CN206538100U - Rail lifting device - Google Patents

Rail lifting device Download PDF

Info

Publication number
CN206538100U
CN206538100U CN201720231329.8U CN201720231329U CN206538100U CN 206538100 U CN206538100 U CN 206538100U CN 201720231329 U CN201720231329 U CN 201720231329U CN 206538100 U CN206538100 U CN 206538100U
Authority
CN
China
Prior art keywords
hanging plate
lifting
rail
lifting hanging
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720231329.8U
Other languages
Chinese (zh)
Inventor
蒋双全
刘承权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Corp
Original Assignee
China 19th Metallurgical Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 19th Metallurgical Corp filed Critical China 19th Metallurgical Corp
Priority to CN201720231329.8U priority Critical patent/CN206538100U/en
Application granted granted Critical
Publication of CN206538100U publication Critical patent/CN206538100U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to the crane girder rail installation Technology such as factory building field, discloses a kind of rail lifting device.The instrument includes the first lifting hanging plate and the second lifting hanging plate, the first lifting hanging plate and the second lifting hanging plate include the clamping part and superposed connecting portion positioned at bottom, the connecting portion offers hinge hole, hole for hoist is provided with above the hinge hole, the clamping part of the first lifting hanging plate and the second lifting hanging plate is oppositely arranged the clamp port for constituting and being used for clamping rail, first lifting hanging plate and the second lifting hanging plate are hinged by hinge hole, when being coincided in the position of the first lifting hanging plate and the hole for hoist of the second lifting hanging plate, the clamp port is in clamp position.The rail lifting device passes through hole for hoist by instruments such as snap rings, is not fallen off so as to ensure that clamping is stable, safe and reliable, only a people is just operable, saves manpower, and processing is simple, with low cost.

Description

Rail lifting device
Technical field
The utility model is related to the crane girder rail installation Technology such as factory building field, especially a kind of rail slinger Tool.
Background technology
In Construction of Multi-Storey Industrial Buildings, the Crane Beam System for crane load-bearing and walking is the disaster in installation process Point.Crane runway is generally in place using truck crane lifting, then the method installed using artificial centering.Due to single steel rail weight Weight, and in irregular shape, rail lifting can not use conventional lifting device, therefore general in hoisting process be hung using tying up The mode of dress.Although after tying up Hoisting Security, being reliably, the drawbacks of maximum rail dropping place, hoisting rope is bad to be taken, and is generally required Two people coordinate, and rail is pried away from crane girder by a people using crowbar, and another people takes out hoisting rope.The process of rail is prized in crowbar In, rail easily rolls or slid, if two people coordinate not in place, easily occurs security incident, and waste of manpower resource.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of easy to operate, safe and reliable rail slinger Tool.
Rail lifting device disclosed in the utility model, including the first lifting hanging plate and the second lifting hanging plate, described first Lifting hanging plate and the second lifting hanging plate includes the clamping part and superposed connecting portion positioned at bottom, and the connecting portion is opened up Have and hole for hoist is provided with above hinge hole, the hinge hole, the clamping part phase of the first lifting hanging plate and the second lifting hanging plate The clamp port for being used for clamping rail is constituted to setting, the first lifting hanging plate and the second lifting hanging plate are hinged by hinge hole, When the position of the hole for hoist of first lifting hanging plate and the second lifting hanging plate coincides, the clamp port is in clamp position.
Preferably, the inside bottom surface of the clamping part and the underside shape of rail head of rail match.
Preferably, the first lifting hanging plate and the second lifting hanging plate are hinged by connecting bolt through hinge hole.
Preferably, the thickness of the first lifting hanging plate and the second lifting hanging plate is 10~20mm.
The beneficial effects of the utility model are:The rail lifting device passes through hole for hoist by instruments such as snap rings, so as to protect Card clamping is stable not to be fallen off, and safe and reliable, only a people is just operable, saves manpower, and processing is simple, with low cost.
Brief description of the drawings
Fig. 1 is the schematic diagram for lifting hanging plate;
Fig. 2 is the schematic diagram of rail lifting device open mode;
Fig. 3 is the schematic diagram of rail lifting device clamp position;
Fig. 4 is the schematic diagram of rail lifting device practice.
Reference:First lifting hanging plate 1, the second lifting hanging plate 2, clamping part 3, connecting portion 4, hinge hole 5, hole for hoist 6, Rail 7.
Embodiment
The utility model is further illustrated below in conjunction with the accompanying drawings.
As shown in figures 1-4, rail lifting device of the present utility model, including the first lifting lifting hanging plate of hanging plate 1 and second 2, the first lifting hanging plate 1 and second lifting hanging plate 2 includes the clamping part 3 and superposed connecting portion 4 positioned at bottom, The connecting portion 4 offers hinge hole 5, and the top of hinge hole 5 is provided with hole for hoist 6, the first lifting hanging plate 1 and second The clamping part 3 of lifting hanging plate 2 is oppositely arranged the clamp port for constituting and being used for clamping rail 7, and the first lifting lifting of hanging plate 1 and second is hung Plate 2 is hinged by hinge hole 5, when being coincided in the position of the hole for hoist 6 of the first lifting lifting hanging plate 2 of hanging plate 1 and second, institute State clamp port and be in clamp position.
The first lifting lifting of hanging plate 1 and second hanging plate 2 is generally made using steel plate, and thickness is 10~20mm.To ensure to hang The stabilization of dress, the lifting device of rail 7 is generally used in pairs, using 2 lift-on/lift-off systems, is chosen after Hoisting Position, respectively by two The lifting device of rail 7 is held on rail 7, and hole for hoist 6 is passed through by snap ring or other instruments, then is connected with hanging device, So as to realize lifting.For the contact area of increase lifting hanging plate and rail 7, inside bottom surface and the rail head of rail 7 of the clamping part 3 Underside shape match.
Concrete scheme implementation steps of the present utility model are as follows:
1st, according to shown in Fig. 1,4 pieces of lifting hanging plates are processed with t=16mm steel plates, specific blank size can be according to different steel The model of rail 7 is modified;
2nd, using M24*60 plain bolts, lifting hanging plate is assembled according to Fig. 2 and Fig. 3, after nut fastening, Ying Yugang Plate has 3-4mm gaps, to ensure that two pieces of lifting hanging plates can be freely movable;
3rd, using 2 lift-on/lift-off system ceiling mounted tracks, choose after Hoisting Position, using snap ring by lifting hanging plate card in orbit Hoisting rope is connected with lifting device;
4th, ceiling mounted tracks, track unclamps snap ring afterwards in place, you can take out hoisting rope and lifting device, completes lifting.

Claims (4)

1. rail lifting device, it is characterised in that:Including the first lifting hanging plate (1) and the second lifting hanging plate (2), described first hangs Filling hanging plate (1) and the second lifting hanging plate (2) includes the clamping part (3) and superposed connecting portion (4) positioned at bottom, described Connecting portion (4) offers and hole for hoist (6) is provided with above hinge hole (5), the hinge hole (5), the first lifting hanging plate (1) The clamp port for constituting and being used for clamping rail (7), the first lifting hanging plate are oppositely arranged with the clamping part (3) of the second lifting hanging plate (2) (1) it is hinged with the second lifting hanging plate (2) by hinge hole (5), hanging plate (2) is lifted in the first lifting hanging plate (1) and second When the position of hole for hoist (6) coincides, the clamp port is in clamp position.
2. rail lifting device as claimed in claim 1, it is characterised in that:The inside bottom surface and rail of the clamping part (3) (7) underside shape of rail head matches.
3. rail lifting device as claimed in claim 1, it is characterised in that:The first lifting hanging plate (1) and the second lifting Hanging plate (2) is hinged by connecting bolt through hinge hole (5).
4. rail lifting device as claimed in claim 1, it is characterised in that:The first lifting hanging plate (1) and the second lifting The thickness of hanging plate (2) is 10~20mm.
CN201720231329.8U 2017-03-10 2017-03-10 Rail lifting device Active CN206538100U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720231329.8U CN206538100U (en) 2017-03-10 2017-03-10 Rail lifting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720231329.8U CN206538100U (en) 2017-03-10 2017-03-10 Rail lifting device

Publications (1)

Publication Number Publication Date
CN206538100U true CN206538100U (en) 2017-10-03

Family

ID=59942258

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720231329.8U Active CN206538100U (en) 2017-03-10 2017-03-10 Rail lifting device

Country Status (1)

Country Link
CN (1) CN206538100U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108408567A (en) * 2018-03-27 2018-08-17 五冶集团上海有限公司 Trolley track replaces suspender and trolley track replacing options

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108408567A (en) * 2018-03-27 2018-08-17 五冶集团上海有限公司 Trolley track replaces suspender and trolley track replacing options

Similar Documents

Publication Publication Date Title
CN102900021B (en) Split mounting type bridge wet joint construction method
CN205151516U (en) Simple and easy hoist and mount of prefabricated wallboard
CN106400691A (en) Integrated construction process for anti-collision wall formwork
CN206538100U (en) Rail lifting device
CN203716062U (en) Integral type pier body decorating hanging basket
CN204057659U (en) The prefabricated superimposed panel lifting appliance of super large
CN201598093U (en) Hoisting fixture for large-sized sectional box-type beam
CN106121259A (en) The hanging apparatus of embedded integrated outer wall plate and hanging method thereof
CN203653057U (en) Special hanging tool of unballasted track plate
CN205973521U (en) Extended type hangs in cabin
CN209723565U (en) Attached tower crane attachment construction operation platform outside a kind of steel-core wall structure
CN203794439U (en) Auxiliary lifting device for large-sized lifting lug-free component
CN204265231U (en) T beam forms suspender
CN203499232U (en) Attached lifting scaffold
CN203022327U (en) Elevator shaft high-altitude construction platform device
CN207001999U (en) Large tank shape equipment hoisting shoulder pole girder
CN204980842U (en) Crane girder hoist and mount special lifting device
CN206665957U (en) A kind of detachable auxiliary hanger
CN110778095A (en) External protection frame of assembled structure
CN205935718U (en) Hoist device of embedded integral side fascia
CN205713035U (en) All steel for climbing frame protects crane
CN103803395A (en) Hydraulic motor installation hoisting beam as well as application thereof
CN204728722U (en) Construction formwork lifting device
CN201581649U (en) Strung-hung carrying pole beam for mounting of high multi-layer steel structure
CN204569816U (en) The erecting device of plug ramming machine steel structure truss bottom a kind of beam eaves

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant