CN206706590U - A kind of cast-in-place simply supported beam construction detachable connection system of steel pipe column bracket method - Google Patents
A kind of cast-in-place simply supported beam construction detachable connection system of steel pipe column bracket method Download PDFInfo
- Publication number
- CN206706590U CN206706590U CN201720548986.5U CN201720548986U CN206706590U CN 206706590 U CN206706590 U CN 206706590U CN 201720548986 U CN201720548986 U CN 201720548986U CN 206706590 U CN206706590 U CN 206706590U
- Authority
- CN
- China
- Prior art keywords
- steel
- pipe column
- steel pipe
- hoop
- bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本实用新型属于桥梁工程中支架施工技术领域,具体涉及一种钢管柱支架法现浇简支梁施工用可拆卸式连接系,解决了钢管柱支撑桁架时,需要钢管柱支撑的稳定的问题。其包括钢管柱与钢管柱连接部分以及钢管柱与墩身连接部分,钢管柱与墩身连接部分包括钢管柱钢抱箍、墩身横桥向钢抱箍以及墩身纵桥向钢抱箍,钢管柱钢抱箍与墩身横桥向钢抱箍以及墩身纵桥向钢抱箍之间通过若干丝杠连接;将钢管柱与钢管柱连接闭合成环的钢管柱与钢管柱连接部分包括对撑和剪刀撑,各钢管柱上套设上下两组对撑,相邻两钢管柱上的四个对撑通过剪刀撑连接。本实用新型可以满足钢管柱的稳定性,结构简单,操作方便,可重复利用。
The utility model belongs to the technical field of support construction in bridge engineering, in particular to a detachable connection system for the construction of cast-in-place simply supported beams by a steel pipe column support method, which solves the problem that steel pipe column support needs to be stable when the steel pipe column supports a truss. It includes the connecting part of the steel pipe column and the steel pipe column and the connecting part of the steel pipe column and the pier body. The steel hoop of the steel pipe column is connected with the steel hoop of the horizontal bridge of the pier body and the steel hoop of the longitudinal bridge of the pier body through several screw screws; For pair braces and scissor braces, two sets of upper and lower pairs of braces are set on each steel pipe column, and the four pairs of braces on two adjacent steel pipe columns are connected by scissor braces. The utility model can satisfy the stability of the steel pipe column, has the advantages of simple structure, convenient operation and reusability.
Description
技术领域technical field
本实用新型属于桥梁工程中支架施工技术领域,具体涉及一种钢管柱支架法现浇简支梁施工用可拆卸式连接系。The utility model belongs to the technical field of support construction in bridge engineering, and in particular relates to a detachable connection system for the construction of cast-in-place simply supported beams by a steel pipe column support method.
背景技术Background technique
在支架法简支梁施工中,对膺架式支架施工时,需要搭设钢管柱来支撑桁架。钢管柱稳定性需要保障,因此设计钢抱箍连接系将钢管柱与钢管柱、钢管柱与墩身进行连接加固。In the construction of simply supported beams by the bracket method, when constructing the truss-type brackets, it is necessary to erect steel pipe columns to support the trusses. The stability of the steel pipe column needs to be guaranteed, so the steel hoop connection system is designed to connect and reinforce the steel pipe column to the steel pipe column, and the steel pipe column to the pier body.
发明内容Contents of the invention
本实用新型的目的是为了解决钢管柱支撑桁架时,需要钢管柱支撑的稳定,提供了一种钢管柱支架法现浇简支梁施工用可拆卸式连接,可以满足钢管柱的稳定性,结构简单,操作方便,可重复利用。The purpose of this utility model is to solve the steel pipe column supporting the truss, which requires the stability of the steel pipe column support, and provides a detachable connection for the construction of cast-in-place simply supported beams by the steel pipe column support method, which can meet the stability of the steel pipe column and the structure. Simple, easy to operate and reusable.
本实用新型采用如下技术方案实现:The utility model adopts following technical scheme to realize:
钢管柱支架法现浇简支梁施工用可拆卸式连接系,包括钢管柱与钢管柱连接部分以及钢管柱与墩身连接部分,钢管柱与墩身连接部分包括钢管柱钢抱箍、墩身横桥向钢抱箍以及墩身纵桥向钢抱箍,墩身两侧的各钢管柱分别通过钢管柱钢抱箍连接,墩身横桥向钢抱箍与墩身纵桥向钢抱箍连接形成墩身的整体闭合的环形抱箍,钢管柱钢抱箍与墩身横桥向钢抱箍以及墩身纵桥向钢抱箍之间通过若干丝杠连接;The detachable connection system for cast-in-place simply supported beam construction with steel pipe column support method includes the connection part between steel pipe column and steel pipe column and the connection part between steel pipe column and pier body. The connection part between steel pipe column and pier body includes steel hoop of steel pipe column and pier body The steel hoops towards the horizontal bridge and the steel hoops towards the longitudinal bridge of the pier body. The steel pipe columns on both sides of the pier body are respectively connected by the steel hoops of steel pipe columns. Connecting to form an overall closed ring hoop of the pier body, the steel hoop of the steel pipe column is connected with the steel hoop of the transverse bridge of the pier body and the steel hoop of the longitudinal bridge of the pier body through several screw screws;
将钢管柱与钢管柱连接闭合成环的钢管柱与钢管柱连接部分包括对撑和剪刀撑,各钢管柱上套设上下两组对撑,相邻两钢管柱上的四个对撑通过剪刀撑连接。The steel pipe column and the steel pipe column are connected and closed to form a ring. The connecting part of the steel pipe column and the steel pipe column includes a pair of braces and a scissors brace. Each steel pipe column is set with two sets of upper and lower pairs of braces. stay connected.
所述的钢管柱前、后两侧分别设置互相平行的上下两槽钢作为钢管柱钢抱箍主梁,上下两槽钢之间留有间隙,上下两槽钢通过钢板连接,各钢管柱左右两侧有穿设于上下槽钢间隙之间的对拉杆,对拉杆将钢管柱前后两侧的槽钢连接。The front and rear sides of the steel pipe column are respectively provided with two upper and lower channel steels parallel to each other as the steel hoop main beam of the steel pipe column. There is a gap between the upper and lower channel steels. The upper and lower channel steels are connected by steel plates. On both sides, there are tie rods that pass through the gap between the upper and lower channel steels, and the tie rods connect the channel steels on the front and rear sides of the steel pipe column.
所述的墩身横桥向钢抱箍以及墩身纵桥向钢抱箍包括互相平行的上下两槽钢,上下两槽钢之间留有间隙,上下两槽钢通过钢板连接,墩身横桥向钢抱箍与墩身纵桥向钢抱箍的相邻端通过对拉杆连接。The steel hoops of the horizontal bridge of the pier body and the steel hoops of the longitudinal bridge of the pier body include two upper and lower channel steels parallel to each other. There is a gap between the upper and lower channel steels. The upper and lower channel steels are connected by steel plates. The adjacent ends of the bridgewise steel hoop and the longitudinal bridgewise steel hoop of the pier body are connected by tie rods.
所述的钢管柱钢抱箍与墩身横桥向钢抱箍以及墩身纵桥向钢抱箍之间的连接丝杠的两端分别安装于钢管柱钢抱箍与墩身横桥向钢抱箍以及墩身纵桥向钢抱箍上下槽钢的连接钢板上。The two ends of the connecting screw between the steel hoop of the steel pipe column and the steel hoop of the pier body cross bridge direction and the steel hoop of the pier body longitudinal bridge direction are respectively installed on the steel hoop of the steel pipe column and the cross bridge direction steel hoop of the pier body. The hoop and the longitudinal bridge of the pier body are on the connecting steel plate of the upper and lower channel steel of the steel hoop.
本实用新型所述的连接系均经过力学计算,统一加工成一套完整的连接系统,位置固定、杆件唯一,使用起来更加的规范,连接牢固,安全性更强。丝杠可调节,能适用于不同大小的墩身以及不同间距的支架系统,适应性强。连接系统自成整体,安装及拆卸只需松开固定的几个螺栓即可完成,这种“穿衣式”的安拆方法能节省不少的宝贵的时间,而且连接系统可重复利用。The connection system described in the utility model is processed into a complete set of connection system through mechanical calculation, with fixed position and unique bar, more standardized use, firm connection and stronger safety. The lead screw can be adjusted, which can be applied to pier bodies of different sizes and bracket systems with different spacing, and has strong adaptability. The connection system is self-contained, and the installation and disassembly can be completed only by loosening a few fixed bolts. This "clothes-style" installation and disassembly method can save a lot of precious time, and the connection system can be reused.
本实用新型具有如下有益效果:①加强了钢管柱稳定性;②结构简单,制作方便;③可重复利用;④适用性广,可用于各种墩型施工。The utility model has the following beneficial effects: 1) the stability of the steel pipe column is enhanced; 2) the structure is simple and convenient to manufacture; 3) it can be reused; 4) it has wide applicability and can be used for various pier constructions.
附图说明Description of drawings
图1为本实用新型的纵断面示意图;Fig. 1 is the longitudinal section schematic diagram of the utility model;
图2为本实用新型的横断面示意图;Fig. 2 is the cross-sectional schematic view of the utility model;
图3为本实用新型的平面示意图。Fig. 3 is a schematic plan view of the utility model.
图中:1-钢管柱钢抱箍,2-墩身横桥向钢抱箍,3-墩身纵桥向钢抱箍,4-长型丝杠,5-中型丝杠,6-短型丝杠,7-剪刀撑,8-剪刀撑。In the figure: 1- steel pipe column steel hoop, 2- pier body horizontal bridge steel hoop, 3- pier body longitudinal bridge steel hoop, 4- long screw, 5- medium screw, 6- short Lead screw, 7-scissors support, 8-scissors support.
具体实施方式detailed description
结合附图对本实用新型的具体实施方式作进一步说明。The specific embodiment of the utility model will be further described in conjunction with the accompanying drawings.
钢管柱支架法现浇简支梁施工用可拆卸式连接系,包括钢管柱与钢管柱连接部分以及钢管柱与墩身连接部分,钢管柱与墩身连接部分包括钢管柱钢抱箍1、墩身横桥向钢抱箍2以及墩身纵桥向钢抱箍3,墩身两侧的各钢管柱分别通过钢管柱钢抱箍1连接,墩身横桥向钢抱箍2与墩身纵桥向钢抱箍3连接形成墩身的整体闭合的环形抱箍,钢管柱钢抱箍1与墩身横桥向钢抱箍2以及墩身纵桥向钢抱箍3之间通过若干丝杠连接;The detachable connection system for the construction of cast-in-place simply supported beams by the steel pipe column support method includes the connection part between the steel pipe column and the steel pipe column and the connection part between the steel pipe column and the pier body. Steel hoops 2 to the horizontal bridge of the pier body and steel hoops 3 to the longitudinal bridge of the pier body. The bridge direction steel hoop 3 is connected to form an overall closed ring hoop of the pier body, and several screw screws are passed between the steel pipe column steel hoop 1, the pier body transverse bridge direction steel hoop 2 and the pier body longitudinal bridge direction steel hoop 3 connect;
将钢管柱与钢管柱连接闭合成环的钢管柱与钢管柱连接部分包括对撑和剪刀撑,各钢管柱上套设上下两组对撑,相邻两钢管柱上的四个对撑通过剪刀撑连接。对撑和剪刀撑均为10#槽钢制作而成,主要作用是将钢管柱与钢管柱之间连接加固并闭合成环。The steel pipe column and the steel pipe column are connected and closed to form a ring. The connecting part of the steel pipe column and the steel pipe column includes a pair of braces and a scissors brace. Each steel pipe column is set with two sets of upper and lower pairs of braces. stay connected. Both the brace and the scissor brace are made of 10# channel steel, and their main function is to strengthen the connection between steel pipe columns and close them into a ring.
所述的钢管柱前、后两侧分别设置互相平行的上下两槽钢作为钢管柱钢抱箍主梁,上下两槽钢之间留有间隙,上下两槽钢通过钢板连接,各钢管柱左右两侧有穿设于上下槽钢间隙之间的对拉杆,对拉杆将钢管柱前后两侧的槽钢连接。The front and rear sides of the steel pipe column are respectively provided with two upper and lower channel steels parallel to each other as the steel hoop main beam of the steel pipe column. There is a gap between the upper and lower channel steels. The upper and lower channel steels are connected by steel plates. On both sides, there are tie rods that pass through the gap between the upper and lower channel steels, and the tie rods connect the channel steels on the front and rear sides of the steel pipe column.
所述的墩身横桥向钢抱箍2以及墩身纵桥向钢抱箍3包括互相平行的上下两槽钢,上下两槽钢之间留有间隙,上下两槽钢通过钢板连接,墩身横桥向钢抱箍2与墩身纵桥向钢抱箍3的相邻端通过对拉杆连接。The steel hoop 2 for the horizontal bridge of the pier body and the steel hoop 3 for the longitudinal bridge of the pier body include two upper and lower channel steels parallel to each other. There is a gap between the upper and lower two channel steels. The upper and lower two channel steels are connected by steel plates. The adjacent end of the steel hoop 2 for the horizontal bridge of the body and the steel hoop 3 for the longitudinal bridge of the pier body is connected by a pair of tie rods.
所述的钢管柱钢抱箍1与墩身横桥向钢抱箍2以及墩身纵桥向钢抱箍3之间的连接丝杠的两端分别安装于钢管柱钢抱箍1与墩身横桥向钢抱箍2以及墩身纵桥向钢抱箍3上下槽钢的连接钢板上。The two ends of the connecting screw between the steel pipe column steel hoop 1 and the pier body horizontal bridge direction steel hoop 2 and the pier body longitudinal bridge direction steel hoop 3 are respectively installed on the steel pipe column steel hoop 1 and the pier body On the connecting steel plates of the horizontal bridge to the steel hoop 2 and the vertical bridge of the pier body to the steel hoop 3 of the upper and lower channel steels.
本实用新型涉及的构件由槽钢、钢板、丝杠、螺栓等制成,本实用新型以连接系统为结构,将钢管柱与钢管柱、钢管柱与墩身连接,从而加强了钢管柱的稳定性。The components involved in the utility model are made of channel steel, steel plates, lead screws, bolts, etc. The utility model uses the connection system as the structure to connect the steel pipe column with the steel pipe column, and the steel pipe column with the pier body, thereby enhancing the stability of the steel pipe column sex.
本实用新型具体实施过程:The concrete implementation process of the utility model:
在支架施工前,对现有承台进行清理,将钢管柱位置标记,搭设可拆卸式连接系辅助脚手架,按标记位置安装钢管柱,根据墩身高度来确认可拆卸式连接系安装数量。可拆卸式连接系具体安装与拆卸如下:Before the support construction, clean up the existing cap, mark the position of the steel pipe column, set up the detachable connection system auxiliary scaffold, install the steel pipe column according to the marked position, and confirm the installation quantity of the detachable connection system according to the height of the pier. The specific installation and disassembly of the detachable connection system are as follows:
安装墩身钢抱箍-安装钢管柱-安装钢管柱钢抱箍-安装丝杠-安装钢管柱剪刀撑和对撑;Install the steel hoop of the pier body - install the steel pipe column - install the steel hoop of the steel pipe column - install the screw - install the steel pipe column scissors brace and counter brace;
拆除丝杠-拆除钢管柱钢抱箍-拆除墩身钢抱箍-拆除钢管柱剪刀撑和对撑-拆除钢管柱。Remove the lead screw - remove the steel hoop of the steel pipe column - remove the steel hoop of the pier body - remove the scissors brace and counter brace of the steel pipe column - remove the steel pipe column.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720548986.5U CN206706590U (en) | 2017-05-17 | 2017-05-17 | A kind of cast-in-place simply supported beam construction detachable connection system of steel pipe column bracket method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720548986.5U CN206706590U (en) | 2017-05-17 | 2017-05-17 | A kind of cast-in-place simply supported beam construction detachable connection system of steel pipe column bracket method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206706590U true CN206706590U (en) | 2017-12-05 |
Family
ID=60463775
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720548986.5U Active CN206706590U (en) | 2017-05-17 | 2017-05-17 | A kind of cast-in-place simply supported beam construction detachable connection system of steel pipe column bracket method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206706590U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111119059A (en) * | 2019-12-31 | 2020-05-08 | 四川交投建设工程股份有限公司 | Ultrahigh composite support system for high-pier cast-in-place box girder and construction method |
-
2017
- 2017-05-17 CN CN201720548986.5U patent/CN206706590U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111119059A (en) * | 2019-12-31 | 2020-05-08 | 四川交投建设工程股份有限公司 | Ultrahigh composite support system for high-pier cast-in-place box girder and construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104259717B (en) | Adjustable splicing mould bed | |
| CN205531315U (en) | Detachable reinforced truss floor deck support system | |
| CN103614967B (en) | A kind of stiff skeleton and utilize it to carry out the method for bridge king-post construction | |
| CN205399237U (en) | Reinforcing apparatus of concrete slab bridge / roof beam | |
| CN203808484U (en) | Integrated cantilevered and attached external scaffolding | |
| CN103362069B (en) | Steel-concrete combined box girder concrete wing plate formwork and construction method | |
| CN204298742U (en) | For the supporting and protection structure of Bridge High-pier construction | |
| CN106759457A (en) | The installation method of cantilever design high-accuracy built-in fitting | |
| CN110344332A (en) | A support for the construction of the beam on the main tower of the bridge | |
| CN205224649U (en) | Liftable formula composite floor slab support system | |
| CN206625134U (en) | A kind of side form frock for cast-in-situ box girder | |
| CN203461693U (en) | Bailey truss composite gantry crane super high steel outriggers | |
| CN205591122U (en) | Simple bridge roof beam bearing structure based on beiLei beam support | |
| CN205116030U (en) | No. 0 three angle brackets of piece of box girder bridge have just been constructed in succession | |
| CN208087088U (en) | A kind of tower crane attached wall joint reinforcing structure | |
| CN203247717U (en) | Connecting node of concrete column and steel beam | |
| CN207331426U (en) | A kind of double box steel concrete binder bowstring arch bridges of railway | |
| CN203878779U (en) | Rectangular concrete-filled steel tube column and I-steel beam rebar penetrating type joint | |
| CN204075597U (en) | A kind of adjustable assembled moulding bed | |
| CN203547114U (en) | Wall connecting assembly | |
| CN207988486U (en) | A kind of packaged type frame structure wall template system | |
| CN205369057U (en) | A from lock bracket that is used for two high mounds of wall formula | |
| CN206110793U (en) | Do not take framework of ground area | |
| CN205116431U (en) | Eccentric connection structure who aligns of beam column | |
| CN206828949U (en) | Steel K supports hollow concrete columnar pier |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| PP01 | Preservation of patent right |
Effective date of registration: 20250908 Granted publication date: 20171205 |
|
| PP01 | Preservation of patent right |