CN206611856U - Municipal administration greening bridge pier - Google Patents

Municipal administration greening bridge pier Download PDF

Info

Publication number
CN206611856U
CN206611856U CN201720299738.1U CN201720299738U CN206611856U CN 206611856 U CN206611856 U CN 206611856U CN 201720299738 U CN201720299738 U CN 201720299738U CN 206611856 U CN206611856 U CN 206611856U
Authority
CN
China
Prior art keywords
water
bridge pier
pipe
fixedly connected
water tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720299738.1U
Other languages
Chinese (zh)
Inventor
胡岩荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yueqing Construction Supervision Co Ltd
Original Assignee
Yueqing Construction Supervision Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yueqing Construction Supervision Co Ltd filed Critical Yueqing Construction Supervision Co Ltd
Priority to CN201720299738.1U priority Critical patent/CN206611856U/en
Application granted granted Critical
Publication of CN206611856U publication Critical patent/CN206611856U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of municipal administration greening bridge pier, including water tank, the water tank is provided with the water inlet for water inlet, the water tank is provided through the water-supply-pipe of water tank, the irrigation pipe around bridge pier end face is fixedly connected with the top of the bridge pier, the irrigation pipe is provided with multiple drip irrigations mouthful, the bridge pier is fixedly connected with multiple prefabricated greening grooves in different height, the bottom of the prefabricated greening groove is provided with multiple drip irrigations for draining mouthful, the bottom of the bridge pier is fixedly connected with annular groove, and the water-supply-pipe is provided with the magnetic valve that control water-supply-pipe is opened and closed.By using above-mentioned technical proposal, the moisture in cistern enters in cistern from water inlet.Moisture in cistern is flowed into irrigation pipe from water-supply-pipe, and then allows moisture constantly to instill in multiple prefabricated greening grooves using drip irrigation mouthful.And moisture enters after prefabricated greening groove and fallen into through drip irrigation mouthful prefabricated greening groove in and then the unified processing of progress.

Description

Municipal administration greening bridge pier
Technical field
The utility model is related to bridge pier, more particularly to a kind of municipal administration greening bridge pier.
Background technology
At present, Authorization Notice No. discloses a kind of overpass for CN204762442U Chinese patent document in the prior art Bridge pier greening module.It sets up hitch frame on bridge pier, then prefabricated planting pot is mutually fixed with buckle with hitch frame.It is planted There are osculum and catch basin in basin, be conducive to the growth of plant.And the plant in planting pot can also be changed according to demand, it is convenient It is convenient, it is both artistic and practical.
But the greening module stores groove reservoir storage and less needs often to water, and the water in planting pot can be dripped by rhone Fall earthward, allow ground to become moist through dirty and messy, have impact on the attractive in appearance of city.
Utility model content
The purpose of this utility model is to provide a kind of municipal administration greening bridge pier, the water storage with automation, irrigation bridge pier greening The function of module, exempts the trouble of nourishment..
Above-mentioned technical purpose of the present utility model technical scheme is that:
A kind of municipal administration greening bridge pier, including cistern, the cistern are provided with the water inlet for water inlet, the retaining Pond is provided through being fixedly connected with the irrigation pipe around bridge pier end face at the top of the water-supply-pipe of cistern, the bridge pier, described Irrigation pipe is provided with multiple drip irrigations mouthful, and the bridge pier is fixedly connected with multiple prefabricated greening grooves in different height, described pre- The bottom of greening groove processed is provided with multiple drip irrigations for draining mouthful, and the bottom of the bridge pier is fixedly connected with prefabricated greening groove, The water-supply-pipe is provided with the magnetic valve that control water-supply-pipe is opened and closed.
By using above-mentioned technical proposal, the moisture in cistern enters in cistern from water inlet.Water in cistern Divide and flowed into from water-supply-pipe in irrigation pipe, and then allow moisture constantly to instill in multiple prefabricated greening grooves using drip irrigation mouthful.And moisture Fallen into after into prefabricated greening groove through drip irrigation mouthful in prefabricated greening groove and then the unified processing of progress.
The utility model is further arranged to:The cistern is fixedly connected with two fixed blocks, and each fixed block is worn There is connecting shaft, the connecting bushing is connected to rubber bumper, and the rubber bumper is fixedly connected with floating lever, the other end of the floating lever Ball float is fixedly connected with, after the water level in cistern rises, rubber bumper closing water inlet.
By using above-mentioned technical proposal, after water enters cistern, the water level in cistern uprise so that allow ball float with Water level rising so that ball float, which moves floating lever rising, then allows rubber bumper to turn to closing water inlet around connecting shaft.Therefore Water level in cistern will not be raised again.
The utility model is further arranged to:The water-supply-pipe is provided with the filter cage being threadedly coupled with cistern, the filter Cage is connected with water-supply-pipe.
By using above-mentioned technical proposal so that the debris that filter cage can be limited in cistern enters in water-supply-pipe.
The utility model is further arranged to:Each prefabricated greening groove is fixedly connected with for fixed reinforcement rod, The bridge pier is provided with the hole agreed with reinforcement rod.
By using above-mentioned technical proposal, by reinforcement rod is through bridge pier and then allows prefabricated greening groove to be fixedly connected on bridge pier.
The utility model is further arranged to:The water inlet is fixedly connected with oral siphon, and the oral siphon is provided with excessive The mouth of a river, after water inlet is plugged, water flows out from gap.
By using above-mentioned technical proposal so that after water inlet is plugged, water flows out from gap.
In summary, the utility model has the advantages that:
By using above-mentioned technical proposal, the moisture in cistern enters in cistern from water inlet.Water in cistern Divide and flowed into from water-supply-pipe in irrigation pipe, and then allow moisture constantly to instill in multiple prefabricated greening grooves using drip irrigation mouthful.And moisture Fallen into after into prefabricated greening groove through drip irrigation mouthful in prefabricated greening groove and then the unified processing of progress.
Brief description of the drawings
Fig. 1 is embodiment bridge pier overall diagram;
Fig. 2 is embodiment water storage function structure chart;
Fig. 3 is the enlarged drawing of a-quadrant in Fig. 2;
Fig. 4 is that the prefabricated greening groove of embodiment is installed and drain module schematic diagram;
Fig. 5 is the prefabricated greening groove structure chart of embodiment;
Fig. 6 is that embodiment pours module diagram.
Reference:1st, bridge pier;2nd, prefabricated greening groove;21st, drip irrigation mouthful;22nd, reinforcement rod;23rd, hole;3rd, water tank;31st, filter Cage;32nd, ball float;321st, rubber bumper;33rd, water inlet;34th, gap;35th, oral siphon;4th, magnetic valve;5th, water-supply-pipe;6th, pour Pipe;61st, delivery port;7th, base;71st, annular groove;72nd, discharge outlet;8th, drainpipe;9th, floating lever;10th, fixed block;11st, connect Axle.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
This specific embodiment is only to explain of the present utility model, and it is not to limitation of the present utility model, ability Field technique personnel can make the modification without creative contribution to the present embodiment as needed after this specification is read, but As long as all being protected in right of the present utility model by Patent Law.
Present embodiment discloses a kind of municipal administration greening bridge pier, as shown in figure 1, the bridge pier 1 including cylindrical type.Bridge pier 1 can be with Prefabricated greening groove 2 is installed, there is water tank 3 on the top of bridge pier 1, water tank 3 may be mounted at bridge bottom or the height installed in bridge pier 1 Place, the position of water tank 3 is higher than the prefabricated greening groove 2 positioned at the top.The bottom of water tank 3 is provided with magnetic valve 4, and it is used to control water tank The timing of 3 outlet is opened and closed, and removes the inconvenience of manual watering from.Water inside water tank 3 can flow to irrigation pipe 6 by water-supply-pipe 5, And be the irrigating plant of the inner plantation of prefabricated greening groove 2.
As shown in Figures 2 and 3, water tank 3 is provided with water inlet 33.The interior bottom portion of water tank 3 is provided with for different in filter water The filter cage 31 of thing.Filter cage 31 is threadedly coupled with water tank 3, when filtering cage 31 and needing cleaning, can will be filtered cage 31 and be removed and cleared up.Water The inner side of case 3 also installs floating ball device.Floating ball device includes ball float 32.Ball float 32 is fixedly connected with floating lever 9.Floating lever 9 The other end be connected with block rubber 321.Block rubber 321 is equipped with connecting shaft 11.Connecting shaft 11, which is rotatably connected to, to be fixedly connected on Two fixed blocks 10 of water tank 3.Water inlet 33 is connected with oral siphon 35, and oral siphon 35 is connected to overhead bridge floor gutter again.Enter Water pipe 35 can enter the rainwater diversion that gutter is collected in water tank 3 and then for pouring.The side of oral siphon 35 is additionally provided with spilling water Mouth 34, gap 34 is directly connected in land drain by water pipe.When water inlet 33 is blocked by block rubber 321, oral siphon 35 Interior water can not flow into water tank 3 and from the inflow surface gutter of gap 33, it is to avoid the inner storing water of water tank 3 is excessive.In water tank 3 During water level rises, ball float 32, which can float, drives floating lever 32 to float and then allow rubber bumper 321 to be rotated around connecting shaft 11 Water inlet 33 is covered to block rubber 321.
As shown in Figure 4, Figure 5, prefabricated greening groove 2 is deep-slotted chip breaker and mutually agreed with cylindrical type bridge pier 1, on prefabricated greening groove 2 Two parallel reinforcement rods 22 are reserved with, by boring two parallel holes 23 on bridge pier 1, then in reinforcement rod 22 Smear and hole 23 is inserted after curing agent or rapid-curing cutback concrete etc adhesive, it is possible to which prefabricated greening groove is fixed on bridge pier 1. And 23 distances of two reinforcement rods, 22 distances and hole are identical.Have some in the prefabricated bottom of greening groove 2 The drip irrigation mouthful 61 of individual its bottom of protrusion, the unnecessary water in the prefabricated inside of greening groove 2 can be continued to drip to the prefabricated greening groove 2 of lower floor Fill.Drip irrigation mouthfuls 61, which protrudes from the prefabricated bottom of greening groove 2, can avoid water in the prefabricated bottom of greening groove 2 seepage flow everywhere, and accurately drip In the prefabricated greening groove 2 for entering lower floor.Prefabricated greening groove 2 is made using waterproof material, can prevent water from penetrating into closely coupled thereto Bridge pier 1 so as to bridge pier 1 cause damage.
Can mutually it agree with cylindrical type bridge pier 1 as shown in fig. 6, irrigation pipe 6 is annular, by welding or snapping connection fixation On bridge pier 1.There is the delivery port 61 of some protrusions in the bottom of irrigation pipe 6, delivery port 61 is located at the prefabricated top of greening groove 2, water The plant flowed out and poured in prefabricated greening groove 2 by delivery port 61.
As shown in figure 4, there is annular groove 71 on base 7, from the water of the drippage of drip irrigation mouthful 61 of the prefabricated bottom of greening groove 2 in top most It can concentrate and be dropped onto in annular groove 71 eventually, it is to avoid water is directly dropped onto on the ground, and urban is impacted.On annular groove 71 It is provided with discharge outlet 72, the access discharge outlet 72 of drainpipe 8, and the water in annular groove 71 is drained into gutter, it is to avoid water Pollute urban road.
The present embodiment specific works situation is as follows:Cylindrical Pier 1 is the bridge pier of overpass in city, in cylindrical type bridge pier Drill hole 23 on 1, and the plant in kind in four radians is 90 degree of prefabricated greening grooves 2, and coats in reinforcement rod 22 solidification Hole 23 is inserted in agent, four prefabricated greening grooves 2 is each connected to a fixed two-by-two on bridge pier 1, and just surrounds bridge pier 1 one Week.Upper, middle and lower three can be set to enclose greenbelt on bridge pier 1 altogether.Enough water is collected from overhead bridge floor in water tank 3, and passes through setting Program makes the control of magnetic valve 43 daily fixed time periods of water tank positioned at the bottom of water tank 3 discharge water.The pouring that water passes through annular Plant inside the one prefabricated greening groove 2 of circle is all fully poured onto by pipe 6.Unnecessary water passes through its bottom in prefabricated greening groove 2 Drip irrigation mouthful 21 continues in the prefabricated greening groove 2 of next layer of instillation.Unnecessary water, which can be instilled, in undermost prefabricated greening groove 2 is located at In annular groove 71 on base 7, and drainpipe 8 is flowed into by discharge outlet 72, and finally flowed into land drain.

Claims (5)

1. a kind of municipal administration greening bridge pier, including water tank (3), the water tank (3) are provided with the water inlet (33) for water inlet, it is special Levying is:The water tank (3) is provided through being fixedly connected with the top of the water-supply-pipe (5) of water tank (3), the bridge pier (1) circular The irrigation pipe (6) of bridge pier (1) end face, the irrigation pipe (6) is provided with multiple drip irrigations mouthful (21), and the bridge pier (1) is fixedly connected There are multiple prefabricated greening grooves (2) in different height, the bottom of the prefabricated greening groove (2) is provided with multiple for draining Drip irrigation mouthful (21), the bottom of the bridge pier (1) is fixedly connected with annular groove (71), and the water-supply-pipe (5) is provided with control water delivery Manage the magnetic valve (4) that (5) are opened and closed.
2. municipal administration greening bridge pier according to claim 1, it is characterized in that:The water tank (3) is fixedly connected with two fixations Block (10), each fixed block (10) is equipped with connecting shaft(11), the connecting shaft(11)It is socketed with rubber bumper (321), the rubber Skin bit (321) is fixedly connected with floating lever (9), and the other end of the floating lever (9) is fixedly connected with ball float (32), works as water tank (3) after the water level in rises, rubber bumper (321) closing water inlet (33).
3. municipal administration greening bridge pier according to claim 1, it is characterized in that:The water-supply-pipe (5) is provided with and water tank (3) spiral shell The filter cage (31) of line connection, the filter cage (31) connects with water-supply-pipe (5).
4. municipal administration greening bridge pier according to claim 1, it is characterized in that:Each prefabricated greening groove (2) is fixedly connected Have for fixed reinforcement rod (22), the bridge pier(1)It is provided with and reinforcement rod(22)The hole agreed with(23).
5. municipal administration greening bridge pier according to claim 2, it is characterized in that:The water inlet (33) is fixedly connected with oral siphon (35), the oral siphon (35) is provided with gap(34), after water inlet (33) is plugged, water is from gap(34)Outflow.
CN201720299738.1U 2017-03-27 2017-03-27 Municipal administration greening bridge pier Expired - Fee Related CN206611856U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720299738.1U CN206611856U (en) 2017-03-27 2017-03-27 Municipal administration greening bridge pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720299738.1U CN206611856U (en) 2017-03-27 2017-03-27 Municipal administration greening bridge pier

Publications (1)

Publication Number Publication Date
CN206611856U true CN206611856U (en) 2017-11-07

Family

ID=60234141

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720299738.1U Expired - Fee Related CN206611856U (en) 2017-03-27 2017-03-27 Municipal administration greening bridge pier

Country Status (1)

Country Link
CN (1) CN206611856U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116516797A (en) * 2023-05-29 2023-08-01 江苏雷格建设有限公司 Environment-friendly energy-saving overhead bridge bearing column

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116516797A (en) * 2023-05-29 2023-08-01 江苏雷格建设有限公司 Environment-friendly energy-saving overhead bridge bearing column

Similar Documents

Publication Publication Date Title
CN205636879U (en) System's device is collected, is purified and utilize to overpass rainwater
CN207969440U (en) A kind of Green Roof
CN108661150A (en) A kind of rain-water accumulating acquisition means in Landscape
CN201679036U (en) Waste rainwater automatic greening and irrigating device
CN209260733U (en) A kind of road soil-slope greening draining barricade
CN106638912A (en) Water-saving automatic irrigation and drainage system for green belt
CN206611856U (en) Municipal administration greening bridge pier
CN206433415U (en) A kind of hard is domatic to plant raw structure
CN207794243U (en) Sunk type greenery patches reverse osmosis layer automatic flushing device in a kind of sponge city
CN206706948U (en) A kind of rain processing system of urban green space
CN208462485U (en) A kind of sponge city flower bed
CN107750908B (en) Rain collecting pool and automatic water supplementing irrigation system for arid region
CN207828737U (en) A kind of greenbelt
CN107889737A (en) Anti-clogging replaceable water-collecting infiltrating irrigator
CN213014596U (en) Landscape garden drainage system design structure
CN205382409U (en) Gravity flow rainwater of greenbelt is collected and irrigation system under overpass
CN102106245B (en) Automatic waste rainwater greening and watering device
CN207362803U (en) A kind of landscape canal
CN211772488U (en) Water drainage and storage roadbed structure of road green belt
CN209509120U (en) A kind of rain processing system having both fire engine way and concave herbaceous field
CN209546499U (en) A kind of sponge city trees and shrubs catchwork irrigation system
CN206376344U (en) A kind of grass planting ditch water discharge system
CN207767023U (en) A kind of greenhouse water reclamation system
CN207405689U (en) Irrigate by lifting water to a higher level with a water pump, etc. silt filtering apparatus in a kind of river
CN206506986U (en) The water storage structure of highway greenbelt

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171107

Termination date: 20210327

CF01 Termination of patent right due to non-payment of annual fee