CN206707925U - A kind of new energy wind power plant - Google Patents

A kind of new energy wind power plant Download PDF

Info

Publication number
CN206707925U
CN206707925U CN201720225057.0U CN201720225057U CN206707925U CN 206707925 U CN206707925 U CN 206707925U CN 201720225057 U CN201720225057 U CN 201720225057U CN 206707925 U CN206707925 U CN 206707925U
Authority
CN
China
Prior art keywords
pylon
power plant
wind power
new energy
embedded pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720225057.0U
Other languages
Chinese (zh)
Inventor
陈鸣辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changtai Landes Mechanical Equipment Co Ltd
Original Assignee
Changtai Landes Mechanical Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changtai Landes Mechanical Equipment Co Ltd filed Critical Changtai Landes Mechanical Equipment Co Ltd
Priority to CN201720225057.0U priority Critical patent/CN206707925U/en
Application granted granted Critical
Publication of CN206707925U publication Critical patent/CN206707925U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines

Abstract

The utility model discloses a kind of new energy wind power plant, including ground, pylon, equipment box and conversion cabinet, built-in fitting is provided with inside the ground, the foundation surface is installed with pylon, the tower surface is provided with fixed block, the fixed block side is provided with drag-line, the drag-line surface is provided with dead ring, the tower bottom is provided with pre-embedded pipe, described pre-embedded pipe one end turns on connection with equipment box, and pre-embedded pipe side is provided with separated time import, described conversion cabinet one end is provided with centrifugation blade, the centrifugation blade side is provided with kuppe, the conversion cabinet other end is provided with tail vane.This kind of new energy wind power plant, novelty reasonable in design, installation and removal are relatively simple, while wind-driven generator installation is more firm, using centrifugation blade, can increase the generating efficiency of wind power plant, more practical, are adapted to be widely popularized and use.

Description

A kind of new energy wind power plant
Technical field
A kind of wind power plant is the utility model is related to, more particularly to a kind of new energy wind power plant.
Background technology
Typically, the structure of wind power plant is to possess kuppe on tower top, the kuppe passes through via main shaft support The rotor of blade rotation.Possesses the generator rotated by the main shaft of blade to rotate in the inside of the kuppe mostly.In order to The preferred rotating speed of generator is obtained, is also sometimes following structure, i.e., booster engine is configured between rotor and generator, make generating The rotating speed increase of machine.It is transformed to via power converter, transformer that power system can be supplied to by the electric energy of electrical power generators Electric power.But the installation of existing wind power plant is complex, equipment degree safe to use is relatively low, it is impossible to changes shape windward State, it is unfavorable for permanent development therefore, a kind of it is proposed that new energy wind power plant.
Utility model content
Main purpose of the present utility model is to provide a kind of new energy wind power plant, this kind of new energy wind-power electricity generation Equipment, novelty reasonable in design, installation and removal are relatively simple, while wind-driven generator installation is more firm, using centrifugation blade, The generating efficiency of wind power plant can be increased, it is more practical, it is adapted to be widely popularized and uses, can effectively solves background skill The problem of in art.
To achieve the above object, the technical scheme that the utility model is taken is:
A kind of new energy wind power plant, including ground, pylon, equipment box and conversion cabinet, set inside the ground There is built-in fitting, the foundation surface is installed with pylon, and the tower surface is provided with fixed block, and the fixed block side is provided with Drag-line, the drag-line surface are provided with dead ring, and the tower bottom is provided with pre-embedded pipe, described pre-embedded pipe one end and equipment box Conducting connection, and pre-embedded pipe side is provided with separated time import, described conversion cabinet one end is provided with centrifugation blade, the centrifugation blade Side is provided with kuppe, and the conversion cabinet other end is provided with tail vane, and the interpreter box cavity is provided with fan blade stationary hub, institute State fan blade stationary hub side and be provided with asynchronous generator, the asynchronous generator side is provided with yaw motor, the conversion cabinet Surface is provided with wind-force detector.
Further, the pylon is mutually fixed by fixed block and drag-line with the built-in fitting inside ground.
Further, the centrifugation blade is connected by fan blade stationary hub with asynchronous generator.
Further, the pylon is hollow structure, and described asynchronous generator one end is provided with wire, and the wire passes through tower The pre-embedded pipe of frame inside and tower bottom is connected with equipment box.
Further, the pre-embedded pipe is PVC spool, and the wind-force detector is connected with equipment box, described to set Modem is provided with inside standby case.
Compared with prior art, the utility model has the advantages that:Pylon passes through fixed block and drag-line and ground Internal built-in fitting is mutually fixed, more firm by drag-line and the pylon that built-in fitting is mutually fixed, and dead ring can increase drag-line solid Determine the pulling force between block and built-in fitting, drag-line is in tensioned state, pylon can effectively be fixed, in centrifugation blade Centrifugal treating is passed through in portion, just free to rotate when receiving gentle breeze, is carried out water conservancy diversion to wind-force by kuppe, is accelerated centrifugation blade and turn Dynamic speed, wherein tail vane can be changed the direction of conversion cabinet by windage, conversion cabinet is in state windward, centrifugation Asynchronous generator quick rotation is driven to produce electric energy while fan blade rotates, by the yaw motor of asynchronous generator side, by wind The change of wind direction is delivered in the control loop processor of yaw motor by force detector as sensing element with electric signal, is passed through Compare preprocessor and send yaw command clockwise or counterclockwise to yaw motor, gyroscopic couple during in order to reduce driftage, After motor speed will be slowed down by the decelerator coaxially coupled, yawing is acted on revolving body gear wheel, drives wind wheel To wind, after the completion of to wind, wind vane loses electric signal, and motor is stopped, and During yaw terminates, and can improve wind-force for driftage The efficiency of generating, more practical, this kind of new energy wind power plant, novelty reasonable in design, installation and removal are relatively simple, together When wind-driven generator installation it is more firm, using centrifugation blade, the generating efficiency of wind power plant can be increased, more in fact With being adapted to be widely popularized and use.
Brief description of the drawings
Fig. 1 is the overall structure diagram of the utility model new energy wind power plant.
Fig. 2 is the conversion casing structure schematic diagram of the utility model new energy wind power plant.
2. in figure:1st, ground;2nd, pylon;3rd, equipment box;4th, cabinet is changed;5th, built-in fitting;6th, fixed block;7th, drag-line;8、 Dead ring;9th, pre-embedded pipe;10th, separated time import;11st, centrifugation blade;12nd, kuppe;13rd, tail vane;14th, fan blade stationary hub; 15th, asynchronous generator;16th, yaw motor;17th, wind-force detector.
Embodiment
