CN206500746U - A kind of high efficiency alternating current-direct current double wire welding operational control device - Google Patents

A kind of high efficiency alternating current-direct current double wire welding operational control device Download PDF

Info

Publication number
CN206500746U
CN206500746U CN201720189400.0U CN201720189400U CN206500746U CN 206500746 U CN206500746 U CN 206500746U CN 201720189400 U CN201720189400 U CN 201720189400U CN 206500746 U CN206500746 U CN 206500746U
Authority
CN
China
Prior art keywords
backboard
block
screw rod
direct current
wire welding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720189400.0U
Other languages
Chinese (zh)
Inventor
陈友群
于秀芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaiyin Normal University
Original Assignee
Huaiyin Normal University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaiyin Normal University filed Critical Huaiyin Normal University
Priority to CN201720189400.0U priority Critical patent/CN206500746U/en
Application granted granted Critical
Publication of CN206500746U publication Critical patent/CN206500746U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of high efficiency alternating current-direct current double wire welding operational control device, including controller, the back side of the controller is fixedly connected with backboard, the inside of the backboard offers two axis using backboard as with reference to symmetrical first chute, the inside of two first chutes slidably connects the first sliding block, the first spring is fixedly connected between the lateral surface of first sliding block and the inwall of the first chute, the back side of the backboard is further opened with two/strip through-hole, and two strip through-holes are connected with two the first chutes respectively.The high efficiency alternating current-direct current double wire welding operational control device, fixed block is provided with by the back side in backboard, fixed block is flexibly connected by connecting rod with contiguous block, controller can be fixed on the support in wind tower by fixed block and backboard, by being internally provided with the first spring in the first chute, solve existing alternating current-direct current double wire welding operational control device to be not convenient to use, the problem of influenceing operating efficiency.

Description

A kind of high efficiency alternating current-direct current double wire welding operational control device
Technical field
The utility model is related to alternating current-direct current double wire welding operational control device technical field, specially a kind of high efficiency alternating current-direct current Double wire welding operational control device.
Background technology
Wind tower is welded commonly using alternating current-direct current double wire welding equipment, what alternating current-direct current double wire welding was just welded with dual power supply Mode is welded, and difference is welded with single supply, and two arc currents independently of one another, can carry out independently coordinating control, Neng Goushi Answer the welding of different requirements.
Based on the operation principle of alternating current-direct current double wire welding, when carrying out weld job, operating personnel need to carry out a lot Debugging control, so the volume of the operational control device of alternating current-direct current double wire welding is also very big, in wind tower during progress work high above the ground not Facilitate and carried with being fixed, electric wire can only be elongated, debugging control is carried out by ground staff, it is inconvenient for use, reduce operating personnel Operating efficiency.
Utility model content
(One)The technical problem of solution
In view of the shortcomings of the prior art, the utility model provides a kind of high efficiency alternating current-direct current double wire welding operational control Device, solves existing alternating current-direct current double wire welding operational control device and is not convenient to use, the problem of influenceing operating efficiency.
(Two)Technical scheme
To realize object above, the utility model is achieved by the following technical programs:A kind of high efficiency alternating current-direct current is double Wire bond connects operational control device, including controller, and the back side of the controller is fixedly connected with backboard, and the inside of the backboard is opened up There are two axis using backboard as with reference to symmetrical first chute, the inside of two first chutes slidably connects One sliding block, the first spring is fixedly connected between the lateral surface of first sliding block and the inwall of the first chute.
The back side of the backboard is further opened with two strip through-holes, two strip through-holes respectively with two the first chutes Connection, the one side of first sliding block away from controller is fixedly connected with contiguous block, and the contiguous block is located in strip through-hole Portion, the back side of the backboard is additionally provided with two fixed blocks, and two adjacent one sides of the fixed block offer neck, institute The inside for stating fixed block offers the second chute, and the internal slide of second chute is connected with the second sliding block, and described second slides Block is fixedly connected with connecting rod close to the one side of contiguous block, and the outer surface of the connecting rod is socketed with second spring, and the connecting rod is remote One end from the second sliding block is fixedly connected through fixed block and with one side of the contiguous block away from the first sliding block.
The back side of the backboard is further opened with two jacks, and the inside of the jack is plugged with screw rod, the one of the screw rod End runs through jack and extends to the outside of backboard, and the outer surface thread of the screw rod is connected with correspondence on regulation ring, the backboard The position of jack is further opened with groove, and the inside of groove is installed with bearing, and the inner surface fixed cover of the bearing is connected to company Ring is connect, the lateral surface of the connection ring is fixedly connected with the outer surface of regulation ring, one end of the screw rod is run through regulation ring and prolonged The outside of regulation ring is extended, and one end of screw rod is also fixedly connected with pressing plate, the pressing plate is fixed close to the one side of screw rod to be connected Two gag lever posts are connected to, the position of the back side correspondence gag lever post of the backboard offers spacing hole, and the gag lever post is plugged on limit In the hole of position.
It is preferred that, the inside of the neck is bonded with cushion, and the cushion is rubber blanket.
It is preferred that, the diameter of the regulation ring is twice of platen elevation, and the screw rod and pressing plate are perpendicular.
It is preferred that, the length of the screw rod is identical with the length of gag lever post, and two gag lever posts are using screw rod as with reference to phase Symmetrically.
It is preferred that, one side of the pressing plate away from backboard is located at same vertical flat with one side of the fixed block away from backboard Face, first chute is parallel to each other with horizontal plane.
It is preferred that, the back side institute angle degree scope of one side and backboard of the fixed block away from backboard is 30 to five Ten degree, the fixed block is contacted close to the one side of backboard with one side of the contiguous block away from the first sliding block.
(Three)Beneficial effect
The utility model provides a kind of high efficiency alternating current-direct current double wire welding operational control device, possesses following beneficial effect:
The high efficiency alternating current-direct current double wire welding operational control device, by being provided with fixed block, fixed block at the back side of backboard It is flexibly connected, controller can be fixed on the support in wind tower by fixed block and backboard with contiguous block by connecting rod, is led to Cross and be internally provided with the first spring in the first chute, be internally provided with second spring in the second chute, can adapt to difference The support of diameter, and then controller is fixed, pressing plate is fixedly connected with by one end in screw rod, can tighten control device Fixation, facilitate the operating personnel of work high above the ground to operate controller, it is easy to use, effectively raise operating personnel's Operating efficiency, solves existing alternating current-direct current double wire welding operational control device and is not convenient to use, the problem of influenceing operating efficiency.
Brief description of the drawings
Fig. 1 is the utility model left view;
Fig. 2 is the rearview of the utility model backboard;
Fig. 3 is Section A-A figure in the utility model Fig. 2;
Fig. 4 is section B-B figure in the utility model Fig. 2.
In figure:1 controller, 2 backboards, 3 first chutes, 4 first sliding blocks, 5 first springs, 6 strip through-holes, 7 contiguous blocks, 8 Fixed block, 9 necks, 10 second chutes, 11 second sliding blocks, 12 connecting rods, 13 second springs, 14 jacks, 15 screw rods, 16 regulation rings, 17 bearings, 18 connection rings, 19 pressing plates, 20 gag lever posts, 21 spacing holes, 22 cushions.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
Fig. 1-4 are referred to, the utility model provides a kind of technical scheme:A kind of high efficiency alternating current-direct current double wire welding operation control Device processed, including controller 1, the back side of controller 1 are fixedly connected with backboard 2, and the inside of backboard 2 offers two with backboard 2 Axis is that first chute 3 is parallel to each other with horizontal plane with reference to symmetrical first chute 3, and the inside of two the first chutes 3 is slided Dynamic to be connected with the first sliding block 4, the first sliding block 4 can be moved in the horizontal direction, the lateral surface of the first sliding block 4 and the first chute 3 The first spring 5 is fixedly connected between inwall, the first spring 5 can promote the position of the first sliding block 4 to maintain in backboard 2 Portion.
The back side of backboard 2 is further opened with two strip through-holes 6, and two strip through-holes 6 connect with two the first chutes 3 respectively Logical, the first one side of the sliding block 4 away from controller 1 is fixedly connected with contiguous block 7, and contiguous block 7 is located inside strip through-hole 6, the back of the body The back side of plate 2 is additionally provided with two fixed blocks 8, the back side institute angle degree of one side of the fixed block 8 away from backboard 2 and backboard 2 Scope is 30 to 50 degree, and convenient to be used in wind tower between fixed support two fixed blocks 8 of push-in, fixed block 8 can To two lateral movements, support is clamped, one side and contiguous block 7 one side away from first sliding block 4 of the fixed block 8 close to backboard 2 Contact, the adjacent one side of two fixed blocks 8 offers neck 9, and the inside of neck 9 is bonded with cushion 22, and cushion 22 is rubber Rubber cushion, can strengthen the frictional force of neck 9 and support, and the inside of fixed block 8 offers the second chute 10, the second chute 10 it is interior Portion slidably connects the second sliding block 11, and the second sliding block 11 is fixedly connected with connecting rod 12 close to the one side of contiguous block 7, connecting rod 12 Outer surface is socketed with second spring 13, and the one end of connecting rod 12 away from the second sliding block 11 is through fixed block 8 and with contiguous block 7 away from the The one side of one sliding block 4 is fixedly connected, and fixed block 8 can be moved to the direction away from backboard 2, can use the branch of different thicknesses Frame.
The back side of backboard 2 is further opened with two jacks 14, and the inside of jack 14 is plugged with screw rod 15, and one end of screw rod 15 is passed through Inserting hole 14 and the outside for extending to backboard 2, the outer surface thread of screw rod 15 are connected with correspondence jack on regulation ring 16, backboard 2 14 position is further opened with groove, and the inside of groove is installed with bearing 17, and the inner surface fixed cover of bearing 17 is connected to connection Ring 18, the lateral surface of connection ring 18 is fixedly connected with the outer surface of regulation ring 16, and when rotating regulation ring 16, screw rod 15 can be on edge The direction of jack 14 is moved, and then is pressed in dynamic pressure plate 19 on fixation support, the fixation for the device 1 that tightens control, one end of screw rod 15 Through regulation ring 16 and the outside of regulation ring 16 is extended to, and one end of screw rod 15 is also fixedly connected with pressing plate 19, regulation ring 16 Diameter be twice of the height of pressing plate 19, facilitate operating personnel that screw rod 15 is adjusted, screw rod 15 and pressing plate 19 are perpendicular, press One side of the plate 19 away from backboard 2 is located at same vertical plane with one side of the fixed block 8 away from backboard 2, and pressing plate 19 is close to spiral shell The one side of bar 15 is fixedly connected with two gag lever posts 20, and the position of the back side correspondence gag lever post 20 of backboard 2 offers spacing hole 21, gag lever post 20 is plugged in spacing hole 21, and pressing plate 19 will not follow the rotation of screw rod 15 and rotate, the length and limit of screw rod 15 The length of position bar 20 is identical, and two gag lever posts 20 are with reference to symmetrical with screw rod 15.
In use, user lifts controller 1, two fixed blocks 8 are directed to support and push away near in wind tower, support is with consolidating Determine after the contact of block 8, fixed block 8 is moved along the first chute 3 to both sides, bracket clamp is rear in neck 9 to be stopped promoting, when fixation branch When the longitudinal length of frame is larger, fixed block 8 is pulled out to adapt to support, rotating regulation ring 16 moves screw rod 15, pressing plate 19 complete the fixation of controller 1 when being contacted with support.
In summary, high efficiency alternating current-direct current double wire welding operational control device, by being provided with fixation at the back side of backboard 2 Block 8, fixed block 8 is flexibly connected by connecting rod 12 with contiguous block 7, can be fixed on controller 1 by fixed block 8 and backboard 2 On support in wind tower, by being internally provided with the first spring 5 in the first chute 3, in being internally provided with for the second chute 10 Second spring 13, can adapt to the support of different-diameter, and then controller 1 is fixed, by solid in one end of screw rod 15 Surely pressing plate 19 is connected with, the fixation for the device 1 that can tighten control facilitates the operating personnel of work high above the ground to operate controller 1, It is easy to use, the operating efficiency of operating personnel is effectively raised, existing alternating current-direct current double wire welding operational control device is solved It is not convenient to use, the problem of influenceing operating efficiency.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality Body or operation make a distinction with another entity or operation, and not necessarily require or imply these entities or deposited between operating In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to Nonexcludability is included, so that process, method, article or equipment including a series of key elements not only will including those Element, but also other key elements including being not expressly set out, or also include being this process, method, article or equipment Intrinsic key element.In the absence of more restrictions.By sentence " including one ... the key element limited, it is not excluded that Also there is other identical element in the process including the key element, method, article or equipment ", the electricity occurred in this article Device element is electrically connected with extraneous main controller and 220V civil powers, and main controller can play the routine of control for computer etc. Know equipment.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out in the case where not departing from principle of the present utility model and spirit a variety of changes, repaiies Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of high efficiency alternating current-direct current double wire welding operational control device, including controller(1), the controller(1)The back side consolidate Surely it is connected with backboard(2), it is characterised in that:The backboard(2)Inside offer two with backboard(2)Axis be reference Symmetrical first chute(3), two first chutes(3)Inside slidably connect the first sliding block(4), described first slides Block(4)Lateral surface and the first chute(3)Inwall between be fixedly connected with the first spring(5);
The backboard(2)The back side be further opened with two strip through-holes(6), two strip through-holes(6)Respectively with two One chute(3)Connection, first sliding block(4)Away from controller(1)One side be fixedly connected with contiguous block(7), the company Connect block(7)Positioned at strip through-hole(6)Inside, the backboard(2)The back side be additionally provided with two fixed blocks(8), two described solid Determine block(8)Adjacent one side offers neck(9), the fixed block(8)Inside offer the second chute(10), it is described Second chute(10)Internal slide be connected with the second sliding block(11), second sliding block(11)Close to contiguous block(7)Side Face is fixedly connected with connecting rod(12), the connecting rod(12)Outer surface be socketed with second spring(13), the connecting rod(12)It is remote Second sliding block(11)One end run through fixed block(8)And and contiguous block(7)Away from the first sliding block(4)One side be fixedly connected;
The backboard(2)The back side be further opened with two jacks(14), the jack(14)Inside be plugged with screw rod(15), institute State screw rod(15)One end run through jack(14)And extend to backboard(2)Outside, the screw rod(15)Outer surface thread connect It is connected to regulation ring(16), the backboard(2)Upper correspondence jack(14)Position be further opened with groove, the inside of groove is fixedly mounted There is bearing(17), the bearing(17)Inner surface fixed cover be connected to connection ring(18), the connection ring(18)Lateral surface with Regulation ring(16)Outer surface be fixedly connected, the screw rod(15)One end run through regulation ring(16)And extend to regulation ring(16) Outside, and screw rod(15)One end be also fixedly connected with pressing plate(19), the pressing plate(19)Close to screw rod(15)One side It is fixedly connected with two gag lever posts(20), the backboard(2)The back side correspondence gag lever post(20)Position offer spacing hole (21), the gag lever post(20)It is plugged on spacing hole(21)It is interior.
2. a kind of high efficiency alternating current-direct current double wire welding operational control device according to claim 1, it is characterised in that:The card Groove(9)Inside be bonded with cushion(22), the cushion(22)For rubber blanket.
3. a kind of high efficiency alternating current-direct current double wire welding operational control device according to claim 1, it is characterised in that:It is described to adjust Save ring(16)Diameter be pressing plate(19)Twice of height, the screw rod(15)With pressing plate(19)It is perpendicular.
4. a kind of high efficiency alternating current-direct current double wire welding operational control device according to claim 1, it is characterised in that:The spiral shell Bar(15)Length and gag lever post(20)Length it is identical, two gag lever posts(20)With screw rod(15)For with reference to symmetrical.
5. a kind of high efficiency alternating current-direct current double wire welding operational control device according to claim 1, it is characterised in that:The pressure Plate(19)Away from backboard(2)One side and fixed block(8)Away from backboard(2)One side be located at same vertical plane, it is described First chute(3)It is parallel to each other with horizontal plane.
6. a kind of high efficiency alternating current-direct current double wire welding operational control device according to claim 1, it is characterised in that:It is described solid Determine block(8)Away from backboard(2)One side and backboard(2)Back side institute angle degree scope be 30 to 50 degree, it is described solid Determine block(8)Close to backboard(2)One side and contiguous block(7)Away from the first sliding block(4)One side contact.
CN201720189400.0U 2017-03-01 2017-03-01 A kind of high efficiency alternating current-direct current double wire welding operational control device Expired - Fee Related CN206500746U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720189400.0U CN206500746U (en) 2017-03-01 2017-03-01 A kind of high efficiency alternating current-direct current double wire welding operational control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720189400.0U CN206500746U (en) 2017-03-01 2017-03-01 A kind of high efficiency alternating current-direct current double wire welding operational control device

Publications (1)

Publication Number Publication Date
CN206500746U true CN206500746U (en) 2017-09-19

Family

ID=59840830

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720189400.0U Expired - Fee Related CN206500746U (en) 2017-03-01 2017-03-01 A kind of high efficiency alternating current-direct current double wire welding operational control device

Country Status (1)

Country Link
CN (1) CN206500746U (en)

Similar Documents

Publication Publication Date Title
CN206689782U (en) A kind of outer casing of power supply processing fixing device
CN207027016U (en) A kind of clamping device of electrokinetic cell aluminum hull processing
CN107350830A (en) A kind of clamping device of electrokinetic cell aluminum hull processing
CN207043232U (en) A kind of high efficiency cable swage
CN210321809U (en) Capacitive touch screen detection device
CN207915596U (en) A kind of PVC pipe cutter device
CN207255703U (en) A kind of clamping device of power battery aluminum hull processing
CN205996577U (en) A kind of drilling jig
CN206065738U (en) A kind of electric fan weld jig positioner
CN201950588U (en) Fast clamp and mobile device
CN206500746U (en) A kind of high efficiency alternating current-direct current double wire welding operational control device
CN208358076U (en) A kind of reinforcing bar truss of angle steel welder
CN207189604U (en) A kind of pipe clamping processing frame
CN207087217U (en) A kind of Work fixing device of butt welding machine
CN206779980U (en) It is a kind of can bidirectional modulation motor shaft milling machine V-arrangement fixture
CN210589320U (en) Spring production and processing is with bending structure who has fixture
CN209465729U (en) A kind of machining flange hole tooling
CN208186270U (en) A kind of board construction of LED awning lamp
CN207082984U (en) A kind of motor clamping device
CN206306115U (en) A kind of modular unit robot
CN207818942U (en) A kind of circuit maintenance grounding wire device
CN201455142U (en) Straightening device of energy-saving steel wire rope
CN213291529U (en) Middle seal molding adjustable structure
CN208111723U (en) A kind of electric welding ground wire pincers
CN208358307U (en) Clamping frame is used in a kind of cutting of aluminum alloy mould plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 223300, Huaiyin Normal University, 111 West Changjiang Road, Huaiyin District, Huaian, Jiangsu

Patentee after: Huaiyin Normal College

Address before: 223300 No. 71 traffic road, Jiangsu, Huaian

Patentee before: Huaiyin Normal College

CP02 Change in the address of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170919

Termination date: 20180301

CF01 Termination of patent right due to non-payment of annual fee