CN206720558U - A kind of adjustable steel-reinforcement cage hanger - Google Patents
A kind of adjustable steel-reinforcement cage hanger Download PDFInfo
- Publication number
- CN206720558U CN206720558U CN201720546457.1U CN201720546457U CN206720558U CN 206720558 U CN206720558 U CN 206720558U CN 201720546457 U CN201720546457 U CN 201720546457U CN 206720558 U CN206720558 U CN 206720558U
- Authority
- CN
- China
- Prior art keywords
- support member
- hoist cable
- reinforcement cage
- support
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
技术领域technical field
本实用新型属于吊具技术领域,具体涉及一种可调节式钢筋笼吊具。The utility model belongs to the technical field of hangers, in particular to an adjustable steel cage hanger.
背景技术Background technique
随着桥梁预制拼装施工工艺在城市桥梁建设中的普及,桥梁施工逐渐走向标准化、单元化、规范化及工厂化的方向。其中,在预制立柱和盖梁规模化的生产中,整体制作的钢筋笼预制件需要整体起吊,并吊运至模板中以进行入模浇筑,目前现有的钢筋笼吊装所采用的吊具基本为两点式吊装,例如采用两根吊索或者扁担梁对钢筋笼进行吊装,在使用两根吊索吊装时,一般是在钢筋笼端部和尾部分别设置一个吊点,钢筋笼端部采用大型起重机起吊,钢筋笼尾部采用小型吊车或者装载机起吊,采用这种方式起吊容易导致钢筋笼中部弯曲,使钢筋笼中部变形,同时对钢筋笼的垂直下方造成困难。在使用扁担梁吊装时,这种吊装方式是利用吊机上的主钩、扁担梁、吊索来实现吊装,扁担梁两端分别设置一个滑轮,每个滑轮上设有吊索,吊索的两端通过扣件分别安装在钢筋笼上部的加强筋上,这样形成了两个吊点,扁担梁吊装钢筋笼时具有以下缺点:1.扁担梁在吊装大直径的钢筋笼时,容易使钢筋笼上部发生变形,从而造成钢筋笼的损坏;2.吊装时钢筋笼受力不平衡,易发生倾斜现象,造成安全事故的发生;3.对于重量较大的钢筋笼,两个受力点容易使钢筋笼上方的加强筋与钢筋笼脱离,导致钢筋笼的下放失败。总之,采用两点式吊装时,稳定性差,适用性差,容易使钢筋笼结构发生破坏,甚至造成危险事故的发生。With the popularization of bridge prefabricated assembly construction technology in urban bridge construction, bridge construction is gradually moving towards standardization, unitization, normalization and factoryization. Among them, in the large-scale production of prefabricated columns and cover beams, the steel cage prefabricated parts produced as a whole need to be hoisted as a whole and transported to the formwork for pouring into the mold. It is a two-point hoisting method, such as using two slings or pole beams to hoist the reinforcement cage. When using two slings for hoisting, generally a lifting point is set at the end and tail of the reinforcement cage, and the end of the reinforcement cage is used When lifting by a large crane, use a small crane or loader to lift the tail of the steel cage. Lifting in this way will easily cause the middle part of the steel cage to bend, deform the middle part of the steel cage, and cause difficulties for the vertical bottom of the steel cage. When hoisting with pole beams, this hoisting method is to use the main hook on the crane, pole beams, and slings to achieve hoisting. A pulley is installed at both ends of the pole beam, and a sling is installed on each pulley. The two ends of the sling The ends are respectively installed on the reinforcement bars on the upper part of the steel cage through fasteners, thus forming two lifting points. The pole beam has the following disadvantages when hoisting the steel cage: 1. When the pole beam is hoisting a large-diameter steel cage, it is easy to make the steel cage The upper part is deformed, which causes damage to the steel cage; 2. The force of the steel cage is unbalanced during hoisting, and it is prone to tilting, resulting in safety accidents; 3. For heavy steel cages, the two stress points are easy to make The reinforcing bars above the reinforcement cage were detached from the reinforcement cage, resulting in the failure of lowering the reinforcement cage. In short, when two-point hoisting is used, the stability and applicability are poor, and it is easy to damage the steel cage structure and even cause dangerous accidents.
