CN206496448U - Air handling system - Google Patents
Air handling system Download PDFInfo
- Publication number
- CN206496448U CN206496448U CN201720177507.3U CN201720177507U CN206496448U CN 206496448 U CN206496448 U CN 206496448U CN 201720177507 U CN201720177507 U CN 201720177507U CN 206496448 U CN206496448 U CN 206496448U
- Authority
- CN
- China
- Prior art keywords
- air
- air port
- port
- room
- handling system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model is related to a kind of air handling system, and it includes at least one outdoor air port and at least two indoor air ports;Ventilation air channel is formed between at least one described outdoor air port and an indoor air port, outdoor air also interior can be pumped to by room air pump drainage to outdoor;Temperature adjustment air channel is formed between indoor air port described at least two, refrigerating/heating can be carried out to room air;Air handling system includes single mode of operation and work in combination pattern;Under single mode of operation, air handling system can realize any one in exhausting waste gas, introduction fresh air, temperature adjustment function;Under work in combination pattern, air handling system can realize at least one of following function:Exhausting waste gas introduces fresh air function, exhausting waste gas simultaneously while temperature adjustment function, introduction fresh air are while temperature adjustment function, exhausting waste gas are while introduce fresh air and temperature adjustment function.The utility model disclosure satisfy that a variety of regulatory demands of the people to air, save installing space.
Description
Technical field
The utility model is related to air adjustment field of purification, more particularly to a kind of air handling system.
Background technology
With the continuous improvement of living standard, the continuous improvement of living conditions, requirement of the people to air quality is increasingly
It is high.For example:For kitchen space, existing smoke exhaust ventilator can realize pump drainage oil flue waste gas, but can not to kitchen inletting fresh air, or
Person, can not be freezed or be heated in the case where kitchen temperature is too high or too low.Although having developed in the market special
Suitable for the air-conditioning in kitchen, but product in the market only has refrigeration or heat-production functions, can't realize smoke pumping, ventilation etc.
A variety of functions.Prior art also has air conditioner type smoke exhaust ventilator, although realize input fresh air and fume exhausting function, but without system
Cold function;Or, although realize refrigeration and pump drainage oil flue waste gas function, but without heating or ventilatory etc..
Furthermore, for other interior spaces such as bathroom, smoking room, also have refrigeration, heat, exhausting waste gas, introduce fresh air etc.
It is a variety of to require.
Because the interior spaces such as kitchen, bathroom, smoking room are limited, if meeting a variety of air tune by installing plurality of devices
Section demand, then space-consuming is big, while also influenceing indoor beauty.
Utility model content
The purpose of this utility model is to propose a kind of air handling system, and it has a variety of regulatory functions, disclosure satisfy that many
Air conditioning requirements are planted, and space-consuming is smaller.
To achieve the above object, the utility model provides a kind of air handling system, and it includes at least one outdoor wind
Mouth and at least two indoor air ports;Ventilation air channel is formed between at least one described outdoor air port and an indoor air port,
The ventilation air channel can realize exhausting waste gas function by room air pump drainage to outdoor, and the ventilation air channel also can be by room
Outer air is pumped to interior, realizes and introduces fresh air function;Temperature adjustment air channel, the tune are formed between indoor air port described at least two
Warm air road can carry out refrigerating/heating to room air, realize temperature adjustment function;
The air handling system includes single mode of operation and work in combination pattern;
Under the single mode of operation, the air handling system can realize exhausting waste gas function, introduce fresh air function,
Any one in temperature adjustment function;
Under the work in combination pattern, the air handling system can realize at least one of following function:Pump drainage
Waste gas introduces fresh air function, exhausting waste gas simultaneously while temperature adjustment function, introduction fresh air are while temperature adjustment function, exhausting waste gas are while draw
Enter fresh air and temperature adjustment function.
One preferably or in alternative embodiment, the ventilation air channel includes the first ventilation air channel and the second ventilation air channel, institute
Stating the first ventilation air channel is used for room air pump drainage to outdoor, realizes exhausting waste gas function;The second ventilation air channel is used for
Outdoor air is pumped to interior, realizes and introduces fresh air function.
One preferably or alternative embodiment in, the air handling system have introduce fresh air simultaneously temperature adjustment function when, institute
Air handling system is stated at least including air port, the described first outdoor wind in the first outdoor air port, the first indoor air port and second Room
The first ventilation air channel, the described first outdoor air port and wind in the second Room are formed between mouth and the described first indoor air port
Formed between mouthful in the second ventilation air channel, the described first indoor air port and the second Room and form the temperature adjustment between air port
Air channel.
One preferably or in alternative embodiment, the air handling system has exhausting waste gas temperature adjustment function, introduction simultaneously
Fresh air simultaneously temperature adjustment function when, the air handling system at least includes the first outdoor air port, the first indoor air port, in second Room
Air port and the 3rd indoor air port, the first ventilation wind is formed between the described first outdoor air port and the first indoor air port
Wind in the second ventilation air channel, the second Room is formed in road, the described first outdoor air port and the second Room between air port
The temperature adjustment air channel is formed between mouth and the described 3rd indoor air port.
One preferably or alternative embodiment in, the air handling system there is exhausting waste gas and meanwhile introduce fresh air function,
Introduce fresh air simultaneously temperature adjustment function when, the air handling system at least includes the first outdoor air port, second Room outer air port, first
Air port in indoor air port, second Room, first ventilation is formed between the described first outdoor air port and the first indoor air port
The second ventilation air channel is formed in air channel, the outer air port of the second Room and the second Room between air port, described first is indoor
The temperature adjustment air channel is formed in air port and the second Room between air port.
One preferably or alternative embodiment in, the air handling system there is exhausting waste gas and meanwhile introduce fresh air function,
Exhausting waste gas simultaneously temperature adjustment function, introducing fresh air, temperature adjustment function, exhausting waste gas introduce fresh air and during temperature adjustment function simultaneously simultaneously, institute
Stating air handling system at least includes the first outdoor air port, the outer air port of second Room, the first indoor air port, air port and the in second Room
Three indoor air ports, form the first ventilation air channel between the described first outdoor air port and the first indoor air port, and described the
Air port and described the are formed in the second ventilation air channel, the second Room in two outdoor air ports and the second Room between air port
The temperature adjustment air channel is formed between three indoor air ports.
One preferably or in alternative embodiment, air handling system includes air channel conversion device, is changed by the air channel
Device is used to realize the conversion between each air channel.
One preferably or in alternative embodiment, the indoor air port and the outdoor air port are equipped with independent control valve
Door, the opening and closing for controlling each air port.
One preferably or in alternative embodiment, the second ventilation air channel provided with air cleaning unit and/or for freezing/
The register heated.
One preferably or in alternative embodiment, the temperature adjustment air channel is provided with air cleaning unit and/or for freezing/making
The register of heat.
One preferably or alternative embodiment in, the register include compressor, outdoor heat exchanger, indoor heat exchanger and
Expansion valve.
One preferably or in alternative embodiment, the indoor heat exchanger is two or more, can make the temperature adjustment
Realize dehumidification function in air channel.
One preferably or in alternative embodiment, the indoor heat exchanger is two, respectively the first indoor heat exchanger and the
Two indoor heat exchangers, are provided with the second expansion valve, described the between first indoor heat exchanger and second indoor heat exchanger
The first expansion valve is provided between two indoor heat exchangers and the outdoor heat exchanger.
Based on above-mentioned technical proposal, the utility model at least has the advantages that:
The air handling system that the utility model is provided includes single mode of operation and work in combination pattern;In single work
Under pattern, air handling system can realize any one in exhausting waste gas function, introduction fresh air function, temperature adjustment function;
Under work in combination pattern, air handling system can realize at least one of following function:Exhausting waste gas introduces fresh air simultaneously
Function, exhausting waste gas are while temperature adjustment function, introduction fresh air are while temperature adjustment function, exhausting waste gas introduce fresh air and temperature adjustment work(simultaneously
Energy.The air handling system that the utility model is provided disclosure satisfy that a variety of regulatory demands of the people to air, and many without installing
Equipment is planted, installing space is saved.
Brief description of the drawings
Accompanying drawing described herein is used for providing further understanding to of the present utility model, constitutes the part of the application,
Schematic description and description of the present utility model is used to explain the utility model, does not constitute to of the present utility model improper
Limit.In the accompanying drawings:
The structural representation for the air handling system wherein specific embodiment that Fig. 1 provides for the utility model.
Label in accompanying drawing:
The outdoor air ports of 1- first;The indoor air ports of 2- first;Air port in 3- second Rooms;The indoor air ports of 4- the 3rd;5- first is changed
Gas air channel;The ventilations of 6- second air channel;7- temperature adjustments air channel;The motors of 8- first;The motors of 9- second;10- air channel conversion devices;11- is empty
Air purifying apparatus;The indoor heat exchangers of 12- first;The indoor heat exchangers of 13- second;The expansion valves of 14- first;The expansion valves of 15- second;
16- outdoor units;17- liquid pipes;18- tracheaes.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in embodiment is carried out clear, complete
Ground is described.Obviously, described embodiment is only a part of embodiment of the present utility model, rather than whole embodiments.
Based on embodiment of the present utility model, the institute that those of ordinary skill in the art are obtained under the premise of creative work is not made
There is other embodiment, belong to the scope of the utility model protection.
In description of the present utility model, it is to be understood that term " " center ", " longitudinal direction ", " transverse direction ", "front", "rear",
The orientation or position relationship of the instruction such as "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", " outer " is based on accompanying drawing institutes
The orientation or position relationship shown, is for only for ease of description the utility model and simplifies description, rather than indicate or imply and be signified
Device or element must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that to this practicality
The limitation of novel protected scope.
The air handling system that the utility model is provided is applied to kitchen, can realize kitchen pump drainage oil flue waste gas, introduction
Fresh air, a variety of functions such as freeze, heat, dehumidifying;Other indoor scenarios such as bathroom, smoking room are also applied for simultaneously.
As shown in figure 1, an illustrative examples of the air handling system provided for the utility model, in the schematic reality
Apply in example, air handling system includes at least one outdoor indoor air port 2,3 in air port 1 and at least two;At least one outdoor wind
Form ventilation air channel 5,6 between mouthful 1 and an indoor air port 2,3, take a breath air channel 5,6 can by room air pump drainage to outdoor,
Exhausting waste gas function is realized, outdoor air can also be pumped to interior, realize and introduce fresh air function by ventilation air channel 5,6;At least
Temperature adjustment air channel 7 is formed between two indoor air ports 2,3, temperature adjustment air channel 7 can aspirate room air, to room air system
It is cold/to heat, interior is then emitted into again, realizes temperature adjustment function.
The air handling system that the utility model is provided includes single mode of operation and work in combination pattern.
Under single mode of operation, air handling system can realize exhausting waste gas function, introduce fresh air function, temperature adjustment work(
Any one in energy.
Under work in combination pattern, air handling system can realize at least one of following function:Exhausting waste gas is same
Shi Yinjin fresh air functions, exhausting waste gas are while temperature adjustment function, introduction fresh air are while temperature adjustment function, exhausting waste gas introduce fresh air simultaneously
And temperature adjustment function.
The air handling system that the utility model is provided has exhausting waste gas, introduces fresh air, room air is freezed,
A variety of regulatory functions such as heat, and by different modes of operation, the exclusive use of above-mentioned several functions, Huo Zheji can be realized
Used while planting function, disclosure satisfy that a variety of regulatory demands of the people to air, and plurality of devices need not be installed, saved and install
Space.
In the above-described embodiments, ventilation air channel 5,6 can include the first ventilation air channel 5 and second ventilation air channel 6, and first changes
Gas air channel 5 is used for room air pump drainage to outdoor, realizes exhausting waste gas function;Second ventilation air channel 6 is used for outdoor air
Interior is pumped to, realizes and introduces fresh air function.
In each above-mentioned embodiment, the first ventilation air channel 5 can be provided with the first motor 8, and the first motor 8 is used to provide power
By room air pump drainage to outdoor.Second ventilation air channel 6 can be provided with the second motor 9, and the second motor 9 is used to provide power by room
Outer air is pumped to interior.Temperature adjustment air channel 7 can be provided with the 3rd motor, and the 3rd motor aspirates room air for providing power
Carried out to temperature adjustment air channel 7 after refrigerating/heating, then be emitted into interior.
In each above-mentioned embodiment, the second ventilation air channel 6 can be provided with air cleaning unit 11, by setting air cleaning
Device 11 can be that the fresh air for guiding interior into carries out filtration, purification.
Further, second ventilation air channel 6 can also be provided with for refrigerating/heating register, by set refrigeration/
The register heated, for carrying out refrigerating/heating for the fresh air of introduction.
In each above-mentioned embodiment, temperature adjustment air channel 7 can be provided with the register for refrigerating/heating, be made by setting
Cold/register for heating, for carrying out refrigerating/heating for room air.
Further, temperature adjustment air channel 7 can also be provided with air cleaning unit 11, by setting air cleaning unit 11 can
Filtration, purification is carried out for room air.
In each above-mentioned embodiment, the register for refrigerating/heating can include compressor, outdoor heat exchanger, room
Interior heat exchange 12,13 and expansion valve 14,15.Compressor and outdoor heat exchanger are referred to as outdoor unit 16.The above-mentioned part of register
Annexation can be realized using prior art, no longer be described in detail herein.
One preferably or in alternative embodiment, indoor heat exchanger 12,13 can be two or more, so as to make
Realize dehumidification function in temperature adjustment air channel 7.
In one embodiment, indoor heat exchanger 12,13 can be two, respectively the first indoor heat exchanger 12 and the
Two indoor heat exchangers 13, are provided with the second expansion valve 15, second Room between the first indoor heat exchanger 12 and the second indoor heat exchanger 13
The first expansion valve 14 is provided between interior heat exchanger 13 and outdoor heat exchanger.
Using two or more indoor heat exchangers, the work(of the common heat pump air conditioner such as cooling and warming can be not only realized
Can, the functions such as dehumidifying can also be realized.
The air handling system that the utility model is provided can also include air channel conversion device 10, by setting air channel to change
Device 10 can realize the conversion between each air channel, for example, realize turning between the first ventilation air channel 5 and the second ventilation air channel 6
Change.
One preferably or in alternative embodiment, air channel conversion device 10 can include motor and flashboard, motor drive connection
Flashboard, flashboard is located at the first ventilation air channel 5, and the second ventilation air channel 6 works, and flashboard is located at the second ventilation air channel 6, the first ventilation
Air channel 5 works.
It should be noted that:Air channel conversion device 10 is except using said structure form, it would however also be possible to employ other structures shape
Formula realized, or is replaced using bellows processor, as long as the first ventilation air channel 5 and the second ventilation air channel 6 can be realized
Switching, the switching in air channel 6 of being taken a breath by the first ventilation air channel 5 and second, can realize indoor return air, indoor exhaust air row
Put, a variety of functions such as outdoor fresh air introduction.
Indoor air port and outdoor air port in each above-mentioned embodiment can be provided with independent control valve, for controlling
The opening and closing in each air port.
By the description of each above-mentioned embodiment, the air handling system that the utility model is provided can at least include following
Several specific embodiments.
First specific embodiment:
Air handling system, which has, introduces fresh air temperature adjustment function simultaneously.It is outdoor that air handling system can at least include first
First is formed between air port 3 in the indoor air port 2 in air port 1, first and second Room, the first outdoor indoor air port 2 in air port 1 and first to change
The second ventilation air channel 6, the first indoor air port 2 and second are formed in gas air channel 5, the first outdoor air port 1 and second Room between air port 3
The air-out of air port 3 in temperature adjustment air channel 7, the first indoor air port 2 air intake, second Room is formed between indoor air port 3.
In first specific embodiment, air handling system has single mode of operation, can make the first ventilation air channel 5,
A job in two ventilation air channels 6 and temperature adjustment air channel 7, two other does not work.
In first specific embodiment, because the first ventilation air channel 5 and second ventilation air channel 6 shares the first outdoor air port 1, the
One ventilation air channel 5 and second ventilation air channel 6 preferably single work, it is not recommended that work simultaneously.Can be by setting air channel converting means
10 are put, the conversion in the first ventilation air channel 5 and the second ventilation air channel 6 is realized.
In first specific embodiment, the first ventilation air channel 5 and temperature adjustment air channel 7 share the first indoor air port 2, the first ventilation wind
Road 5 and the preferably single work of temperature adjustment air channel 7, it is not recommended that work simultaneously.
In first specific embodiment, the second ventilation air channel 6 and temperature adjustment air channel 7 can also simultaneously be worked with single work.
In first specific embodiment, the second ventilation air channel 6 and temperature adjustment air channel 7 share air port 3 in second Room, the second ventilation wind
Road 6 and temperature adjustment air channel 7 can share same air cleaning unit 11, the register of refrigerating/heating, motor etc., to save sky
Between.
Second specific embodiment:
As shown in figure 1, air handling system has exhausting waste gas while temperature adjustment function, introduction fresh air are while temperature adjustment function.
Air handling system can be at least including the indoor wind in air port 3 and the 3rd in the first outdoor indoor air port 2 in air port 1, first, second Room
Mouth 4, the first outdoor air port 1 and first is formed in the first ventilation air channel 5, the first outdoor air port 1 and second Room between indoor air port 2
Formed between air port 3 in second ventilation air channel 6, second Room and form temperature adjustment air channel 7 between the indoor air port 4 in air port 3 and the 3rd, the
The air-out of air port 3 in three indoor air port 4 air intakes, second Room.
In second specific embodiment, air handling system has single mode of operation, can make the first ventilation air channel 5,
A job in two ventilation air channels 6 and temperature adjustment air channel 7, two other does not work.
In second specific embodiment, the first ventilation air channel 5 and second ventilation air channel 6 shares the first outdoor air port 1, and first changes
The ventilation air channel 6 preferably single work of gas air channel 5, second, it is not recommended that work simultaneously, when the first ventilation air channel 5 works, can be realized
Smoke pumping waste discharge airway dysfunction, when the second ventilation air channel 6 works, can realize the function to indoor introduction fresh air.Can be by setting
Air channel conversion device 10 is put, the conversion in the first ventilation air channel 5 and the second ventilation air channel 6 is realized.
In second specific embodiment, the first ventilation air channel 5 and temperature adjustment air channel 7 can also simultaneously be worked with single work.
In second specific embodiment, the second ventilation air channel 6 and temperature adjustment air channel 7 can also simultaneously be worked with single work.
In second specific embodiment, the second ventilation air channel 6 and temperature adjustment air channel 7 share air port 3 in second Room, the second ventilation wind
Road 6 and temperature adjustment air channel 7 can share same air cleaning unit 11, the register of refrigerating/heating, motor etc., to save sky
Between.
3rd specific embodiment:
Air handling system has exhausting waste gas while introducing fresh air function, introducing fresh air temperature adjustment function simultaneously.Air is adjusted
Section system can be at least including air port 3, first in the first outdoor air port 1, the outer air port of second Room, the first indoor air port 2, second Room
First is formed between the indoor air port 2 in outdoor air port 1 and first to take a breath air channel 5, the outer air port of second Room and air port 3 in second Room it
Between form second and take a breath air channel 6, form temperature adjustment air channel 7, the first indoor wind between air port 3 in the first indoor air port 2 and second Room
The air-out of air port 3 in 2 air intakes of mouth, second Room.
In 3rd specific embodiment, air handling system has single mode of operation, can make the first ventilation air channel 5,
A job in two ventilation air channels 6 and temperature adjustment air channel 7, two other does not work.
In 3rd specific embodiment, the first ventilation air channel 5 and second ventilation air channel 6 is completely independent, can with single work or
Work simultaneously.When the first ventilation air channel 5 and second ventilation air channel 6 works simultaneously, smoke pumping waste discharge is realized in the first ventilation air channel 5
Airway dysfunction, meanwhile, the function to indoor introduction fresh air is realized in the second ventilation air channel 6.
In 3rd specific embodiment, the first ventilation air channel 5 and temperature adjustment air channel 7 share the first indoor air port 2, the first ventilation wind
Road 5 and the preferably single work of temperature adjustment air channel 7, it is not recommended that work simultaneously.
In 3rd specific embodiment, the second ventilation air channel 6 and temperature adjustment air channel 7 can also simultaneously be worked with single work.
In 3rd specific embodiment, the second ventilation air channel 6 and temperature adjustment air channel 7 share air port 3 in second Room, the second ventilation wind
Road 6 and temperature adjustment air channel 7 can share same air cleaning unit 11, the register of refrigerating/heating, motor etc., to save sky
Between.
4th specific embodiment:
Air handling system has exhausting waste gas, and while introducing fresh air function, exhausting waste gas, temperature adjustment function, introduction are new simultaneously
Temperature adjustment function, exhausting waste gas introduce fresh air and temperature adjustment function to wind simultaneously simultaneously.Air handling system can include the first outdoor wind
Mouthful 1, the outer air port of second Room, the first indoor air port 2, the indoor air port 4 in air port 3 and the 3rd in second Room, the first outdoor air port 1 with
Second is formed in the ventilation of formation first air channel 5 between first indoor air port 2, the outer air port of second Room and second Room between air port 3 to change
Temperature adjustment air channel 7, the 3rd indoor air port 4 air intake, second are formed in gas air channel 6, second Room between the indoor air port 4 in air port 3 and the 3rd
The indoor air-out of air port 3.
In 4th specific embodiment, air handling system has single mode of operation, can make the first ventilation air channel 5,
A job in two ventilation air channels 6 and temperature adjustment air channel 7, two other does not work.
In 4th specific embodiment, the first ventilation air channel 5 and second ventilation air channel 6 is completely independent, can with single work or
Work simultaneously.When the first ventilation air channel 5 and second ventilation air channel 6 works simultaneously, smoke pumping waste discharge is realized in the first ventilation air channel 5
Airway dysfunction, meanwhile, the function to indoor introduction fresh air is realized in the second ventilation air channel 6.
In 4th specific embodiment, the first ventilation air channel 5 and temperature adjustment air channel 7 can also simultaneously be worked with single work.
In 4th specific embodiment, the second ventilation air channel 6 and temperature adjustment air channel 7 can also simultaneously be worked with single work.
In 4th specific embodiment, the first ventilation air channel 5, second ventilation air channel 6 and temperature adjustment air channel 7 can work simultaneously.
In 4th specific embodiment, the second ventilation air channel 6 and temperature adjustment air channel 7 share air port 3 in second Room, the second ventilation wind
Road 6 and temperature adjustment air channel 7 can share same air cleaning unit 11, the register of refrigerating/heating, motor etc., to save sky
Between.
The second ventilation air channel 6, temperature adjustment air channel 7 in aforementioned four specific embodiment can work independently or work simultaneously
Make.When the second ventilation air channel 6 and temperature adjustment air channel 7 work simultaneously, the second ventilation air channel 6 can be realized to indoor introduction fresh air
Function, temperature adjustment air channel 7 can realize refrigeration, heat and the regulatory function such as dehumidify.
The air handling system that the utility model is provided has a variety of ways of realization and regulatory function, and its operating method is not
Together, the function of realization is different, and several operating methods and the realization of the second specific embodiment of air handling system is set forth below
Function.
1st, exhausting waste gas function:
The first indoor outdoor air port 1 in air port 2 and first is opened, and the first motor 8 starts, and oil smoke enters from the first indoor air port 2
Enter the first ventilation air channel 5 again to the first outdoor air port 1, excluded.
2nd, fresh air function is introduced:
Air port 3 is opened in first outdoor air port 1 and second Room, and the second motor 9 starts, and fresh air is from the first outdoor air port
1, which enters second, takes a breath air channel 6, by air cleaning unit 11 and the register of refrigerating/heating, and last new gas is from second Room
The interior row of air port 3 is to interior.
3rd, refrigerating function:
The indoor air port 4 in air port 3 and the 3rd is opened in second Room, the second motor 9 and indoor set refrigerating operaton, refrigerant flow direction
Flowed into from liquid pipe 17, tracheae 18 flows out, the first expansion valve 14 and the part throttle of the second expansion valve 15;Indoor hot-air is from
Three indoor air ports 4 enter temperature adjustment air channel 7, by air cleaning unit 11, and heat exchanger carries out heat exchange cooling indoors, last cold
Air row of air port 3 out of second Room is cooled to indoor.
4th, heat-production functions:
The indoor air port 4 in air port 3 and the 3rd is opened in second Room, the second motor 9 and indoor set heating operation, refrigerant flow direction
Flowed into from tracheae 18, liquid pipe 17 flows out, the first expansion valve 14 and the standard-sized sheet of the second expansion valve 15;Cold air inside is from the 3rd indoor wind
Mouthfuls 4 enter temperature adjustment air channels 7, and by air cleaning unit 11, and indoors, heat exchanger is heated, and last hot-air is from second Room
The interior row of air port 3 is heated up to indoor.
5th, dehumidification function:
The indoor air port 4 in air port 3 and the 3rd is opened in second Room, the second motor 9 and indoor set dehumidifying operation, refrigerant flow direction
Flowed into from liquid pipe 17, tracheae 18 flows out, the standard-sized sheet of the first expansion valve 14 and the part throttle of the second expansion valve 15;Cold air inside
Enter temperature adjustment air channel 7 from the 3rd indoor air port 4, heat exchanger first passes through the first interior by air cleaning unit 11, and indoors
The cooling and dehumidifying of heat exchanger 12, is heated, last dry air row of air port 3 out of second Room by the second indoor heat exchanger 13
To interior.
6th, refrigeration and exhausting waste gas function:
1) the first indoor outdoor air port 1 in air port 2 and first is opened, and the first motor 8 starts, and oil smoke is from the first indoor air port 2
Into the first ventilation air channel 5 again to the first outdoor air port 1, excluded;
2) the indoor air port 4 in air port 3 and the 3rd is opened in second Room, the second motor 9 and indoor set refrigerating operaton, cold-producing medium stream
Flowed into from liquid pipe 17, tracheae 18 flows out, the first expansion valve 14 and the part throttle of the second expansion valve 15;Indoor hot-air from
3rd indoor air port 4 enters temperature adjustment air channel 7, and by air cleaning unit 11, and indoors, heat exchanger carries out heat exchange cooling, most
Cold air row of air port 3 out of second Room is cooled to indoor afterwards.
7th, heat and exhausting waste gas function:
1) the first indoor outdoor air port 1 in air port 2 and first is opened, and the first motor 8 starts, and oil smoke is from the first indoor air port 2
Into the first ventilation air channel 5 again to the first outdoor air port 1, excluded;
2) the indoor air port 4 in air port 3 and the 3rd is opened in second Room, the second motor 9 and indoor set heating operation, cold-producing medium stream
Flowed into from tracheae 18, liquid pipe 17 flows out, the first expansion valve 14 and the standard-sized sheet of the second expansion valve 15;Cold air inside is indoor from the 3rd
Air port 4 enters temperature adjustment air channel 7, and by air cleaning unit 11, and indoors, heat exchanger is heated, and last hot-air is from second
The indoor row of air port 3 is heated up to indoor.
8th, dehumidifying and exhausting waste gas function:
1) the first indoor outdoor air port 1 in air port 2 and first is opened, and the first motor 8 starts, and oil smoke is from the first indoor air port 2
Into the first ventilation air channel 5 again to the first outdoor air port 1, excluded;
2) the indoor air port 4 in air port 3 and the 3rd is opened in second Room, the second motor 9 and indoor set dehumidifying operation, cold-producing medium stream
Flowed into from liquid pipe 17, tracheae 18 flows out, the standard-sized sheet of the first expansion valve 14 and the part throttle of the second expansion valve 15;Indoor cold sky
Gas enters temperature adjustment air channel 7 from the 3rd indoor air port 4, and by air cleaning unit 11, and indoors, heat exchanger first passes through the first Room
The interior cooling and dehumidifying of heat exchanger 12, is heated, last dry air air port 3 out of second Room by the second indoor heat exchanger 13
Arrange to interior.
Several frequently seen regulatory function is only listed in the present embodiment, other functions of being realized by the utility model system are equal
Within the utility model protection domain.
The utility model does not limit to the specific installation site in each air port, can be according to specific installation environment depending on.
In description of the present utility model, it is to be understood that limited using the word such as " first ", " second ", " the 3rd "
Determine parts, it is only for be easy to distinguish above-mentioned parts, such as without Stated otherwise, above-mentioned word is not special
Implication, therefore it is not intended that limitation to the utility model protection domain.
Finally it should be noted that:Above example is only to illustrate the technical solution of the utility model rather than it is limited
System;Although the utility model is described in detail with reference to preferred embodiment, those of ordinary skill in the art should
Understand:Still embodiment of the present utility model can be modified or some technical characteristics are equally replaced
Change;Without departing from the spirit of technical solutions of the utility model, it all should cover in the claimed technical scheme of the utility model
Among scope.
Claims (13)
1. a kind of air handling system, it is characterised in that:Including at least one outdoor air port (1) and at least two indoor air ports
(2,3);Ventilation air channel (5,6), institute are formed between at least one described outdoor air port (1) and an indoor air port (2,3)
Exhausting waste gas function, the ventilation air channel (5,6) can be realized by room air pump drainage to outdoor by stating ventilation air channel (5,6)
Outdoor air can be pumped to interior, realize and introduce fresh air function;Formed and adjusted between indoor air port (2,3) described at least two
Warm air road (7), the temperature adjustment air channel (7) can carry out refrigerating/heating to room air, realize temperature adjustment function;
The air handling system includes single mode of operation and work in combination pattern;
Under the single mode of operation, the air handling system can realize exhausting waste gas function, introduce fresh air function, temperature adjustment
Any one in function;
Under the work in combination pattern, the air handling system can realize at least one of following function:Exhausting waste gas
Fresh air function, exhausting waste gas are introduced simultaneously while temperature adjustment function, introduction fresh air are while temperature adjustment function, exhausting waste gas are introduced newly simultaneously
Wind and temperature adjustment function.
2. air handling system as claimed in claim 1, it is characterised in that:The ventilation air channel (5,6) includes the first ventilation
Air channel (5) and the second ventilation air channel (6), first ventilation air channel (5) are used for room air pump drainage to outdoor, realize pump drainage
Waste gas function;Second ventilation air channel (6) is used to outdoor air being pumped to interior, realizes and introduces fresh air function.
3. air handling system as claimed in claim 2, it is characterised in that:The air handling system has introduction fresh air same
When temperature adjustment function, the air handling system at least includes in the first outdoor air port (1), the first indoor air port (2) and second Room
Air port (3), first ventilation air channel (5) is formed between the described first outdoor air port (1) and the first indoor air port (2),
Second ventilation air channel (6), described first are formed in described first outdoor air port (1) and the second Room between air port (3)
The temperature adjustment air channel (7) is formed in indoor air port (2) and the second Room between air port (3).
4. air handling system as claimed in claim 2, it is characterised in that:The air handling system has exhausting waste gas same
When temperature adjustment function, introduce fresh air temperature adjustment function simultaneously, the air handling system at least includes the first outdoor air port (1), first
Air port (3) and the 3rd indoor air port (4) in indoor air port (2), second Room, the described first outdoor air port (1) and first Room
First ventilation air channel (5), the described first outdoor air port (1) and air port (3) in the second Room are formed between interior air port (2)
Between form second ventilation air channel (6), formation between air port (3) and the described 3rd indoor air port (4) in the second Room
The temperature adjustment air channel (7).
5. air handling system as claimed in claim 2, it is characterised in that:The air handling system has exhausting waste gas same
Shi Yinjin fresh air functions, introduce fresh air temperature adjustment function simultaneously, the air handling system at least include the first outdoor air port (1),
The outer air port of second Room, the first indoor air port (2), air port (3), the described first outdoor air port (1) and first Room in second Room
Form first ventilation air channel (5) between interior air port (2), the outer air port of the second Room and air port (3) in the second Room it
Between formed in second ventilation air channel (6), the first indoor air port (2) and the second Room and form institute between air port (3)
State temperature adjustment air channel (7).
6. air handling system as claimed in claim 2, it is characterised in that:The air handling system has exhausting waste gas same
Shi Yinjin fresh air functions, exhausting waste gas are while temperature adjustment function, introduction fresh air are while temperature adjustment function, exhausting waste gas introduce fresh air simultaneously
And temperature adjustment function, the air handling system is at least including the first outdoor air port (1), the outer air port of second Room, the first indoor air port
(2), air port (3) and the 3rd indoor air port (4) in second Room, the described first outdoor air port (1) and the described first indoor air port (2)
Between form first ventilation air channel (5), formed between the outer air port of the second Room and air port (3) in the second Room described in
In second ventilation air channel (6), the second Room temperature adjustment air channel is formed between air port (3) and the 3rd indoor air port (4)
(7)。
7. air handling system as claimed in claim 1, it is characterised in that:Including air channel conversion device (10), by described
Air channel conversion device (10) is used to realize the conversion between each air channel.
8. air handling system as claimed in claim 1, it is characterised in that:The indoor air port and the outdoor air port are all provided with
There is independent control valve, the opening and closing for controlling each air port.
9. air handling system as claimed in claim 2, it is characterised in that:Second ventilation air channel (6) is net provided with air
(11) and/or the register for refrigerating/heating are put in makeup.
10. air handling system as claimed in claim 1, it is characterised in that:The temperature adjustment air channel (7) fills provided with air cleaning
Put (11) and/or the register for refrigerating/heating.
11. the air handling system as described in claim 9 or 10, it is characterised in that:The register includes compressor, room
External heat exchanger, indoor heat exchanger and expansion valve.
12. air handling system as claimed in claim 11, it is characterised in that:The indoor heat exchanger be two or two with
On, the temperature adjustment air channel (7) can be made to realize dehumidification function.
13. air handling system as claimed in claim 12, it is characterised in that:The indoor heat exchanger is two, is respectively
First indoor heat exchanger (12) and the second indoor heat exchanger (13), first indoor heat exchanger (12) in the second Room with changing
The second expansion valve (15) is provided between hot device (13), is provided between second indoor heat exchanger (13) and the outdoor heat exchanger
First expansion valve (14).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720177507.3U CN206496448U (en) | 2017-02-27 | 2017-02-27 | Air handling system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720177507.3U CN206496448U (en) | 2017-02-27 | 2017-02-27 | Air handling system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206496448U true CN206496448U (en) | 2017-09-15 |
Family
ID=59806649
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720177507.3U Active CN206496448U (en) | 2017-02-27 | 2017-02-27 | Air handling system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206496448U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106642419A (en) * | 2017-02-27 | 2017-05-10 | 珠海格力电器股份有限公司 | Air conditioning system |
CN108800412A (en) * | 2018-06-29 | 2018-11-13 | 池州市浮子信息技术服务有限公司 | A kind of Domestic hanging heating new wind turbine of refrigerating integrated formula |
-
2017
- 2017-02-27 CN CN201720177507.3U patent/CN206496448U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106642419A (en) * | 2017-02-27 | 2017-05-10 | 珠海格力电器股份有限公司 | Air conditioning system |
CN107975890A (en) * | 2017-02-27 | 2018-05-01 | 珠海格力电器股份有限公司 | Air handling system |
CN108800412A (en) * | 2018-06-29 | 2018-11-13 | 池州市浮子信息技术服务有限公司 | A kind of Domestic hanging heating new wind turbine of refrigerating integrated formula |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106642419A (en) | Air conditioning system | |
CN205717538U (en) | Mixed ventilation heating air conditioning equipment | |
CN110360700A (en) | A kind of air in kitchen regulating system | |
CN103615788B (en) | A kind of control method of air conditioner | |
CN102425820A (en) | Split-type air conditioner capable of realizing nighttime ventilation | |
CN202254004U (en) | Multifunctional air conditioner window machine | |
CN208237997U (en) | Air conditioner indoor unit | |
CN104776527A (en) | Indoor environment control unit and system, building system and passive building | |
CN206496448U (en) | Air handling system | |
CN206803381U (en) | Independent temperature-humidity control air-conditioning box | |
JP3506333B2 (en) | Ceiling heat recovery machine | |
CN106871395B (en) | Double-plate double-cold-source heat recovery fresh air handling unit | |
CN208253831U (en) | In conjunction with the recovery type heat split-type air conditioner of mechanical refrigeration and evaporation cooling technique | |
KR100929875B1 (en) | Air conditioner with noise reduction structure | |
CN109974261A (en) | A kind of air heat exchanger core | |
KR20110001753A (en) | Ventilating system for building | |
CN208952264U (en) | A kind of double plate heat recovery fresh air units of family formula | |
CN204301237U (en) | The energy-conservation evaporative condenser air conditioner system of a kind of overall process | |
CN102374601B (en) | Energy-saving-type intelligent air renewal system of integrated air conditioner | |
KR102143407B1 (en) | Heat exchnage ventilation apparatus | |
EA009575B1 (en) | Method for ventilating building facilities and a device therefor | |
CN205505217U (en) | Hydrophily heat exchange vent sash | |
JP2020148386A (en) | Pressure heat exchange ventilation type building | |
KR20070100434A (en) | Airconditioner system | |
CN202303760U (en) | Energy-saving intelligent fresh air ventilating system of integrated air conditioner |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |