CN206477337U - A kind of steel-pipe pile construction of diaphragm wall guider - Google Patents

A kind of steel-pipe pile construction of diaphragm wall guider Download PDF

Info

Publication number
CN206477337U
CN206477337U CN201720108701.6U CN201720108701U CN206477337U CN 206477337 U CN206477337 U CN 206477337U CN 201720108701 U CN201720108701 U CN 201720108701U CN 206477337 U CN206477337 U CN 206477337U
Authority
CN
China
Prior art keywords
steel
control wheel
pipe pile
guide rod
oriented
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720108701.6U
Other languages
Chinese (zh)
Inventor
张继红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Solid Earth Rock Engineering Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720108701.6U priority Critical patent/CN206477337U/en
Application granted granted Critical
Publication of CN206477337U publication Critical patent/CN206477337U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model is related to foundation pit enclosure and a kind of steel-pipe pile construction of diaphragm wall guider in pile foundation engineering field, including leading truck (3), guide rod (4), it is oriented to the part of control wheel (5) three, guiding control wheel (5) therein wraps axially directed control wheel and is oriented to two kinds of control wheel with reversing, guide rod (4) is connected with leading truck (3), control wheel (5) is oriented to be connected with guide rod (4), perpendicularity and flatness of the steel-pipe pile (1) in pile driving process can be controlled by being oriented to control wheel (5), guide rod (4) therein may be configured as comprising outside control cabinet (8), internal movable case (7), the combining structure of the part of oil cylinder (9) three, so as to conveniently realize the flexible of guide rod (4), the utility model can accurately control pile sinking perpendicularity and flatness, speed of application is fast, low cost.

Description

A kind of steel-pipe pile construction of diaphragm wall guider
Technical field
The utility model is related to foundation pit enclosure and pile foundation engineering field in Geotechnical Engineering field.
Background technology
Steel-pipe pile diaphragm wall is by being connected between the adjacent stake of steel-pipe pile between the stake of setting sealing earth-retaining, many steel-pipe piles being existed It is linked to be the continuous wall for being capable of earth-retaining sealing during construction as foundation pit enclosure structure, can recycling entirely.Steel-pipe pile diaphragm wall Set double buckle to be socketed between adjacent steel-pipe pile, found in work progress, it is parallel between construction perpendicularity and adjacent studs Degree is especially important to quality control on construction and speed of application to be solved, it is necessary to take further measures.
The content of the invention
The purpose of this utility model is to provide a kind of steel-pipe pile construction of diaphragm wall guider, and the guider can conveniently have The construction perpendicularity and flatness of effect ground control steel-pipe pile diaphragm wall, efficiency high, speed are fast.
The steel-pipe pile construction of diaphragm wall guider includes leading truck, guide rod, is oriented to the part of control wheel three, therein to lead Two kinds of control wheel is oriented to reversing including axially directed control wheel to control wheel, axially directed control wheel is to control steel-pipe pile along stake The utensil that can be rolled of axis direction positioning, reverses and is oriented to control wheel to control steel-pipe pile to roll around what stake axis direction rotated Utensil, guide rod is connected with leading truck, is oriented to control wheel and is connected with guide rod.
In above-mentioned steel-pipe pile construction of diaphragm wall guider, above-mentioned guide rod be can make guiding control wheel relative to Mobile utensil is connected between steel-pipe pile or stake.
In above-mentioned steel-pipe pile construction of diaphragm wall guider, above-mentioned leading truck includes two layers or multilayer knot up and down Structure, is connected between Rotating fields by column up and down.
In above-mentioned steel-pipe pile construction of diaphragm wall guider, above-mentioned guiding control wheel is with being oriented to by rotary shaft The tubular structure of bar connection.
In above-mentioned steel-pipe pile construction of diaphragm wall guider, above-mentioned guide rod includes outside control cabinet, internal shifting Dynamic case, the part of oil cylinder three, outside control cabinet therein are connected with leading truck, and internal movable case is by rotary shaft with being oriented to control wheel Connection, is connected between internal movable case and outside control cabinet by oil cylinder.
In above-mentioned steel-pipe pile construction of diaphragm wall guider, above-mentioned leading truck is with possessing the mechanical bottom of locomotive function Seat connection.
Steel-pipe pile construction of diaphragm wall guider of the present utility model, can quickly realize that the plug of steel-pipe pile diaphragm wall is applied Work, and the perpendicularity and flatness of steel-pipe pile diaphragm wall can be effectively accurately controlled, available for pattern foundation pit supporting structure and pile foundation engineering, peace Complete reliable, speed of application is fast, and cost is low.
Brief description of the drawings
Fig. 1 is that a kind of only steel-pipe pile including axially directed control wheel used in one embodiment of the present utility model is continuous Wall construction guiding device top view;
Fig. 2 is that one kind used in one embodiment of the present utility model includes axially directed control wheel with reversing guiding control The steel-pipe pile construction of diaphragm wall guider top view of wheel;
Fig. 3 is a kind of leading truck of steel-pipe pile construction of diaphragm wall guider used in one embodiment of the present utility model Side view;
Fig. 4 is the first of a kind of steel-pipe pile construction of diaphragm wall guider used in one embodiment of the present utility model It is oriented to control wheel and the guide rod structure detail of construction;
Fig. 5 is second of a kind of steel-pipe pile construction of diaphragm wall guider used in one embodiment of the present utility model It is oriented to control wheel and the guide rod structure detail of construction.
Embodiment
As one embodiment of the present utility model as shown in Fig. 1~Fig. 5, steel pipe of the present utility model is mainly introduced The structure construction and operation principle of stake construction of diaphragm wall guider.In the present embodiment, as shown in FIG. 1 to 3, steel-pipe pile connects Continuous wall construction guiding device includes leading truck (3), guide rod (4), is oriented to the part of control wheel (5) three, guiding control wheel therein (5) wrap axially directed control wheel and be oriented to two kinds of control wheel with reversing, in Fig. 1, give the planar cloth of axially directed control wheel Schematic diagram is put, axially directed control wheel is located at the not homonymy of steel-pipe pile (1) respectively, so that the plane position of controllable steel-pipe pile (1) Put, and relative can be rolled between steel-pipe pile (1) and guiding control wheel (5), therefore steel-pipe pile (1) is sinking to soil body work progress In, may be such that steel-pipe pile (1) be maintained at be oriented to control wheel (5) place plan-position it is motionless, so as to effectively control steel-pipe pile (1) Perpendicularity.In the present embodiment, two layers or more than two layers of guiding control wheel (5), the i.e. difference in steel-pipe pile (1) can be set Height and position sets guiding control wheel (5) as shown in Figure 1, it can be ensured that edge stake axle of the steel-pipe pile (1) during piling construction The positioning in line direction, in the present embodiment, can by guiding control wheel (5) as shown in Figure 1 according to diagonally disposed in the upper of taper pile Hypomere, can control the gradient of taper pile construction.In the present embodiment, steel-pipe pile diaphragm wall is during piling construction, often Occur torsion problem, under the influence of a pile positioning and the construction flatness of steel-pipe pile diaphragm wall, therefore need to set torsion be oriented to control Ratch, as shown in Figure 2.In fig. 2, it is identical with Fig. 1,2 pairs of axially directed control wheels are arranged, in addition, compared to Figure 1, increase Reverse for a pair and to be oriented to control wheels, reverse the plane position for being oriented to connector (2) between stake of the control wheel by controlling steel-pipe pile (1) Put, axis of the connector (2) not further around steel-pipe pile (1) during piling construction is reversed between making stake.In the present embodiment, it is oriented to Bar (4) is connected with leading truck (3), is oriented to control wheel (5) and is connected with guide rod (4).In the present embodiment, guide rod (4) is can The utensil that moves or stretch on leading truck (3) makes guiding control wheel (5) to be moved on guide rod (4), so just may be used To realize that moderately connector (2) and the space being oriented between control wheel (5) are big between regulation steel-pipe pile (1) and stake in work progress It is small, also it is suitable for the change in size of connector (2) between different steel-pipe piles (1) and stake.In the present embodiment, leading truck (3) can be wrapped Containing double-layer structure up and down, connected up and down between double-layer structure by column, as shown in Figure 3.In the present embodiment, it is oriented to control wheel (5) it can be bearing or the tubular structure being connected by rotary shaft (6) with guide rod (4) as shown in Figure 4.In order to It is easy to constructing operation, in the present embodiment, above-mentioned guide rod (4) can be designed as shown in Figure 5 comprising outside control cabinet (8), internal movable case (7), the combining structure of the part of oil cylinder (9) three, outside control cabinet (8) therein are connected with leading truck (3), Internal movable case (7) by rotary shaft (6) be oriented to control wheel (5) be connected, internal movable case (7) with outside control cabinet (8) it Between by oil cylinder (9) connect, between internal movable case (7) and oil cylinder (9), outside control cabinet (8) and oil cylinder (9) between can use (10) connection is sold, also can be using other type of attachment connections.In the present embodiment, tied using guide rod (4) as shown in Figure 5 Configuration formula, can easily control to be oriented to the flexible of control wheel (5), efficiency of construction is high by oil cylinder (9).In the present embodiment, lead It can be connected to frame (3) with possessing the mechanical pedestal of locomotive function, mechanical pedestal can use walking or track structure, in order to Leading truck (3) is quickly moved in work progress.
This patent includes but is not limited to alternative other construction methods used of professional person in the art.

Claims (6)

1. a kind of steel-pipe pile construction of diaphragm wall guider, it is characterized in that including leading truck (3), guide rod (4), being oriented to control wheel (5) three parts, guiding control wheel (5) therein includes axially directed control wheel and is oriented to two kinds of control wheel with reversing, axially directed The utensil that can be rolled that control wheel positions for control steel-pipe pile (1) along stake axis direction, it is control steel pipe to reverse and be oriented to control wheel Stake (1) utensil that can be rolled for rotate around stake axis direction, guide rod (4) is connected with leading truck (3), guiding control wheel (5) and Guide rod (4) is connected.
2. steel-pipe pile construction of diaphragm wall guider according to claim 1, it is characterized in that above-mentioned guide rod (4) is energy Enough make guiding control wheel (5) relative to utensil that (2) movement is connected between steel-pipe pile (1) or stake.
3. steel-pipe pile construction of diaphragm wall guider according to claim 1, it is characterized in that above-mentioned leading truck (3) is included Two layers or sandwich construction, are connected between Rotating fields by column up and down up and down.
4. steel-pipe pile construction of diaphragm wall guider according to claim 1, it is characterized in that above-mentioned guiding control wheel (5) For the tubular structure being connected by rotary shaft (6) with guide rod (4).
5. steel-pipe pile construction of diaphragm wall guider according to claim 1, it is characterized in that above-mentioned guide rod (4) is included Outside control cabinet (8), internal movable case (7), the part of oil cylinder (9) three, outside control cabinet (8) therein are connected with leading truck (3), Internal movable case (7) by rotary shaft (6) be oriented to control wheel (5) be connected, internal movable case (7) with outside control cabinet (8) it Between pass through oil cylinder (9) connect.
6. steel-pipe pile construction of diaphragm wall guider according to claim 1, it is characterized in that above-mentioned leading truck (3) and tool The mechanical pedestal of standby locomotive function is connected.
CN201720108701.6U 2017-02-04 2017-02-04 A kind of steel-pipe pile construction of diaphragm wall guider Active CN206477337U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720108701.6U CN206477337U (en) 2017-02-04 2017-02-04 A kind of steel-pipe pile construction of diaphragm wall guider

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720108701.6U CN206477337U (en) 2017-02-04 2017-02-04 A kind of steel-pipe pile construction of diaphragm wall guider

Publications (1)

Publication Number Publication Date
CN206477337U true CN206477337U (en) 2017-09-08

Family

ID=59754397

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720108701.6U Active CN206477337U (en) 2017-02-04 2017-02-04 A kind of steel-pipe pile construction of diaphragm wall guider

Country Status (1)

Country Link
CN (1) CN206477337U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110725302A (en) * 2019-10-25 2020-01-24 浙江省地矿建设有限公司 Construction method of prefabricated cast-in-place combined underground diaphragm wall
CN115262618A (en) * 2022-09-21 2022-11-01 南通市海洋水建工程有限公司 Boosting station steel structure foundation construction matching tool and method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110725302A (en) * 2019-10-25 2020-01-24 浙江省地矿建设有限公司 Construction method of prefabricated cast-in-place combined underground diaphragm wall
CN110725302B (en) * 2019-10-25 2021-12-07 浙江省地矿建设有限公司 Construction method of prefabricated cast-in-place combined underground diaphragm wall
CN115262618A (en) * 2022-09-21 2022-11-01 南通市海洋水建工程有限公司 Boosting station steel structure foundation construction matching tool and method thereof
CN115262618B (en) * 2022-09-21 2023-09-01 南通市海洋水建工程有限公司 Matched tooling and method for construction of booster station steel structure foundation

Similar Documents

Publication Publication Date Title
CN206477337U (en) A kind of steel-pipe pile construction of diaphragm wall guider
CN104568421B (en) Dynamic load testing testbed for agricultural mechanical rotary cultivation part
CN206782934U (en) A kind of winder
CN104568420B (en) Small multifunctional trolley based on soil bin testbed
CN101269563A (en) Superposition enclosing apparatus for continuous long expanded polytetrafluoroethylene sealing material
CN105804762A (en) Station-tunneling through and turn-over device for shield tunneling machine
CN204078022U (en) Rivers waterway revetment construction Special engineering ship
CN2921107Y (en) Deep-layer stirring core-inserting pile machine
CN205742196U (en) It is provided with the boring casing guider of correcting mechanism
CN107792215A (en) A kind of belt wheel industrial robot
CN104326382A (en) Cantilever beam and cantilever crane using same
CA2634606A1 (en) Foundation pile driver
CN107720586A (en) A kind of extra large work winch easy to remove
CN102286977A (en) Rotary drilling precast pile machine and construction method thereof
JP7306627B2 (en) Carriage with rail feeder
CN108331395A (en) The adjustable parking device in space, shutdown system and parking method
CN207376405U (en) A kind of new compacting machine
CN203292238U (en) Ellipse correction device
CN206233235U (en) A kind of architectural engineering pile driving equipment
CN206835766U (en) One kind automatically controls greenhouse
CN206779810U (en) A kind of rotary soldering tool for H profile steel post
CN110202584A (en) Legged type robot leg exercise modification method and system with semi-cylindrical foot end
CN105691772B (en) It folds by machine
CN203284819U (en) Righting and deviation rectifying system of pile body
CN106738835A (en) A kind of film double-sided Embosser

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20181107

Address after: 200086 502, room 4, Lane 306, Helen Road, Hongkou District, Shanghai.

Patentee after: Shanghai Solid Earth Rock Engineering Co., Ltd.

Address before: 200086 502, room 4, Lane 306, Helen Road, Hongkou District, Shanghai.

Patentee before: Zhang Jihong