CN206616409U - High ferro is liftoff, and bridge-type cast-in-place concrete roadbed hydraulic pressure stress formwork replaces ground formwork - Google Patents

High ferro is liftoff, and bridge-type cast-in-place concrete roadbed hydraulic pressure stress formwork replaces ground formwork Download PDF

Info

Publication number
CN206616409U
CN206616409U CN201720218243.1U CN201720218243U CN206616409U CN 206616409 U CN206616409 U CN 206616409U CN 201720218243 U CN201720218243 U CN 201720218243U CN 206616409 U CN206616409 U CN 206616409U
Authority
CN
China
Prior art keywords
mould bases
bridge
hydraulic pressure
meters
bases body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720218243.1U
Other languages
Chinese (zh)
Inventor
陈永生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720218243.1U priority Critical patent/CN206616409U/en
Application granted granted Critical
Publication of CN206616409U publication Critical patent/CN206616409U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A kind of liftoff bridge-type cast-in-place concrete roadbed hydraulic pressure stress formwork of high ferro is disclosed instead of ground erecting device, and device supports mould bases body using hydraulic pressure stress, and mould bases body is manufactured using channel-section steel and iron plate, if:Way of concrete foundations is 4 meters wide, two bridges pedal span for 18 meters, mould bases body is designed to 4 meters wide, 17.8 rice is long, the two ends of mould bases body length respectively set two hydraulic pressure steel cylinders, the two ends that 4 hydraulic pressure steel cylinders are fixed on mould bases body length turn into an entirety, hold level with both hands under hydraulic pressure steel cylinder in mould bases body lower end, hydraulic column can 2.5 meters of reduction, during cast-in-situ bridge way of concrete foundations, whole weight concrete and mould bases body weight stress are at the basic point of 4 hydraulic column lower ends, pedaled at hydraulic column stress basic point with bridge as an entirety, when cast-in-place concrete bridge is pedaled, hydraulic column stress basic point will simultaneously be poured, the shape of hydraulic column stress basic point is provided in the left and right both sides that bridge is pedaled, highly put down and pedal top in bridge and down measure 5.5 meters.

Description

High ferro is liftoff, and bridge-type cast-in-place concrete roadbed hydraulic pressure stress formwork replaces ground formwork
Technical field
Present invention relates to building field, the support mould bases construction for bridge-type way of concrete foundations that high-speed railway is liftoff.
Background technology
At present in the support mould bases construction of the building liftoff bridge-type cast-in-place concrete roadbed of high-speed railway, the side of mould bases is supported Method is that whole body frame and mould bases body are combined into using 0.06 meter of iron pipe, and it is enterprising then with the template of fritter to be laid on mould bases again Row cast-in-place concrete roadbed, construction method less science, waste of manpower is big, and the duration is slow, is configured mould bases and disassembles cumbersome.
The content of the invention
The present invention main purpose is will to build the liftoff bridge-type cast-in-place concrete roadbed iron pipe supporting construction mould of high-speed railway Support body changes to be, mould bases body is supported with hydraulic pressure stress, and mould bases body constitutes way of concrete foundations width using formed channel steel and iron plate knot And two bridge pedal the mould bases body of length between span, if:Bridge-type way of concrete foundations that high-speed railway is liftoff is 4 meters wide, and two bridges pedal span For 1Rice it is long, thus mould bases body is designed to it is 4 meters wide, it is 17.8 meters long, it is high 3 meters, iron plate is then welded on mould bases body plane, shape It is a mould bases body into mould bases and template, the two ends of mould bases body length respectively set two hydraulic pressure steel cylinders, and 4 hydraulic pressure steel cylinders are fixed on The two ends of mould bases body length turn into holds level with both hands in mould bases body lower end under an entirety, hydraulic pressure steel cylinder, and hydraulic column can 2.5 meters of reduction, mould The shape of support body work, figure:It is shown, when cast-in-place concrete roadbed lower end is 5.5 meters with ground level distance, hydraulic column emersion 2.5 Rice, during cast-in-situ bridge way of concrete foundations, whole weight concrete and mould bases body weight stress is in the basic point of 4 hydraulic column lower ends On, pedaled at hydraulic column stress basic point with bridge as an entirety, when cast-in-place concrete bridge is pedaled it is necessary to which hydraulic column stress basic point is same When pour, the shape of hydraulic column stress basic point is provided in the left and right both sides that bridge is pedaled, and highly puts down and pedals top in bridge and down measure 5.5 Rice.
Brief description of the drawings
(1) represents hydraulic column in figure, and (2) represent hydraulic pressure steel cylinder, and (3) represent mould bases body.
Embodiment
When liftoff bridge-type cast-in-place concrete roadbed will use the present invention device, (3) mould bases body is pacified with crane first Between two bridges are pedaled, 4 hydraulic columns of mould bases body lower end are aligned at the concrete stress basic point also poured, (1) hydraulic pressure (3) mould bases body jacking to trivial fixed height, is now shut hydraulic valve by post emersion, when cast-in-place, the weight and mould of concrete The weight of support body all stress are at 4 hydraulic column basic points, when needing to disassemble, by (1) hydraulic column retract (2) hydraulic pressure steel cylinder, it is whole Individual mould bases body lands naturally, and mould bases body then is hung into scene with crane.

Claims (1)

1. a kind of liftoff bridge-type cast-in-place concrete roadbed hydraulic pressure stress formwork of high ferro replaces ground erecting device, device is using independent Mould bases, it is characterised in that:Cast-in-place concrete roadbed iron pipe supporting construction mould bases structural reform is for being, with hydraulic pressure stress support mould bases Body, mould bases body constitutes way of concrete foundations width using formed channel steel and iron plate knot and Liang Qiao pedals the mould bases body of length between span, If:Bridge-type way of concrete foundations that high-speed railway is liftoff is 4 meters wide, and it is 18 meters long that two bridges, which pedal span, and mould bases body thus is designed into 4 meters Width, it is 17.8 meters long, it is high 3 meters, iron plate is then welded on mould bases body plane, it is a mould bases body, mould bases to form mould bases and template The two ends of body length respectively set two hydraulic pressure steel cylinders, and the two ends that 4 hydraulic pressure steel cylinders are fixed on mould bases body length turn into an entirety, Hold level with both hands under hydraulic pressure steel cylinder in mould bases body lower end, hydraulic column can 2.5 meters of reduction, cast-in-place concrete roadbed lower end is with ground level distance At 5.5 meters, hydraulic column rise from 2.5 meters, during cast-in-situ bridge way of concrete foundations, whole weight concrete and mould bases body weight stress in On the basic point of 4 hydraulic column lower ends, pedaled at hydraulic column stress basic point with bridge as an entirety.
CN201720218243.1U 2017-03-02 2017-03-02 High ferro is liftoff, and bridge-type cast-in-place concrete roadbed hydraulic pressure stress formwork replaces ground formwork Expired - Fee Related CN206616409U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720218243.1U CN206616409U (en) 2017-03-02 2017-03-02 High ferro is liftoff, and bridge-type cast-in-place concrete roadbed hydraulic pressure stress formwork replaces ground formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720218243.1U CN206616409U (en) 2017-03-02 2017-03-02 High ferro is liftoff, and bridge-type cast-in-place concrete roadbed hydraulic pressure stress formwork replaces ground formwork

Publications (1)

Publication Number Publication Date
CN206616409U true CN206616409U (en) 2017-11-07

Family

ID=60232057

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720218243.1U Expired - Fee Related CN206616409U (en) 2017-03-02 2017-03-02 High ferro is liftoff, and bridge-type cast-in-place concrete roadbed hydraulic pressure stress formwork replaces ground formwork

Country Status (1)

Country Link
CN (1) CN206616409U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638167A (en) * 2017-03-02 2017-05-10 陈永生 High speed rail suspension bridge type cast-in-situ concrete roadbed hydraulic bearing support die replacing ground die

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638167A (en) * 2017-03-02 2017-05-10 陈永生 High speed rail suspension bridge type cast-in-situ concrete roadbed hydraulic bearing support die replacing ground die

Similar Documents

Publication Publication Date Title
CN105926853B (en) A kind of half Prefabricated concrete-filled steel tube column and preparation method thereof of built-in high-strength shaped steel
CN105839536B (en) A kind of construction method of Cable-stayed Bridge Pylon
CN102808383B (en) Curved bridge counter-slope jacking construction process
CN103243640B (en) Cap beam efficient, convenient and quick to construct and construction method thereof
CN104831639B (en) A kind of ultra-wide nonprismatic continuous beam 0# block consolidation and releasing construction method
CN108894116B (en) Prefabricated stand column assembling construction method
CN104631333A (en) Moving hanger frame and method for small cross beam, small longitudinal beam and bridge deck slab cast-in-situ construction of arch bridge
CN109184259B (en) Sliding construction technology for building
CN105200925B (en) Construction method of ultra-wide main arch ring of large span open-spandrel type arch bridge in extremely-cold regions
CN105507168A (en) Multi-span box girder integral ultrahigh alternate jacking construction system and method
CN104695336A (en) Double-layer cast-in-situ beam support construction method adopting sequence from upper layer to lower layer
CN104612120A (en) Integrated construction method related to in-water steel pipe pile establishing platform
CN106284428A (en) A kind of concrete column method for supporting of building structure post-cast strip
CN206616409U (en) High ferro is liftoff, and bridge-type cast-in-place concrete roadbed hydraulic pressure stress formwork replaces ground formwork
CN102733307A (en) Method for constructing cast-in-place beam falsework
CN204475183U (en) A kind of hoop platform for bridge pier column construction
CN207998793U (en) A kind of multifunctional box shaped steel bracket structure
CN204780635U (en) Super wide nonprismatic continuous beam 0# piece concreties and relieves construction structures
CN206887771U (en) A kind of small across footpath plate-beam construction platform structure
CN206589121U (en) It is a kind of to be used for precast beam, the diaphragm plate horizontal reinforcement mounting and positioning device of plate
CN105839851B (en) Using the construction method for the prefabricated frame trestle that segmentation connection is formed
CN104746434B (en) Closure segment formwork system without dismantling outer formwork
CN104929154B (en) Covered back-digging subway station totally-enclosed post one-time-concreting molding construction technique
CN203730011U (en) Formwork limiting device
CN207846202U (en) A kind of double steel cylinder temporary supports for precast beam installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171107

Termination date: 20180302

CF01 Termination of patent right due to non-payment of annual fee