CN206706806U CN201720552517.0U CN201720552517U CN206706806U CN 206706806 U CN206706806 U CN 206706806U CN 201720552517 U CN201720552517 U CN 201720552517U CN 206706806 U CN206706806 U CN 206706806U
Authority
CN
China
Prior art keywords
pile
rigid
flexible
cover
distance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720552517.0U
Other languages
Chinese (zh)
Inventor
黎志
陈怡宏
梁俊阁
黄煌
张意
张有俊
薄自胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Education Construction (group) Co Ltd
Chongqing Construction Engineering Group Co Ltd
Chongqing Construction Residential Engineering Co Ltd
Original Assignee
Chongqing Education Construction (group) Co Ltd
Chongqing Construction Engineering Group Co Ltd
Chongqing Construction Residential Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Education Construction (group) Co Ltd, Chongqing Construction Engineering Group Co Ltd, Chongqing Construction Residential Engineering Co Ltd filed Critical Chongqing Education Construction (group) Co Ltd
Priority to CN201720552517.0U priority Critical patent/CN206706806U/en
Application granted granted Critical
Publication of CN206706806U publication Critical patent/CN206706806U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of dual composite foundation of rigid and flexible pile, including rigid pile, flexible pile, pile cover, mattress layer and basis;Rigid pile and flexible pile arranged for interval in the plane, pile cover is shaped as step type and is arranged in rigid pile, the edge of pile cover and the distance of flexible pile are more than the half distance between rigid pile and flexible pile and less than rigid piles and the distance of flexible pile, rigid pile stake top sets 30mm thickness mattress layers, and basis instrument is above mattress layer.The utility model institute pile cover is extended downwardly successively using stepped by multiple concentric turns, make when basic sedimentation downwards, pile cover is passed to first topmost, then slowly extending to the bottom of pile cover makes power uniformly spread alleviation pile cover stress jumping phenomenon during transmitting downwards, rigid pile only assume responsibility for the fractional load of building simultaneously, and another part load is undertaken by inter-pile soil, can suitably reduce the bearing requirements of rigid pile, part pile body expense is saved, while can accelerating construction progress.

Description

A kind of dual composite foundation of rigid and flexible pile
Technical field
It the utility model is related to a kind of ground in building field, and in particular to a kind of dual composite foundation of rigid and flexible pile.
Background technology
In conventional composite ground, the stress distribution between stake soil is uneven, causes the application of the composite foundation technology Necessarily being restricted with effect, its main cause has two aspects, when, in conventional composite ground, rigid pile rigidity is with respect to stake Between soil, its rigidity is big, and most of load is carried by rigid pile foundation first, inter-pile soil carrying very little, unless rigid pile occur After larger compression sedimentation, inter-pile soil side participates in carrying.Second, for muddy soft soil or similar foundation in saturated soft soil In, because natural foundation bearing capacity is too low, its rigidity differs bigger with rigid pile, can not utilize this during conventional composite Foundation Design The partly bearing capacity of weak subsoil, so traditional composite foundation is not suitable for muddy soft soil or similar soft layer.
Utility model content
Problem to be solved in the utility model is provided a kind of hard and soft for the above-mentioned deficiency in the presence of prior art The property dual composite foundation of stake realizes that pile-soil stress is redistributed.
To achieve the above object, the utility model employs following technical scheme:A kind of rigid and flexible pile is dual compoundly Base, including rigid pile, flexible pile, pile cover, mattress layer and basis;The rigid pile is spaced cloth in the plane with the flexible pile Put, the pile cover is shaped as step type and is arranged in the rigid pile, the distance at the edge of the pile cover and the flexible pile It is described firm more than the half distance between the rigid pile and flexible pile and less than the rigid pile and the distance of flexible pile Property stake stake top set the thick mattress layers of 30mm, the basis instrument is above the mattress layer.
Further, the rigid pile stake top is to divide into 20cm*20cm without muscle spread foundation, the no muscle spread foundation both ends Border on respectively with the rigid pile and the flexible pile.
Further, the no muscle spread foundation sets expansion joint with the rigid pile and the flexible pile boundary respectively.
Compared to prior art, the utility model has the advantages that:Rigid pile described in the utility model with it is described Flexible pile arranged for interval in the plane, i.e., left and right and it is spaced up and down, spatially forms three not with depth together with the soil body Same rigidity gradient, the rigid pile use pile for prestressed pipe, and the flexible pile uses lime pile;The pile cover is using stepped Extended downwardly successively by multiple concentric turns, make, when the basis sedimentation downwards, to pass to the pile cover first topmost, so The bottom of the pile cover is slowly extended to afterwards make power uniformly spread the alleviation pile cover stress during transmitting downwards dash forward Become phenomenon, the pile cover be with subsoil modulus of compressibility similar in flexible pile cap, by setting the flexible pile water swelling Compacted soil layer, soil moisture content is reduced, while extrude inter-pile soil, so as to improve inter-pile soil compactness and bearing capacity, increased simultaneously The side friction of the rigid pile;The thick mattress layers of 30mm are set in the rigid pile stake top, further improve basis collaboration work Make ability;The edge of the pile cover is that bottom outer ring and the distance of the flexible pile are more than the rigid pile and flexible pile simultaneously Between distance half and make while save the pile cover cost less than the distance of the rigid pile and flexible pile described Pile cover by its lower end transmit during power can the covering stake of maximum area see native contact area, the rigid pile only undertakes The fractional load of building, another part load are undertaken by inter-pile soil, improve soil body bearing capacity up to 20~50%, this Sample, under conditions of equal bearing capacity is ensured, the bearing requirements of the rigid pile can be suitably reduced, save part pile body and take With, while can accelerating construction progress.
Further advantage, target and feature of the present utility model embody part by following explanation, and part will also pass through Research of the present utility model and practice are understood by the person skilled in the art.
Brief description of the drawings
Fig. 1 is a kind of dual composite foundation structure schematic diagram of rigid and flexible pile of the utility model.
Fig. 2 is that a kind of dual composite foundation of rigid and flexible pile of the utility model arranges schematic diagram.
Fig. 3 is that the utility model sets schematic diagram without muscle spread foundation.
Embodiment
In order that technological means, creation characteristic, reached purpose that the utility model is realized more understand and are easy to acting on Understand, the utility model is further elaborated with reference to the accompanying drawings and detailed description:
The utility model proposes a kind of dual composite foundation of rigid and flexible pile, including rigid pile 1, flexible pile 2, pile cover 3, cotton-padded mattress Bed course 4 and basis 5;Arranged for interval, the pile cover 3 are shaped as step type simultaneously to the rigid pile 1 in the plane with the flexible pile 2 It is arranged in the rigid pile 1, the distance at the edge of the pile cover 3 and the flexible pile 2 is more than the rigid pile 1 and flexible pile Half distance between 2 and less than the distance of the rigid pile 1 and flexible pile 2, the stake top of rigid pile 1 sets 30mm thickness The mattress layer 4, described basic 5 are arranged on the top of mattress layer 4.
Rigid pile described in the utility model and the flexible pile arranged for interval in the plane, i.e. left and right be spaced up and down, Three different rigidity gradients spatially are formed with depth together with the soil body, the rigid pile uses pile for prestressed pipe, described Flexible pile uses lime pile;The pile cover is extended downwardly successively using stepped by multiple concentric turns, make when the basis to During lower sedimentation, the pile cover is passed to first topmost, then slowly extending to the bottom of the pile cover makes power transmit downwards During uniformly spread the alleviation pile cover stress jumping phenomenon, the pile cover for subsoil modulus of compressibility similar in Flexible pile cap, by setting the compacted soil layer of flexible pile water swelling, soil moisture content is reduced, while extrude inter-pile soil, from And inter-pile soil compactness and bearing capacity are improved, while increase the side friction of the rigid pile;Set in the rigid pile stake top The thick mattress layers of 30mm, further improve basic collaborative work ability;Simultaneously the edge of the pile cover be bottom outer ring with The distance of the flexible pile be more than between the rigid pile and flexible pile the half of distance and less than the rigid pile with it is soft Property stake distance make the pile cover can maximum area during transmitting power by its lower end while save the pile cover cost Covering stake see soil contact area, the rigid pile only assume responsibility for building fractional load, another part load is by between stake Soil undertakes, and improves soil body bearing capacity up to 20~50%, so, under conditions of equal bearing capacity is ensured, can suitably drop The bearing requirements of the low rigid pile, part pile body expense is saved, while can accelerating construction progress.
As specific embodiment, the no section of muscle spread foundation 7 is arranged to 20cm*20cm, and its length is according to described firm Horizontal range between property stake 1 and the flexible pile 2 and set.
As specific embodiment, the stake top of rigid pile 1 is expanded with dividing into 20cm*20cm without muscle spread foundation 7, the no muscle Exhibition basis 7 is made up of materials such as cyclopean concrete, dirt and tabias forms elastic foundation, when described basic 5 settle, The mattress layer 4 for ramming and filling out using graded broken stone is given in first power transmission, and the mattress layer 4 passes to the pile cover 3 of step type, by The dispersion force of pile cover 3 makes settling capacity diffuse to its bottom, by being transmitted to the no muscle for its bottom maximum area of pile cover 3 Spread foundation 7, because the basic 5 no both ends of muscle spread foundation 7 connect with the rigid pile 1 and the flexible pile 2 respectively Earth, so the rigidity that the cyclopean concrete of the no muscle spread foundation 7 has disperses power to inter-pile soil 6 to surrounding, while by Dirt and tabia etc. form the no muscle spread foundation 7 and occupy flexible, make described basic 5 can be resetted under appropriate bar shaped.
As specific embodiment, the no muscle spread foundation 7 respectively with the rigid pile 1 and the boundary of flexible pile 2 Expansion joint 8 is set, enable by the expansion joint 8 at the rigid pile 1 and the flexible pile 2 and the no muscle spread foundation 7 Alleviate deformation so as to protect the rigid pile 1 and the flexible pile 2.
Finally illustrate, above example is only unrestricted to illustrate the technical solution of the utility model, although ginseng The utility model is described in detail according to preferred embodiment, it will be understood by those within the art that, can be to this The technical scheme of utility model is modified or equivalent substitution, without departing from the objective and model of technical solutions of the utility model Enclose, it all should cover among right of the present utility model.

Claims (3)

  1. A kind of 1. dual composite foundation of rigid and flexible pile, it is characterised in that:Including rigid pile (1), flexible pile (2), pile cover (3), cotton-padded mattress Bed course (4) and basis (5);The rigid pile (1) and the flexible pile (2) arranged for interval in the plane, pile cover (3) shape For step type and it is arranged in the rigid pile (1), the edge of the pile cover (3) is more than institute with the distance of the flexible pile (2) State the half distance between rigid pile (1) and flexible pile (2) and be less than the rigid pile (1) and the distance of flexible pile (2), Rigid pile (1) stake top sets the thick mattress layers (4) of 30mm, and the basis (5) is arranged on above the mattress layer (4).
  2. A kind of 2. dual composite foundation of rigid and flexible pile according to claim 1, it is characterised in that:Rigid pile (1) stake top To divide into 20cm*20cm without muscle spread foundation (7), no muscle spread foundation (7) both ends respectively with the rigid pile (1) and institute Flexible pile (2) is stated to border on.
  3. A kind of 3. dual composite foundation of rigid and flexible pile according to claim 2, it is characterised in that:The no muscle spread foundation (7) expansion joint (8) are set with the rigid pile (1) and the flexible pile (2) boundary respectively.
CN201720552517.0U 2017-05-17 2017-05-17 A kind of dual composite foundation of rigid and flexible pile Expired - Fee Related CN206706806U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720552517.0U CN206706806U (en) 2017-05-17 2017-05-17 A kind of dual composite foundation of rigid and flexible pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720552517.0U CN206706806U (en) 2017-05-17 2017-05-17 A kind of dual composite foundation of rigid and flexible pile

Publications (1)

Publication Number Publication Date
CN206706806U true CN206706806U (en) 2017-12-05

Family

ID=60464548

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720552517.0U Expired - Fee Related CN206706806U (en) 2017-05-17 2017-05-17 A kind of dual composite foundation of rigid and flexible pile

Country Status (1)

Country Link
CN (1) CN206706806U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108130826A (en) * 2018-01-18 2018-06-08 中铁二院工程集团有限责任公司 A kind of karst railway bed substrate antidumping foundation reinforcing structure
CN109356589A (en) * 2018-09-19 2019-02-19 郑州安源工程技术有限公司 The design and construction method of supporting construction can be recycled in a kind of ladder-like deep circle vertical shaft assembled of flexible compound
CN110965398A (en) * 2019-11-25 2020-04-07 中南大学 Expansive soil foundation structure containing ballastless track roadbed and construction method
CN114960305A (en) * 2022-04-24 2022-08-30 南昌大学 High-speed railway subgrade lower expansive soil foundation reinforcing structure and construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108130826A (en) * 2018-01-18 2018-06-08 中铁二院工程集团有限责任公司 A kind of karst railway bed substrate antidumping foundation reinforcing structure
CN109356589A (en) * 2018-09-19 2019-02-19 郑州安源工程技术有限公司 The design and construction method of supporting construction can be recycled in a kind of ladder-like deep circle vertical shaft assembled of flexible compound
CN110965398A (en) * 2019-11-25 2020-04-07 中南大学 Expansive soil foundation structure containing ballastless track roadbed and construction method
CN114960305A (en) * 2022-04-24 2022-08-30 南昌大学 High-speed railway subgrade lower expansive soil foundation reinforcing structure and construction method

Similar Documents

Publication Publication Date Title
CN206706806U (en) A kind of dual composite foundation of rigid and flexible pile
CN101153475B (en) Redbeds mudstone filled high-speed railway subgrade and construction method thereof
CN103821160B (en) Soft soil foundation combined pile net structure
CN201095717Y (en) Red beds filled high-speed railway roadbed
CN207376616U (en) A kind of draining bamboo joint pile and its composite foundation system
CN106193066A (en) A kind of Loess landslide administering method based on restoration of the ecosystem
CN204940030U (en) Reconstruction and extension project new-old concrete bond Pavement mosaic structure
CN104060601B (en) The construction method of utilizing precast construction stake pile foundation to carry out ground processing
CN101200888A (en) Construction method of composite foundation
CN201530968U (en) High-speed railway liquefying soil foundation-roadbed seismic strengthening structure
CN202543966U (en) Pile-supported cantilever retaining wall
CN105421328A (en) Collapsible loess area roadbed foundation treatment structure and construction method
CN105887807B (en) A kind of precast reinforced concrete pile of three-dimensional draining and construction method
CN104234028B (en) A kind of double nethike embrane sand-protecting barrier laydown machine
CN202745068U (en) CFG (Cement Fly-ash Gravel) pile-PHC (Prestressed High-intensity Concrete) tubular pile combined type long-short pile composite foundation
CN107268373A (en) A kind of water permeability asphalt concrete road and its construction method
CN208039239U (en) A kind of Novel variable-section prefabricated pile
CN205420939U (en) Roadbed structure of crowded native bored concrete pile stake net of bidirectional screw
Zedan et al. Experimental Investigation of Square Footing Resting on Sand over Gypseous Soils
CN107829442A (en) A kind of Deep Thick Soft Ground Area long-short-pile composite foundation
CN205421297U (en) Slope reinforcement software structure
CN210002383U (en) kinds of pile composite foundation
CN108193576A (en) A kind of sustainable infiltration paving structure for alleviating urban heat land effect
CN203475457U (en) Composite pile foundation used for soft soil building foundation
CN210886796U (en) Subgrade is consolidated to weak soil

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171205

Termination date: 20210517

CF01 Termination of patent right due to non-payment of annual fee