CN206624564U - A kind of construction clamp - Google Patents

A kind of construction clamp Download PDF

Info

Publication number
CN206624564U
CN206624564U CN201720176027.5U CN201720176027U CN206624564U CN 206624564 U CN206624564 U CN 206624564U CN 201720176027 U CN201720176027 U CN 201720176027U CN 206624564 U CN206624564 U CN 206624564U
Authority
CN
China
Prior art keywords
screw
clamp
arm
connecting arm
boom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720176027.5U
Other languages
Chinese (zh)
Inventor
张礼君
蔡明金
毛祥华
严淑梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongjian Environment Group Co Ltd
Original Assignee
Zhongjian Environment Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongjian Environment Group Co Ltd filed Critical Zhongjian Environment Group Co Ltd
Priority to CN201720176027.5U priority Critical patent/CN206624564U/en
Application granted granted Critical
Publication of CN206624564U publication Critical patent/CN206624564U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Clamps And Clips (AREA)

Abstract

The utility model discloses a kind of construction clamp,Including caliper,Free bearing,Linking arm,Arm and stop screw,The caliper is provided with two and bottom is set in inside horizontal buckling,The free bearing is welded on caliper inside top,The linking arm bottom is arranged in free bearing by stop screw,Set at the top of the linking arm in outward bending,Run through limited location screw in the middle part of the linking arm,The arm is located at the top of linking arm,The arm bottom is connected by stop screw with linking arm,It is connected with each other at the top of the arm through stop screw,Stop screw front end at the top of the arm is provided with suspension hook,Stop screw rear end at the top of the arm is provided with suspension ring,Screw rod is installed in the middle part of the caliper,Described screw rod one end is welded with montant,The screw rod other end is welded with block,Compression spring is installed between on the outside of the linking arm and at the top of caliper,Construction of the present utility model clamp good clamping effect,Sound construction,Use range is wide.

Description

一种建筑施工用夹钳Clamps for building construction

技术领域technical field

本实用新型涉及一种建筑施工用夹钳。The utility model relates to a clamp for building construction.

背景技术Background technique

建筑施工是指工程建设实施阶段的生产活动,是各类建筑物的建造过程,也可以说是把设计图纸上的各种线条,在指定的地点,变成实物的过程。它包括基础工程施工、主体结构施工、屋面工程施工、装饰工程施工等。施工作业的场所称为“建筑施工现场”或叫“施工现场”,也叫工地。吊装是指吊车或者起升机构对设备的安装、就位的统称。吊装一般需要吊具(或称吊索具)配合进行,吊具由专业生产厂家制造。介绍吊装技术,特别是使用起重机吊装技术的专业网站,如起重机吊装技术之家等。土法施工用的滚动法装卸移动设备,滚杠的粗细要一致,年度应比托排宽度长50cm,严禁带手套填滚杠。装卸车时滚边的坡度不得大于20°,滚道的搭设要平整、坚实,接头错开,滚动的速度不宜太快,必要时要用溜绳。在安装过程中,如发现问题应及时采取措施,处理后再继续起吊。用扒杆吊装大型塔类设备时,多台卷扬机联合操作,必须要求各卷扬机的卷扬速度大致相同,要保证塔体上各吊点受力大致趋于均匀,避免塔体受力不匀而变形。采用回转法或扳倒法吊装塔罐时,塔体底部安装的铰腕必须具有抵抗起吊过程中所产生水平推力的能力,起吊过程中塔体的左右溜绳必须牢靠,塔体回转就位高度时,使其慢慢落入基础,避免发生意外和变形。架体上或建筑物上安装设备时,其强度和稳定性要达到安装条件的要求。在设备安装定位后要按图纸的要求连接紧固或焊接,满足了设计要求的强度和具有稳固性后,才能脱钩,否则要进行临时固定。操纵中不准猛力推拉操纵杆,开始起升前,检查离合器杆必须处于断开位置上。 自由降落作业只能在下降吊钩时或所吊载荷小于许用荷的30%时使用,禁止在自由下落中紧急制动。Building construction refers to the production activities in the implementation stage of engineering construction. It is the construction process of various buildings. It can also be said to be the process of turning various lines on the design drawings into real objects at designated locations. It includes basic engineering construction, main structure construction, roofing engineering construction, decoration engineering construction, etc. The place where the construction works is called "construction site" or "construction site", also called construction site. Hoisting refers to the general term for the installation and positioning of equipment by a crane or a lifting mechanism. Hoisting generally requires the cooperation of spreaders (or called slings), which are manufactured by professional manufacturers. Introduce hoisting technology, especially professional websites using crane hoisting technology, such as the home of crane hoisting technology, etc. For the rolling method used in local construction to load and unload mobile equipment, the thickness of the rollers must be consistent, and the annual width should be 50cm longer than the width of the supporting row. It is strictly forbidden to fill the rollers with gloves. When loading and unloading the truck, the slope of the rolling edge shall not be greater than 20°. The raceway shall be set up flat and firm, the joints shall be staggered, and the rolling speed shall not be too fast. A slip rope shall be used if necessary. During the installation process, if any problem is found, measures should be taken in time, and the lifting should be continued after treatment. When hoisting large-scale tower equipment with pick-up poles, multiple winches are operated jointly, and the hoisting speed of each hoist must be roughly the same. It is necessary to ensure that the force on each lifting point on the tower body tends to be roughly uniform, so as to avoid uneven force on the tower body. out of shape. When the tower tank is hoisted by the slewing method or the knocking down method, the hinge installed at the bottom of the tower body must have the ability to resist the horizontal thrust generated during the hoisting process. , let it slowly fall into the foundation to avoid accidents and deformation. When installing equipment on a frame or a building, its strength and stability must meet the requirements of the installation conditions. After the equipment is installed and positioned, it must be connected and fastened or welded according to the requirements of the drawings. The decoupling can only be done after the strength and stability of the design requirements are met, otherwise it must be temporarily fixed. Do not push or pull the joystick violently during the operation. Before starting to lift, check that the clutch lever must be in the disconnected position. The free fall operation can only be used when the hook is lowered or when the suspended load is less than 30% of the allowable load, and emergency braking during free fall is prohibited.

目前现有的吊装用的夹钳是一种用于夹持,紧固,或吊装的工具,被广泛应用于冶金、运输、铁路、港口、等行业。但是现有的建筑施工夹钳夹持效果不好,结构不牢固,使用范围不广。The current existing clamps for hoisting are a tool for clamping, fastening, or hoisting, and are widely used in industries such as metallurgy, transportation, railways, ports, and the like. However, the clamping effect of the existing construction clamps is not good, the structure is not firm, and the application range is not wide.

实用新型内容Utility model content

有鉴于此,本实用新型目的是提供一种夹持效果好,结构牢固,使用范围广的建筑施工用夹钳。In view of this, the purpose of the utility model is to provide a construction clamp with good clamping effect, firm structure and wide application range.

为了解决上述技术问题,本实用新型的技术方案是:一种建筑施工用夹钳,包括钳体、铰座、连接臂、吊臂和限位螺钉,所述钳体设有两个且底部均呈向内水平弯折设置,所述铰座焊接在钳体顶部内侧,所述连接臂底部通过限位螺钉安装在铰座内,所述连接臂顶部呈向外弯折设置,所述连接臂中部贯穿有限位螺钉,所述吊臂设在连接臂顶部,所述吊臂底部通过限位螺钉与连接臂连接,所述吊臂顶部贯穿限位螺钉相互连接,所述吊臂顶部的限位螺钉前端安装有吊钩,所述吊臂顶部的限位螺钉后端安装有吊环,所述钳体中部安装有螺杆,所述螺杆一端焊接有竖杆,所述螺杆另一端焊接有挡块,所述连接臂外侧与钳体顶部之间安装有压缩弹簧。In order to solve the above-mentioned technical problems, the technical solution of the utility model is: a clamp for building construction, including a clamp body, a hinge seat, a connecting arm, a boom and a limit screw, and the clamp body is provided with two The hinge seat is welded on the inner side of the top of the caliper body, the bottom of the connecting arm is installed in the hinge seat through a limit screw, the top of the connecting arm is bent outward, and the connecting arm The middle part runs through the limit screw, the boom is arranged on the top of the connecting arm, the bottom of the boom is connected with the connecting arm through the limit screw, the top of the boom is connected to each other through the limit screw, and the limit screw on the top of the boom A hook is installed at the front end of the screw, a suspension ring is installed at the rear end of the limit screw on the top of the boom, a screw is installed in the middle of the clamp body, a vertical rod is welded at one end of the screw, and a stopper is welded at the other end of the screw. A compression spring is installed between the outside of the connecting arm and the top of the caliper body.

作为优选,所述钳体内侧设置有防滑纹路,使得钳体内侧具有防滑功能。Preferably, the inner side of the pliers body is provided with anti-slip lines, so that the inner side of the pliers body has an anti-slip function.

作为优选,所述压缩弹簧两端分别与连接臂和钳体焊接,保持压缩弹簧安装牢固。Preferably, both ends of the compression spring are respectively welded to the connecting arm and the caliper body to keep the compression spring firmly installed.

作为优选,所述螺杆与竖杆呈垂直设置,竖杆方便带动螺杆转动,调节螺杆另一端挡块的位置。Preferably, the screw rod and the vertical rod are vertically arranged, and the vertical rod can conveniently drive the screw rod to rotate and adjust the position of the stopper at the other end of the screw rod.

作为优选,所述铰座内通过限位螺钉还安装有限位臂,限位臂能够限定钳体之间的间距,防止钳体张开角度过大。As a preference, a limiting arm is also installed in the hinge seat through a limiting screw, and the limiting arm can limit the distance between the pliers to prevent the pliers from opening too much.

作为优选,所述限位臂顶部通过限位螺钉相互连接,限位臂之间可以活动,并且限位臂可以在铰座内活动。Preferably, the tops of the limit arms are connected to each other by limit screws, the limit arms can move, and the limit arms can move in the hinge seat.

作为优选,所述螺杆与钳体螺纹连接,钳体相应位置钻有螺纹孔,使得螺杆可以安装在螺纹孔内。Preferably, the screw rod is threadedly connected with the pliers body, and threaded holes are drilled at corresponding positions of the pliers body, so that the screw rod can be installed in the threaded holes.

本实用新型技术效果主要体现在以下方面:设置的钳体设有两个且底部均呈向内水平弯折,使得钳体能够防止被夹持的物品掉落,保持夹持效果好,压缩弹簧使得钳体处于扩张的状态,方便对物品夹持;设置的连接臂底部通过限位螺钉安装在铰座内,吊臂底部通过限位螺钉与连接臂连接,吊臂顶部贯穿限位螺钉相互连接,保持结构牢固,同时能够活动;设置的钳体中部安装有螺杆,螺杆一端焊接有竖杆,螺杆另一端焊接有挡块,转动螺杆能够调节挡块与钳体内侧的间距,对板状物品进行固定,而不使用挡块夹持时,钳体内侧可以放置袋装的五件,保持使用范围广。The technical effect of the utility model is mainly reflected in the following aspects: two pliers are provided and the bottoms are horizontally bent inward, so that the pliers can prevent the clamped items from falling, keep the clamping effect good, and compress the spring Make the clamp body in the expanded state, which is convenient for clamping objects; the bottom of the connecting arm is installed in the hinge seat through the limit screw, the bottom of the boom is connected with the connecting arm through the limit screw, and the top of the boom is connected to each other through the limit screw , to keep the structure firm and able to move at the same time; a screw is installed in the middle of the pliers, one end of the screw is welded with a vertical rod, and the other end of the screw is welded with a stopper, turning the screw can adjust the distance between the stopper and the inner side of the pliers. When fixing without clamping with a stopper, five pieces in a bag can be placed inside the pliers body, keeping a wide range of use.

附图说明Description of drawings

图1为本实用新型一种建筑施工用夹钳的结构图。Fig. 1 is a structural diagram of a construction clamp of the present invention.

图2为本实用新型一种建筑施工用夹钳的铰座剖面结构图。Fig. 2 is a cross-sectional structure diagram of a hinge seat of a construction clamp of the present invention.

具体实施方式detailed description

以下结合附图,对本实用新型的具体实施方式作进一步详述,以使本实用新型技术方案更易于理解和掌握。Below in conjunction with the accompanying drawings, the specific implementation of the utility model will be further described in detail, so as to make the technical solution of the utility model easier to understand and grasp.

一种建筑施工用夹钳,包括钳体1、铰座2、连接臂3、吊臂4和限位螺钉5,所述钳体1设有两个且底部均呈向内水平弯折设置,钳体1的弯折处采用机械加工成型,钳体1内放置物品时由于物品的重力作用,能够使得钳体1由张开状态而向内靠拢,放置物品掉落。所述铰座2焊接在钳体1顶部内侧,保持铰座结构牢固。所述连接臂3底部通过限位螺钉5安装在铰座2内,限位螺钉5贯穿铰座5和连接臂3底部,使得连接臂3底部能够在铰座5内活动。所述连接臂3顶部呈向外弯折设置,所述连接臂3中部贯穿有限位螺钉5,连接臂3之间可以活动所述吊臂4设在连接臂3顶部,所述吊臂4底部通过限位螺钉5与连接臂3连接,限位螺钉5贯穿吊臂4底部和连接臂3顶部。所述吊臂4顶部贯穿限位螺钉5相互连接,吊臂4之间可以活动。所述吊臂4顶部的限位螺钉5前端安装有吊钩6,吊钩6设有相应的通孔能够被螺钉穿过,吊钩6可以悬挂吊射。所述吊臂4顶部的限位螺钉5后端安装有吊环7,吊环7底部为钢板实体被限位螺钉5贯穿,吊环7能够与吊机的卡接。所述钳体1中部安装有螺杆8,所述螺杆8一端焊接有竖杆9,所述螺杆8另一端焊接有挡块10,通过竖杆9转动调节螺杆8的位置从而调节挡块10的位置。所述连接臂3外侧与钳体1顶部之间安装有压缩弹簧11,使得钳体1受到向上的拉力,处于扩张状态。所述钳体1内侧设置有防滑纹路12。所述压缩弹簧11两端分别与连接臂3和钳体1焊接。所述螺杆8与竖杆9呈垂直设置。所述铰座2内通过限位螺钉5还安装有限位臂13。所述限位臂13顶部通过限位螺钉5相互连接。所述螺杆8与钳体1螺纹连接。本实施例的限位螺钉5为M20内六角限位螺钉。A clamp for building construction, comprising a clamp body 1, a hinge seat 2, a connecting arm 3, a boom 4 and a stop screw 5, the clamp body 1 is provided with two and the bottoms are bent horizontally inwards, The bending part of the pliers body 1 is formed by machining, and when an article is placed in the pliers body 1, due to the gravity of the article, the pliers body 1 can be moved inward from the opened state, and the placed article falls. The hinge seat 2 is welded on the inside of the top of the caliper body 1 to keep the structure of the hinge seat firm. The bottom of the connecting arm 3 is installed in the hinge seat 2 through a limit screw 5, and the limit screw 5 runs through the hinge seat 5 and the bottom of the connecting arm 3, so that the bottom of the connecting arm 3 can move in the hinge seat 5. The top of the connecting arm 3 is bent outwards, the middle part of the connecting arm 3 runs through the limit screw 5, and the connecting arms 3 can move. The boom 4 is arranged on the top of the connecting arm 3, and the bottom of the boom 4 It is connected with the connecting arm 3 through a limit screw 5 , and the limit screw 5 runs through the bottom of the boom 4 and the top of the connecting arm 3 . The tops of the booms 4 pass through stop screws 5 and are connected to each other, and the booms 4 are movable. The front end of the limit screw 5 on the top of the boom 4 is equipped with a suspension hook 6, and the suspension hook 6 is provided with a corresponding through hole that can be passed by the screw, and the suspension hook 6 can be suspended for hanging. The back end of the stop screw 5 on the top of the boom 4 is equipped with a suspension ring 7, and the bottom of the suspension ring 7 is a steel plate entity that is penetrated by the stop screw 5, and the suspension ring 7 can be clamped with the crane. The middle part of the caliper body 1 is equipped with a screw rod 8, one end of the screw rod 8 is welded with a vertical rod 9, and the other end of the screw rod 8 is welded with a block 10, and the position of the screw rod 8 is adjusted by the rotation of the vertical rod 9 to adjust the position of the stop block 10. Location. A compression spring 11 is installed between the outer side of the connecting arm 3 and the top of the pliers body 1, so that the pliers body 1 is pulled upwards and is in an expanded state. The inside of the pliers body 1 is provided with anti-slip lines 12 . Both ends of the compression spring 11 are welded to the connecting arm 3 and the caliper body 1 respectively. The screw rod 8 and the vertical rod 9 are arranged vertically. A limit arm 13 is also installed in the hinge seat 2 through a limit screw 5 . The tops of the limit arms 13 are connected to each other by limit screws 5 . The screw rod 8 is threadedly connected with the pliers body 1 . The stop screw 5 in this embodiment is an M20 hexagon socket stop screw.

本实用新型技术效果主要体现在以下方面:设置的钳体设有两个且底部均呈向内水平弯折,使得钳体能够防止被夹持的物品掉落,保持夹持效果好,压缩弹簧使得钳体处于扩张的状态,方便对物品夹持;设置的连接臂底部通过限位螺钉安装在铰座内,吊臂底部通过限位螺钉与连接臂连接,吊臂顶部贯穿限位螺钉相互连接,保持结构牢固,同时能够活动;设置的钳体中部安装有螺杆,螺杆一端焊接有竖杆,螺杆另一端焊接有挡块,转动螺杆能够调节挡块与钳体内侧的间距,对板状物品进行固定,而不使用挡块夹持时,钳体内侧可以放置袋装的五件,保持使用范围广。The technical effect of the utility model is mainly reflected in the following aspects: two pliers are provided and the bottoms are horizontally bent inward, so that the pliers can prevent the clamped items from falling, keep the clamping effect good, and compress the spring Make the clamp body in the expanded state, which is convenient for clamping objects; the bottom of the connecting arm is installed in the hinge seat through the limit screw, the bottom of the boom is connected with the connecting arm through the limit screw, and the top of the boom is connected to each other through the limit screw , to keep the structure firm and able to move at the same time; a screw is installed in the middle of the pliers, one end of the screw is welded with a vertical rod, and the other end of the screw is welded with a stopper, turning the screw can adjust the distance between the stopper and the inner side of the pliers. When fixing without clamping with a stopper, five pieces in a bag can be placed inside the pliers body, keeping a wide range of use.

当然,以上只是本实用新型的典型实例,除此之外,本实用新型还可以有其它多种具体实施方式,凡采用等同替换或等效变换形成的技术方案,均落在本实用新型要求保护的范围之内。Of course, the above are only typical examples of the utility model. In addition, the utility model can also have other various specific implementation modes. within the range.

Claims (7)

1.一种建筑施工用夹钳,其特征在于:包括钳体、铰座、连接臂、吊臂和限位螺钉,所述钳体设有两个且底部均呈向内水平弯折设置,所述铰座焊接在钳体顶部内侧,所述连接臂底部通过限位螺钉安装在铰座内,所述连接臂顶部呈向外弯折设置,所述连接臂中部贯穿有限位螺钉,所述吊臂设在连接臂顶部,所述吊臂底部通过限位螺钉与连接臂连接,所述吊臂顶部贯穿限位螺钉相互连接,所述吊臂顶部的限位螺钉前端安装有吊钩,所述吊臂顶部的限位螺钉后端安装有吊环,所述钳体中部安装有螺杆,所述螺杆一端焊接有竖杆,所述螺杆另一端焊接有挡块,所述连接臂外侧与钳体顶部之间安装有压缩弹簧。1. A clamp for building construction is characterized in that: comprise clamp body, hinge seat, connecting arm, boom and limit screw, described clamp body is provided with two and the bottom all is inward horizontal bending setting, The hinge seat is welded on the inner side of the top of the caliper body, the bottom of the connecting arm is installed in the hinge seat through a limit screw, the top of the connecting arm is bent outward, and the middle part of the connecting arm passes through the limit screw. The boom is arranged on the top of the connecting arm, the bottom of the boom is connected with the connecting arm through a limit screw, the top of the boom is connected to each other through the limit screw, and the front end of the limit screw on the top of the boom is equipped with a hook. The rear end of the limit screw on the top of the boom is equipped with a suspension ring, the middle part of the clamp body is equipped with a screw rod, one end of the screw rod is welded with a vertical rod, and the other end of the screw rod is welded with a stopper, the outer side of the connecting arm and the clamp body Compression springs are installed between the tops. 2.根据权利要求1所述的建筑施工用夹钳,其特征在于:所述钳体内侧设置有防滑纹路。2. The clamp for building construction according to claim 1, characterized in that: the inner side of the clamp body is provided with anti-skid lines. 3.根据权利要求1所述的建筑施工用夹钳,其特征在于:所述压缩弹簧两端分别与连接臂和钳体焊接。3. The construction clamp according to claim 1, characterized in that: the two ends of the compression spring are respectively welded to the connecting arm and the clamp body. 4.根据权利要求1所述的建筑施工用夹钳,其特征在于:所述螺杆与竖杆呈垂直设置。4. The clamp for building construction according to claim 1, characterized in that: the screw rod is perpendicular to the vertical rod. 5.根据权利要求1所述的建筑施工用夹钳,其特征在于:所述铰座内通过限位螺钉还安装有限位臂。5 . The construction clamp according to claim 1 , wherein a limit arm is installed in the hinge seat through a limit screw. 6 . 6.根据权利要求5所述的建筑施工用夹钳,其特征在于:所述限位臂顶部通过限位螺钉相互连接。6. The construction clamp according to claim 5, characterized in that: the tops of the limiting arms are connected to each other by limiting screws. 7.根据权利要求1所述的建筑施工用夹钳,其特征在于:所述螺杆与钳体螺纹连接。7. The clamp for building construction according to claim 1, characterized in that: the screw rod is threadedly connected with the clamp body.
CN201720176027.5U 2017-02-27 2017-02-27 A kind of construction clamp Expired - Fee Related CN206624564U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720176027.5U CN206624564U (en) 2017-02-27 2017-02-27 A kind of construction clamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720176027.5U CN206624564U (en) 2017-02-27 2017-02-27 A kind of construction clamp

Publications (1)

Publication Number Publication Date
CN206624564U true CN206624564U (en) 2017-11-10

Family

ID=60210780

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720176027.5U Expired - Fee Related CN206624564U (en) 2017-02-27 2017-02-27 A kind of construction clamp

Country Status (1)

Country Link
CN (1) CN206624564U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106865404A (en) * 2017-02-27 2017-06-20 成都佰思汇信科技有限责任公司 A kind of construction clamp

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106865404A (en) * 2017-02-27 2017-06-20 成都佰思汇信科技有限责任公司 A kind of construction clamp

Similar Documents

Publication Publication Date Title
CN201713215U (en) Flange pipe hanger
CN208791021U (en) Tool is used in a kind of lifting of cylindrical objects
CN204675621U (en) A kind of shackle for rapid unhooking in tubing string lifting
CN206624564U (en) A kind of construction clamp
CN205773024U (en) Convenient pipeline promotes auxiliary device
CN205442405U (en) Anchor clamps play to put in a position
CN111960251A (en) Steel bar truss hoisting method and steel bar truss hoisting tool thereof
CN210908618U (en) Turnover device for assembling H-shaped steel
CN208980187U (en) Auxiliary mould for assembled steel beam lifting
CN217577958U (en) A spreader for hoisting prefabricated PCF components
CN205973449U (en) Jack -up handling rigging of buffering pulley
CN206255766U (en) A kind of metal saw saw blade special hanger
CN204702399U (en) A kind of Steel plate hoisting implement
CN203782503U (en) Special copy lifting device related to steel rail lifting
CN203998712U (en) A kind of annealing furnace roller way conveying roller mounting hanger
CN211664530U (en) Integral hoisting sling of straightening machine
CN206955520U (en) Anti-collapse three-leg support
CN204310695U (en) Template overhead hoist
CN204038883U (en) A kind of shoulder pole girder with swivel hook
CN202657829U (en) Hoisting in place device for fixing branch hinge of arc gate
CN209957212U (en) Lifting appliance and lifting system for mounting component under beam
CN205820683U (en) A kind of simple from clamping suspender
CN109592555A (en) Structure node and its application method for H-type steel beam lifting
CN207108239U (en) A kind of Novel steel profile hoisting device
CN206511798U (en) The special hanger of large-scale component pallet

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171110

Termination date: 20190227

CF01 Termination of patent right due to non-payment of annual fee