665U
- Authority
- CN
- China
- Prior art keywords
- welded
- plate
- gear
- cement
- bearing seat
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及一种建筑水泥传送设备,尤其涉及一种建筑砌墙用水泥高效传送设备。The utility model relates to a construction cement transmission equipment, in particular to a high-efficiency cement transmission equipment for building walls.
背景技术Background technique
水泥:粉状水硬性无机胶凝材料。加水搅拌后成浆体,能在空气中硬化或者在水中更好的硬化,并能把砂、石等材料牢固地胶结在一起。是碎石及片石的意思。早期石灰与火山灰的混合物与现代的石灰火山灰水泥很相似,用它胶结碎石制成的混凝土,硬化后不但强度较高,而且还能抵抗淡水或含盐水的侵蚀。长期以来,它作为一种重要的胶凝材料,广泛应用于土木建筑、水利、国防等工程。Cement: powdery hydraulic inorganic gelling material. After adding water and stirring, it becomes a slurry, which can be hardened in the air or better hardened in water, and can firmly bind sand, stone and other materials together. It means gravel and flakes. In the early years the mixture of lime and volcanic ash is very similar to lime pozzolanic cement, use it to glue concrete which made of crushed stone. After hardening, the cement not only has high strength, but also can resist the erosion of fresh water or salt water. For a long time, as an important cementing material, it is widely used in civil engineering, water conservancy, national defense and other projects.
砌墙工人砌到很高时需要使用机架,站在机架上施工使用完水泥上下来回去不方便,其他工人传递水泥存在耗费人力、传递速度慢的缺点,因此亟需研发一种节省人力、传递效率高的建筑砌墙用水泥高效传送设备。The workers who build the wall need to use the frame when they build it very high. It is inconvenient to go up and down after standing on the frame and use the cement. Other workers have the disadvantages of labor-intensive and slow transfer of cement. Therefore, it is urgent to develop a manpower-saving , High-efficiency cement transmission equipment for building walls with high transmission efficiency.
实用新型内容Utility model content
(1)要解决的技术问题(1) Technical problems to be solved
本实用新型为了克服工人传递水泥存在耗费人力、传递速度慢的缺点,本实用新型要解决的技术问题是提供一种节省人力、传递效率高的建筑砌墙用水泥高效传送设备。In order to overcome the shortcomings of manpower consumption and slow transmission speed of workers in transferring cement, the utility model aims to solve the technical problem of providing a high-efficiency cement conveying equipment for building walls that saves manpower and has high transfer efficiency.
(2)技术方案(2) Technical solution
为了解决上述技术问题,本实用新型提供了这样一种建筑砌墙用水泥高效传送设备,包括有底板、车轮、升降装置、推杆、连接杆、旋转装置、放置板和固定装置,底板底部左右两侧转动式连接有车轮,底板顶部右侧通过螺栓连接的方式连接有升降装置,升降装置右侧中部焊接有推杆,升降装置左侧焊接有连接杆,连接杆左侧焊接有旋转装置,旋转装置顶部焊接有放置板,放置板顶部均匀开有放置槽。In order to solve the above technical problems, the utility model provides such a high-efficiency cement conveying equipment for building walls, including a base plate, wheels, lifting devices, push rods, connecting rods, rotating devices, placing plates and fixing devices. The two sides are rotatably connected with wheels, and the right side of the top of the bottom plate is connected with a lifting device through bolt connection. The middle part of the right side of the lifting device is welded with a push rod, the left side of the lifting device is welded with a connecting rod, and the left side of the connecting rod is welded with a rotating device. A placement plate is welded on the top of the rotating device, and placement slots are evenly opened on the top of the placement plate.
优选地,升降装置包括有机械箱、第一轴承座、丝杆、螺母、第一锥齿轮、导杆、导套、第一连接板、第二轴承座、第一转轴、摇杆和第二锥齿轮,底板顶部右侧通过螺栓连接的方式连接有机械箱,机械箱左壁开有一字孔,机械箱内右壁上下对称焊接有第一轴承座,第一轴承座内的轴承之间过盈连接有丝杆,丝杆上设有螺母,螺母与丝杆配合,丝杆底端过盈连接有第一锥齿轮,两第一轴承座左端焊接有导杆,导杆上滑动式连接有导套,导套与导杆配合,导套与螺母之间焊接连接,导套左端焊接有第一连接板,第一连接板左端焊接有连接杆,机械箱右壁下侧焊接有第二轴承座,第二轴承座内的轴承过盈连接有第一转轴,第一转轴右端焊接有摇杆,第一转轴左端过盈连接有第二锥齿轮,第一锥齿轮与第二锥齿轮啮合。Preferably, the lifting device includes a mechanical box, a first bearing seat, a screw, a nut, a first bevel gear, a guide rod, a guide sleeve, a first connecting plate, a second bearing seat, a first rotating shaft, a rocker and a second For bevel gears, the right side of the top of the bottom plate is connected to the mechanical box by means of bolt connection. There is a word hole on the left wall of the mechanical box. The first bearing seat is welded symmetrically up and down on the right wall of the mechanical box. The bearings in the first bearing seat pass through There is a screw rod connected to the surplus, and there is a nut on the screw rod. The nut cooperates with the screw rod. The bottom end of the screw rod is connected with the first bevel gear. The left end of the two first bearing seats is welded with a guide rod. The guide sleeve, the guide sleeve and the guide rod are matched, the guide sleeve and the nut are welded and connected, the first connecting plate is welded on the left end of the guide sleeve, the connecting rod is welded on the left end of the first connecting plate, and the second bearing is welded on the lower side of the right wall of the mechanical box Seat, bearing interference connection in the second bearing seat has the first rotating shaft, and the right end of the first rotating shaft is welded with rocking bar, and the left end of the first rotating shaft is interference-connected with the second bevel gear, and the first bevel gear meshes with the second bevel gear.
优选地,旋转装置包括有环形滑轨、第一滑块、支架、第三轴承座、第二转轴、第一齿轮、旋转电机、第二齿轮和第二连接板,连接杆左侧焊接有环形滑轨,环形滑轨上滑动式连接有两个第一滑块,两个第一滑块上均焊接有支架,环形滑轨内中心焊接有第三轴承座,第三轴承座内的轴承过盈连接有第二转轴,第二转轴中部过盈连接有第一齿轮,环形滑轨内右侧通过螺栓连接的方式连接有旋转电机,旋转电机的输出轴上过盈连接有第二齿轮,第一齿轮与第二齿轮啮合,两个支架之间焊接有第二连接板,第二转轴顶部与第二连接板底部通过焊接的方式连接的。Preferably, the rotating device includes an annular slide rail, a first slider, a bracket, a third bearing seat, a second rotating shaft, a first gear, a rotating motor, a second gear and a second connecting plate, and a ring is welded on the left side of the connecting rod. There are two first sliders slidingly connected on the ring-shaped slide rail, brackets are welded on the two first sliders, a third bearing seat is welded in the center of the ring-shaped slide rail, and the bearings in the third bearing seat pass through There is a second rotating shaft in the surplus connection, the first gear is in the interference connection in the middle of the second rotating shaft, the rotating motor is connected to the right side of the ring slide rail through bolt connection, and the second gear is in the interference connection on the output shaft of the rotating motor. A gear meshes with a second gear, a second connecting plate is welded between the two brackets, and the top of the second rotating shaft is connected to the bottom of the second connecting plate by welding.
优选地,还包括有固定装置,固定装置包括有第一滑轨、第二滑块、固定板、压板、卡块、弹簧、升降杆和固定块,机械箱右壁下侧通过螺栓连接的方式连接有第一滑轨,第一滑轨上滑动式连接有第二滑块,机械箱右壁下侧通过螺栓连接的方式连接有固定板,固定板中部开有小孔,固定板顶部左右两侧开有卡槽,第二滑块右端焊接有压板,压板底部右侧两侧焊接有卡块,卡块与卡槽配合,压板底部和固定板顶部之间左右对称焊接有弹簧,压板底部中心焊接有升降杆,升降杆穿过小孔底部焊接有固定块。Preferably, a fixing device is also included, and the fixing device includes a first slide rail, a second slide block, a fixing plate, a pressure plate, a clamping block, a spring, a lifting rod and a fixing block, and the lower side of the right wall of the mechanical box is connected by bolts The first slide rail is connected with the second slide block slidingly connected on the first slide rail. The lower side of the right wall of the mechanical box is connected with the fixing plate by means of bolt connection. There is a small hole in the middle of the fixing plate. There is a card slot on the side, a pressure plate is welded on the right end of the second slider, and blocks are welded on both sides of the right side of the bottom of the pressure plate. A lifting rod is welded, and a fixed block is welded on the bottom of the lifting rod through the small hole.
优选地,升降装置还包括有橡胶套,摇杆上套接有橡胶套。Preferably, the lifting device further includes a rubber sleeve, and the rocker is sleeved with a rubber sleeve.
优选地,机械箱材料为不锈钢。Preferably, the material of the mechanical case is stainless steel.
优选地,连接杆材料为Q235钢。Preferably, the material of the connecting rod is Q235 steel.
优选地,旋转电机为伺服电机。Preferably, the rotary motor is a servo motor.
工作原理:当需要使用本设备时,运输工人首先将本装满水泥的水泥桶放置在放置板上的放置槽内,然后推动本设备至砌墙工人的附近,运输工人通过控制升降装置工作,升降装置带动左侧的连接杆、旋转装置和放置板向上运动,当装满水泥的水泥桶到达砌墙工人能够拿到的高度时,运输工人将控制升降装置不在运动,然后控制旋转装置缓慢旋转,砌墙工人将装满水泥的水泥桶提出,放置在附近,将没有水泥的水泥桶放置在放置板上的放置槽内,运输工人通过控制升降装置工作,升降装置带动左侧的连接杆、旋转装置和放置板向下运动复位,控制旋转装置停止工作,本装置结构简单。使用方便,能够减少工人的劳动强度。Working principle: When the equipment needs to be used, the transport workers first place the cement bucket filled with cement in the placement slot on the placement plate, and then push the equipment to the vicinity of the wall workers, and the transport workers work by controlling the lifting device. The lifting device drives the connecting rod on the left, the rotating device and the placing plate to move upwards. When the cement bucket filled with cement reaches the height that the masons can take, the transport workers will control the lifting device not to move, and then control the rotating device to rotate slowly. , the wall-builder lifts the cement bucket full of cement and places it nearby, and puts the cement bucket without cement in the placement groove on the placement board. The transport worker works by controlling the lifting device, and the lifting device drives the connecting rod on the left, The rotating device and the placing plate move downward to reset, and the rotating device is controlled to stop working. The structure of the device is simple. It is easy to use and can reduce the labor intensity of workers.
因为升降装置包括有机械箱、第一轴承座、丝杆、螺母、第一锥齿轮、导杆、导套、第一连接板、第二轴承座、第一转轴、摇杆和第二锥齿轮,底板顶部右侧通过螺栓连接的方式连接有机械箱,机械箱左壁开有一字孔,机械箱内右壁上下对称焊接有第一轴承座,第一轴承座内的轴承之间过盈连接有丝杆,丝杆上设有螺母,螺母与丝杆配合,丝杆底端过盈连接有第一锥齿轮,两第一轴承座左端焊接有导杆,导杆上滑动式连接有导套,导套与导杆配合,导套与螺母之间焊接连接,导套左端焊接有第一连接板,第一连接板左端焊接有连接杆,机械箱右壁下侧焊接有第二轴承座,第二轴承座内的轴承过盈连接有第一转轴,第一转轴右端焊接有摇杆,第一转轴左端过盈连接有第二锥齿轮,第一锥齿轮与第二锥齿轮啮合。运输工人通过顺逆时针摇动摇杆,摇杆通过第二轴承座带动第二锥齿轮旋转,第二锥齿轮带动第一锥齿轮旋转,第一锥齿轮进而带动丝杆旋转,螺母在丝杆上运动,便可带动导套第一连接板上下运动,进而带动放置板上下运动,从而达到快速运输的功能,本装置操作简单,有利于运输工人根据砌墙工人所在位置高度进行升降调节。Because the lifting device includes a mechanical box, a first bearing seat, a screw, a nut, a first bevel gear, a guide rod, a guide sleeve, a first connecting plate, a second bearing seat, a first rotating shaft, a rocker and a second bevel gear The right side of the top of the bottom plate is connected to the mechanical box by means of bolt connection. There is a word hole on the left wall of the mechanical box. The first bearing seat is welded symmetrically up and down on the right wall of the mechanical box. The bearings in the first bearing seat are connected with interference. There is a screw rod with a nut on the screw rod, the nut cooperates with the screw rod, the bottom end of the screw rod is connected with the first bevel gear, the left end of the two first bearing seats is welded with a guide rod, and the guide rod is slidably connected with a guide sleeve , the guide sleeve is matched with the guide rod, the guide sleeve and the nut are welded and connected, the left end of the guide sleeve is welded with the first connecting plate, the left end of the first connecting plate is welded with the connecting rod, and the lower side of the right wall of the mechanical box is welded with the second bearing seat, The bearing in the second bearing seat is interference-connected with a first rotating shaft, the right end of the first rotating shaft is welded with a rocker, and the left end of the first rotating shaft is interference-connected with a second bevel gear, and the first bevel gear meshes with the second bevel gear. The transport worker shakes the rocker clockwise and counterclockwise, the rocker drives the second bevel gear to rotate through the second bearing seat, the second bevel gear drives the first bevel gear to rotate, the first bevel gear then drives the screw to rotate, and the nut is on the screw The movement can drive the first connecting plate of the guide sleeve to move up and down, and then drive the placing plate to move up and down, so as to achieve the function of fast transportation. The device is easy to operate, and it is beneficial for the transport workers to adjust the height according to the position of the wall workers.
因为旋转装置包括有环形滑轨、第一滑块、支架、第三轴承座、第二转轴、第一齿轮、旋转电机、第二齿轮和第二连接板,连接杆左侧焊接有环形滑轨,环形滑轨上滑动式连接有两个第一滑块,两个第一滑块上均焊接有支架,环形滑轨内中心焊接有第三轴承座,第三轴承座内的轴承过盈连接有第二转轴,第二转轴中部过盈连接有第一齿轮,环形滑轨内右侧通过螺栓连接的方式连接有旋转电机,旋转电机的输出轴上过盈连接有第二齿轮,第一齿轮与第二齿轮啮合,两个支架之间焊接有第二连接板,第二转轴顶部与第二连接板底部通过焊接的方式连接的,运输工人通过控制旋转电机旋转,旋转电机带动第二齿轮旋转,第二齿轮带动第一齿轮旋转,进而带动第二转轴旋转,第二转轴通过第二连接板带动支架旋转,支架带动放置板旋转,砌墙工人将最近的放置槽上装满水泥的水泥桶取出,放置板旋转带动另一个装满水泥的水泥桶再次转至最近的位置,继而方便砌墙工人取出装满水泥的水泥桶和放置空的水泥桶。Because the rotating device includes an annular slide rail, a first slider, a bracket, a third bearing seat, a second rotating shaft, a first gear, a rotating motor, a second gear and a second connecting plate, the left side of the connecting rod is welded with an annular slide rail , There are two first sliders slidingly connected on the ring slide rail, and brackets are welded on the two first sliders, and the third bearing seat is welded in the center of the ring slide rail, and the bearings in the third bearing seat are connected with interference There is a second rotating shaft, the middle part of the second rotating shaft is interference-connected with the first gear, and the right side of the ring slide rail is connected with a rotating motor through bolt connection, and the output shaft of the rotating motor is interference-connected with the second gear, the first gear It meshes with the second gear, and the second connecting plate is welded between the two brackets. The top of the second rotating shaft is connected to the bottom of the second connecting plate by welding. The transport worker controls the rotation of the rotating motor, and the rotating motor drives the second gear to rotate. , the second gear drives the first gear to rotate, and then drives the second rotating shaft to rotate, the second rotating shaft drives the bracket to rotate through the second connecting plate, the bracket drives the placing plate to rotate, and the wall-builder puts the cement bucket filled with cement on the nearest placing trough Take it out, and the rotation of the placing board drives another cement bucket filled with cement to the nearest position again, and then it is convenient for the wall workers to take out the cement bucket filled with cement and place an empty cement bucket.
因为还包括有固定装置,固定装置包括有第一滑轨、第二滑块、固定板、压板、卡块、弹簧、升降杆和固定块,机械箱右壁下侧通过螺栓连接的方式连接有第一滑轨,第一滑轨上滑动式连接有第二滑块,机械箱右壁下侧通过螺栓连接的方式连接有固定板,固定板中部开有小孔,固定板顶部左右两侧开有卡槽,第二滑块右端焊接有压板,压板底部右侧两侧焊接有卡块,卡块与卡槽配合,压板底部和固定板顶部之间左右对称焊接有弹簧,压板底部中心焊接有升降杆,升降杆穿过小孔底部焊接有固定块,当需要将本装置进行固定时,工人可挤压压板,压板带动升降杆和固定块向下运动,弹簧被压缩,卡块卡入卡槽内,固定块与地面接触,防止本设备滑动,不要移动时,将压板向上拔起,卡块离开卡槽,弹簧恢复形长,带动升降杆和固定块向上运动复位,本装置结构简单,方便操作。Because it also includes a fixing device, the fixing device includes a first slide rail, a second slide block, a fixing plate, a pressing plate, a clamping block, a spring, a lifting rod and a fixing block, and the lower side of the right wall of the mechanical box is connected by bolts. The first slide rail, the second slide block is slidably connected to the first slide rail, and the fixed plate is connected to the lower side of the right wall of the mechanical box through bolt connection. There is a small hole in the middle of the fixed plate, and the left and right sides are opened There is a card slot, the right end of the second slider is welded with a pressure plate, the right side of the bottom of the pressure plate is welded with blocks, the blocks are matched with the card slot, the spring is welded symmetrically between the bottom of the pressure plate and the top of the fixed plate, and the center of the bottom of the pressure plate is welded with Lifting rod, the lifting rod passes through the bottom of the small hole and is welded with a fixed block. When the device needs to be fixed, the worker can squeeze the pressure plate, and the pressure plate drives the lifting rod and the fixed block to move downward, the spring is compressed, and the block is inserted into the card. In the slot, the fixed block is in contact with the ground to prevent the device from sliding. When not moving, pull up the pressure plate, the block leaves the slot, the spring restores its shape, and drives the lifting rod and the fixed block to move upward and reset. The structure of the device is simple. Easy to operate.
因为升降装置还包括有橡胶套,摇杆上套接有橡胶套,工人再推动本设备时不易损伤手,并且提高了本装置的舒适性。Because the lifting device also includes a rubber sleeve, and the rocker is sleeved with a rubber sleeve, the worker is not easy to injure his hands when pushing the device, and the comfort of the device is improved.
因为机械箱材料为不锈钢,不锈钢耐腐蚀性和耐酸性强,可延长装置的使用寿命。Because the material of the mechanical box is stainless steel, the stainless steel has strong corrosion resistance and acid resistance, which can prolong the service life of the device.
因为连接杆材料为Q235钢,Q235钢硬度高,不容易变形,使装置的使用寿命更长。Because the material of the connecting rod is Q235 steel, the Q235 steel has high hardness and is not easily deformed, so that the service life of the device is longer.
因为旋转电机为伺服电机,抗过载能力强,高速性能好,能精准控制其转速。Because the rotating motor is a servo motor, it has strong overload resistance, good high-speed performance, and can precisely control its speed.
(3)有益效果(3) Beneficial effect
本实用新型达到了节省人力、传递效率高的效果,使用本实用新型能够一次性传递多桶水泥,提高了效率,能够减少工人的劳动强度。The utility model achieves the effects of saving manpower and high transfer efficiency. The utility model can transfer multiple buckets of cement at one time, which improves the efficiency and reduces the labor intensity of workers.
附图说明Description of drawings
图1为本实用新型的第一种主视结构示意图。Fig. 1 is a schematic structural diagram of the first kind of front view of the utility model.
图2为本实用新型放置板的俯视结构示意图。Fig. 2 is a top view structural schematic diagram of the placement board of the present invention.
图3为本实用新型升降装置的第一种主视结构示意图。Fig. 3 is a schematic structural diagram of the first type of front view of the lifting device of the present invention.
图4为本实用新型旋转装置的主视结构示意图。Fig. 4 is a front structural schematic diagram of the rotating device of the present invention.
图5为本实用新型环形滑轨的立体结构示意图。Fig. 5 is a schematic diagram of the three-dimensional structure of the annular slide rail of the present invention.
图6为本实用新型的第二种主视结构示意图。Fig. 6 is a schematic structural diagram of the second front view of the utility model.
图7为本实用新型升降装置的第二种主视结构示意图。Fig. 7 is a schematic structural diagram of the second front view of the lifting device of the present invention.
附图中的标记为:1-底板,2-车轮,3-升降装置,31-机械箱,32-一字孔,33-第一轴承座,34-丝杆,35-螺母,36-第一锥齿轮,37-导杆,38-导套,39-第一连接板,310-第二轴承座,311-第一转轴,312-摇杆,313-第二锥齿轮,314-橡胶套,4-推杆,5-连接杆,6-旋转装置,61-环形滑轨,62-第一滑块,63-支架,64-第三轴承座,65-第二转轴,66-第一齿轮,67-旋转电机,68-第二齿轮,69-第二连接板,7-放置板,8-放置槽,9-固定装置,91-第一滑轨,92-第二滑块,93-固定板,94-小孔,95-卡槽,96-压板,97-卡块,98-弹簧,99-升降杆,910-固定块。The marks in the accompanying drawings are: 1-base plate, 2-wheel, 3-lifting device, 31-mechanical box, 32-slotted hole, 33-the first bearing seat, 34-screw mandrel, 35-nut, 36-the first One bevel gear, 37-guide rod, 38-guide sleeve, 39-first connecting plate, 310-second bearing seat, 311-first rotating shaft, 312-rocker, 313-second bevel gear, 314-rubber sleeve , 4-push rod, 5-connecting rod, 6-rotation device, 61-ring slide rail, 62-first slider, 63-bracket, 64-third bearing seat, 65-second shaft, 66-first Gear, 67-rotary motor, 68-second gear, 69-second connecting plate, 7-placement plate, 8-placement groove, 9-fixing device, 91-first slide rail, 92-second slide block, 93 -fixed plate, 94-small hole, 95-card slot, 96-press plate, 97-block, 98-spring, 99-lifting rod, 910-fixed block.
具体实施方式detailed description
下面结合附图和实施例对本实用新型作进一步的说明。Below in conjunction with accompanying drawing and embodiment the utility model is described further.
实施例1Example 1
一种建筑砌墙用水泥高效传送设备,如图1-7所示,包括有底板1、车轮2、升降装置3、推杆4、连接杆5、旋转装置6、放置板7和固定装置9,底板1底部左右两侧转动式连接有车轮2,底板1顶部右侧通过螺栓连接的方式连接有升降装置3,升降装置3右侧中部焊接有推杆4,升降装置3左侧焊接有连接杆5,连接杆5左侧焊接有旋转装置6,旋转装置6顶部焊接有放置板7,放置板7顶部均匀开有放置槽8。A high-efficiency cement conveying equipment for building walls, as shown in Figure 1-7, includes a bottom plate 1, wheels 2, lifting device 3, push rod 4, connecting rod 5, rotating device 6, placing plate 7 and fixing device 9 , the left and right sides of the bottom of the bottom plate 1 are rotationally connected with the wheels 2, the right side of the top of the bottom plate 1 is connected with the lifting device 3 by means of bolt connection, the push rod 4 is welded in the middle part of the right side of the lifting device 3, and the connecting rod 4 is welded on the left side of the lifting device 3 Rod 5, connecting rod 5 left side is welded with rotation device 6, and rotation device 6 top is welded with placement plate 7, and placement plate 7 top evenly has placement groove 8.
实施例2Example 2
一种建筑砌墙用水泥高效传送设备,如图1-7所示,包括有底板1、车轮2、升降装置3、推杆4、连接杆5、旋转装置6、放置板7和固定装置9,底板1底部左右两侧转动式连接有车轮2,底板1顶部右侧通过螺栓连接的方式连接有升降装置3,升降装置3右侧中部焊接有推杆4,升降装置3左侧焊接有连接杆5,连接杆5左侧焊接有旋转装置6,旋转装置6顶部焊接有放置板7,放置板7顶部均匀开有放置槽8。A high-efficiency cement conveying equipment for building walls, as shown in Figure 1-7, includes a bottom plate 1, wheels 2, lifting device 3, push rod 4, connecting rod 5, rotating device 6, placing plate 7 and fixing device 9 , the left and right sides of the bottom of the bottom plate 1 are rotationally connected with the wheels 2, the right side of the top of the bottom plate 1 is connected with the lifting device 3 by means of bolt connection, the push rod 4 is welded in the middle part of the right side of the lifting device 3, and the connecting rod 4 is welded on the left side of the lifting device 3 Rod 5, connecting rod 5 left side is welded with rotation device 6, and rotation device 6 top is welded with placement plate 7, and placement plate 7 top evenly has placement groove 8.
升降装置3包括有机械箱31、第一轴承座33、丝杆34、螺母35、第一锥齿轮36、导杆37、导套38、第一连接板39、第二轴承座310、第一转轴311、摇杆312和第二锥齿轮313,底板1顶部右侧通过螺栓连接的方式连接有机械箱31,机械箱31左壁开有一字孔32,机械箱31内右壁上下对称焊接有第一轴承座33,第一轴承座33内的轴承之间过盈连接有丝杆34,丝杆34上设有螺母35,螺母35与丝杆34配合,丝杆34底端过盈连接有第一锥齿轮36,两第一轴承座33左端焊接有导杆37,导杆37上滑动式连接有导套38,导套38与导杆37配合,导套38与螺母35之间焊接连接,导套38左端焊接有第一连接板39,第一连接板39左端焊接有连接杆5,机械箱31右壁下侧焊接有第二轴承座310,第二轴承座310内的轴承过盈连接有第一转轴311,第一转轴311右端焊接有摇杆312,第一转轴311左端过盈连接有第二锥齿轮313,第一锥齿轮36与第二锥齿轮313啮合。Lifting device 3 comprises mechanical case 31, the first bearing seat 33, screw mandrel 34, nut 35, the first bevel gear 36, guide rod 37, guide sleeve 38, the first connecting plate 39, the second bearing seat 310, the first Revolving shaft 311, rocking bar 312 and second bevel gear 313, bottom plate 1 top right side is connected with mechanical case 31 by the mode of bolt connection, mechanical case 31 left wall has a word hole 32, and mechanical case 31 inner right wall is welded up and down symmetrically with The first bearing block 33 and the bearings in the first bearing block 33 are interferingly connected with a threaded mandrel 34, the threaded mandrel 34 is provided with a nut 35, the nut 35 cooperates with the threaded mandrel 34, and the bottom end of the threaded mandrel 34 is interference-connected with The first bevel gear 36, the left ends of the two first bearing seats 33 are welded with guide rods 37, the guide rods 37 are slidably connected with guide sleeves 38, the guide sleeves 38 cooperate with the guide rods 37, the guide sleeves 38 and the nuts 35 are welded and connected , the left end of the guide sleeve 38 is welded with the first connecting plate 39, the left end of the first connecting plate 39 is welded with the connecting rod 5, the lower side of the right wall of the mechanical box 31 is welded with the second bearing seat 310, and the bearing interference in the second bearing seat 310 Connected with a first rotating shaft 311, the right end of the first rotating shaft 311 is welded with a rocker 312, and the left end of the first rotating shaft 311 is interference-connected with a second bevel gear 313, and the first bevel gear 36 meshes with the second bevel gear 313.
实施例3Example 3
一种建筑砌墙用水泥高效传送设备,如图1-7所示,包括有底板1、车轮2、升降装置3、推杆4、连接杆5、旋转装置6、放置板7和固定装置9,底板1底部左右两侧转动式连接有车轮2,底板1顶部右侧通过螺栓连接的方式连接有升降装置3,升降装置3右侧中部焊接有推杆4,升降装置3左侧焊接有连接杆5,连接杆5左侧焊接有旋转装置6,旋转装置6顶部焊接有放置板7,放置板7顶部均匀开有放置槽8。A high-efficiency cement conveying equipment for building walls, as shown in Figure 1-7, includes a bottom plate 1, wheels 2, lifting device 3, push rod 4, connecting rod 5, rotating device 6, placing plate 7 and fixing device 9 , the left and right sides of the bottom of the bottom plate 1 are rotationally connected with the wheels 2, the right side of the top of the bottom plate 1 is connected with the lifting device 3 by means of bolt connection, the push rod 4 is welded in the middle part of the right side of the lifting device 3, and the connecting rod 4 is welded on the left side of the lifting device 3 Rod 5, connecting rod 5 left side is welded with rotation device 6, and rotation device 6 top is welded with placement plate 7, and placement plate 7 top evenly has placement groove 8.
升降装置3包括有机械箱31、第一轴承座33、丝杆34、螺母35、第一锥齿轮36、导杆37、导套38、第一连接板39、第二轴承座310、第一转轴311、摇杆312和第二锥齿轮313,底板1顶部右侧通过螺栓连接的方式连接有机械箱31,机械箱31左壁开有一字孔32,机械箱31内右壁上下对称焊接有第一轴承座33,第一轴承座33内的轴承之间过盈连接有丝杆34,丝杆34上设有螺母35,螺母35与丝杆34配合,丝杆34底端过盈连接有第一锥齿轮36,两第一轴承座33左端焊接有导杆37,导杆37上滑动式连接有导套38,导套38与导杆37配合,导套38与螺母35之间焊接连接,导套38左端焊接有第一连接板39,第一连接板39左端焊接有连接杆5,机械箱31右壁下侧焊接有第二轴承座310,第二轴承座310内的轴承过盈连接有第一转轴311,第一转轴311右端焊接有摇杆312,第一转轴311左端过盈连接有第二锥齿轮313,第一锥齿轮36与第二锥齿轮313啮合。Lifting device 3 comprises mechanical case 31, the first bearing seat 33, screw mandrel 34, nut 35, the first bevel gear 36, guide rod 37, guide sleeve 38, the first connecting plate 39, the second bearing seat 310, the first Revolving shaft 311, rocking bar 312 and second bevel gear 313, bottom plate 1 top right side is connected with mechanical case 31 by the mode of bolt connection, mechanical case 31 left wall has a word hole 32, and mechanical case 31 inner right wall is welded up and down symmetrically with The first bearing block 33 and the bearings in the first bearing block 33 are interferingly connected with a threaded mandrel 34, the threaded mandrel 34 is provided with a nut 35, the nut 35 cooperates with the threaded mandrel 34, and the bottom end of the threaded mandrel 34 is interference-connected with The first bevel gear 36, the left ends of the two first bearing seats 33 are welded with guide rods 37, the guide rods 37 are slidably connected with guide sleeves 38, the guide sleeves 38 cooperate with the guide rods 37, the guide sleeves 38 and the nuts 35 are welded and connected , the left end of the guide sleeve 38 is welded with the first connecting plate 39, the left end of the first connecting plate 39 is welded with the connecting rod 5, the lower side of the right wall of the mechanical box 31 is welded with the second bearing seat 310, and the bearing interference in the second bearing seat 310 Connected with a first rotating shaft 311, the right end of the first rotating shaft 311 is welded with a rocker 312, and the left end of the first rotating shaft 311 is interference-connected with a second bevel gear 313, and the first bevel gear 36 meshes with the second bevel gear 313.
旋转装置6包括有环形滑轨61、第一滑块62、支架63、第三轴承座64、第二转轴65、第一齿轮66、旋转电机67、第二齿轮68和第二连接板69,连接杆5左侧焊接有环形滑轨61,环形滑轨61上滑动式连接有两个第一滑块62,两个第一滑块62上均焊接有支架63,环形滑轨61内中心焊接有第三轴承座64,第三轴承座64内的轴承过盈连接有第二转轴65,第二转轴65中部过盈连接有第一齿轮66,环形滑轨61内右侧通过螺栓连接的方式连接有旋转电机67,旋转电机67的输出轴上过盈连接有第二齿轮68,第一齿轮66与第二齿轮68啮合,两个支架63之间焊接有第二连接板69,第二转轴65顶部与第二连接板69底部通过焊接的方式连接的。The rotating device 6 includes an annular slide rail 61, a first slider 62, a bracket 63, a third bearing seat 64, a second rotating shaft 65, a first gear 66, a rotating motor 67, a second gear 68 and a second connecting plate 69, An annular slide rail 61 is welded on the left side of the connecting rod 5, and two first sliders 62 are slidably connected on the annular slide rail 61, and brackets 63 are welded on the two first sliders 62, and the inner center of the annular slide rail 61 is welded There is a third bearing seat 64, the bearing in the third bearing seat 64 is interference-connected with the second rotating shaft 65, the middle part of the second rotating shaft 65 is interference-connected with the first gear 66, and the right side of the ring slide rail 61 is connected by bolts Connected with a rotary motor 67, the output shaft of the rotary motor 67 is interference-connected with a second gear 68, the first gear 66 meshes with the second gear 68, a second connecting plate 69 is welded between the two brackets 63, and the second rotating shaft 65 tops are connected to the bottom of the second connecting plate 69 by welding.
实施例4Example 4
一种建筑砌墙用水泥高效传送设备,如图1-7所示,包括有底板1、车轮2、升降装置3、推杆4、连接杆5、旋转装置6、放置板7和固定装置9,底板1底部左右两侧转动式连接有车轮2,底板1顶部右侧通过螺栓连接的方式连接有升降装置3,升降装置3右侧中部焊接有推杆4,升降装置3左侧焊接有连接杆5,连接杆5左侧焊接有旋转装置6,旋转装置6顶部焊接有放置板7,放置板7顶部均匀开有放置槽8。A high-efficiency cement conveying equipment for building walls, as shown in Figure 1-7, includes a bottom plate 1, wheels 2, lifting device 3, push rod 4, connecting rod 5, rotating device 6, placing plate 7 and fixing device 9 , the left and right sides of the bottom of the bottom plate 1 are rotationally connected with the wheels 2, the right side of the top of the bottom plate 1 is connected with the lifting device 3 by means of bolt connection, the push rod 4 is welded in the middle part of the right side of the lifting device 3, and the connecting rod 4 is welded on the left side of the lifting device 3 Rod 5, connecting rod 5 left side is welded with rotation device 6, and rotation device 6 top is welded with placement plate 7, and placement plate 7 top evenly has placement groove 8.
升降装置3包括有机械箱31、第一轴承座33、丝杆34、螺母35、第一锥齿轮36、导杆37、导套38、第一连接板39、第二轴承座310、第一转轴311、摇杆312和第二锥齿轮313,底板1顶部右侧通过螺栓连接的方式连接有机械箱31,机械箱31左壁开有一字孔32,机械箱31内右壁上下对称焊接有第一轴承座33,第一轴承座33内的轴承之间过盈连接有丝杆34,丝杆34上设有螺母35,螺母35与丝杆34配合,丝杆34底端过盈连接有第一锥齿轮36,两第一轴承座33左端焊接有导杆37,导杆37上滑动式连接有导套38,导套38与导杆37配合,导套38与螺母35之间焊接连接,导套38左端焊接有第一连接板39,第一连接板39左端焊接有连接杆5,机械箱31右壁下侧焊接有第二轴承座310,第二轴承座310内的轴承过盈连接有第一转轴311,第一转轴311右端焊接有摇杆312,第一转轴311左端过盈连接有第二锥齿轮313,第一锥齿轮36与第二锥齿轮313啮合。Lifting device 3 comprises mechanical case 31, the first bearing seat 33, screw mandrel 34, nut 35, the first bevel gear 36, guide rod 37, guide sleeve 38, the first connecting plate 39, the second bearing seat 310, the first Revolving shaft 311, rocking bar 312 and second bevel gear 313, bottom plate 1 top right side is connected with mechanical case 31 by the mode of bolt connection, mechanical case 31 left wall has a word hole 32, and mechanical case 31 inner right wall is welded up and down symmetrically with The first bearing block 33 and the bearings in the first bearing block 33 are interferingly connected with a threaded mandrel 34, the threaded mandrel 34 is provided with a nut 35, the nut 35 cooperates with the threaded mandrel 34, and the bottom end of the threaded mandrel 34 is interference-connected with The first bevel gear 36, the left ends of the two first bearing seats 33 are welded with guide rods 37, the guide rods 37 are slidably connected with guide sleeves 38, the guide sleeves 38 cooperate with the guide rods 37, the guide sleeves 38 and the nuts 35 are welded and connected , the left end of the guide sleeve 38 is welded with the first connecting plate 39, the left end of the first connecting plate 39 is welded with the connecting rod 5, the lower side of the right wall of the mechanical box 31 is welded with the second bearing seat 310, and the bearing interference in the second bearing seat 310 Connected with a first rotating shaft 311, the right end of the first rotating shaft 311 is welded with a rocker 312, and the left end of the first rotating shaft 311 is interference-connected with a second bevel gear 313, and the first bevel gear 36 meshes with the second bevel gear 313.
旋转装置6包括有环形滑轨61、第一滑块62、支架63、第三轴承座64、第二转轴65、第一齿轮66、旋转电机67、第二齿轮68和第二连接板69,连接杆5左侧焊接有环形滑轨61,环形滑轨61上滑动式连接有两个第一滑块62,两个第一滑块62上均焊接有支架63,环形滑轨61内中心焊接有第三轴承座64,第三轴承座64内的轴承过盈连接有第二转轴65,第二转轴65中部过盈连接有第一齿轮66,环形滑轨61内右侧通过螺栓连接的方式连接有旋转电机67,旋转电机67的输出轴上过盈连接有第二齿轮68,第一齿轮66与第二齿轮68啮合,两个支架63之间焊接有第二连接板69,第二转轴65顶部与第二连接板69底部通过焊接的方式连接的。The rotating device 6 includes an annular slide rail 61, a first slider 62, a bracket 63, a third bearing seat 64, a second rotating shaft 65, a first gear 66, a rotating motor 67, a second gear 68 and a second connecting plate 69, An annular slide rail 61 is welded on the left side of the connecting rod 5, and two first sliders 62 are slidably connected on the annular slide rail 61, and brackets 63 are welded on the two first sliders 62, and the inner center of the annular slide rail 61 is welded There is a third bearing seat 64, the bearing in the third bearing seat 64 is interference-connected with the second rotating shaft 65, the middle part of the second rotating shaft 65 is interference-connected with the first gear 66, and the right side of the ring slide rail 61 is connected by bolts Connected with a rotary motor 67, the output shaft of the rotary motor 67 is interference-connected with a second gear 68, the first gear 66 meshes with the second gear 68, a second connecting plate 69 is welded between the two brackets 63, and the second rotating shaft 65 tops are connected to the bottom of the second connecting plate 69 by welding.
还包括有固定装置9,固定装置9包括有第一滑轨91、第二滑块92、固定板93、压板96、卡块97、弹簧98、升降杆99和固定块910,机械箱31右壁下侧通过螺栓连接的方式连接有第一滑轨91,第一滑轨91上滑动式连接有第二滑块92,机械箱31右壁下侧通过螺栓连接的方式连接有固定板93,固定板93中部开有小孔94,固定板93顶部左右两侧开有卡槽95,第二滑块92右端焊接有压板96,压板96底部右侧两侧焊接有卡块97,卡块97与卡槽95配合,压板96底部和固定板93顶部之间左右对称焊接有弹簧98,压板96底部中心焊接有升降杆99,升降杆99穿过小孔94底部焊接有固定块910。Also include fixture 9, fixture 9 includes first slide rail 91, second slide block 92, fixed plate 93, pressing plate 96, block 97, spring 98, elevating rod 99 and fixed block 910, mechanical box 31 right The lower side of the wall is connected with a first slide rail 91 by bolt connection, the first slide rail 91 is slidably connected with a second slider 92, and the lower side of the right wall of the mechanical box 31 is connected with a fixed plate 93 by bolt connection, The middle part of the fixed plate 93 is provided with a small hole 94, the left and right sides of the top of the fixed plate 93 are provided with draw-in grooves 95, the right end of the second slider 92 is welded with a pressing plate 96, and the right side of the bottom of the pressing plate 96 is welded with a clamping block 97, and the clamping block 97 Cooperate with draw-in groove 95, between pressing plate 96 bottoms and fixed plate 93 tops, left-right symmetry is welded with spring 98, and pressing plate 96 bottom centers are welded with elevating rod 99, and elevating rod 99 passes aperture 94 bottoms and is welded with fixed block 910.
升降装置3还包括有橡胶套314,摇杆312上套接有橡胶套314。The lifting device 3 also includes a rubber sleeve 314 , and the rocker 312 is sleeved with the rubber sleeve 314 .
机械箱31材料为不锈钢。Mechanical case 31 materials are stainless steel.
连接杆5材料为Q235钢。The connecting rod 5 is made of Q235 steel.
旋转电机67为伺服电机。The rotary motor 67 is a servo motor.
工作原理:当需要使用本设备时,运输工人首先将本装满水泥的水泥桶放置在放置板7上的放置槽8内,然后推动本设备至砌墙工人的附近,运输工人通过控制升降装置3工作,升降装置3带动左侧的连接杆5、旋转装置6和放置板7向上运动,当装满水泥的水泥桶到达砌墙工人能够拿到的高度时,运输工人将控制升降装置3不在运动,然后控制旋转装置6缓慢旋转,砌墙工人将装满水泥的水泥桶提出,放置在附近,将没有水泥的水泥桶放置在放置板7上的放置槽8内,运输工人通过控制升降装置3工作,升降装置3带动左侧的连接杆5、旋转装置6和放置板7向下运动复位,控制旋转装置6停止工作,本装置结构简单。使用方便,能够减少工人的劳动强度。Working principle: When the equipment needs to be used, the transportation worker first places the cement bucket filled with cement in the placement groove 8 on the placement board 7, and then pushes the equipment to the vicinity of the wall workers, and the transportation worker controls the lifting device 3 work, the lifting device 3 drives the connecting rod 5 on the left side, the rotating device 6 and the placing plate 7 to move upward, when the cement bucket filled with cement reaches the height that the wall workers can get, the transport worker will control the lifting device 3 to leave Movement, and then control the rotating device 6 to rotate slowly, the wall-laying worker will put out the cement bucket filled with cement, place it nearby, and place the cement bucket without cement in the placement groove 8 on the placement board 7, and the transport worker will control the lifting device 3 work, the lifting device 3 drives the connecting rod 5 on the left side, the rotating device 6 and the placement plate 7 to move downward and reset, and the rotating device 6 is controlled to stop working. The structure of the device is simple. It is easy to use and can reduce the labor intensity of workers.
因为升降装置3包括有机械箱31、第一轴承座33、丝杆34、螺母35、第一锥齿轮36、导杆37、导套38、第一连接板39、第二轴承座310、第一转轴311、摇杆312和第二锥齿轮313,底板1顶部右侧通过螺栓连接的方式连接有机械箱31,机械箱31左壁开有一字孔32,机械箱31内右壁上下对称焊接有第一轴承座33,第一轴承座33内的轴承之间过盈连接有丝杆34,丝杆34上设有螺母35,螺母35与丝杆34配合,丝杆34底端过盈连接有第一锥齿轮36,两第一轴承座33左端焊接有导杆37,导杆37上滑动式连接有导套38,导套38与导杆37配合,导套38与螺母35之间焊接连接,导套38左端焊接有第一连接板39,第一连接板39左端焊接有连接杆5,机械箱31右壁下侧焊接有第二轴承座310,第二轴承座310内的轴承过盈连接有第一转轴311,第一转轴311右端焊接有摇杆312,第一转轴311左端过盈连接有第二锥齿轮313,第一锥齿轮36与第二锥齿轮313啮合。运输工人通过顺逆时针摇动摇杆312,摇杆312通过第二轴承座310带动第二锥齿轮313旋转,第二锥齿轮313带动第一锥齿轮36旋转,第一锥齿轮36进而带动丝杆34旋转,螺母35在丝杆34上运动,便可带动导套38第一连接板39上下运动,进而带动放置板7上下运动,从而达到快速运输的功能,本装置操作简单,有利于运输工人根据砌墙工人所在位置高度进行升降调节。Because the lifting device 3 includes a mechanical case 31, the first bearing block 33, a screw mandrel 34, a nut 35, the first bevel gear 36, a guide rod 37, a guide sleeve 38, the first connecting plate 39, the second bearing block 310, the first A rotating shaft 311, a rocker 312 and a second bevel gear 313, the top right side of the bottom plate 1 is connected with a mechanical box 31 by means of bolts, the left wall of the mechanical box 31 has a word hole 32, and the inner right wall of the mechanical box 31 is welded symmetrically up and down There is a first bearing seat 33, the bearings in the first bearing seat 33 are interferingly connected with a screw rod 34, the screw rod 34 is provided with a nut 35, the nut 35 cooperates with the screw rod 34, and the bottom end of the screw rod 34 is connected with interference There is a first bevel gear 36, a guide rod 37 is welded to the left ends of the two first bearing seats 33, a guide sleeve 38 is slidably connected to the guide rod 37, the guide sleeve 38 cooperates with the guide rod 37, and the guide sleeve 38 is welded to the nut 35 connection, the left end of the guide sleeve 38 is welded with a first connecting plate 39, the left end of the first connecting plate 39 is welded with a connecting rod 5, the lower side of the right wall of the mechanical box 31 is welded with a second bearing seat 310, and the bearing in the second bearing seat 310 is over The first rotating shaft 311 is connected with the first rotating shaft 311. The right end of the first rotating shaft 311 is welded with a rocker 312. The left end of the first rotating shaft 311 is interference connected with the second bevel gear 313. The transport worker shakes the rocker 312 clockwise, the rocker 312 drives the second bevel gear 313 to rotate through the second bearing seat 310, the second bevel gear 313 drives the first bevel gear 36 to rotate, and the first bevel gear 36 drives the screw rod 34 rotation, the nut 35 moves on the screw rod 34, which can drive the first connecting plate 39 of the guide sleeve 38 to move up and down, and then drive the placement plate 7 to move up and down, so as to achieve the function of fast transportation. This device is easy to operate and is beneficial to transport workers Lift and adjust according to the height of the wall-laying workers.
因为旋转装置6包括有环形滑轨61、第一滑块62、支架63、第三轴承座64、第二转轴65、第一齿轮66、旋转电机67、第二齿轮68和第二连接板69,连接杆5左侧焊接有环形滑轨61,环形滑轨61上滑动式连接有两个第一滑块62,两个第一滑块62上均焊接有支架63,环形滑轨61内中心焊接有第三轴承座64,第三轴承座64内的轴承过盈连接有第二转轴65,第二转轴65中部过盈连接有第一齿轮66,环形滑轨61内右侧通过螺栓连接的方式连接有旋转电机67,旋转电机67的输出轴上过盈连接有第二齿轮68,第一齿轮66与第二齿轮68啮合,两个支架63之间焊接有第二连接板69,第二转轴65顶部与第二连接板69底部通过焊接的方式连接的,运输工人通过控制旋转电机67旋转,旋转电机67带动第二齿轮68旋转,第二齿轮68带动第一齿轮66旋转,进而带动第二转轴65旋转,第二转轴65通过第二连接板69带动支架63旋转,支架63带动放置板7旋转,砌墙工人将最近的放置槽8上装满水泥的水泥桶取出,放置板7旋转带动另一个装满水泥的水泥桶再次转至最近的位置,继而方便砌墙工人取出装满水泥的水泥桶和放置空的水泥桶。Because the rotating device 6 includes an annular slide rail 61, a first slide block 62, a support 63, a third bearing seat 64, a second rotating shaft 65, a first gear 66, a rotating motor 67, a second gear 68 and a second connecting plate 69 , the left side of the connecting rod 5 is welded with an annular slide rail 61, two first sliders 62 are slidably connected on the annular slide rail 61, and a bracket 63 is welded on the two first sliders 62, and the inner center of the annular slide rail 61 The third bearing seat 64 is welded, and the bearing in the third bearing seat 64 is connected with the second rotating shaft 65 in an interference fit. The middle part of the second rotating shaft 65 is connected with the first gear 66 in an interference fit. The rotary motor 67 is connected in the same way, the output shaft of the rotary motor 67 is connected with the second gear 68 by interference, the first gear 66 meshes with the second gear 68, the second connecting plate 69 is welded between the two brackets 63, the second The top of the rotating shaft 65 is connected to the bottom of the second connecting plate 69 by welding. The transport worker controls the rotation of the rotating motor 67, and the rotating motor 67 drives the second gear 68 to rotate. The second gear 68 drives the first gear 66 to rotate, and then drives the second gear 68 to rotate. The second rotating shaft 65 rotates, the second rotating shaft 65 drives the bracket 63 to rotate through the second connecting plate 69, the bracket 63 drives the placement plate 7 to rotate, the wall-laying workers take out the cement bucket filled with cement on the nearest placement groove 8, and the placement plate 7 rotates Drive another cement bucket full of cement to turn to the nearest position again, and then make things convenient for the wall worker to take out the cement bucket full of cement and place an empty cement bucket.
因为还包括有固定装置9,固定装置9包括有第一滑轨91、第二滑块92、固定板93、压板96、卡块97、弹簧98、升降杆99和固定块910,机械箱31右壁下侧通过螺栓连接的方式连接有第一滑轨91,第一滑轨91上滑动式连接有第二滑块92,机械箱31右壁下侧通过螺栓连接的方式连接有固定板93,固定板93中部开有小孔94,固定板93顶部左右两侧开有卡槽95,第二滑块92右端焊接有压板96,压板96底部右侧两侧焊接有卡块97,卡块97与卡槽95配合,压板96底部和固定板93顶部之间左右对称焊接有弹簧98,压板96底部中心焊接有升降杆99,升降杆99穿过小孔94底部焊接有固定块910,当需要将本装置进行固定时,工人可挤压压板96,压板96带动升降杆99和固定块910向下运动,弹簧98被压缩,卡块97卡入卡槽95内,固定块910与地面接触,防止本设备滑动,不要移动时,将压板96向上拔起,卡块97离开卡槽95,弹簧98恢复形长,带动升降杆99和固定块910向上运动复位,本装置结构简单,方便操作。Because also include fixture 9, fixture 9 includes first slide rail 91, second slide block 92, fixed plate 93, pressing plate 96, block 97, spring 98, elevating rod 99 and fixed block 910, mechanical case 31 The lower side of the right wall is connected with a first slide rail 91 by means of bolt connection, the first slide rail 91 is slidably connected with a second slide block 92, and the lower side of the right wall of the mechanical box 31 is connected with a fixed plate 93 by means of bolt connection , the middle part of the fixed plate 93 is provided with a small hole 94, and the left and right sides of the top of the fixed plate 93 are provided with card slots 95, the right end of the second slider 92 is welded with a pressing plate 96, and the right side of the bottom of the pressing plate 96 is welded with a clamping block 97, the clamping block 97 cooperates with draw-in groove 95, and spring 98 is welded symmetrically between the bottom of pressing plate 96 and the top of fixed plate 93, and the center of pressing plate 96 bottoms is welded with elevating rod 99, and elevating rod 99 passes aperture 94 bottoms and is welded with fixed block 910, when When the device needs to be fixed, the worker can squeeze the pressing plate 96, and the pressing plate 96 drives the lifting rod 99 and the fixing block 910 to move downward, the spring 98 is compressed, the locking block 97 is inserted into the slot 95, and the fixing block 910 is in contact with the ground , to prevent the device from sliding and not to move, pull up the pressure plate 96, the block 97 leaves the slot 95, the spring 98 restores its shape, and drives the lifting rod 99 and the fixed block 910 to move upward and reset. This device has a simple structure and is easy to operate .
因为升降装置3还包括有橡胶套314,摇杆312上套接有橡胶套314,工人再推动本设备时不易损伤手,并且提高了本装置的舒适性。Because the lifting device 3 also includes a rubber sheath 314, and the rocking bar 312 is sleeved with the rubber sheath 314, the worker is not easy to injure his hands when he pushes the equipment, and the comfort of the device is improved.
因为机械箱31材料为不锈钢,不锈钢耐腐蚀性和耐酸性强,可延长装置的使用寿命。Because the mechanical box 31 is made of stainless steel, the stainless steel has strong corrosion resistance and acid resistance, which can prolong the service life of the device.
因为连接杆5材料为Q235钢,Q235钢硬度高,不容易变形,使装置的使用寿命更长。Because the connecting rod 5 is made of Q235 steel, the Q235 steel has high hardness and is not easily deformed, so that the service life of the device is longer.
因为旋转电机67为伺服电机,抗过载能力强,高速性能好,能精准控制其转速。Because the rotary motor 67 is a servo motor, it has strong overload resistance, good high-speed performance, and can accurately control its rotational speed.
以上所述实施例仅表达了本实用新型的优选实施方式,其描述较为具体和详细,但并不能因此而理解为对本实用新型专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干变形、改进及替代,这些都属于本实用新型的保护范围。因此,本实用新型专利的保护范围应以所附权利要求为准。The above-mentioned embodiments only express the preferred implementation of the utility model, and the description thereof is relatively specific and detailed, but should not be construed as limiting the patent scope of the utility model. It should be pointed out that those skilled in the art can make several modifications, improvements and substitutions without departing from the concept of the present invention, all of which belong to the protection scope of the present utility model. Therefore, the scope of protection of the utility model patent should be based on the appended claims.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720387685.9U CN206720665U (en) | 2017-04-14 | 2017-04-14 | A high-efficiency conveying equipment for cement used in building walls |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720387685.9U CN206720665U (en) | 2017-04-14 | 2017-04-14 | A high-efficiency conveying equipment for cement used in building walls |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206720665U true CN206720665U (en) | 2017-12-08 |
Family
ID=60503557
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720387685.9U Expired - Fee Related CN206720665U (en) | 2017-04-14 | 2017-04-14 | A high-efficiency conveying equipment for cement used in building walls |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206720665U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108217162A (en) * | 2017-12-26 | 2018-06-29 | 周远桂 | A kind of construction material transfer equipment |
| CN108381762A (en) * | 2018-02-10 | 2018-08-10 | 黄朝仁 | One kind is built a wall promotes agitating device with cement |
| CN116425083A (en) * | 2023-04-17 | 2023-07-14 | 江苏中宝龙工程机械有限公司 | High construction elevator of stability |
-
2017
- 2017-04-14 CN CN201720387685.9U patent/CN206720665U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108217162A (en) * | 2017-12-26 | 2018-06-29 | 周远桂 | A kind of construction material transfer equipment |
| CN108381762A (en) * | 2018-02-10 | 2018-08-10 | 黄朝仁 | One kind is built a wall promotes agitating device with cement |
| CN116425083A (en) * | 2023-04-17 | 2023-07-14 | 江苏中宝龙工程机械有限公司 | High construction elevator of stability |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206123935U (en) | High -efficient compounding device of cement for building | |
| CN106272969B (en) | A kind of cement mortar quick agitator for building | |
| CN201941081U (en) | Gantry type die overturning returning machine | |
| CN206720665U (en) | A high-efficiency conveying equipment for cement used in building walls | |
| CN106363804A (en) | Efficient raw material mixing device for cement brick manufacturing | |
| CN206230684U (en) | A kind of cement brick making efficient evenly mixing device of raw material | |
| CN207496982U (en) | A kind of filling loading device of finished cement for cement production | |
| CN108680390B (en) | Sampling device for premixed concrete mixture | |
| CN211168682U (en) | Cement promotes conveying equipment for cement manufacture | |
| CN204488863U (en) | A kind of bagged cement dedicated transfer car | |
| CN108608575A (en) | A kind of portable construction Machines stirring trolley | |
| WO2018010307A1 (en) | Concrete mixing plant | |
| CN206335709U (en) | A kind of cement paste gear formula quick agitator for building | |
| CN210934822U (en) | Water based paint mixing arrangement for building | |
| CN211473489U (en) | Concrete gap grouting device | |
| CN214210400U (en) | A batching device for cement production and processing | |
| CN207669524U (en) | A kind of concrete conveyer belt | |
| CN221316304U (en) | Concrete transportation device | |
| CN210414975U (en) | A concrete mixing device for road bridge construction | |
| CN112267469A (en) | Cement pouring equipment for building engineering | |
| CN207063542U (en) | A kind of device for green concrete construction | |
| CN203355968U (en) | Automatic oil brushing device for side plates for aerated block production | |
| CN205088963U (en) | Concrete feeding hopper | |
| CN217461507U (en) | A concrete conveying device | |
| CN218894421U (en) | An energy-saving, environment-friendly and anti-blocking concrete pouring device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: An efficient cement conveying equipment for building wall Effective date of registration: 20200922 Granted publication date: 20171208 Pledgee: Hanhua Financing Guarantee Co.,Ltd. Jilin Branch Pledgor: CHANGCHUN KUNLUN CONSTRUCTION Co.,Ltd. Registration number: Y2020220000066 |
|
| PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
| PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20230301 Granted publication date: 20171208 Pledgee: Hanhua Financing Guarantee Co.,Ltd. Jilin Branch Pledgor: CHANGCHUN KUNLUN CONSTRUCTION CO.,LTD. Registration number: Y2020220000066 |
|
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171208 |