CN206602318U - Conductor spacer installation auxiliary device - Google Patents
Conductor spacer installation auxiliary device Download PDFInfo
- Publication number
- CN206602318U CN206602318U CN201720357237.4U CN201720357237U CN206602318U CN 206602318 U CN206602318 U CN 206602318U CN 201720357237 U CN201720357237 U CN 201720357237U CN 206602318 U CN206602318 U CN 206602318U
- Authority
- CN
- China
- Prior art keywords
- ratchet
- wheel shaft
- wire rope
- side wheel
- auxiliary device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Electric Cable Installation (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及间隔棒安装领域,具体为一种间隔棒安装辅助装置。The utility model relates to the field of installation of spacer rods, in particular to an auxiliary device for installation of spacer rods.
背景技术Background technique
特高压或超高压分裂导线间隔棒安装和更换时,由于导线张力很大,安装非常困难。市面上有现成的辅助装置,但该装置笨重难用,通常安装该装置的难度甚至大于安装间隔棒的难度。因此,此装置设计和结构均有问题,根本不适合线路工程间隔棒安装作业,已遭到弃用。现通常的做法是在导线上由多人配合用力,把导线拉入间隔棒沟槽内固定来实现间隔棒安装,不仅特别费力而且危险性增加。特别是处理最后几根导线时,线上人员劳动强度成倍增加,劳动效率低下。因此,发明一种简单高效的间隔棒安装辅助装置势在必行。When installing and replacing UHV or EHV split conductor spacers, the installation is very difficult due to the high tension of the conductors. There are readily available assistive devices on the market, but they are bulky and difficult to use, and are often even more difficult to install than spacers. Therefore, the design and structure of this device have problems, and it is not suitable for the installation operation of line engineering spacers at all, and has been abandoned. Existing common way is to cooperate hard by many people on the wire, wire is pulled into the groove of spacer bar and fixes to realize spacer bar installation, not only laborious especially but also dangerous increase. Especially when handling the last few wires, the labor intensity of the on-line personnel is doubled, and the labor efficiency is low. Therefore, it is imperative to invent a simple and efficient spacer rod installation aid.
实用新型内容Utility model content
本实用新型的目的在于提供一种间隔棒安装辅助装置,能够减轻施工和检修人员劳动强度,提高安装检修效率,最大限度保证安全。其轻量化本体和巧妙设计必将为特高压或超高压分裂导线间隔棒安装和更换带来革命性改变,进而取得非常可观的综合效益。The purpose of the utility model is to provide an auxiliary device for spacer rod installation, which can reduce the labor intensity of construction and maintenance personnel, improve installation and maintenance efficiency, and ensure safety to the greatest extent. Its lightweight body and ingenious design will surely bring revolutionary changes to the installation and replacement of UHV or EHV split conductor spacers, and then achieve very considerable comprehensive benefits.
为实现上述目的,本实用新型提供如下技术方案:一种间隔棒安装辅助装置,其特征在于:包含有尼龙挂钩、钢丝绳、棘轮、扳手孔、右侧轮轴、左侧轮轴、钢丝绳轮槽,所述尼龙挂钩通过钢丝绳连接棘轮,所述棘轮连接左侧轮轴,所述棘轮与设置于右侧轮轴上的棘爪活动连接,所述棘轮设置有扳手孔,所述右侧轮轴和左侧轮轴设置有钢丝绳轮槽。In order to achieve the above purpose, the utility model provides the following technical solutions: a spacer rod installation auxiliary device, characterized in that: it includes a nylon hook, a steel wire rope, a ratchet, a wrench hole, a right wheel shaft, a left wheel shaft, and a wire rope wheel groove. The nylon hook is connected to the ratchet through a wire rope, the ratchet is connected to the left axle, the ratchet is movably connected to the pawl arranged on the right axle, the ratchet is provided with a wrench hole, and the right axle and the left axle are provided with Has a wire sheave groove.
所述尼龙挂钩上设置有锁扣。The nylon hook is provided with a buckle.
所述尼龙挂钩设置为双钩结构。The nylon hook is configured as a double hook structure.
本实用新型具有如下有益效果:The utility model has the following beneficial effects:
1、结构简单、价格便宜,仅有中间加力棘轮和钢丝绳及导线挂钩,可利用现有加力扳手;1. The structure is simple and the price is cheap. There are only middle booster ratchets, wire ropes and wire hooks, and the existing booster wrench can be used;
2、设计先进,所有钢丝绳索预先设计统一长度,一动全动,保证受力均匀;2. Advanced design, all steel wire ropes are pre-designed with a uniform length, one movement and full movement, ensuring uniform force;
3、便于携带,重量轻、体积小,导线挂钩采用轻质尼龙材料,可随身携带;3. It is easy to carry, light in weight and small in size, and the wire hook is made of lightweight nylon material, which can be carried with you;
4、本装置辅助安装间隔棒操作方便灵活,不需移动位置,还可根据情况更换挂钩,实现四、八分裂导线变换。4. The auxiliary installation spacer of this device is convenient and flexible to operate, without moving the position, and the hook can also be replaced according to the situation, so as to realize the conversion of four or eight split wires.
本发明实用后,能够减轻施工和检修人员劳动强度,提高安装检修效率,最大限度保证安全。其轻量化本体和巧妙设计必将为特高压或超高压分裂导线间隔棒安装和更换带来革命性改变,进而取得非常可观的综合效益。After the invention is practical, the labor intensity of construction and maintenance personnel can be reduced, the efficiency of installation and maintenance can be improved, and safety can be guaranteed to the greatest extent. Its lightweight body and ingenious design will surely bring revolutionary changes to the installation and replacement of UHV or EHV split conductor spacers, and then achieve very considerable comprehensive benefits.
附图说明Description of drawings
图1所示是本实用新型的结构主视图;Shown in Fig. 1 is the structural front view of the present utility model;
图2所示是本实用新型的侧视图;Shown in Fig. 2 is the side view of the utility model;
图3所示是本实用新型的俯视图。Shown in Fig. 3 is the top view of the utility model.
具体实施方式detailed description
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.
实施例1Example 1
一种间隔棒安装辅助装置,其特征在于:包含有尼龙挂钩1、钢丝绳2、棘轮3、扳手孔4、右侧轮轴5、左侧轮轴6、钢丝绳轮槽7,所述尼龙挂钩1通过钢丝绳2连接棘轮3,所述尼龙挂钩1设置为双钩结构,所述尼龙挂钩1上设置有锁扣,所述棘轮3连接左侧轮轴6,所述棘轮3与设置于右侧轮轴5上的棘爪活动连接,棘轮3、左侧轮轴6、右侧轮轴5组成棘轮、棘齿模组,所述棘轮3设置有扳手孔4,所述右侧轮轴5和左侧轮轴6设置有钢丝绳轮槽7。An auxiliary device for installing a spacer, characterized in that it includes a nylon hook 1, a steel wire rope 2, a ratchet 3, a wrench hole 4, a right wheel shaft 5, a left wheel shaft 6, and a wire rope wheel groove 7. The nylon hook 1 passes through the wire rope 2 is connected to the ratchet 3, the nylon hook 1 is set as a double hook structure, the nylon hook 1 is provided with a lock, the ratchet 3 is connected to the left axle 6, and the ratchet 3 is connected to the ratchet on the right axle 5. The claws are movably connected, the ratchet 3, the left axle 6, and the right axle 5 form a ratchet and ratchet module, the ratchet 3 is provided with a wrench hole 4, and the right axle 5 and the left axle 6 are provided with wire rope wheel grooves 7.
使用过程Use process
对于四分裂导线,可使用单钩结构。松开钢丝绳2,把尼龙挂钩1挂在安装间隔棒附近的导线上并锁上卡扣,先用手拧紧棘轮3、棘齿模组,调整尼龙挂钩1到适当位置。再使用两把扳手,一把固定,另一把放入扳手孔4中缓慢旋紧棘轮3、棘齿模组,在此过程初始阶段,注意调整挂钩到合适位置。继续旋紧棘轮、棘齿模组,直到导线间距接近间隔棒尺寸,放入间隔棒,把上端一根导线固定在间隔棒中。继续旋紧棘轮、棘齿模组,同时引导剩余导线进入间隔棒导线槽内,然后固定导线。间隔棒安装完成后,缓慢松开棘轮、棘齿模组,解锁挂钩锁扣,取下挂钩和装置放入工具包中。然后可进行下一个间隔棒的安装工作。For four-split conductors, a single hook structure can be used. Loosen the wire rope 2, hang the nylon hook 1 on the wire near the installation spacer and lock the buckle, first tighten the ratchet 3 and the ratchet module by hand, and adjust the nylon hook 1 to a proper position. Then use two wrenches, one is fixed, and the other is put into the wrench hole 4 to slowly tighten the ratchet 3 and the ratchet module. At the initial stage of the process, pay attention to adjusting the hook to a proper position. Continue to tighten the ratchet and ratchet modules until the distance between the wires is close to the size of the spacer bar, put the spacer bar in, and fix the upper end of a wire in the spacer bar. Continue to tighten the ratchet and the ratchet module, and at the same time guide the remaining wires into the wire groove of the spacer bar, and then fix the wires. After the spacer is installed, slowly loosen the ratchet and the ratchet module, unlock the hook lock, remove the hook and the device and put them in the tool bag. Then the installation work of the next spacer can be carried out.
对于八分裂导线,我们可以把单尼龙挂钩更换为既定的双钩。基于同样原理进行间隔棒的安装工作。For eight-split leads, we can replace the single nylon hook with the established double hook. Carry out the installation work of spacer rod based on the same principle.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720357237.4U CN206602318U (en) | 2017-04-07 | 2017-04-07 | Conductor spacer installation auxiliary device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720357237.4U CN206602318U (en) | 2017-04-07 | 2017-04-07 | Conductor spacer installation auxiliary device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206602318U true CN206602318U (en) | 2017-10-31 |
Family
ID=60144484
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720357237.4U Expired - Fee Related CN206602318U (en) | 2017-04-07 | 2017-04-07 | Conductor spacer installation auxiliary device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206602318U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110752548A (en) * | 2019-11-29 | 2020-02-04 | 国网四川省电力公司检修公司 | Device and method of use for replacing wire spacers of ±800kV transmission lines |
-
2017
- 2017-04-07 CN CN201720357237.4U patent/CN206602318U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110752548A (en) * | 2019-11-29 | 2020-02-04 | 国网四川省电力公司检修公司 | Device and method of use for replacing wire spacers of ±800kV transmission lines |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN100464474C (en) | Method and device for live replacement of tension insulator strings for high-voltage transmission lines | |
| CN201421982Y (en) | Transmission line robot walking device | |
| CN103618258B (en) | A kind of electric transmission line erection tightener | |
| CN206602318U (en) | Conductor spacer installation auxiliary device | |
| CN206250670U (en) | It is a kind of to be easy to operation and safe replacing device for insulator | |
| CN101364716B (en) | Clamp type hot-line work fastener and using method | |
| CN202905991U (en) | Safe operation electric ground wire | |
| CN202488034U (en) | Lifting device for electric transmission line of angle iron tower | |
| CN102518388B (en) | Climbing ladder special for 500KV composite insulator | |
| CN203722140U (en) | Manual wire tightening device for electrical-power wiring | |
| CN103683098A (en) | Method of replacing strain poles without laying down lines | |
| CN104253394B (en) | A kind of replacing instrument of strain insulator string | |
| CN204333769U (en) | A kind of transmission line connecting tool | |
| CN102263391B (en) | Portable overhead grounding-wire raiser | |
| CN104201602B (en) | A kind of UHV transmission line bunch of insulator charged for replacement method and gold utensil thereof | |
| CN203939245U (en) | A kind of string girder tensioning frock | |
| CN203455531U (en) | Optical cable tightener | |
| CN208971043U (en) | A kind of large-section lead card line mechanism | |
| CN204144807U (en) | For changing the wire grip of duplex insulator string | |
| CN203883381U (en) | Wire-tensioning device for wire tower line overhaul | |
| CN209805246U (en) | A Lifting System Based on Insulator Strings | |
| CN201266806Y (en) | Tool for fastening 220kv strain clamp bolt | |
| CN207530433U (en) | For replacing the specific purpose tool of suspension clamp shield lines | |
| CN206004226U (en) | For shortening the device of overhead line structures operation stringing time | |
| CN204131005U (en) | Double loop tangent tower steeple head cross-arm jig |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171031 Termination date: 20180407 |