CN206717329U - CCB timeliness frocks - Google Patents

CCB timeliness frocks Download PDF

Info

Publication number
CN206717329U
CN206717329U CN201720226744.4U CN201720226744U CN206717329U CN 206717329 U CN206717329 U CN 206717329U CN 201720226744 U CN201720226744 U CN 201720226744U CN 206717329 U CN206717329 U CN 206717329U
Authority
CN
China
Prior art keywords
block
welding
contract
welding block
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720226744.4U
Other languages
Chinese (zh)
Inventor
罗世兵
李楠支
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Yousheng Aluminum Co., Ltd
Original Assignee
SHANGHAI UNISON ALUMINUM PRODUCTS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI UNISON ALUMINUM PRODUCTS CO Ltd filed Critical SHANGHAI UNISON ALUMINUM PRODUCTS CO Ltd
Priority to CN201720226744.4U priority Critical patent/CN206717329U/en
Application granted granted Critical
Publication of CN206717329U publication Critical patent/CN206717329U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Connection Of Plates (AREA)

Abstract

The utility model discloses a kind of CCB timeliness frock, including bottom plate, left and right fix welding block, eight contract blocks and ten welding blocks;Left and right is fixed welding block and is respectively welded in being welded with ten welding blocks on the left and right end of bottom plate, bottom plate, and the first to the 7th welding block is set close to a side of bottom plate, and the 8th to the tenth welding block is set close to another side of bottom plate;First contract block is installed on first and the tenth on welding block, second contract block is installed on second and the tenth on welding block, 3rd contract block is installed on the 3rd and the 9th welding block, 4th contract block is installed on the 4th and the 8th welding block, 5th and the 6th contract block is mounted on the 5th and the 8th welding block, 7th contract block is installed on the 6th and the 8th welding block, and the 8th contract block is installed on the 7th and the 8th welding block.Part is fixed in frock, and weld zone heat affected area performance improves after low temperature aging, and welding performance improves, and is applied external force and is allowed part deformation to be bonded, and welding deformation obtains improving and welding interior stress eliminates.

Description

CCB timeliness frocks
Technical field
It the utility model is related in welding technology field, more particularly to a kind of control Welded deformation, elimination welding Stress and the CCB timeliness frocks of part shaping.
Background technology
Body shell formula structure is mainly made up of the beam of the molded multi-section of aluminium extruded.The main carrying position of vehicle body is main Connected by MIG (welding) welding manner.Problem existing for aluminium and aluminum alloy MIG welding:
1st, the thermal conductivity and specific heat capacity of aluminium and aluminium alloy are carbon steel and more than twice of low-alloy steel, and the thermal conductivity of aluminium is More than ten times of austenitic stainless steel.In welding process, substantial amounts of heat can rapidly be transmitted to intrinsic silicon, thus weld aluminium And during aluminium alloy, energy is in addition to being consumed in and melting metal bath, and also more energy expenditures are inside metallic matrix.Cause to weld Heat input is excessive in termination process, heat affected area hydraulic performance decline.
2nd, the linear expansion coefficient of aluminium and aluminium alloy is about carbon steel and low-alloy steel twice.The density of liquid fine aluminium:700 DEG C when be 2.38g/cm3, the density of solid-state fine aluminium:It is 2.7g/cm under normal temperature3.Cubical contraction during solidified aluminum, welding deformation and Welding interior stress increases.Aluminium and Welded molten bath easily produce shrinkage cavity, fire check and higher welding interior stress when solidifying.
At present, CCB (Cross Car Beam, the fascia board girder) welding of a all aluminium alloy extrusion forming is total Into crossbeam carrying position is connected by MIG welding manners.
Problem be present in CCB welding assembly:
1st, CCB parts assembly is intensive in tubular column bracket region weld seam, and part deformation is larger after the completion of welding, in welded seam area The position of concentration, girder hydraulic performance decline.
2nd, connecting bracket number of parts is more on crossbeam, is all to be welded using MIG, weld seam quantity is more, causes to weld on crossbeam It is workpiece bending deformed after the completion of connecing.
Utility model content
The utility model is directed to problem and shortage existing for prior art, there is provided a kind of new CCB timeliness frocks.
The utility model is that solve above-mentioned technical problem by following technical proposals:
The utility model provides a kind of CCB timeliness frock, and its feature is, it include a bottom plate, a left fixed welding block, One right fixed welding block, eight contract blocks and ten welding blocks;
The left fixed welding block and the right fixed welding block are respectively welded left end and right-hand member in the bottom plate, on the bottom plate and Ten welding blocks are welded between the left fixed welding block and the right fixed welding block, wherein, the first welding block to the 7th Welding block is set close to a side of the bottom plate, and the 8th welding block to the tenth welding block is set close to another side of the bottom plate Put;
The first contract block is installed on first welding block and the tenth welding block, and the second contract block is installed on second weldering Connect on block and the tenth welding block, the 3rd contract block is installed on the 3rd welding block and the 9th welding block, the 4th contract block It is installed on the 4th welding block and the 8th welding block, the 5th contract block is installed on the 5th welding block and the 8th welding block On, the 6th contract block is installed on the 5th welding block and the 8th welding block, and the 7th contract block is installed on the 6th welding block On the 8th welding block, the 8th contract block is installed on the 7th welding block and the 8th welding block.
It is preferred that the left fixed welding block, the inner face of the right fixed welding block and ten welding blocks are in same flat In face.
On the basis of common sense in the field is met, above-mentioned each optimum condition, can be combined, produce the utility model respectively compared with Good example.
Positive effect of the present utility model is:
Part is fixed in timeliness frock, after low temperature aging, weld zone heat affected area performance improves, corresponding weldering Performance is connect also to improve.Applying external force in timeliness frock allows part deformation to be bonded, and welding deformation is improved and welding interior stress Eliminate.
Brief description of the drawings
Fig. 1 is the structural representation one of the CCB timeliness frocks of the utility model preferred embodiment.
Fig. 2 is the structural representation two of the CCB timeliness frocks of the utility model preferred embodiment.
Embodiment
It is new below in conjunction with this practicality to make the purpose, technical scheme and advantage of the utility model embodiment clearer Accompanying drawing in type embodiment, the technical scheme in the embodiment of the utility model is clearly and completely described, it is clear that is retouched The embodiment stated is the utility model part of the embodiment, rather than whole embodiments.Based on the implementation in the utility model Example, the every other embodiment that those of ordinary skill in the art are obtained on the premise of creative work is not made, all belongs to In the scope of the utility model protection.
As illustrated in fig. 1 and 2, the present embodiment provides a kind of CCB timeliness frock, and it includes 1, one left fixed welding block of a bottom plate 11st, a right fixed welding block 10, one first contract block 2, one second contract block 3, one the 3rd contract block 4, one the 4th contract block 5, one the 5th contract Block 6, one the 6th contract block 7, one the 7th contract block 8, one the 8th contract block 9, one first welding block 12, one second welding block 13, one the 3rd Welding block 14, one the 4th welding block 15, one the 5th welding block 16, one the 6th welding block 17, the weldering of one the 7th welding block 18, one the 8th Connect block 19, one the 9th welding block 20 and 1 the tenth welding block 21.
Left end and right-hand member in the bottom plate 1, the bottom is respectively welded in the left fixed welding block 11 and the right fixed welding block 10 Ten welding blocks are welded with plate 1 and between the left fixed welding block 11 and the right fixed welding block 10, wherein, the first weldering Connect block to set close to a side of the bottom plate 1 to the 7th welding block, the 8th welding block to the tenth welding block is close to the bottom plate 1 Another side is set.
The first contract block 2 is installed on first welding block 12 and the tenth welding block 21, and the second contract block 3 is installed on this On second welding block 13 and the tenth welding block 21, the 3rd contract block 4 is installed on the 3rd welding block 14 and the 9th welding block On 20, the 4th contract block 5 is installed on the 4th welding block 15 and the 8th welding block 19, the 5th contract block 6 be installed on this On five welding blocks 16 and the 8th welding block 19, the 6th contract block 7 is installed on the 5th welding block 16 and the 8th welding block 19 On, the 7th contract block 8 is installed on the 6th welding block 17 and the 8th welding block 19, and the 8th contract block 9 is installed on the 7th On welding block 18 and the 8th welding block 19.
After welding together, by the inner face of the left fixed welding block 11, the right fixed welding block 10 and ten welding blocks It is processed so that interior machined surface all ensures in a plane (roughness and size are according to drawing requirement), i.e. the left fixation The inner face of welding block 11, the right fixed welding block 10 and ten welding blocks is in same plane.
Part, which is fixed in the CCB timeliness frocks, ensures part in a plane, in the case of low temperature aging, welding Area heat affected area performance improves, and corresponding welding performance also improves.After the completion of the welding of CCB welding assembly, accessory size bending becomes Shape, in timeliness frock applying external force allows part deformation to be bonded, after low temperature aging, in welding deformation is improved and welded Stress elimination.CCB timeliness frock can effectively control welding deformation and improve the performance after welding.
The specifically used process of the present embodiment is:
First part is placed in the way of design drawing in the CCB timeliness frocks, by the first contract block 1, the second contract block 2, 3rd contract block 3, the 4th contract block 4, the 5th contract block 5, the 6th contract block 6, the 7th contract block 7, the 8th contract block 8 are placed on corresponding position, It is with bolt that those contract blocks are urgent, it is fixed according to contract block order in timeliness frock, contract block is during urgent to zero Part has a reforming process, by force by part attaching tooling.Frock is put into aging furnace after the completion of fixation and carries out low temperature aging, when After the completion of effect, part is removed, completes a part circulation.
By timeliness frock, welding deformation can be effectively controlled, and improves welding performance, eliminates welding interior stress.
Although the foregoing describing specific embodiment of the present utility model, it will be appreciated by those of skill in the art that These are merely illustrative of, and the scope of protection of the utility model is defined by the appended claims.Those skilled in the art Member can make numerous variations or repair to these embodiments on the premise of without departing substantially from principle of the present utility model and essence Change, but these changes and modification each fall within the scope of protection of the utility model.

Claims (1)

  1. A kind of 1. CCB timeliness frock, it is characterised in that it include a bottom plate, a left fixed welding block, a right fixed welding block, Eight contract blocks and ten welding blocks;
    The left fixed welding block and the right fixed welding block are respectively welded left end and right-hand member in the bottom plate, on the bottom plate and are located at Ten welding blocks are welded between the left fixed welding block and the right fixed welding block, wherein, the first welding block to the 7th welding Block is set close to a side of the bottom plate, and the 8th welding block to the tenth welding block is set close to another side of the bottom plate;
    The first contract block is installed on first welding block and the tenth welding block, and the second contract block is installed on second welding block On the tenth welding block, the 3rd contract block is installed on the 3rd welding block and the 9th welding block, the installation of the 4th contract block In on the 4th welding block and the 8th welding block, the 5th contract block is installed on the 5th welding block and the 8th welding block, 6th contract block is installed on the 5th welding block and the 8th welding block, and the 7th contract block is installed on the 6th welding block and should On 8th welding block, the 8th contract block is installed on the 7th welding block and the 8th welding block.
CN201720226744.4U 2017-03-09 2017-03-09 CCB timeliness frocks Active CN206717329U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720226744.4U CN206717329U (en) 2017-03-09 2017-03-09 CCB timeliness frocks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720226744.4U CN206717329U (en) 2017-03-09 2017-03-09 CCB timeliness frocks

Publications (1)

Publication Number Publication Date
CN206717329U true CN206717329U (en) 2017-12-08

Family

ID=60501651

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720226744.4U Active CN206717329U (en) 2017-03-09 2017-03-09 CCB timeliness frocks

Country Status (1)

Country Link
CN (1) CN206717329U (en)

Similar Documents

Publication Publication Date Title
CN109131566B (en) Lapping structure of automobile cross beam and longitudinal beam and welding method of cross beam and longitudinal beam
CN102211525A (en) Design method for extruded magnesium alloy instrument panel tube beam
CN108857127B (en) Welding method of frame type aluminum alloy car body top cover
CN206412396U (en) A kind of lightweight battery case based on lattice structure
CN109501867A (en) Frame-type vehicle body structure of rear cabin and welding method
CN112117411A (en) Sandwich structure bottom plate of power battery lower box body and power battery lower box body
CN206717329U (en) CCB timeliness frocks
CN209553308U (en) A kind of Rear secondary frame for vehicle
CN103832041B (en) Glass fibre-aluminum alloy composite pipe barometric pressure load preparation method and device
CN111605616B (en) Automobile front longitudinal beam assembly, automobile chassis structure and electric automobile
CN205752452U (en) A kind of cooler bin in New-energy electric vehicle
CN208132241U (en) A kind of cross beam of laser cutting machine of cast aluminium forming
CN113978562B (en) Threshold beam structure
CN110789618B (en) Automobile rear shock absorber mounting seat
CN206524362U (en) A kind of new-energy automobile aluminum alloy battery casing
CN107344569A (en) Integral type reinforcing block and the preceding Hold Beam attachment structure using the reinforcing block
CN112298360B (en) Front auxiliary frame front mounting seat structure, front auxiliary frame and vehicle
CN211828888U (en) Battery box steel-aluminum composite plate reinforcing beam
CN207479883U (en) A kind of radiator for thin plate aluminum alloy welding tooling
CN212423293U (en) Rear floor structure and car
CN206493955U (en) A kind of modularization framework and its curb girder
CN206202434U (en) Pipe beam assembly and automobile
CN211592701U (en) Automobile frame assembly of non-bearing type automobile body
CN213619985U (en) Instrument board crossbeam support connection structure suitable for fuel cell hydrogen can car
CN213594389U (en) Connecting structure of aluminum side wall framework and steel underframe crossbeam of passenger car

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 201702, Shanghai Qingpu District, Shanghai Qing Ping highway 2058

Patentee after: Shanghai Yousheng Aluminum Co., Ltd

Address before: 201702, Shanghai Qingpu District, Shanghai Qing Ping highway 2058

Patentee before: SHANGHAI UNISON ALUMINUM PRODUCTS Co.,Ltd.