Technological means, creation characteristic, reached purpose and effect to realize the utility model are easy to understand, below With reference to embodiment, the utility model is expanded on further.
As shown in Figure 1-2, a kind of new energy wind power plant, including ground 1, pylon 2, equipment box 3 and conversion cabinet 4, the inside of ground 1 is provided with built-in fitting 5, and the surface of ground 1 is installed with pylon 2, and the surface of pylon 2, which is provided with, to be fixed Block 6, the side of fixed block 6 are provided with drag-line 7, and the surface of drag-line 7 is provided with dead ring 8, and the bottom of pylon 2 is provided with built-in line Pipe 9, described one end of pre-embedded pipe 9 connects with the conducting of equipment box 3, and the side of pre-embedded pipe 9 is provided with separated time import 10, the conversion The one end of cabinet 4 is provided with centrifugation blade 11, and the side of centrifugation blade 11 is provided with kuppe 12, and the conversion other end of cabinet 4 is set There is tail vane 13, conversion cabinet 4 inner chamber is provided with fan blade stationary hub 14, and the side of fan blade stationary hub 14 is provided with asynchronous hair Motor 15, the side of asynchronous generator 15 are provided with yaw motor 16, and conversion cabinet 4 surface is provided with wind-force detector 17.
Wherein, the pylon 2 is fixed by fixed block 6 and drag-line 7 with the phase of built-in fitting 5 inside ground 1.
Wherein, the centrifugation blade 11 is connected by fan blade stationary hub 14 with asynchronous generator 15.
Wherein, the pylon 2 is hollow structure, and described one end of asynchronous generator 15 is provided with wire, and the wire passes through tower The pre-embedded pipe 9 of the inside of frame 2 and the bottom of pylon 2 is connected with equipment box 3.
Wherein, the pre-embedded pipe 9 is PVC spool, and the wind-force detector 17 is connected with equipment box 3, described to set The standby inside of case 3 is provided with modem.
It should be noted that the utility model is a kind of new energy wind power plant, during work, pass through ground 1 and tower The combination of frame 2, wherein pylon 2 are fixed by fixed block 6 and drag-line 7 with the phase of built-in fitting 5 inside ground 1, by drag-line 7 and pre-buried The pylon 2 that the phase of part 5 is fixed more firmly, while can be rapidly assembled and disassembled to pylon 2, be applied to wind-driven generator More environment, while pulling force of the drag-line 7 between fixed block 6 and built-in fitting 5 can be increased by the dead ring 8 on the surface of drag-line 7, Drag-line 7 is in tensioned state, pylon 2 can effectively be fixed, by the conversion cabinet 4 at the top of pylon 2, wherein centrifuging Fan blade 11 is connected by fan blade stationary hub 14 with asynchronous generator 15, by the He of centrifugation blade 11 for changing the one end of cabinet 4 The combination of asynchronous generator 15, centrifugal treating is passed through in the inside of centrifugation blade 11, just free to rotate when receiving gentle breeze, by water conservancy diversion 12 pairs of wind-force of cover carry out water conservancy diversion, accelerate the speed that centrifugation blade 11 rotates, and wherein tail vane 13 can be changed conversion by windage The direction of cabinet 4, makes conversion cabinet 4 be in state windward, drives asynchronous generator 15 quick while centrifugation blade 11 rotates Rotate and produce electric energy, by the yaw motor 16 of the side of asynchronous generator 15, sensing element is used as by wind direction by wind-force detector 17 Change be delivered to electric signal in the control loop processor of yaw motor 16, by comparing preprocessor to yaw motor 16 Yaw command clockwise or counterclockwise is sent, gyroscopic couple during in order to reduce driftage, motor speed will be by coaxially coupling Decelerator slow down after, yawing is acted on revolving body gear wheel, drives wind wheel driftage to wind, after the completion of to wind, Wind vane loses electric signal, and motor is stopped, and During yaw terminates, and can improve the efficiency of wind-power electricity generation, more practical, together When pylon 2 be hollow structure, described one end of asynchronous generator 15 is provided with wire, and the wire is by the inside of pylon 2 and pylon 2 The pre-embedded pipe 9 of bottom is connected with equipment box 3, and pre-embedded pipe is PVC spools, and the service life of PVC spools is longer, by different Direct current caused by step generator 15 enters equipment box 3 by wire, and direct current is converted into alternating current by equipment box 3, and right It is powered outside, by the separated time import 10 of the side of pre-embedded pipe 9 more typhoon power generators can be made to carry out feeding electricity to equipment box 3 Stream, it is more practical, while the inside of equipment box 3 is provided with modem, modem can turn over the data signal of computer The analog signal that can be transmitted along ordinary telephone line is translated into, and these analog signals can be by another modulatedemodulate of the circuit other end Device is adjusted to receive, so as to complete the remote control to equipment box.
The advantages of general principle and principal character of the present utility model and the utility model has been shown and described above.One's own profession The technical staff of industry is it should be appreciated that the utility model is not restricted to the described embodiments, described in above-described embodiment and specification Simply illustrate principle of the present utility model, on the premise of the spirit and scope of the utility model is not departed from, the utility model is also Various changes and modifications are had, these changes and improvements are both fallen within claimed the scope of the utility model.The utility model Claimed scope is by appended claims and its equivalent thereof.

Claims (5)

1. a kind of new energy wind power plant, including ground(1), pylon(2), equipment box(3)With conversion cabinet(4), it is special Sign is:The ground(1)Inside is provided with built-in fitting(5), the ground(1)Surface is installed with pylon(2), the pylon (2)Surface is provided with fixed block(6), the fixed block(6)Side is provided with drag-line(7), the drag-line(7)Surface is provided with dead ring (8), the pylon(2)Bottom is provided with pre-embedded pipe(9), the pre-embedded pipe(9)One end and equipment box(3)Conducting connection, and Pre-embedded pipe(9)Side is provided with separated time import(10), the conversion cabinet(4)One end is provided with centrifugation blade(11), the centrifugation Fan blade(11)Side is provided with kuppe(12), the conversion cabinet(4)The other end is provided with tail vane(13), the conversion cabinet(4) Inner chamber is provided with fan blade stationary hub(14), the fan blade stationary hub(14)Side is provided with asynchronous generator(15), it is described asynchronous Generator(15)Side is provided with yaw motor(16), the conversion cabinet(4)Surface is provided with wind-force detector(17).
A kind of 2. new energy wind power plant according to claim 1, it is characterised in that:The pylon(2)By solid Determine block(6)And drag-line(7)With ground(1)Internal built-in fitting(5)It is mutually fixed.
A kind of 3. new energy wind power plant according to claim 1, it is characterised in that:The centrifugation blade(11)It is logical Cross fan blade stationary hub(14)With asynchronous generator(15)It is connected.
A kind of 4. new energy wind power plant according to claim 1, it is characterised in that:The pylon(2)To be hollow Structure, the asynchronous generator(15)One end is provided with wire, and the wire passes through pylon(2)Internal and pylon(2)Bottom Pre-embedded pipe(9)With equipment box(3)It is connected.
A kind of 5. new energy wind power plant according to claim 1, it is characterised in that:The pre-embedded pipe(9)For PVC spool, the wind-force detector(17)With equipment box(3)It is connected, the equipment box(3)Inside is provided with modulation /demodulation Device.
CN201720225057.0U 2017-03-09 2017-03-09 A kind of new energy wind power plant Expired - Fee Related CN206707925U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720225057.0U CN206707925U (en) 2017-03-09 2017-03-09 A kind of new energy wind power plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720225057.0U CN206707925U (en) 2017-03-09 2017-03-09 A kind of new energy wind power plant

Publications (1)

Publication Number Publication Date
CN206707925U true CN206707925U (en) 2017-12-05

Family

ID=60469448

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720225057.0U Expired - Fee Related CN206707925U (en) 2017-03-09 2017-03-09 A kind of new energy wind power plant

Country Status (1)

Country Link
CN (1) CN206707925U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108708827A (en) * 2018-05-07 2018-10-26 南京宁风能源科技有限公司 A kind of high-efficiency wind driven generator group
CN112523955A (en) * 2020-11-26 2021-03-19 诸暨和创电机科技有限公司 Wind power generation equipment with overload protection function

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108708827A (en) * 2018-05-07 2018-10-26 南京宁风能源科技有限公司 A kind of high-efficiency wind driven generator group
CN112523955A (en) * 2020-11-26 2021-03-19 诸暨和创电机科技有限公司 Wind power generation equipment with overload protection function
CN112523955B (en) * 2020-11-26 2022-04-12 海南斯兰低碳投资有限公司 Wind power generation equipment with overload protection function

Similar Documents

Publication Publication Date Title
EP1865198B1 (en) Emergency pitch drive power supply for a wind turbine
CN101397975A (en) N layer spheroid cavity turbo type wind generator
US8629570B1 (en) Wind turbine blades with reinforcing, supporting and stabilizing components and enlarged swept area
JP2003129935A (en) Wind power generator
CN206707925U (en) A kind of new energy wind power plant
CN204716464U (en) Utilize the electricity generating device of tunnel wind power
CN201953571U (en) Wind power generation device for high-voltage transmission tower
CN202228266U (en) Wind collection type wind generating set
CN201198817Y (en) Separating and interconnecting network dual-purpose direct drive paddle-changing type wind power generator
CN203022974U (en) Double-impeller direct-driven type wind power generator
CN206419164U (en) A kind of pivoted frame mechanism of wind-driven generator
CN107061141A (en) A kind of wind-driven generator provided with siphon air channel
CN201679634U (en) Self-circulating wind driven generator
CN208564844U (en) Gentle breeze energy-gathering device suitable for breeze wind
CN107642461A (en) A kind of high-efficient wind generating equipment
CN207583560U (en) A kind of high-efficient wind generating equipment
CN210622980U (en) Small-sized breeze generator set
CN208203469U (en) A kind of wind-driven generator with diversion function
CN207847855U (en) One kind being based on ocean energy wind power generation plant
CN206636703U (en) One kind building air port duct wind power generation plant
CN207004726U (en) A kind of double wind turbine generators
CN102016300A (en) A balloon suspension high altitude wind generator apparatus and a wind turbine generator device
CN206738085U (en) A kind of wind power generation plant that can reduce noise
CN206942924U (en) A kind of wind-driven generator provided with siphon air channel
CN108869185A (en) A kind of device to be generated electricity using Karman vortex street

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171205

Termination date: 20180309