实用新型内容Utility model content
本实用新型所要解决的技术问题在于针对上述现有技术中的不足,提供一种可调节式钢筋笼吊具。其结构简单,通过四根吊索实现对钢筋笼的吊装,避免两点式吊装引起的钢筋笼受力不平衡、钢筋笼上方的加强筋与钢筋笼脱离的现象,同时通过多个第一调节孔和第二调节孔可调节四根吊索的安装位置,这样能够对不同直径的钢筋笼进行吊装,扩大了适用范围。The technical problem to be solved by the utility model is to provide an adjustable steel cage hanger for the above-mentioned deficiencies in the prior art. Its structure is simple, and the hoisting of the steel cage is realized by four slings, which avoids the unbalanced force of the steel cage caused by the two-point hoisting, and the phenomenon that the reinforcement above the steel cage is separated from the steel cage. The installation position of the four slings can be adjusted through the hole and the second adjustment hole, so that steel cages of different diameters can be hoisted, which expands the scope of application.
为解决上述技术问题,本实用新型采用的技术方案是:一种可调节式钢筋笼吊具,其特征在于:包括支撑架、安装在所述支撑架上面的吊耳和安装在所述支撑架上且用于吊装钢筋笼的吊索组件;In order to solve the above technical problems, the technical solution adopted by the utility model is: an adjustable steel cage hanger, which is characterized in that it includes a support frame, lifting lugs installed on the support frame and sling assembly for hoisting the reinforcement cage;
所述支撑架由第一支撑件和第二支撑件组成,所述第一支撑件和所述第二支撑件呈十字形布设;The support frame is composed of a first support and a second support, and the first support and the second support are arranged in a cross shape;
所述吊索组件包括安装在第一支撑件的第一组吊索和安装在第二支撑件上的第二组吊索,所述第一组吊索与第一支撑件和所述第二组吊索与第二支撑件均为可拆卸连接,所述第一组吊索分别为安装在第一支撑件两端的第一吊索和第二吊索,所述第二组吊索分别为安装在第二支撑件两端的第三吊索和第四吊索,The sling assembly includes a first set of slings mounted on a first support and a second set of slings mounted on a second support, the first set of slings being connected to the first support and the second The set of slings is detachably connected to the second support, the first set of slings are respectively the first sling and the second sling installed at both ends of the first support, and the second set of slings are respectively a third sling and a fourth sling mounted at both ends of the second support,
所述第一支撑件上开设有多个用于调节第一吊索和第二吊索安装位置的第一调节孔,所述第二支撑件上开设有多个用于调节第三吊索和第四吊索安装位置的第二调节孔。The first support member is provided with a plurality of first adjustment holes for adjusting the installation positions of the first sling and the second sling, and the second support member is provided with a plurality of adjustment holes for adjusting the installation positions of the third sling and the second sling. Second adjustment hole for fourth sling mounting location.
上述一种可调节式钢筋笼吊具,其特征在于:所述第一吊索和第二吊索均通过U型卡扣安装在所述第一支撑件的两端,所述第三吊索和第四吊索均通过U型卡扣安装在第二支撑件的两端。The above-mentioned adjustable steel cage hanger is characterized in that: the first sling and the second sling are installed on both ends of the first support through U-shaped buckles, and the third sling and the fourth sling are installed on both ends of the second support through U-shaped buckles.
上述一种可调节式钢筋笼吊具,其特征在于:多个所述第一调节孔沿第一支撑件的长度方向均匀布设,多个所述第二调节孔沿第二支撑件的长度方向均匀布设。The above-mentioned adjustable steel cage hanger is characterized in that: a plurality of the first adjustment holes are evenly arranged along the length direction of the first support member, and a plurality of the second adjustment holes are arranged along the length direction of the second support member Spread evenly.
上述一种可调节式钢筋笼吊具,其特征在于:所述第一支撑件和第二支撑件的连接处的上方固定有上加固板,所述吊耳安装在所述上加固板上,所述第一支撑件和第二支撑件的连接处的下方固定有下加固板。The above-mentioned adjustable steel cage hanger is characterized in that: an upper reinforcing plate is fixed above the junction of the first support and the second support, and the lifting lug is installed on the upper reinforcing plate, A lower reinforcing plate is fixed below the junction of the first support and the second support.
上述一种可调节式钢筋笼吊具,其特征在于:所述上加固板和下加固板均为矩形钢板,所述矩形钢板的四个顶角固定在所述第一支撑件和第二支撑件上。The above-mentioned adjustable steel cage hanger is characterized in that: the upper reinforcement plate and the lower reinforcement plate are both rectangular steel plates, and the four corners of the rectangular steel plates are fixed on the first support and the second support on file.
上述一种可调节式钢筋笼吊具,其特征在于:所述第一支撑件和第二支撑件均为工字钢或槽钢。The above-mentioned adjustable steel cage hanger is characterized in that: the first support member and the second support member are both I-beams or channel steels.
本实用新型与现有技术相比具有以下优点:Compared with the prior art, the utility model has the following advantages:
1.本实用新型结构简单,设计合理,通过四根吊索对钢筋笼进行吊装,即采用四点式吊装,四点式吊装相比两点式吊装增加了两个受力点,这样能够使钢筋笼受力更加均衡和平衡,保证钢筋笼在起吊过程中平稳,避免钢筋笼发生倾斜现象,甚至造成危险事故的发生。1. The utility model is simple in structure and reasonable in design. The steel cage is hoisted by four slings, that is, four-point hoisting is adopted. Compared with the two-point hoisting, the four-point hoisting adds two stress points, which can make The force of the reinforcement cage is more even and balanced, ensuring the stability of the reinforcement cage during the lifting process, avoiding the tilting of the reinforcement cage, and even causing dangerous accidents.
2.本实用新型第一支撑件上开设有多个第一调节孔,以及第二支撑件上开设有多个第二调节孔,这样可通过调节四根吊索的安装位置,使吊具适用于不同直径大小的钢筋笼,不仅提高了吊具的稳定性也扩大了吊具的适用范围。2. There are multiple first adjustment holes on the first support of the utility model, and multiple second adjustment holes on the second support. In this way, the installation position of the four slings can be adjusted to make the spreader suitable for use. Reinforcement cages with different diameters not only improve the stability of the spreader but also expand the scope of application of the spreader.
3.本实用新型的四根吊索可拆卸安装在第一支撑件和第二支撑件上,拆装方便。3. The four slings of the utility model can be detachably installed on the first support member and the second support member, which is convenient for disassembly and assembly.
4.本实用新型四点式吊装钢筋笼,相对于两点式吊装增加了两个吊点,使每一个吊点承受钢筋笼的重力小于两点式承受的钢筋笼重力,避免加强筋和钢筋笼脱离的现象。4. The four-point hoisting steel cage of the utility model adds two hoisting points compared to the two-point hoisting, so that the gravity of each hoisting point to bear the steel cage is less than that of the two-point hoisting steel cage, avoiding reinforcement bars and steel bars Cage detachment phenomenon.
综上所述,本实用新型结构简单、操作方便、设计合理,通过四根吊索实现对钢筋笼的吊装,避免两点式吊装引起的钢筋笼受力不平衡、钢筋笼上方的加强筋与钢筋笼脱离的现象,同时通过多个第一调节孔和第二调节孔可调节四根吊索的安装位置,这样能够对不同直径的钢筋笼进行吊装,扩大了适用范围。To sum up, the utility model has the advantages of simple structure, convenient operation and reasonable design. The hoisting of the reinforcement cage is realized by four slings, which avoids the unbalanced force of the reinforcement cage caused by the two-point hoisting, and the reinforcement bars above the reinforcement cage and the The reinforcement cage is detached, and the installation positions of the four slings can be adjusted through a plurality of first adjustment holes and second adjustment holes, so that reinforcement cages of different diameters can be hoisted and the scope of application is expanded.
下面通过附图和实施例,对本实用新型的技术方案做进一步的详细描述。The technical solutions of the present utility model will be further described in detail through the drawings and embodiments below.
附图说明Description of drawings
图1为本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.
图2为本实用新型第一支撑件、第二支撑件和上加固板的安装关系示意图。Fig. 2 is a schematic diagram of the installation relationship of the first support, the second support and the upper reinforcing plate of the present invention.
图3为本实用新型第一支撑件、第二支撑件和下加固板的安装关系示意图。Fig. 3 is a schematic diagram of the installation relationship of the first support member, the second support member and the lower reinforcing plate of the present invention.
附图标记说明:Explanation of reference signs:
1—第一支撑件; 1-1—第一调节孔; 2—第二支撑件;1—the first support; 1-1—the first adjustment hole; 2—the second support;
2-1—第二调节孔; 3—第一吊索; 4—第二吊索;2-1—the second adjustment hole; 3—the first sling; 4—the second sling;
5—第三吊索; 6—第四吊索; 7—吊耳;5—third sling; 6—fourth sling; 7—hanging lug;
8—上加固板; 9—下加固板。8—upper reinforcing plate; 9—lower reinforcing plate.
具体实施方式detailed description
如图1所示,本实用新型包括支撑架、安装在所述支撑架上面的吊耳7和安装在所述支撑架上且用于吊装钢筋笼的吊索组件。As shown in FIG. 1 , the utility model includes a support frame, lifting lugs 7 installed on the support frame, and a sling assembly installed on the support frame and used for hoisting a reinforcement cage.
本实施例中,所述支撑架由第一支撑件1和第二支撑件2组成,所述第一支撑件1和所述第二支撑件2呈十字形布设。In this embodiment, the support frame is composed of a first support 1 and a second support 2, and the first support 1 and the second support 2 are arranged in a cross shape.
本实施例中,所述吊索组件包括安装在第一支撑件1的第一组吊索和安装在第二支撑件2上的第二组吊索,所述第一组吊索与第一支撑件1和所述第二组吊索与第二支撑件2均为可拆卸连接,所述第一组吊索分别为安装在第一支撑件1的两端的第一吊索3和第二吊索4,所述第二组吊索分别为安装在第二支撑件2两端的第三吊索5和第四吊索6,所述第一支撑件1上开设有多个用于调节第一吊索3和第二吊索4安装位置的第一调节孔1-1,所述第二支撑件2上开设有多个用于调节第三吊索5和第四吊索6安装位置的第二调节孔2-1。In this embodiment, the sling assembly includes a first group of slings installed on the first support 1 and a second group of slings installed on the second support 2, the first group of slings and the first The support 1 and the second set of slings are all detachably connected to the second support 2, and the first set of slings are respectively the first sling 3 and the second sling installed at both ends of the first support 1. The sling 4, the second group of slings are respectively the third sling 5 and the fourth sling 6 installed at both ends of the second support 2, and the first support 1 is provided with a plurality of A first adjustment hole 1-1 for the installation position of the first sling 3 and the second sling 4, and a plurality of holes for adjusting the installation positions of the third sling 5 and the fourth sling 6 are opened on the second support member 2 The second adjustment hole 2-1.
本实施例中,所述第一吊索3和第二吊索4均通过U型卡扣安装在所述第一支撑件1两端,所述第三吊索5和第四吊索6均通过U型卡扣安装在第二支撑件2两端。In this embodiment, both the first sling 3 and the second sling 4 are installed on both ends of the first support 1 through U-shaped buckles, and the third sling 5 and the fourth sling 6 are both It is installed on both ends of the second support member 2 through a U-shaped buckle.
具体实施时,由于第一支撑件1和所述第二支撑件2呈十字形布设,四根所述吊索分别安装在第一支撑件1的两端和第二支撑件2的两端,这样就可通过四根吊索对钢筋笼进行起吊,四点式相比两点式能够提高起吊稳定性,使钢筋笼受力更加平衡,有效防止钢筋笼在起吊时发生倾斜现象,同时也不会使钢筋笼发生变形现象,保证安全、稳定的下放至模板中,同时由于采用四点式吊装,也能够避免钢筋笼上部的加强筋与钢筋笼发生脱离现象,尤其对于质量较大的钢筋笼。During specific implementation, since the first support member 1 and the second support member 2 are arranged in a cross shape, the four slings are respectively installed at both ends of the first support member 1 and the two ends of the second support member 2, In this way, the steel cage can be lifted by four slings. Compared with the two-point type, the four-point type can improve the lifting stability, make the force on the steel cage more balanced, effectively prevent the steel cage from tilting during lifting, and also not It will cause deformation of the reinforcement cage to ensure safe and stable lowering into the formwork. At the same time, due to the four-point hoisting, it can also avoid the separation of the reinforcement bars on the upper part of the reinforcement cage and the reinforcement cage, especially for the larger reinforcement cages. .
具体实施时,所述第一支撑件1上开设有多个用于调节第一吊索3和第二吊索4安装位置的第一调节孔1-1,所述第二支撑件2上开设有多个用于调节第三吊索5和第四吊索6安装位置的第二调节孔2-1,且所述第一吊索3、第二吊索4、第三吊索5和第四吊索6均通过可拆卸的U型卡扣相对应的第一支撑件1的两端和第二支撑件2的两端,可通过第一调节孔1-1和第二调节孔2-1调节四根所述吊索的安装位置,这样吊具能够适用于不同直径大小的钢筋笼,避免现有技术中一个吊具仅适用于一个尺寸大小的钢筋笼的现象。During specific implementation, a plurality of first adjustment holes 1-1 for adjusting the installation positions of the first sling 3 and the second sling 4 are opened on the first support member 1, and a plurality of first adjustment holes 1-1 are opened on the second support member 2. There are a plurality of second adjustment holes 2-1 for adjusting the installation positions of the third sling 5 and the fourth sling 6, and the first sling 3, the second sling 4, the third sling 5 and the first sling The four slings 6 all pass through the detachable U-shaped buckles corresponding to the two ends of the first support 1 and the two ends of the second support 2, and can pass through the first adjustment hole 1-1 and the second adjustment hole 2- 1. Adjust the installation positions of the four slings, so that the sling can be applied to steel cages of different diameters, avoiding the phenomenon in the prior art that a sling is only suitable for steel cages of one size.
本实施例中,多个所述第一调节孔1-1沿第一支撑件1的延伸方向均匀布设,多个所述第二调节孔2-1沿第二支撑件2的延伸方向均匀布设。In this embodiment, a plurality of the first adjustment holes 1-1 are evenly arranged along the extension direction of the first support member 1, and a plurality of the second adjustment holes 2-1 are evenly arranged along the extension direction of the second support member 2 .
如图2和图3所示,本实施例中,所述第一支撑件1和第二支撑件2的连接处的上方固定有上加固板8,所述吊耳7安装在所述上加固板8上,所述第一支撑件1和第二支撑件2的连接处的下方固定有下加固板9,所述上加固板8和下加固板9均为矩形钢板,所述矩形钢板的四个顶角固定在所述第一支撑件1和第二支撑件2上,这样设计的目的是:1.通过上加固板8和下加固板9能够增加整个吊具的强度,提高整个吊具的稳定性;2.通过将所述矩形钢板的四个顶角固定在所述第一支撑件1和第二支撑件2上,提高了整个吊具的平衡性。As shown in Fig. 2 and Fig. 3, in this embodiment, an upper reinforcing plate 8 is fixed above the junction of the first support member 1 and the second support member 2, and the lifting lug 7 is installed on the upper reinforcing plate. On the plate 8, a lower reinforcing plate 9 is fixed below the junction of the first support member 1 and the second support member 2, and the upper reinforcing plate 8 and the lower reinforcing plate 9 are both rectangular steel plates. The four vertices are fixed on the first support 1 and the second support 2. The purpose of this design is: 1. The strength of the whole hanger can be increased by the upper reinforcement plate 8 and the lower reinforcement plate 9, and the entire suspension can be improved. 2. By fixing the four vertices of the rectangular steel plate on the first support 1 and the second support 2, the balance of the entire spreader is improved.
本实施例中,所述第一支撑件1和第二支撑件2均为工字钢或槽钢,这样取材方便,降低制造成本。In this embodiment, the first support member 1 and the second support member 2 are both I-beams or channel steels, which facilitates material acquisition and reduces manufacturing costs.
本实用新型的使用过程:The use process of the utility model:
首先根据钢筋笼直径大小调节四根吊索的安装位置,即通过U型卡扣将第一吊索3和第二吊索4安装在第一支撑件1上开设的第一调节孔1-1上,第三吊索5和第四吊索6安装在第二支撑件2上开设的第二调节孔2-1上,并检查四根吊索安装是否牢固;其次在将第一吊索3、第二吊索4、第三吊索5和第四吊索6的下端与钢筋笼上方的加强筋连接,保证四根吊索在钢筋笼上安装位置呈圆形;最后将吊耳7与起重机相扣,开启起重机将钢筋笼下放至模板中。First, adjust the installation position of the four slings according to the diameter of the steel cage, that is, install the first sling 3 and the second sling 4 on the first adjustment hole 1-1 opened on the first support 1 through a U-shaped buckle. On, the third sling 5 and the fourth sling 6 are installed on the second adjustment hole 2-1 opened on the second support 2, and check whether the installation of the four slings is firm; secondly, install the first sling 3 , the lower ends of the second sling 4, the third sling 5 and the fourth sling 6 are connected with the reinforcing ribs above the reinforcement cage to ensure that the installation positions of the four slings on the reinforcement cage are circular; The cranes are interlocked, and the crane is turned on to lower the reinforcement cage into the formwork.
以上所述,仅是本实用新型的较佳实施例,并非对本实用新型作任何限制,凡是根据本实用新型技术实质对以上实施例所作的任何简单修改、变更以及等效结构变化,均仍属于本实用新型技术方案的保护范围内。The above are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any simple modifications, changes and equivalent structural changes made to the above embodiments according to the technical essence of the present utility model still belong to Within the scope of protection of the technical solution of the utility model.
Claims (6)
- A kind of 1. adjustable steel-reinforcement cage hanger, it is characterised in that:Hanger including support frame, above support frame as described above (7) the hoist cable component and on support frame as described above and for lifting steel reinforcement cage;Support frame as described above is made up of the first support member (1) and the second support member (2), first support member (1) and the second support Part (2) is laid in cross;The hoist cable component is included installed in first group of hoist cable of the first support member (1) and on the second support member (2) Second group of hoist cable, first group of hoist cable and the first support member (1) and second group of hoist cable and the second support member (2) are can Dismantling connection, first group of hoist cable are respectively the first hoist cable (3) and the second hoist cable installed in the first support member (1) both ends (4), second group of hoist cable is respectively installed in the 3rd hoist cable (5) and the 4th hoist cable (6) at the second support member (2) both ends, institute State and multiple the first regulations for being used to adjust the first hoist cable (3) and the second hoist cable (4) installation site are offered on the first support member (1) Hole (1-1), offer on second support member (2) and multiple be used to adjust the 3rd hoist cable (5) and the 4th hoist cable (6) installation site The second adjustment hole (2-1).
- 2. according to a kind of adjustable steel-reinforcement cage hanger described in claim 1, it is characterised in that:First hoist cable (3) and Second hoist cable (4) is arranged on the both ends of first support member (1) by U-shaped buckle, and the 3rd hoist cable (5) and the 4th is hung Rope (6) is arranged on the both ends of the second support member (2) by U-shaped buckle.
- 3. according to a kind of adjustable steel-reinforcement cage hanger described in claim 1 or 2, it is characterised in that:Multiple described first adjust Length direction of the knothole (1-1) along the first support member (1) is uniformly laid, and multiple second adjustment holes (2-1) support along second The length direction of part (2) is uniformly laid.
- 4. according to a kind of adjustable steel-reinforcement cage hanger described in claim 1 or 2, it is characterised in that:First support member (1) and the junction of the second support member (2) is fixedly arranged above securing plate (8), and the hanger (7) is arranged on the upper reinforcing On plate (8), lower securing plate (9) is fixed with below the junction of first support member (1) and the second support member (2).
- 5. according to a kind of adjustable steel-reinforcement cage hanger described in claim 4, it is characterised in that:The upper securing plate (8) and Lower securing plate (9) is rectangular steel plates, and four drift angles of the rectangular steel plates are fixed on first support member (1) and second In support member (2).
