CN206651245U - Intensive artemia hatching device - Google Patents

Intensive artemia hatching device Download PDF

Info

Publication number
CN206651245U
CN206651245U CN201621373479.4U CN201621373479U CN206651245U CN 206651245 U CN206651245 U CN 206651245U CN 201621373479 U CN201621373479 U CN 201621373479U CN 206651245 U CN206651245 U CN 206651245U
Authority
CN
China
Prior art keywords
hatching
tank
artemia
intensive
incubation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621373479.4U
Other languages
Chinese (zh)
Inventor
罗思
梁永哲
金诗语
马卫忠
单承康
王猛
梁文斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201621373479.4U priority Critical patent/CN206651245U/en
Application granted granted Critical
Publication of CN206651245U publication Critical patent/CN206651245U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Farming Of Fish And Shellfish (AREA)

Abstract

The utility model discloses an intensive steamed worm hatching apparatus, the device is including setting up the groove of hatching on the support, hatch inslot and install temperature control mechanism, hatch inslot and install a plurality of hatching jars, illumination control mechanism is installed on the hatching jar top, the hatching bottom is the toper section, the toper section is arranged in and is hatched the bottom outside of groove, there are collecting pipe and delivery pipe in toper section both sides cartridge respectively, the collecting pipe top is stretched into in the hatching jar and is arranged in hatching jar centricity, the bottom is installed the tourmaline layer in the toper section, toper section end rigid coupling has the trachea of taking the stagnant water valve, trachea end-to-end connection has aerifys the mechanism of rolling. The utility model discloses it is nimble changeable, can avoid extensive concentrated hatching because of phenomena such as the bait supply that the hatching failure causes is not enough and the wasting of resources, high efficiency still need not the secondary separation simultaneously.

Description

A kind of intensive artemia hatching apparatus
Technical field
It the utility model is related to technical field of aquaculture, and in particular to a kind of intensive artemia hatching apparatus.
Background technology
In industrial fish cultivating production process, carry out extensive concentrate frequently with hatchery or hatching tank and hatch artemia. Hatch due to artemia is influenceed by many factors such as illumination, water temperature, dissolved oxygen level, water quality, is easily hatched in hatching process The phenomenon of failure.Phenomena such as extensive hatching will unsuccessfully cause bait insufficient or interrupt, artemia cysts wastes.Extensive hatching Supply time and supply quantity, the flexibility for also defining artemia are low.Currently, artemia is mainly carried out using secondary separation method Collect, first separate artemia and unhatched artemia cysts with seawater and chorion, then artemia is separated with unhatched artemia cysts.This Although kind of method efficiently utilizes the lamination that artemia does not hatch artemia cysts under static conditions with chorion and, but process compared with To be cumbersome time-consuming, especially when hatching water body is larger, it is awkward and manages, and artemia can also be gone out by fresh water flush for a long time Phenomena such as existing activity reduces, is dead.
Utility model content
The utility model aims to provide a kind of intensive artemia hatching apparatus, to solve to be deposited in existing artemia hatching process Easy appearance hatching failure, flexibility is low, the cumbersome time-consuming, operation of hatching process and management inconvenience, death rate height etc. are asked Topic.
The utility model is achieved by following technical solution:
A kind of intensive artemia hatching apparatus, including the incubation tank being arranged on support, water temperature control is installed in incubation tank Mechanism processed, some hatching tanks are installed in incubation tank, hatching upper end is provided with illumination controlling organization, and hatching tank bottom end is taper Section, conical section are placed in outside incubation tank bottom, are fitted with collecting pipe and delivery pipe respectively in conical section both sides, collecting pipe top is stretched Enter to hatch and be placed in hatching tank centre in tank, conical section inner bottom part is provided with gas rock layers, and conical section end is connected with band sealing The tracheae of valve, tracheae end are connected with inflation rolling mechanism.
The water-temperature control mechanism includes being arranged on the heated at constant temperature rod of incubation tank inner bottom part and stirs water immersible pump and temperature Meter.
The illumination controlling organization includes the cover for being hinged on hatching upper end, and cover is engraved structure or network structure, Cover is provided with some equally distributed irradiation lights towards the side in hatching tank, in addition to the timer that is connected with irradiation light and Power switch, timer and power switch are arranged on incubation tank outer wall.
It is described inflation rolling mechanism include air pump, air pump output end is provided with shunting nozzle, be connected on shunting nozzle and Hatch some flexible pipes of tank quantity identical, tracheae of the every hose end respectively with a hatching tank bottom end is connected.
The incubation tank and hatching tank are made of transparent material.
The cover is engraved structure or network structure.
Controlling switch is installed on the collecting pipe.
Control valve is installed on the delivery pipe.
The irradiation light is LED.
The beneficial effects of the utility model are:
Compared with prior art, intensive artemia hatching apparatus provided by the utility model, can be according to needed for actual production Bait quantity, select a number of hatching tank to hatch for artemia, effectively avoid the excessive or insufficient phenomenon of artemia quantity, and Avoid single hatchery or hatch the risk of tank hatching failure;In hatching process, by hatching hatching of the tank top with irradiation light Cover decides whether to add illumination to control the brooding time of artemia and acquisition time, and when being hatched by timer record Between, convenient management and control;After artemia hatching, make full use of the lamination of artemia, from the cone of hatching tank bottom on Side directly collects artemia, and the artemia collected feeds or directly fed after using silk cover filtering, without fresh water flush and secondary separation, Operating efficiency can be improved and reduce the infringement to artemia activity;Artemia is collected and finished, and can be arranged by hatching the Large Diameter Pipeline of pot bottom Pipe quick drain and cleaning are put, it is easy to use;Incubation tank and hatching tank are transparent material, person's observation and operation easy to operation.
Brief description of the drawings
Fig. 1 is structure chart of the present utility model;
In figure:1- incubation tanks, 2- heated at constant temperature rods, 3- stir water immersible pump, 4- thermometers, 5- hatching tanks, 6- gas rock layers, 7- Tracheae, 8- collecting pipes, 9- delivery pipes, 10- timers, 11- covers, 12- irradiation lights, 13- air pumps, 14- supports, 71- water check valves, 81- controlling switches, 91- control valves, 121- power switches, 131- shunting valves, 132- flexible pipes.
Embodiment
The technical solution of the utility model is described further below in conjunction with drawings and Examples, but required protection Scope is not limited to described;
As shown in figure 1, intensive artemia hatching apparatus provided by the utility model, including hatching on the support 14 is set Groove 1, water-temperature control mechanism is installed in incubation tank 1, some hatching tanks 5 are installed in incubation tank 1, hatching tank 5 top is provided with Illumination controlling organization, hatching tank 5 bottom is conical section, and conical section is placed in outside the bottom of incubation tank 1, inserted respectively in conical section both sides Equipped with collecting pipe 8 and delivery pipe 9, the top of collecting pipe 8, which is stretched into hatching tank 5, to be placed in hatching the centre of tank 5, conical section inner bottom part Gas rock layers 6 are installed, conical section end is connected with the tracheae 7 with water check valve 71, and the end of tracheae 7 is connected with inflation rolling mechanism.
The water-temperature control mechanism includes being arranged on the heated at constant temperature rod 2 of the inner bottom part of incubation tank 1 and stirs water immersible pump 3 and temperature Degree meter 4.
The illumination controlling organization includes the cover 11 for being hinged on hatching tank 5 top, and cover 11 is engraved structure or netted Structure, cover 11 are provided with some equally distributed irradiation lights 12 towards the side in hatching tank 5, in addition to the phase of irradiation light 12 Timer 10 and power switch 121 even, timer 10 and power switch 121 are arranged on the outer wall of incubation tank 1.
The inflation rolling mechanism includes air pump 13, and the output end of air pump 13 is provided with shunting nozzle 131, divided on shunting nozzle 131 It is not connected with and hatches the bottom of tank 5 with one respectively with hatching some flexible pipes 132 of the quantity identical of tank 5, the every end of flexible pipe 132 Tracheae 7 is connected.
The incubation tank 1 and hatching tank 5 are made of transparent materials such as PVC.
The cover 11 is engraved structure or network structure.
Controlling switch 81 is installed on the collecting pipe 8.
Control valve 91 is installed on the delivery pipe 9.
The irradiation light 12 is LED.
Embodiment 1:
The present embodiment is carried out simultaneously using 6 hatching tanks 5, injects running water, closing control switch in incubation tank 1 first 81st, control valve 91 and water check valve 71, the artificial seawater configured is poured into hatching tank 5, makes tank inland sea water level and incubation tank 1 In originally water level maintain an equal level;Start heating rod 2 and stir water immersible pump 3, the water temperature in incubation tank 1 is adjusted to suitable artemia hatching Temperature, water temperature pass through the real-time display of thermometer 4;Artemia cysts is poured into hatching tank 5, booster air pump 13 simultaneously opens water check valve 71, Compressed air is entered in hatching tank 5 by flexible pipe 132 makes worm's ovum constantly be rolled in tank 5 is hatched, while starts timer 10 and remember Record brooding time;Capping hatching tank 11 is decided whether according to indoor illumination intensity and production requirement and whether starts irradiation light 12, irradiation light 12 is controlled by power switch 121;After artemia incubation of membrane, close water check valve 71 and air pump 13 stops inflation, it is quiet Put 30min;Controlling switch 81 is opened, the artemia of hatching is collected by collecting pipe 8, and the artemia gathered uses silk cover filtering After feed or directly feed;After artemia is collected, closing control switch 81, control valve 91 is opened, by the chorion of residual and not The artemia cysts of hatching is filtered out with bolting silk;Closing control valve 91, by the hatching of filtering gained, manually seawater pours into hatching tank 5, and beats Opening and closing water valve 71, start the hatching of next round artemia.
Embodiment 2:
The present embodiment is carried out simultaneously using 4 hatching tanks 5, injects running water, closing control switch in incubation tank 1 first 81st, control valve 91 and water check valve 71, the artificial seawater configured is poured into hatching tank 5, makes tank inland sea water level and incubation tank 1 In originally water level maintain an equal level;Start heating rod 2 and stir water immersible pump 3, the water temperature in incubation tank 1 is adjusted to suitable artemia hatching Temperature, water temperature pass through the real-time display of thermometer 4;Artemia cysts is poured into hatching tank 5, booster air pump 13 simultaneously opens water check valve 71, Compressed air is entered in hatching tank 5 by flexible pipe 132 makes worm's ovum constantly be rolled in tank 5 is hatched, while starts timer 10 and remember Record brooding time;Capping hatching tank 11 is decided whether according to indoor illumination intensity and production requirement and whether starts irradiation light 12, irradiation light 12 is controlled by power switch 121;After artemia incubation of membrane, close water check valve 71 and air pump 13 stops inflation, it is quiet Put 10min;Controlling switch 81 is opened, the artemia of hatching is collected by collecting pipe 8, and the artemia gathered uses silk cover filtering After feed or directly feed;After artemia is collected, closing control switch 81, control valve 91 is opened, by the chorion of residual and not The artemia cysts of hatching is filtered out with bolting silk;Closing control valve 91, by the hatching of filtering gained, manually seawater pours into hatching tank 5, and beats Opening and closing water valve 71, start the hatching of next round artemia.
Embodiment 3:
The present embodiment is carried out simultaneously using 8 hatching tanks 5, injects running water, closing control switch in incubation tank 1 first 81st, control valve 91 and water check valve 71, the artificial seawater configured is poured into hatching tank 5, makes tank inland sea water level and incubation tank 1 In originally water level maintain an equal level;Start heating rod 2 and stir water immersible pump 3, the water temperature in incubation tank 1 is adjusted to suitable artemia hatching Temperature, water temperature pass through the real-time display of thermometer 4;Artemia cysts is poured into hatching tank 5, booster air pump 13 simultaneously opens water check valve 71, Compressed air is entered in hatching tank 5 by flexible pipe 132 makes worm's ovum constantly be rolled in tank 5 is hatched, while starts timer 10 and remember Record brooding time;Capping hatching tank 11 is decided whether according to indoor illumination intensity and production requirement and whether starts irradiation light 12, irradiation light 12 is controlled by power switch 121;After artemia incubation of membrane, close water check valve 71 and air pump 13 stops inflation, it is quiet Put 20min;Controlling switch 81 is opened, the artemia of hatching is collected by collecting pipe 8, and the artemia gathered uses silk cover filtering After feed or directly feed;After artemia is collected, closing control switch 81, control valve 91 is opened, by the chorion of residual and not The artemia cysts of hatching is filtered out with bolting silk;Closing control valve 91, by the hatching of filtering gained, manually seawater pours into hatching tank 5, and beats Opening and closing water valve 71, start the hatching of next round artemia.
Above-described embodiment is only several preferred embodiments of the present utility model, is not used to limit protection of the present utility model Scope, all deformation, modification or equivalent substitution made on the basis of the technical solution of the utility model etc., all should fall into this reality With new protection domain.

Claims (9)

  1. A kind of 1. intensive artemia hatching apparatus, it is characterised in that:Including the incubation tank (1) being arranged on support (14), hatching Water-temperature control mechanism is installed in groove (1), some hatching tanks (5) are installed in incubation tank (1), hatching tank (5) top is provided with Illumination controlling organization, hatching tank (5) bottom is conical section, and conical section is placed in outside incubation tank (1) bottom, in conical section both sides point Collecting pipe (8) and delivery pipe (9) are not fitted with, and collecting pipe (8) top, which is stretched into hatching tank (5), to be placed in hatching tank (5) center Centre, conical section inner bottom part are provided with gas rock layers (6), and conical section end is connected with the tracheae (7) with water check valve (71), tracheae (7) End is connected with inflation rolling mechanism.
  2. 2. intensive artemia hatching apparatus according to claim 1, it is characterised in that:The water-temperature control mechanism includes setting Put incubation tank (1) inner bottom part heated at constant temperature rod (2) and stir water immersible pump (3) and thermometer (4).
  3. 3. intensive artemia hatching apparatus according to claim 1, it is characterised in that:The illumination controlling organization includes hinge The cover (11) on hatching tank (5) top is connected on, cover (11) is provided with some equally distributed towards the side in hatching tank (5) Irradiation light (12), in addition to the timer (10) and power switch (121) being connected with irradiation light (12), timer (10) and power supply Switch (121) is arranged on incubation tank (1) outer wall.
  4. 4. intensive artemia hatching apparatus according to claim 1, it is characterised in that:The inflation rolling mechanism includes gas Pump (13), air pump (13) output end are provided with shunting nozzle (131), are connected on shunting nozzle (131) and hatching tank (5) quantity Some flexible pipes of identical (132), tracheae (7) of every flexible pipe (132) end respectively with hatching tank (5) bottom are connected.
  5. 5. intensive artemia hatching apparatus according to claim 1, it is characterised in that:The incubation tank (1) and hatching tank (5) it is made of transparent material.
  6. 6. intensive artemia hatching apparatus according to claim 3, it is characterised in that:The cover (11) is engraved structure Or network structure.
  7. 7. intensive artemia hatching apparatus according to claim 1, it is characterised in that:It is provided with the collecting pipe (8) Controlling switch (81).
  8. 8. intensive artemia hatching apparatus according to claim 1, it is characterised in that:It is provided with the delivery pipe (9) Control valve (91).
  9. 9. intensive artemia hatching apparatus according to claim 3, it is characterised in that:The irradiation light (12) is LED.
CN201621373479.4U 2016-12-14 2016-12-14 Intensive artemia hatching device Active CN206651245U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621373479.4U CN206651245U (en) 2016-12-14 2016-12-14 Intensive artemia hatching device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621373479.4U CN206651245U (en) 2016-12-14 2016-12-14 Intensive artemia hatching device

Publications (1)

Publication Number Publication Date
CN206651245U true CN206651245U (en) 2017-11-21

Family

ID=60313517

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621373479.4U Active CN206651245U (en) 2016-12-14 2016-12-14 Intensive artemia hatching device

Country Status (1)

Country Link
CN (1) CN206651245U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106719168A (en) * 2016-12-14 2017-05-31 中国电建集团贵阳勘测设计研究院有限公司 Intensive artemia hatching device for fish proliferation and releasing station and use method thereof
CN111789068A (en) * 2020-07-16 2020-10-20 滨州市胜英水产有限公司 Fairy shrimp egg hatching equipment and hatching method thereof
CN113519464A (en) * 2021-06-28 2021-10-22 中国水产科学研究院黑龙江水产研究所 Efficient artemia nauplii hatching device and operation method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106719168A (en) * 2016-12-14 2017-05-31 中国电建集团贵阳勘测设计研究院有限公司 Intensive artemia hatching device for fish proliferation and releasing station and use method thereof
CN111789068A (en) * 2020-07-16 2020-10-20 滨州市胜英水产有限公司 Fairy shrimp egg hatching equipment and hatching method thereof
CN113519464A (en) * 2021-06-28 2021-10-22 中国水产科学研究院黑龙江水产研究所 Efficient artemia nauplii hatching device and operation method
CN113519464B (en) * 2021-06-28 2022-05-13 中国水产科学研究院黑龙江水产研究所 Efficient artemia nauplii hatching device and operation method

Similar Documents

Publication Publication Date Title
CN206651245U (en) Intensive artemia hatching device
CN205161579U (en) Fairy shrimp hatching apparatus convenient to worm's ovum separation
CN204070102U (en) A kind of animal self-waterer
CN203279661U (en) Insulated culturing facility for automatically monitoring and managing culturing of aquatic animals
CN204860607U (en) A support pond temporarily for fish production
CN206423369U (en) Cultivate the integrated cultivating system of fish
CN206043139U (en) A kind of aquaculture pond
CN208159708U (en) A kind of herding raising canopy
CN106942122A (en) Aquaculture device
CN208940722U (en) Water installations are changed in a kind of novel plant fish culture pond blowdown
CN106719168A (en) Intensive artemia hatching device for fish proliferation and releasing station and use method thereof
CN204616742U (en) A kind of continuous-flow type hangs water fish hanging culture system
CN206196691U (en) A kind of marine aquatic product culturing pool
CN212116707U (en) Circulating water culture system with position-controllable water outlet layer
CN108308053A (en) It is a kind of to continue water supply installation, drinking-water system and batch production sheep cultivation equipment
CN107012082A (en) The bioreactor of both culturing microalgae
CN206303011U (en) A kind of shrimp culture pond of easy blowdown
CN110214707B (en) Intelligent excrement collection device for large pig farm
CN211832420U (en) Pneumatic oxygenation filters buoyancy drive and feeds and eats integrative equipment
CN206533941U (en) A kind of multifunction fish tank
CN209428237U (en) A kind of smelly water purifying device of urban black
CN205161622U (en) Circulating fairy shrimp hatching apparatus
CN207836538U (en) Waterfowl health breeding environment intelligent control system based on artificial intelligence
CN207235857U (en) Miniflow water spawn incubation device
CN204762732U (en) Monkey is water supply system for cage

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant