CN206656709U - A kind of deep rock mass or soil deformation test backfilling apparatus - Google Patents

A kind of deep rock mass or soil deformation test backfilling apparatus Download PDF

Info

Publication number
CN206656709U
CN206656709U CN201720295724.2U CN201720295724U CN206656709U CN 206656709 U CN206656709 U CN 206656709U CN 201720295724 U CN201720295724 U CN 201720295724U CN 206656709 U CN206656709 U CN 206656709U
Authority
CN
China
Prior art keywords
test
test tube
deep rock
soil deformation
rock mass
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720295724.2U
Other languages
Chinese (zh)
Inventor
姜永涛
姜克寒
高东东
周中
杨金庞
朱辉
杨光
张齐芳
耿石军
岳志坤
张家贺
周成丰
汪志峰
李光山
李丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South University
Sinohydro Bureau 8 Co Ltd
PowerChina Railway Construction Co Ltd
Original Assignee
Central South University
Sinohydro Bureau 8 Co Ltd
PowerChina Railway Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South University, Sinohydro Bureau 8 Co Ltd, PowerChina Railway Construction Co Ltd filed Critical Central South University
Priority to CN201720295724.2U priority Critical patent/CN206656709U/en
Application granted granted Critical
Publication of CN206656709U publication Critical patent/CN206656709U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

本实用新型公开了一种深层岩体或土体变形测试回填装置,包括测试管(3),所述的测试管(3)为一整体或多根所述的测试管(3)之间通过外连接套管(4)连接,所述的测试管(3)的底端设有底盖(2),所述的测试管(3)的顶端设有顶盖(8),所述的测试管(3)的外表面设有至少一组竖向沉降磁环组,注浆软管(6)的一端与所述的测试管(3)的底端并齐固定,所述的注浆软管(6)的另一端与预制回填料压浆机(7)连接。本实用新型回填方法及装置操作简单,可以极大地提高测试精度。能更好的满足各种要求高精度的安全监测工程,如运用到隧道、高边坡、深基坑及坝体的变形监测。

The utility model discloses a deep rock or soil deformation test backfill device, which comprises a test tube (3), and the test tube (3) is a whole or a plurality of test tubes (3) pass through The outer connection sleeve (4) is connected, the bottom end of the test tube (3) is provided with a bottom cover (2), the top end of the test tube (3) is provided with a top cover (8), and the test tube (3) is provided with a top cover (8). The outer surface of the tube (3) is provided with at least one set of vertical subsidence magnetic rings, one end of the grouting hose (6) is aligned with the bottom end of the test tube (3), and the grouting soft The other end of the pipe (6) is connected to the prefabricated backfill grouting machine (7). The backfilling method and device of the utility model are easy to operate and can greatly improve the testing accuracy. It can better meet various requirements of high-precision safety monitoring projects, such as deformation monitoring applied to tunnels, high slopes, deep foundation pits and dams.

Description

A kind of deep rock mass or soil deformation test backfilling apparatus
Technical field
The utility model is related to a kind of rock mass or soil deformation test backfilling apparatus, be specifically related to a kind of deep rock mass or Soil deformation tests backfilling apparatus.
Background technology
With the development of China's economic society, the development foundation Facilities Construction of country energetically, engineering project is increasingly pursued The security of construction, the working security monitoring and life-cycle monitoring of project are taken seriously especially.As tunnel, high slope, deep basal pit and The deformation monitoring of the projects such as dam body is to construction and safe to use plays very big forewarning function.For the Deep Rock soil on project periphery Body deformation monitoring pursues high-frequency, high precision.It is existing drilling earth-filling method be measurement pipe install after with coarse sand in Aperture backfills, and this method is difficult the true strain of accurate reaction Rock And Soil, and seal is very poor, easy gas leakage spillage, Construction safety is influenceed, can also influence measurement accuracy.
Utility model content
Technical problem to be solved in the utility model be to provide it is a kind of it is simple to operate, measuring accuracy is high, it is various to meet It is required that deep rock mass or soil deformation the test backfilling apparatus of high-precision safety monitoring project.
In order to solve the above-mentioned technical problem, deep rock mass or soil deformation test backfilling apparatus provided by the utility model, Including testing tube, described testing tube be integral or the testing tube described in more between connected by outer connection sleeve pipe, it is described The bottom of testing tube be provided with bottom, the top of described testing tube is provided with top cover, and the outer surface of described testing tube is provided with extremely Few one group of Vertical Settlement magnet ring group, the bottom of one end of slip casting flexible pipe and described testing tube are simultaneously fixed together, and described slip casting is soft The other end of pipe is connected with prefabricated backfill material pneumatic mortar machine.
Further, in addition to one can cover the protection bung that measurement drills.
The structure of described Vertical Settlement magnet ring group is:Vertical Settlement magnet ring is enclosed on described testing tube or described outer connected The outer surface of female connector pipe, and can in certain scope on the described testing tube or described outer connection sleeve pipe freely up and down Slide, the both ends of described Vertical Settlement magnet ring are equipped with rubber spring set, and the port of each described rubber spring set is provided with Locating ring, each described locating ring are provided with multiple locating ring fastening screws, and described rubber spring set is enclosed on described survey On test tube or in described outer connection sleeve pipe, described locating ring location sealing is on described testing tube, described locating ring Described locating ring is fixed on described testing tube by fastening screw.
Described rubber spring set is tubbiness, and upper and lower two parts are seamless with described Vertical Settlement magnet ring top and bottom respectively Knot.
Described rubber spring set stress can slide up and down >=± 30mm in the range of stretch.
Described locating ring is enclosed on the both ends of described rubber spring set, and its internal diameter can be adjusted, and pass through described positioning Ring fastening screw fastens, and ensures that described Vertical Settlement magnet ring is overall and forms closed cavity with described testing tube.
Described testing tube is the pvc pipe with interior grooves.Testing tube inside is deviational survey provided with " ten " word cross recesses Instrument probe roller guide groove.
Described outer connection sleeve pipe internal diameter is equal to the external diameter of described testing tube, and convex inside described outer connection sleeve pipe Rise and be engaged with described testing tube exterior groove.
The both ends of described outer connection sleeve pipe are close to relatively with described test pipe end, and tighten described outer adapter sleeve The screw at two of pipe is with fixation.
Backfilling apparatus is tested using the deep rock mass or soil deformation of above-mentioned technical proposal, using drilling machine in design measuring point On drill through the measurement drilling of certain depth, and collect drilling core or core tests its modulus of compressibility;Slip casting flexible pipe and pre- is installed System backfill material pneumatic mortar machine;Expect that pneumatic mortar machine up injects prefabricated backfill by slip casting flexible pipe to foot of hole is measured using prefabricated backfill Material.
The utility model earth-filling method and device are simple to operate, can be greatly enhanced measuring accuracy.It can better meet The high-precision safety monitoring project of various requirement, such as apply to the deformation monitoring of tunnel, high slope, deep basal pit and dam body.
The Deep Rock soil body that the utility model meets project periphery carries out having high-frequency, the deformation prison of high precision Survey.The true strain that existing drilling earth-filling method is difficult accurate reaction Rock And Soil is overcome, and seal is poor, easily leakage The problems such as gas spillage, ensure construction safety and measurement accuracy.Prefabricated time stuffing process is backfilled using the reverse slip casting of bottom hole, is ensured as far as possible The uniformity of measured hole backfill material and surrounding formations modulus of compressibility, deformation synchronism is improved to increase measurement accuracy.Particularly with The rock stratum of bad hydraulic permeability, reverse pressure injection backfill material can be very good to exclude the muddy water mud that drilling leaves, and ensure the closely knit of backfill. The a range of concrete backfill of the mouth of pipe, plays sealing function, avoids gas leakage spillage and influences construction speed and ground driving And personal security.The utility model earth-filling method and device are simple to operate, can be greatly enhanced measuring accuracy.Can preferably it expire The sufficient high-precision safety monitoring project of various requirement, such as apply to the deformation monitoring of tunnel, high slope, deep basal pit and dam body.
In summary, the utility model is that one kind is simple to operate, measuring accuracy is high, can meet the high-precision peace of various requirement The deep rock mass or soil deformation test backfilling apparatus of full monitoring works.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is Vertical Settlement magnet ring of the present utility model and testing tube junction schematic diagram.
Fig. 3 is Vertical Settlement magnet ring overall schematic of the present utility model.
In figure:1st, measurement drilling;2nd, bottom;3rd, testing tube;4th, outer connection sleeve pipe;5th, Vertical Settlement magnet ring;5-1, rubber Spring housing;5-2, locating ring;5-3, locating ring fastening screw;6th, slip casting flexible pipe;7th, prefabricated backfill material pneumatic mortar machine;8th, tube top is tested Lid;9th, bung is protected.
Embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings.
Referring to Fig. 1, Fig. 2 and Fig. 3, connected between three testing tubes 3 by two outer connection sleeve pipes 4, the bottom of testing tube 3 Provided with bottom 2, the top of testing tube 3 is provided with top cover 8, and the outer surface of testing tube 3 is provided with two groups of Vertical Settlement magnet ring groups, vertical heavy Dropping the structure of magnet ring group is:5 sets of Vertical Settlement magnet ring, and can be in certain scope outside in the outer surface of outer connection sleeve pipe 4 Slip in connection sleeve pipe 4 freely up and down, the both ends of Vertical Settlement magnet ring 5 are equipped with rubber spring set 5-1, each rubber spring Set 5-1 port is provided with multiple locating ring fastening screw 5-3, rubber spring set provided with locating ring 5-2, each locating ring 5-2 5-1 is covered in outer connection sleeve pipe 4, and locating ring 5-2 location sealings are on testing tube 3, and locating ring fastening screw 5-3 is by locating ring 5- 2 are fixed on testing tube 3.The bottom of one end of slip casting flexible pipe 6 and testing tube 3 is simultaneously fixed together, the other end of slip casting flexible pipe 6 with it is pre- System backfill material pneumatic mortar machine 7 connects.
Further, in addition to one can cover the protection bung 9 for measuring drilling 1.
Rubber spring set 5-1 is tubbiness, upper and lower two parts respectively with the top and bottom seamless coupling of Vertical Settlement magnet ring 5.
Rubber spring set 5-1 stress can slide up and down >=± 30mm in the range of stretch.
Locating ring 5-2 is enclosed on rubber spring set 5-1 both ends, and its internal diameter can be adjusted, and pass through locating ring fastening screw 5-3 Fastening, ensure that Vertical Settlement magnet ring 5 is overall and form closed cavity with testing tube 3.
Testing tube 3 is the pvc pipe with interior grooves, and it is that clinometer probe roller is led that inside, which is provided with " ten " word cross recesses, Groove.
The outer internal diameter of connection sleeve pipe 4 is equal to the external diameter of testing tube 3, and the internal protrusion of outer connection sleeve pipe 4 and described test The exterior groove of pipe 3 is engaged.
The both ends of outer connection sleeve pipe 4 are close to relatively with the termination of testing tube 3, and tighten two of described outer connection sleeve pipe 4 Screw with fixation.
Another embodiment, testing tube 3 are integral, and Vertical Settlement magnet ring 5 is enclosed on the outer surface of testing tube 3, and can be one Slip in fixed scope on testing tube 3 freely up and down, the two of Vertical Settlement magnet ring 5 is equipped with rubber spring set 5-1, each Rubber spring set 5-1 port is provided with multiple locating ring fastening screw 5-3, rubber provided with locating ring 5-2, each locating ring 5-2 Glue spring housing 5-1 is enclosed on testing tube 3, and on testing tube 3, locating ring fastening screw 5-3 will determine locating ring 5-2 location sealings Position ring 5-2 is fixed on testing tube 3.The bottom of one end of slip casting flexible pipe 6 and testing tube 3 is simultaneously fixed together, slip casting flexible pipe 6 it is another One end is connected with prefabricated backfill material pneumatic mortar machine 7.
Referring to Fig. 1, Fig. 2 and Fig. 3, the deformation test backfill side of deep rock mass or soil deformation test backfilling apparatus is used Method, including instrument connection drills through, backfilling apparatus installation and instrument connection backfill.First, one is drilled through on design measuring point using drilling machine A diameter of 108mm of depthkeeping degree testing bore holes 1, and collect drilling core or core tests its modulus of compressibility;Then installation is deep Layer rock mass or soil deformation test backfilling apparatus, installation steps include the installation of the bottom 2 of the testing tube 3 of first, use adhesive tape Fix the bottom of slip casting flexible pipe 6 one and pipe testing tube 3 and together, connected with outer connection sleeve pipe 4 and lengthen more testing tubes 3, by Step repeats the above steps, during constantly toward clear water is filled in testing tube 3, transfer to the angle of rotary test pipe 3 behind position, Make any pair of " ten " word groove in testing tube 3 parallel to intended deformations direction, and top cover 8 is installed;Followed by prefabricated time Filler pneumatic mortar machine 7 up injects modulus of compressibility and backfill stratum core-drilling or soil by slip casting flexible pipe 6 to 1 bottom of measurement drilling The same or like prefabricated backfill material of modulus of compressibility of core, slow hoisting grouting flexible pipe 6 during slip casting, the body of prefabricated backfill material Product is Qi (i=1,2 ...):
Wherein:HiFor the thickness of certain same sex rock-soil layer;
R is the actual inner diameter of testing bore holes 1;
R is the external diameter of testing tube 3.
Stop backfill when backfill is away from mouth of pipe 1m or so, it is close with the concrete backfill mouth of pipe after filling settlement to be returned is closely knit Envelope, the backfill of measurement drilling 1 are measuring the aperture installation protection cover 9 of drilling 1 after finishing.
The utility model earth-filling method and device are simple to operate, can be greatly enhanced measuring accuracy.It can better meet The high-precision safety monitoring project of various requirement, such as apply to the deformation monitoring of tunnel, high slope, deep basal pit and dam body.

Claims (10)

1.一种深层岩体或土体变形测试回填装置,包括测试管(3),其特征是:所述的测试管(3)为一整体或多根所述的测试管(3)之间通过外连接套管(4)连接,所述的测试管(3)的底端设有底盖(2),所述的测试管(3)的顶端设有顶盖(8),所述的测试管(3)的外表面设有至少一组竖向沉降磁环组,注浆软管(6)的一端与所述的测试管(3)的底端并齐固定,所述的注浆软管(6)的另一端与预制回填料压浆机(7)连接。1. A backfilling device for deep rock mass or soil deformation testing, comprising a test tube (3), characterized in that: the test tube (3) is a whole or between a plurality of test tubes (3) Connected by an external connecting sleeve (4), the bottom end of the test tube (3) is provided with a bottom cover (2), and the top end of the test tube (3) is provided with a top cover (8), and the test tube (3) is provided with a top cover (8). The outer surface of the test tube (3) is provided with at least one set of vertical subsidence magnetic ring groups, and one end of the grouting hose (6) is aligned with the bottom end of the test tube (3) and fixed, and the grouting The other end of the hose (6) is connected to the prefabricated backfill grouting machine (7). 2.根据权利要求1所述的深层岩体或土体变形测试回填装置,其特征在于:还包括一个能盖住测量钻孔的保护桶盖(9)。2. The backfilling device for deep rock mass or soil deformation test according to claim 1, characterized in that: it also includes a protective barrel cover (9) capable of covering the measurement borehole. 3.根据权利要求1或2所述的深层岩体或土体变形测试回填装置,其特征在于:所述的竖向沉降磁环组的结构是:竖向沉降磁环(5)套在所述的测试管(3)或所述的外连接套管(4)的外表面,并能在一定的范围内在所述的测试管(3)或所述的外连接套管(4)上上下自由的滑动,所述的竖向沉降磁环(5)的两端均设有橡胶弹簧套(5-1),每个所述的橡胶弹簧套(5-1)的端口设有定位环(5-2),每个所述的定位环(5-2)上设有多个定位环紧固螺丝(5-3),所述的橡胶弹簧套(5-1)套在所述的测试管(3)上或所述的外连接套管(4)上,所述的定位环(5-2)定位密封在所述的测试管(3)上,所述的定位环紧固螺丝(5-3)将所述的定位环(5-2)固定在所述的测试管(3)上。3. The deep rock mass or soil deformation test backfill device according to claim 1 or 2, characterized in that: the structure of the vertical subsidence magnetic ring group is: the vertical subsidence magnetic ring (5) is sleeved on the the outer surface of the test tube (3) or the outer connection sleeve (4), and can move up and down on the test tube (3) or the outer connection sleeve (4) within a certain range Free sliding, the two ends of the vertical settlement magnetic ring (5) are provided with rubber spring sleeves (5-1), and the ports of each of the rubber spring sleeves (5-1) are provided with positioning rings ( 5-2), each of the positioning rings (5-2) is provided with a plurality of positioning ring fastening screws (5-3), and the rubber spring sleeve (5-1) is set on the test On the tube (3) or on the outer connecting sleeve (4), the positioning ring (5-2) is positioned and sealed on the test tube (3), and the positioning ring fastening screw ( 5-3) Fix the positioning ring (5-2) on the test tube (3). 4.根据权利要求3所述的深层岩体或土体变形测试回填装置,其特征在于:所述的橡胶弹簧套(5-1)为桶状,上下两部分分别与所述的竖向沉降磁环(5)上下面无缝联结。4. The deep rock mass or soil deformation test backfill device according to claim 3, characterized in that: the rubber spring sleeve (5-1) is barrel-shaped, and the upper and lower parts are respectively connected to the vertical settlement The upper and lower parts of the magnetic ring (5) are connected seamlessly. 5.根据权利要求3所述的深层岩体或土体变形测试回填装置,其特征在于:所述的橡胶弹簧套(5-1)受力能在上下滑动≥±30mm范围内伸缩。5. The backfilling device for deep rock mass or soil deformation test according to claim 3, characterized in that: the rubber spring sleeve (5-1) can be stretched and contracted within the range of sliding up and down ≥±30mm under force. 6.根据权利要求3所述的深层岩体或土体变形测试回填装置,其特征在于:所述的定位环(5-2)套在所述的橡胶弹簧套(5-1)的两端,其内径能调节,并通过所述的定位环紧固螺丝(5-3)紧固,保证所述的竖向沉降磁环(5)整体与所述的测试管(3)形成密闭的空腔。6. The backfilling device for deep rock or soil deformation testing according to claim 3, characterized in that: the positioning ring (5-2) is sleeved on both ends of the rubber spring sleeve (5-1) , its inner diameter can be adjusted, and it is fastened by the fastening screw (5-3) of the positioning ring to ensure that the vertical subsidence magnetic ring (5) and the test tube (3) form an airtight space as a whole cavity. 7.根据权利要求1或2所述的深层岩体或土体变形测试回填装置,其特征在于:所述的测试管(3)为具有内部凹槽的PVC管。7. The deep rock mass or soil deformation test backfill device according to claim 1 or 2, characterized in that: the test pipe (3) is a PVC pipe with internal grooves. 8.根据权利要求1或2所述的深层岩体或土体变形测试回填装置,其特征在于:所述的测试管(3)内部设有“十”字交叉凹槽为测斜仪探头滚轮导槽。8. The backfilling device for deep rock mass or soil deformation test according to claim 1 or 2, characterized in that: the inside of the test tube (3) is provided with a "cross" groove for the inclinometer probe roller Guide groove. 9.根据权利要求1或2所述的深层岩体或土体变形测试回填装置,其特征在于:所述的外连接套管(4)内径等于所述的测试管(3)的外径,并且所述的外连接套管(4)内部凸起与所述的测试管(3)外部凹槽咬合。9. The backfill device for deep rock mass or soil deformation test according to claim 1 or 2, characterized in that: the inner diameter of the outer connecting sleeve (4) is equal to the outer diameter of the test pipe (3), And the inner protrusion of the outer connection sleeve (4) engages with the outer groove of the test tube (3). 10.根据权利要求1或2所述的深层岩体或土体变形测试回填装置,其特征在于:所述的外连接套管(4)的两端与所述的测试管(3)端头紧贴相对,并拧紧所述的外连接套管(4)的两头的螺丝以固定。10. The deep rock or soil deformation test backfill device according to claim 1 or 2, characterized in that: the two ends of the outer connecting sleeve (4) and the end of the test pipe (3) close to each other, and tighten the screws at both ends of the outer connecting sleeve (4) to fix.
CN201720295724.2U 2017-03-24 2017-03-24 A kind of deep rock mass or soil deformation test backfilling apparatus Expired - Fee Related CN206656709U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720295724.2U CN206656709U (en) 2017-03-24 2017-03-24 A kind of deep rock mass or soil deformation test backfilling apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720295724.2U CN206656709U (en) 2017-03-24 2017-03-24 A kind of deep rock mass or soil deformation test backfilling apparatus

Publications (1)

Publication Number Publication Date
CN206656709U true CN206656709U (en) 2017-11-21

Family

ID=60316468

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720295724.2U Expired - Fee Related CN206656709U (en) 2017-03-24 2017-03-24 A kind of deep rock mass or soil deformation test backfilling apparatus

Country Status (1)

Country Link
CN (1) CN206656709U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU192948U1 (en) * 2019-07-18 2019-10-08 федеральное государственное бюджетное образовательное учреждение высшего образования "Донской государственный технический университет" (ДГТУ) Measuring probe for monitoring residual deformations and temperatures of multilayer road structures
RU2710901C1 (en) * 2019-06-26 2020-01-14 Вахтанг Парменович Матуа Method for automatic remote monitoring of accumulation of residual deformations and vibrations of heat and moisture conditions of elements of road structures in real operating conditions
CN111351471A (en) * 2018-12-21 2020-06-30 航天科工惯性技术有限公司 Cable depth suspension device and system of sliding inclinometer
CN111855963A (en) * 2020-07-31 2020-10-30 交通运输部公路科学研究所 A kind of test method and test device for internal void of rock and soil layer
RU2784647C1 (en) * 2021-11-23 2022-11-29 Федеральное Автономное Учреждение "Российский Дорожный Научно-Исследовательский Институт" Method for accelerated testing of road constructions

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111351471A (en) * 2018-12-21 2020-06-30 航天科工惯性技术有限公司 Cable depth suspension device and system of sliding inclinometer
CN111351471B (en) * 2018-12-21 2022-05-31 航天科工惯性技术有限公司 Cable depth suspension device and system of sliding inclinometer
RU2710901C1 (en) * 2019-06-26 2020-01-14 Вахтанг Парменович Матуа Method for automatic remote monitoring of accumulation of residual deformations and vibrations of heat and moisture conditions of elements of road structures in real operating conditions
RU192948U1 (en) * 2019-07-18 2019-10-08 федеральное государственное бюджетное образовательное учреждение высшего образования "Донской государственный технический университет" (ДГТУ) Measuring probe for monitoring residual deformations and temperatures of multilayer road structures
CN111855963A (en) * 2020-07-31 2020-10-30 交通运输部公路科学研究所 A kind of test method and test device for internal void of rock and soil layer
CN111855963B (en) * 2020-07-31 2021-04-23 交通运输部公路科学研究所 A kind of test method and test device for internal void of rock and soil layer
RU2784647C1 (en) * 2021-11-23 2022-11-29 Федеральное Автономное Учреждение "Российский Дорожный Научно-Исследовательский Институт" Method for accelerated testing of road constructions

Similar Documents

Publication Publication Date Title
CN201672998U (en) Surrounding rock drilling multi-point stress gauge
CN103742129B (en) The method of weak seam measuring gas pressure of coal bed by drilling hole
CN206656709U (en) A kind of deep rock mass or soil deformation test backfilling apparatus
CN106918322B (en) A combined test method for horizontal and vertical deformation of deep rock mass or soil mass
CN101358455A (en) Method and device for embedding lateral earth pressure sensor in soil
CN105318824B (en) A kind of method that wall rock loosening ring is measured based on distributed resistance foil gauge
CN215261690U (en) Layered anchoring type multi-point displacement meter
CN110778308B (en) Drilling-while-drilling gas flow testing device and method
CN106595548A (en) Displacement measuring method for the inner part of enclosing rock for tunnel inner face
CN105780822A (en) Monitoring instrument equipment for underwater foundation layered settlement measurement and arrangement method for monitoring instrument equipment
CN115655133A (en) Optical fiber strain sensing pipe column and ground stress measuring method
CN103573269B (en) Shield tunnel grouting layer performance detection method
CN206656713U (en) The Vertical Settlement magnet ring structure of deep rock mass or soil body sedimentation and deformation test device
CN112629723B (en) High-precision multi-depth air bag type soil pressure gauge
CN204252103U (en) A kind of deviational survey hole osmometer device
CN112857642B (en) Method for measuring soil pressure in multiple depths
CN118481741B (en) A device and method for real-time monitoring of movement trajectory of rock layers on top of a mine
CN210714663U (en) Device for testing gas flow while drilling
CN108035740B (en) A kind of slip casting geologic model test slurry stop and its construction method
CN216621544U (en) An earth pressure box drilling and burying device
CN116378765A (en) Device and method for rapidly measuring gas pressure under high water content
CN106979754A (en) A kind of waterproof rock displacement measurement apparatus
CN210426413U (en) Multipoint displacement measuring system based on magnetic displacement sensor
CN201000324Y (en) Casing type drilling multi-point extensometer
CN220690321U (en) High ground stress testing device based on ultra-deep drilling

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171121