- 6. according to a kind of adjustable steel-reinforcement cage hanger described in claim 1 or 2, it is characterised in that:First support member (1) and the second support member (2) is I-steel or channel-section steel.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720546457.1U CN206720558U (en) | 2017-05-16 | 2017-05-16 | A kind of adjustable steel-reinforcement cage hanger |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720546457.1U CN206720558U (en) | 2017-05-16 | 2017-05-16 | A kind of adjustable steel-reinforcement cage hanger |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206720558U true CN206720558U (en) | 2017-12-08 |
Family
ID=60512157
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720546457.1U Active CN206720558U (en) | 2017-05-16 | 2017-05-16 | A kind of adjustable steel-reinforcement cage hanger |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206720558U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110258534A (en) * | 2019-06-17 | 2019-09-20 | 中南大学 | A kind of device and method for guaranteeing ground-connecting-wall steel reinforcement cage and vertically hanging |
| CN112359836A (en) * | 2020-11-05 | 2021-02-12 | 江苏省交通工程集团有限公司 | Large-diameter pile foundation reinforcement cage supporting device and construction method applying same |
| CN113532824A (en) * | 2021-06-30 | 2021-10-22 | 中信国安建工集团有限公司 | High-altitude operation hanging basket performance detection platform and operation method |
| CN115744574A (en) * | 2022-11-04 | 2023-03-07 | 中铁上海工程局集团有限公司 | Oval steel reinforcement cage hoisting accessory |
-
2017
- 2017-05-16 CN CN201720546457.1U patent/CN206720558U/en active Active
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110258534A (en) * | 2019-06-17 | 2019-09-20 | 中南大学 | A kind of device and method for guaranteeing ground-connecting-wall steel reinforcement cage and vertically hanging |
| CN110258534B (en) * | 2019-06-17 | 2024-01-30 | 中南大学 | Device and method for guaranteeing vertical hoisting of diaphragm wall reinforcement cage |
| CN112359836A (en) * | 2020-11-05 | 2021-02-12 | 江苏省交通工程集团有限公司 | Large-diameter pile foundation reinforcement cage supporting device and construction method applying same |
| CN113532824A (en) * | 2021-06-30 | 2021-10-22 | 中信国安建工集团有限公司 | High-altitude operation hanging basket performance detection platform and operation method |
| CN115744574A (en) * | 2022-11-04 | 2023-03-07 | 中铁上海工程局集团有限公司 | Oval steel reinforcement cage hoisting accessory |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206720558U (en) | A kind of adjustable steel-reinforcement cage hanger | |
| CN109081247A (en) | A kind of hanging method of vestibule large-span steel girder | |
| CN109095343A (en) | Assembled hanger | |
| CN106586811A (en) | Hoisting overturning device for concrete tower drum and hoisting overturning method | |
| CN106276577A (en) | The suspension bracket of a kind of framework isolated footing and operational approach | |
| CN205296844U (en) | Precast box girder steel strand wires hoisting point | |
| CN204434116U (en) | A kind of hanging device for interior courtyard lifting pipeline | |
| CN206538126U (en) | The large-scale overweight equipment handling constructing device of Super High | |
| CN108946475B (en) | Overturning and hoisting system and method for horizontal equipment | |
| CN105780659A (en) | Lifting appliance special for erection of large-tonnage steel box beam segment in non-stayed cable area of cable-stayed bridge | |
| CN206665952U (en) | A kind of novel hanging tool | |
| CN210505201U (en) | A kind of equipment for hoisting steel bars in batches | |
| CN103979442B (en) | The method of 6400 tons of Hydraulic double-type crane lifting cost tropsch reactors | |
| CN208948679U (en) | Assembled hanger | |
| CN110697585A (en) | A mechanism for self-detaching attachment device | |
| CN110697564A (en) | Hoisting device and hoisting method for precast concrete beam | |
| CN210944589U (en) | Self-detaching attachment mechanism | |
| CN106121254B (en) | A construction method of a heavy-duty component transportation system after dismantling by reverse method | |
| CN210084724U (en) | A general hoisting accessory is hung to plane four points for precast concrete component | |
| CN213085209U (en) | A balance beam type member lifting device | |
| CN211366754U (en) | A light and easy-to-install tower crane | |
| CN210888045U (en) | an assembled mold | |
| CN209567737U (en) | Reinforcement cage hoisting installation device under limited headroom | |
| CN219031467U (en) | Hoisting device for outer curtain wall unit body | |
| CN223002567U (en) | Novel building block cage |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |