CN206530054U - A kind of cast-in-situ concrete columns hang mould - Google Patents
A kind of cast-in-situ concrete columns hang mould Download PDFInfo
- Publication number
- CN206530054U CN206530054U CN201720088575.2U CN201720088575U CN206530054U CN 206530054 U CN206530054 U CN 206530054U CN 201720088575 U CN201720088575 U CN 201720088575U CN 206530054 U CN206530054 U CN 206530054U
- Authority
- CN
- China
- Prior art keywords
- hanging
- steel
- cast
- die cavity
- perforation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
本实用新型涉及一种现浇混凝土柱吊模,包括四个吊模槽钢和钢筋卡扣;四个吊模槽钢依次首尾相接构成方形的钢架,每一个吊模槽钢沿其轴向均具有长条形凹槽,且长条形凹槽处于吊模槽钢远离钢架中心的一侧,每一个吊模槽钢的上侧壁上设置有多个第一穿孔,每一个吊模槽钢的下侧壁上设置有多个第二穿孔,相邻两个吊模槽钢之间均通过钢筋卡扣连接,钢筋卡扣的两端分别伸入相邻两个吊模槽钢上的第一穿孔内;相邻两个吊模槽钢的连接处的下端均设置有吊模凳。相对现有技术,本实用新型具有操作方便快捷,适用范围广,可循环利用,安全可靠,且有效控制施工现场柱脚的麻面、漏浆、钢筋偏位等质量缺陷。
The utility model relates to a hanging formwork for cast-in-place concrete columns, which comprises four hanging formwork channel steels and steel bar buckles; the four hanging formwork channel steels are sequentially connected end to end to form a square steel frame, and each hanging formwork channel steel is connected along its axis. Each has a strip-shaped groove, and the strip-shaped groove is on the side of the hanging mold channel steel away from the center of the steel frame. A plurality of first perforations are arranged on the upper side wall of each hanging mold channel steel. The lower side wall of the mold channel steel is provided with a plurality of second perforations, and the two adjacent hanging mold channel steels are connected by steel buckles, and the two ends of the steel bar buckles respectively extend into the two adjacent hanging mold channel steels In the first perforation on the top; the lower end of the connection between two adjacent hanging formwork channel steels is provided with a hanging formwork stool. Compared with the prior art, the utility model has the advantages of convenient and fast operation, wide application range, recyclable utilization, safety and reliability, and can effectively control quality defects such as pockmarks, slurry leakage, and steel bar deviation of the column feet on the construction site.
Description
技术领域technical field
本实用新型涉及建筑工程技术领域,特别涉及一种现浇混凝土柱吊模。The utility model relates to the technical field of construction engineering, in particular to a cast-in-situ concrete column hanging form.
背景技术Background technique
吊模是指没有支撑而悬挂在其它固定物上的模板。在现浇混凝土柱的施工中,一般的柱吊模等施工工艺不合理和施工工艺过于繁琐,费时费力,同时也造成了现场不能很好的控制住质量缺陷,比如发现施工现场柱脚多出现涨模、漏浆、蜂窝、麻面、钢筋偏位等质量缺陷,严重影响了施工质量和观感效果。通过分析发现虽然现场也采取了钉模板条、砂浆封堵等施工工艺解决此问题,但这些施工工艺较为费时费力,使用效果也不是很理想。Suspended formwork refers to a formwork that is suspended from other fixtures without support. In the construction of cast-in-place concrete columns, the general construction techniques such as column hanging formwork are unreasonable and the construction techniques are too cumbersome, time-consuming and labor-intensive. At the same time, the quality defects cannot be well controlled on site. For example, it is found that there are many column feet on the construction site. Quality defects such as mold expansion, grout leakage, honeycomb, pitted surface, and steel bar deviation have seriously affected the construction quality and visual effect. Through the analysis, it was found that although construction techniques such as nailing formwork strips and mortar plugging were also adopted on site to solve this problem, these construction techniques were time-consuming and laborious, and the results were not very satisfactory.
实用新型内容Utility model content
本实用新型的目的是提供一种现浇混凝土柱吊模,所要解决的技术问题是:一般的柱吊模等施工工艺不合理和施工工艺过于繁琐,费时费力,同时也造成了现场不能很好的控制住质量缺陷。The purpose of this utility model is to provide a cast-in-situ concrete column formwork. The technical problems to be solved are: the general column formwork and other construction techniques are unreasonable and the construction process is too cumbersome, time-consuming and labor-intensive, and at the same time, the site is not good. control the quality defects.
本实用新型解决上述技术问题的技术方案如下:一种现浇混凝土柱吊模,包括四个吊模槽钢和钢筋卡扣;四个所述吊模槽钢依次首尾相接构成方形的钢架,每一个所述吊模槽钢沿其轴向均具有长条形凹槽,且所述长条形凹槽处于所述吊模槽钢远离所述钢架中心的一侧,每一个所述吊模槽钢的上侧壁上设置有多个第一穿孔,每一个所述吊模槽钢的下侧壁上设置有多个第二穿孔,相邻两个所述吊模槽钢之间均通过钢筋卡扣连接,所述钢筋卡扣的两端分别伸入相邻两个吊模槽钢上的第一穿孔内;相邻两个所述吊模槽钢的连接处的下端均设置有吊模凳。The technical scheme of the utility model for solving the above-mentioned technical problems is as follows: a cast-in-situ concrete column hanging form, including four hanging formwork channel steels and steel bar buckles; the four hanging formwork channel steels are connected end to end in turn to form a square steel frame , each of the hanging form channel steels has a strip-shaped groove along its axial direction, and the strip-shaped grooves are on the side of the hanging formwork channel steel away from the center of the steel frame, each of the The upper side wall of the hanging formwork channel steel is provided with a plurality of first perforations, and the lower side wall of each of the hanging formwork channel steels is provided with a plurality of second perforations, between two adjacent hanging formwork channel steels They are all connected by steel bar buckles, and the two ends of the steel bar buckles respectively extend into the first perforations on the two adjacent hanging mold channel steels; the lower ends of the joints of the two adjacent hanging mold channel steels are all set There are hanging mold stools.
本实用新型的有益效果是:通过四个吊模槽钢、钢筋卡扣和吊模凳构成,结构简单且实用方便,具有操作方便快捷,适用范围广,可以根据柱径大小和施工缝位置进行调节,可循环利用,安全可靠,且有效控制施工现场柱脚的麻面、漏浆、钢筋偏位等质量缺陷。The beneficial effects of the utility model are: it is composed of four hanging formwork channel steels, steel buckles and hanging formwork stools, the structure is simple and practical, the operation is convenient and fast, and the application range is wide. Adjustable, recyclable, safe and reliable, and effectively control quality defects such as pitting, slurry leakage, and steel bar deviation at the construction site.
在上述技术方案的基础上,本实用新型还可以做如下改进。On the basis of the above technical solutions, the utility model can also be improved as follows.
进一步,多个所述第一穿孔等间距排列,多个所述第二穿孔与多个所述第一穿孔一一对应。Further, the plurality of first through holes are arranged at equal intervals, and the plurality of second through holes correspond to the plurality of first through holes one by one.
采用上述进一步方案的有益效果是:第一穿孔距排列,便于对相邻两个吊模槽钢进行固定,多个第二穿孔便于相邻两个吊模槽钢对吊模凳进行连接。The beneficial effect of adopting the above further solution is: the arrangement of the first perforation distance facilitates the fixing of two adjacent hanging form channel steels, and the plurality of second perforations facilitates the connection of the two adjacent hanging form channel steels to the hanging form stool.
进一步,相邻两个所述第一穿孔的间距为50mm,每一个第一穿孔4距离其靠近的棱边均为25mm。Further, the distance between two adjacent first through holes is 50 mm, and each first through hole 4 is 25 mm away from its adjacent edge.
采用上述进一步方案的有益效果是:两个第一穿孔的间距为50mm,距边均为25mm,标准化孔距,便于进行标准件制作。The beneficial effect of adopting the above further scheme is that the distance between the two first perforations is 50mm, and the distance from the sides is 25mm, and the distance between the holes is standardized, which is convenient for the production of standard parts.
进一步,四个所述吊模槽钢的高度均为80mm。Further, the heights of the four hanging formwork channel steels are all 80mm.
采用上述进一步方案的有益效果是:吊模槽钢的高度为80mm,符合施工标准。The beneficial effect of adopting the above further scheme is that the height of the hanging formwork channel steel is 80 mm, which meets the construction standard.
进一步,所述吊模凳包括吊模凳本体、叠加模块和两个螺栓,两个所述螺栓的下部均固定连接在所述吊模凳本体的上端,所述叠加模块套装在两个所述螺栓上,且两个所述螺栓的上部分别伸入其上方的两个吊模槽钢的第二穿孔内。Further, the hanging form stool includes a hanging form stool body, a superposition module and two bolts, the lower parts of the two bolts are fixedly connected to the upper ends of the hanging form stool body, and the superposition module is set on the two Bolts, and the tops of the two bolts respectively extend into the second through holes of the two hanger channel steels above it.
采用上述进一步方案的有益效果是:叠加模块层叠在吊模凳本体,便于调整吊模凳的高度,适应施工标准。The beneficial effect of adopting the above further scheme is that the stacking modules are stacked on the hanging formwork stool body, which is convenient for adjusting the height of the hanging formwork stool and adapting to the construction standard.
进一步,所述吊模凳本体包括两个锥尖向下的锥状板,两个所述锥状板呈90度夹角相连,且两个所述锥状板一体成型;两个所述螺栓的下部分别连接在两个所述锥状板的上端。Further, the hanging mold stool body includes two conical plates with the conical points pointing down, the two conical plates are connected at an angle of 90 degrees, and the two conical plates are integrally formed; the two bolts The lower part is respectively connected to the upper ends of the two cone-shaped plates.
采用上述进一步方案的有益效果是:两个锥状板构成的吊模凳本体,便于对吊模槽钢进行支撑,提升结构稳固性。The beneficial effect of adopting the above further solution is that the formwork stool body composed of two conical plates is convenient for supporting the formwork channel steel and improving the stability of the structure.
进一步,所述叠加模块设置有多个,多个所述叠加模块由上至下依次套装在两个所述螺栓上。Further, there are multiple stacking modules, and the multiple stacking modules are sequentially fitted on the two bolts from top to bottom.
采用上述进一步方案的有益效果是:多个叠加模块层叠在吊模凳本体,便于调整吊模凳的高度,适应施工标准。The beneficial effect of adopting the above-mentioned further solution is that multiple superimposed modules are stacked on the formwork stool body, which is convenient for adjusting the height of the formwork stool and adapting to construction standards.
进一步,每一个所述叠加模块的高度为20mm。Further, the height of each of the stacked modules is 20mm.
采用上述进一步方案的有益效果是:叠加模块的高度标准化,便于调节吊模凳的高度。The beneficial effect of adopting the above further solution is: the height of the stacking modules is standardized, which facilitates the adjustment of the height of the hanging mold stool.
附图说明Description of drawings
图1为本实用新型一种现浇混凝土柱吊模的主视图;Fig. 1 is the front view of a kind of cast-in-place concrete column hanging mold of the utility model;
图2为图1的A处放大图;Figure 2 is an enlarged view of A in Figure 1;
图3为吊模凳的结构拆分图;Fig. 3 is the structural disassembly diagram of hanging mold stool;
图4为吊模凳的主视图;Fig. 4 is the front view of hanging mold stool;
图5为柱模钢板封模的结构示意图;Fig. 5 is the structural representation of column formwork steel plate seal mold;
图6为柱体、楼板、柱模钢板和钢筋的结构示意图。Fig. 6 is a structural schematic view of a column body, a floor slab, a column formwork plate and steel bars.
附图中,各标号所代表的部件列表如下:In the accompanying drawings, the list of parts represented by each label is as follows:
1、吊模槽钢,2、钢筋卡扣,3、槽体,4、第一穿孔,5、第二穿孔,6、吊模凳,7、吊模凳本体,8、叠加模块,9、螺栓,10、锥状板,11、柱体, 12、楼板,13、柱模钢板,14、钢筋。1. Hanging formwork channel steel, 2. Reinforcement buckle, 3. Tank body, 4. First perforation, 5. Second perforation, 6. Hanging formwork stool, 7. Hanging formwork stool body, 8. Superposition module, 9. Bolt, 10, conical plate, 11, cylinder, 12, floor slab, 13, column formwork plate, 14, steel bar.
具体实施方式detailed description
以下结合附图对本实用新型的原理和特征进行描述,所举实例只用于解释本实用新型,并非用于限定本实用新型的范围。The principles and features of the present utility model are described below in conjunction with the accompanying drawings, and the examples given are only used to explain the utility model, and are not used to limit the scope of the utility model.
如图1和图2所示,一种现浇混凝土柱吊模,包括四个吊模槽钢1和钢筋卡扣2;四个所述吊模槽钢1依次首尾相接构成方形的钢架,每一个所述吊模槽钢1沿其轴向均具有长条形凹槽3,且所述长条形凹槽3处于所述吊模槽钢1远离所述钢架中心的一侧,每一个所述吊模槽钢1的上侧壁上设置有多个第一穿孔4,每一个所述吊模槽钢1的下侧壁上设置有多个第二穿孔 5,相邻两个所述吊模槽钢1之间均通过钢筋卡扣2连接,所述钢筋卡扣2 的两端分别伸入相邻两个吊模槽钢1上的第一穿孔4内;相邻两个所述吊模槽钢1的连接处的下端均设置有吊模凳6;As shown in Figure 1 and Figure 2, a hanging formwork for cast-in-place concrete columns includes four hanging formwork channel steels 1 and steel bar buckles 2; the four hanging formwork channel steels 1 are connected end to end in sequence to form a square steel frame , each of the hanging form channel steel 1 has an elongated groove 3 along its axial direction, and the elongated groove 3 is on the side of the hanging form channel steel 1 away from the center of the steel frame, A plurality of first perforations 4 are provided on the upper side wall of each of the hanging form channel steel 1, and a plurality of second perforations 5 are provided on the lower side wall of each of the hanging form channel steel 1, two adjacent The hanging mold channel steels 1 are all connected by steel bar buckles 2, and the two ends of the steel bar buckles 2 respectively extend into the first perforations 4 on two adjacent hanging mold channel steels 1; The lower end of the joint of the hanging mold channel steel 1 is provided with a hanging mold stool 6;
通过四个吊模槽钢1、钢筋卡扣2和吊模凳6构成,结构简单且实用方便,具有操作方便快捷,适用范围广,可以根据柱径大小和施工缝位置进行调节,可循环利用,安全可靠,且有效控制施工现场柱脚的麻面、漏浆、钢筋偏位等质量缺陷。Consisting of four hanging formwork channel steel 1, steel buckle 2 and hanging formwork stool 6, the structure is simple, practical and convenient, with convenient and quick operation, wide application range, can be adjusted according to the size of the column diameter and the position of the construction joint, and can be recycled , safe and reliable, and effectively control quality defects such as pockmarks, grout leakage, and steel bar deviation at the construction site.
上述实施例中,多个所述第一穿孔4等间距排列,多个所述第二穿孔5 与多个所述第一穿孔4一一对应;第一穿孔距排列,便于对相邻两个吊模槽钢1进行固定,多个第二穿孔5便于相邻两个吊模槽钢1对吊模凳6进行连接。In the above-mentioned embodiment, a plurality of said first through holes 4 are arranged at equal intervals, and a plurality of said second through holes 5 correspond to a plurality of said first through holes 4 one by one; The hanging mold channel steel 1 is fixed, and a plurality of second perforations 5 facilitate the connection of two adjacent hanging mold channel steels 1 to the hanging mold stool 6 .
上述实施例中,相邻两个所述第一穿孔4的间距为50mm,每一个第一穿孔4距离其靠近的棱边均为25mm;两个第一穿孔的间距为50mm,距边均为 25mm,标准化孔距,便于进行标准件制作。In the above-mentioned embodiment, the distance between two adjacent first perforations 4 is 50 mm, and the distance between each first perforation 4 is 25 mm from its adjacent edge; the distance between two first perforations is 50 mm, and the distance from the edge is 25 mm. 25mm, standardized hole spacing, easy to make standard parts.
上述实施例中,四个所述吊模槽钢1的高度均为80mm;吊模槽钢1的高度为80mm,符合施工标准。In the above embodiment, the heights of the four hanging formwork channel steels 1 are all 80 mm; the height of the hanging formwork channel steels 1 is 80 mm, which meets the construction standards.
上述实施例中,如图3和图4所示,所述吊模凳6包括吊模凳本体7、叠加模块8和两个螺栓9,两个所述螺栓9的下部均固定连接在所述吊模凳本体7的上端,所述叠加模块8套装在两个所述螺栓9上,且两个所述螺栓 9的上部分别伸入其上方的两个吊模槽钢1的第二穿孔5内;叠加模块8层叠在吊模凳本体7,便于调整吊模凳6的高度,适应施工标准。In the above embodiment, as shown in Fig. 3 and Fig. 4, the hanging form stool 6 includes a hanging form stool body 7, a stacking module 8 and two bolts 9, and the lower parts of the two bolts 9 are fixedly connected to the The upper end of the hanging mold stool body 7, the superposition module 8 is set on the two bolts 9, and the upper parts of the two bolts 9 respectively extend into the second perforations 5 of the two hanging mold channel steel 1 above it Inside; the stacking module 8 is stacked on the hanging mold stool body 7, which is convenient for adjusting the height of the hanging mold stool 6 and adapting to the construction standard.
上述实施例中,所述吊模凳本体7包括两个锥尖向下的锥状板10,两个所述锥状板10呈90度夹角相连,且两个所述锥状板10一体成型;两个所述螺栓9的下部分别连接在两个所述锥状板10的上端;两个锥状板10构成的吊模凳本体7,便于对吊模槽钢1进行支撑,提升结构稳固性。In the above embodiment, the hanging mold stool body 7 includes two conical plates 10 with the conical points pointing downwards, the two conical plates 10 are connected at an angle of 90 degrees, and the two conical plates 10 are integrated Forming; the lower parts of the two bolts 9 are respectively connected to the upper ends of the two conical plates 10; the formwork stool body 7 formed by the two conical plates 10 is convenient for supporting the formwork channel steel 1 and lifting the structure stability.
上述实施例中,所述叠加模块8设置有多个,多个所述叠加模块8由上至下依次套装在两个所述螺栓9上;多个叠加模块8层叠在吊模凳本体,便于调整吊模凳的高度,适应施工标准。In the above embodiment, there are multiple superposition modules 8, and the plurality of superposition modules 8 are sequentially set on the two bolts 9 from top to bottom; multiple superposition modules 8 are stacked on the hanging mold stool body, which is convenient Adjust the height of the formwork stool to suit the construction standard.
上述实施例中,每一个所述叠加模块8的高度为20mm;叠加模块的高度标准化,便于调节吊模凳的高度。In the above embodiment, the height of each of the stacking modules 8 is 20mm; the height of the stacking modules is standardized, which is convenient for adjusting the height of the hanging mold stool.
实施例2:Example 2:
如图1、图5、图6所示,一种现浇混凝土柱方法,包括以下步骤:As shown in Fig. 1, Fig. 5 and Fig. 6, a method for cast-in-place concrete columns comprises the following steps:
步骤S1.安装楼板12的底板,在底板对应柱体11处设置有四个孔,在底板上绑扎楼板12和柱体11的钢筋14;Step S1. Install the bottom plate of the floor 12, four holes are arranged on the bottom plate corresponding to the column 11, and the steel bars 14 of the floor 12 and the column 11 are bound on the bottom plate;
步骤S2.根据楼板12的厚度将在吊模凳本体7上层叠叠加模块8,装配四个吊模凳6;将四个吊模凳6分别一一对应安装在底板的四个孔内;Step S2. According to the thickness of the floor slab 12, the superimposed modules 8 are stacked on the hanging formwork stool body 7, and four hanging formwork stools 6 are assembled; the four hanging formwork stools 6 are respectively installed in four holes of the bottom plate in one-to-one correspondence;
步骤S3.根据柱体11的尺寸将四个吊模槽钢1安装在四个吊模凳6上;Step S3. Install the four hanging mold channel steels 1 on the four hanging mold stools 6 according to the size of the column body 11;
步骤S4.通过钢筋卡扣2两端分别伸入相邻两个吊模槽钢1上的第一穿孔4内,将四个吊模槽钢1进行加固;Step S4. Extend the two ends of the steel bar buckle 2 into the first perforation 4 on the two adjacent hanging mold channel steels 1, and reinforce the four hanging mold channel steels 1;
步骤S5.向楼板12和柱体11的下部浇筑混凝土,待混凝土浇筑完成并初凝后,拆去吊模槽钢1和钢筋卡扣2,并拔出吊模凳6;Step S5. Concrete is poured on the floor 12 and the lower part of the column 11. After the concrete is poured and initially set, the hanging formwork channel steel 1 and the steel bar buckle 2 are removed, and the hanging formwork stool 6 is pulled out;
步骤S6.通过四个柱模钢板13对柱体11处进行封模,向柱体11处浇筑混凝土至完工;Step S6. Seal the column 11 through four column formwork plates 13, and pour concrete to the column 11 until completion;
具有操作方便快捷,适用范围广,可以根据柱径大小和施工缝位置进行调节,可循环利用,安全可靠,且有效控制施工现场柱脚的麻面、漏浆、钢筋偏位等质量缺陷。It is convenient and quick to operate, and has a wide range of applications. It can be adjusted according to the size of the column diameter and the position of the construction joint. It is recyclable, safe and reliable, and can effectively control quality defects such as pitting, grout leakage, and steel bar deviation at the column foot on the construction site.
以上所述仅为本实用新型的较佳实施例,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present utility model shall be included in this utility model. within the scope of protection of utility models.
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720088575.2U CN206530054U (en) | 2017-01-20 | 2017-01-20 | A kind of cast-in-situ concrete columns hang mould |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720088575.2U CN206530054U (en) | 2017-01-20 | 2017-01-20 | A kind of cast-in-situ concrete columns hang mould |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206530054U true CN206530054U (en) | 2017-09-29 |
Family
ID=59917447
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720088575.2U Expired - Fee Related CN206530054U (en) | 2017-01-20 | 2017-01-20 | A kind of cast-in-situ concrete columns hang mould |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206530054U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106760508A (en) * | 2017-01-20 | 2017-05-31 | 桂林电子科技大学 | A kind of cast-in-situ concrete columns hang mould and cast-in-place concrete column method |
CN107877664A (en) * | 2017-11-21 | 2018-04-06 | 重庆大业新型建材集团有限公司 | Building element lamination prepares and uses side mode structure |
-
2017
- 2017-01-20 CN CN201720088575.2U patent/CN206530054U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106760508A (en) * | 2017-01-20 | 2017-05-31 | 桂林电子科技大学 | A kind of cast-in-situ concrete columns hang mould and cast-in-place concrete column method |
CN106760508B (en) * | 2017-01-20 | 2022-03-25 | 桂林电子科技大学 | Cast-in-place concrete column hanging mould and cast-in-place concrete column method |
CN107877664A (en) * | 2017-11-21 | 2018-04-06 | 重庆大业新型建材集团有限公司 | Building element lamination prepares and uses side mode structure |
CN107877664B (en) * | 2017-11-21 | 2024-05-28 | 重庆恒昇大业建筑科技集团有限公司 | Side form structure for building component lamination preparation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202017346U (en) | Late poured band hanging formwork structure | |
CN103362069B (en) | Steel and concrete combined box girder concrete wing plate formwork and construction method | |
CN202627493U (en) | Combined template for constructing elevator shaft | |
CN206530054U (en) | A kind of cast-in-situ concrete columns hang mould | |
CN204626966U (en) | A kind of deformation joint formwork erection device | |
CN206530056U (en) | Construction beam adjustable supporting device | |
CN105952140B (en) | Tool-type steel framework Wood-plastic formwork system and its construction technology for cast-in-place concrete | |
CN102493480B (en) | Reusable mold with square holes reserved for equipment foundation | |
CN110017141B (en) | A rapid formwork system for ultra-deep shaft concrete ring frame beam and its construction method | |
CN203475310U (en) | Formwork for concrete slabs of composite steel-concrete box girders | |
CN209384644U (en) | Adjustable floor lowering plate supporting die | |
CN204081483U (en) | A kind of structure of rotten when preventing pouring reinforcement concrete post suspension column | |
CN115075613B (en) | Assembled building supporting system and construction method thereof | |
CN202559737U (en) | Toilet descend plate setting support mold | |
CN106760508A (en) | A kind of cast-in-situ concrete columns hang mould and cast-in-place concrete column method | |
CN212715900U (en) | Early-dismantling template system for supporting first and then shaping | |
CN104453217A (en) | Elevator shaft whole formwork lifting construction method | |
CN210685368U (en) | Convenient reinforcing complete die set for concrete wall formworks on two sides of deformation joint | |
CN203856199U (en) | Prefabricated square steel stepping die | |
CN109235709B (en) | Full cast-in-place outer wall structure of building | |
CN109267750B (en) | Adjustable turnover type kitchen and bathroom reversed ridge construction process and reversed ridge mold thereof | |
CN106836601A (en) | A kind of preparation method of the compoboard with assembled support with adjustable negative reinforcement | |
CN205894662U (en) | Modular triangle steel truss template | |
CN207498986U (en) | Pipe gallery Quick Release formwork erecting structure | |
CN206873494U (en) | A kind of operating platform for narrow space on the outside of barricade |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170929 Termination date: 20220120 |