CN206476389U - Piping lane Pipe installing conveying device - Google Patents
Piping lane Pipe installing conveying device Download PDFInfo
- Publication number
- CN206476389U CN206476389U CN201720170187.9U CN201720170187U CN206476389U CN 206476389 U CN206476389 U CN 206476389U CN 201720170187 U CN201720170187 U CN 201720170187U CN 206476389 U CN206476389 U CN 206476389U
- Authority
- CN
- China
- Prior art keywords
- pressing plate
- bolt hole
- baffle plate
- bearing
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 description 7
- 238000003466 welding Methods 0.000 description 6
- 239000000463 material Substances 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
Landscapes
- Warehouses Or Storage Devices (AREA)
Abstract
The utility model discloses a kind of piping lane Pipe installing conveying device, including pipe carrier and pressing plate, the pipe carrier includes roller and turning rolls, bearing is provided with the middle of the roller, the roller is arranged on the turning rolls by the bearing, the pressing plate has two, the turning rolls two ends are linked together by bolt and the first nut with the pressing plate respectively, the pressing plate is fixed on by screw rod and the second nut in the steelframe support beam for needing conveyance conduit to install, the turning rolls includes baffle plate and support, support is quadrilateral structure, wherein correspondence both sides in side are the short supports with bracket holes, other side is the long stent for being connected and being provided with the first bolt hole with short support by bracket holes, baffle plate setting has two, it is separately positioned on two short supports, bearing hole is provided with baffle plate, baffle plate is connected by bearing hole with the bearing.The utility model is easy to use, it is possible to increase Pipe installing efficiency.
Description
Technical field:
The utility model is related to a kind of Pipe installing conveying device, more particularly to a kind of piping lane Pipe installing conveying dress
Put.
Background technology:
The corridor of piping lane, i.e. pipeline, is the place that many pipelines are concentrated in chemical industry and its related class factory, along device
Or arranged outside factory building, it is usually in the air, to be propped up with support, forms the appearance similar with corridor, typically there is pipeline length, install
The features such as height is big, had the following problems when installing piping lane pipeline in the past:Crane is had bad luck to be taken for a long time, mechanical use time
It is long;Crane lifting hoisting point position is more, and repetition is returned the vehicle to the garage and knock off, car of standing, installed, and mechanical service efficiency is low;Live jack usage amount is big, construction
Cost is big;Set up weld bond shelf many, frame work and frame work materials'use amount are big;The wind-proof shed amount of setting up is big during welding;When pipeline is had bad luck,
It is dangerous big.
Utility model content:
Technical problem to be solved in the utility model is:Overcoming the deficiencies in the prior art, there is provided the convenient installation of one kind, energy
Enough improve the piping lane Pipe installing conveying device of installation effectiveness.
The utility model is for the technical solution adopted for solving the technical problem:
A kind of piping lane Pipe installing conveying device, including pipe carrier and pressing plate, the pipe carrier include roller
And turning rolls, bearing is provided with the middle of the roller, and the roller is arranged on the turning rolls by the bearing, the pressure
Plate has two, and the turning rolls two ends are linked together by bolt and the first nut with the pressing plate respectively, and the pressing plate leads to
Cross screw rod and the second nut is fixed in the steelframe support beam for needing conveyance conduit to install.
The turning rolls includes baffle plate and support, and support is quadrilateral structure, and wherein correspondence both sides in side are to carry support
The short support in hole, other side is the long stent for being connected and being provided with the first bolt hole with short support by bracket holes, and baffle plate is set
Two are equipped with, is separately positioned on two short supports, bearing hole is provided with baffle plate, baffle plate is connected by bearing hole and the bearing
Connect.
The second bolt hole and adjustable distance bolt hole are provided with the pressing plate, adjustable distance bolt hole is separately positioned on institute
State and two the second bolts hole, the position of the second bolt hole and institute are provided between the both sides of pressing plate, two adjustable distance bolts hole
The position for stating the first bolt hole matches, and the second bolt hole is fixed together with the first bolt hole by the first nut.
The height of the baffle plate is more than the radius of roller, and the pressing plate utilizes screw rod and second by adjustable distance bolt hole
Nut is fixed in the steelframe support beam for needing conveyance conduit to install.
Pipe carrier is fixed on using pressing plate, screw rod and nut in the steelframe support beam for needing conveyance conduit to install, Gu
Crane fixes erect-position in one end of steelframe support beam after fixed, and frame work, which only needs to set up in the position for needing to install, installs shelf, will
Weld bond frame rides upon the close position for installing pipeline just nearby, after pipeline is installed, and butt welding, welding are carried out in weld bond position
Terminate to promote it to be moved rearwards by, during first pipeline of counterpart, can stagger and install another pipeline in place, repeat to install just afterwards
Position, until this section of pipe row's installation.
Positive beneficial effect of the present utility model is:
1st, in the utility model when pipeline is installed, crane fixes erect-position, it is not necessary to which repetition is returned the vehicle to the garage and knock off, stands and car and wear
Dress, improves service efficiency, and then improve the installation effectiveness of pipeline.
2nd, processing sets up that shelf amount is few in the utility model, frame work and the usage amount of material is reduced, while welding position
Fixation is put, windproof fluffy quantity of setting up is reduced, and same position installs pipeline, and jack usage amount is reduced, so as to reduce early stage
Engineering input, with good economic benefit.
3rd, the utility model center platen carries adjustable distance bolt hole, steelframe support beam phase that can be with diversified forms
Match somebody with somebody, it is applied widely, with good practicality.
4th, in the utility model using pipe carrier come to being conveyed and being installed into discharge pipe in long pipe support, it is to avoid
The problems such as workload manually pulled is big, facilitates the installation of pipeline, and avoids the friction of pipeline and steelframe support beam, rises
To the effect of protective conduit.
Brief description of the drawings:
Fig. 1 is structural representation when the utility model piping lane Pipe installing conveying device is fixed;
Fig. 2 is Fig. 1 top view;
Fig. 3 is the structural representation of pipe carrier in Fig. 1;
Fig. 4 is Fig. 3 left view;
Fig. 5 is the structural representation of Fig. 1 center platens.
Embodiment:
The utility model is further explained and explanation with specific embodiment below in conjunction with the accompanying drawings:
Referring to Fig. 1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5:In figure, 1- pressing plates, 2- rollers, 3- bearings, 4- baffle plates, 5- bracket holes, 6-
Short support, the bolts hole of 7- first, 8- long stents, 9- steelframe support beams, 10- screw rods, the bolts hole of 11- second, 12- adjustable distance spiral shells
Keyhole, the nuts of 13- first, the nuts of 14- second.
Embodiment:A kind of piping lane Pipe installing conveying device, including pipe carrier and pressing plate 1, pipe carrier includes
Bearing 3 is provided with the middle of roller 2 and turning rolls, roller 2, roller 2 is arranged on turning rolls by bearing 3, and pressing plate 1 there are two,
Turning rolls two ends are linked together by bolt and the first nut 13 with pressing plate 1 respectively, and pressing plate 1 passes through the nut of screw rod 10 and second
14 are fixed in the steelframe support beam 9 for needing conveyance conduit to install.
Turning rolls includes baffle plate 4 and support, and support is quadrilateral structure, and wherein correspondence both sides in side are to carry bracket holes 5
Short support 6, other side is the long stent 8 for being connected and being provided with the first bolt hole 7 with short support 6 by bracket holes 5, baffle plate
4 are provided with two, be separately positioned on two short support 6, bearing hole is provided with baffle plate 4, baffle plate 4 passes through bearing hole and bearing
3 connections.
The second bolt hole 11 and adjustable distance bolt hole 12 are provided with pressing plate 1, adjustable distance bolt hole 12 is set respectively
Two the second bolts hole 11, the second bolt hole 11 are provided between the both sides of the pressing plate 1, two adjustable distance bolts hole 12
Position and the position of first bolt hole 7 match, the second bolt hole 11 and the first bolt hole 7 are solid by the first nut 13
It is scheduled on together.
The height of baffle plate 4 is more than the radius of roller 2, and pressing plate 1 utilizes screw rod 10 and second by adjustable distance bolt hole 12
Nut 14 is fixed in the steelframe support beam 9 for needing conveyance conduit to install.
Pipe carrier is fixed on the steelframe branch for needing conveyance conduit to install using pressing plate 1, the nut 14 of screw rod 10 and second
Support on beam 9, crane fixes erect-position in one end of steelframe support beam 9 after fixing, frame work only needs to set up in the position for needing to install
Shelf is installed, weld bond frame is ridden upon into the close position for installing pipeline just nearby, after pipeline is installed, in the progress pair of weld bond position
Mouth welding, welding terminates to promote the pipeline being welded to be moved rearwards by, during first pipeline of counterpart, can stagger and install another in place
Pipeline, repeats to install in place afterwards, until this section of pipe row's installation, after dismounting, can carry out the installation that pipe is arranged on next pipe support.
It is described above, only it is preferred embodiments of the present utility model, does not make any formal to the utility model
Limitation, it is every according to technical spirit of the present utility model above example is made it is any it is simple modification, equivalent variations with
Modification, still falls within the protection domain of technical solutions of the utility model.
Claims (4)
1. a kind of piping lane Pipe installing conveying device, including pipe carrier and pressing plate(1), it is characterized in that:The pipeline
Device includes roller(2)And turning rolls, the roller(2)Centre is provided with bearing(3), the roller(2)Pass through the bearing(3)
It is arranged on the turning rolls, the pressing plate(1)There are two, the turning rolls two ends pass through bolt and the first nut respectively(13)
With the pressing plate(1)Link together, the pressing plate(1)Pass through screw rod(10)With the second nut(14)Being fixed on needs delivery pipe
The steelframe support beam that road is installed(9)On.
2. piping lane Pipe installing conveying device according to claim 1, it is characterized in that:The turning rolls includes baffle plate(4)
And support, support is quadrilateral structure, and wherein correspondence both sides in side are to carry bracket holes(5)Short support(6), other side is
Pass through bracket holes(5)With short support(6)Connect and be provided with the first bolt hole(7)Long stent(8), baffle plate(4)It is provided with two
It is individual, it is separately positioned on two short supports(6)On, baffle plate(4)On be provided with bearing hole, baffle plate(4)Pass through bearing hole and the axle
Hold(3)Connection.
3. piping lane Pipe installing conveying device according to claim 1, it is characterized in that:The pressing plate(1)On be provided with
Two bolts hole(11)With adjustable distance bolt hole(12), adjustable distance bolt hole(12)It is separately positioned on the pressing plate(1)Two
Side, two adjustable distance bolts hole(12)Between be provided with two the second bolts hole(11), the second bolt hole(11)Position with
First bolt hole(7)Position match, the second bolt hole(11)With the first bolt hole(7)Pass through the first nut(13)Gu
It is scheduled on together.
4. piping lane Pipe installing conveying device according to claim 2, it is characterized in that:The baffle plate(4)Height be more than
Roller(2)Radius, the pressing plate(1)Pass through adjustable distance bolt hole(12)Utilize screw rod(10)With the second nut(14)It is fixed
In the steelframe support beam for needing conveyance conduit to install(9)On.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720170187.9U CN206476389U (en) | 2017-02-24 | 2017-02-24 | Piping lane Pipe installing conveying device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720170187.9U CN206476389U (en) | 2017-02-24 | 2017-02-24 | Piping lane Pipe installing conveying device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206476389U true CN206476389U (en) | 2017-09-08 |
Family
ID=59746527
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720170187.9U Expired - Fee Related CN206476389U (en) | 2017-02-24 | 2017-02-24 | Piping lane Pipe installing conveying device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206476389U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108482940A (en) * | 2018-04-17 | 2018-09-04 | 陕西建工安装集团有限公司 | A kind of pipeline mounting device and installation method |
-
2017
- 2017-02-24 CN CN201720170187.9U patent/CN206476389U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108482940A (en) * | 2018-04-17 | 2018-09-04 | 陕西建工安装集团有限公司 | A kind of pipeline mounting device and installation method |
CN108482940B (en) * | 2018-04-17 | 2023-11-14 | 陕西建工安装集团有限公司 | Pipeline conveying and installing device and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205675087U (en) | A kind of high-altitude pipe transporting mounting vehicle | |
CN203997798U (en) | Pipe conveyer bracket type truss | |
CN205048404U (en) | Combustion engine exhaust -heat boiler | |
CN205639870U (en) | A pipeline gallows is synthesized in heavy construction | |
CN206476389U (en) | Piping lane Pipe installing conveying device | |
CN106975890B (en) | Setting tool for the welding of fire hydrant connecting bend | |
CN207618963U (en) | It is a kind of using fork truck at the top of basement pipe laying device | |
CN206539784U (en) | A kind of cold and heat insulation thrust conduit saddle | |
CN205602588U (en) | Tubular product conveyor | |
CN103953061A (en) | Sea wind power guiding pipe frame foundation structure | |
CN203330611U (en) | Adjustable pipeline assembly welding bracket | |
CN201071684Y (en) | Sheave wheel platform connected by L shaped bolt | |
CN203808097U (en) | Foundation structure of offshore wind-power pipe frame | |
CN207508786U (en) | The special guider of spiral welded pipe Cutting dolly | |
CN209244088U (en) | A kind of simple long bolt bolt splicing joint structure for truss | |
CN201924941U (en) | Hoisting device for reinforced concrete pipe segment | |
CN201245402Y (en) | Transportation sling | |
CN202007019U (en) | Supporting device of belt conveyor | |
CN214658943U (en) | Standard knot main part and standard knot | |
CN204983865U (en) | Cross shaped steel | |
CN220266851U (en) | Hinge device for double-clamping-plate steel beam installation | |
CN210738065U (en) | Super long distance attachment device of vertical transportation equipment | |
CN203454088U (en) | Suspended type connecting device for supporting and hanging beams in large power station boiler roof system | |
CN205919006U (en) | Piping erection locking frame | |
CN111412330B (en) | Hoisting piece and hanging bracket at pipeline connecting position |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 450000 Zhengzhou, China Central Plains District, North Street, No. 2 West Station Patentee after: POWER CHINA HENAN ENGINEERING Co.,Ltd. Address before: 450051 Zhengzhou, China Central Plains District, North Street, No. 2 West Station Patentee before: POWERCHINA HENAN ENGINEERING Corp. |
|
CP03 | Change of name, title or address | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170908 |
|
CF01 | Termination of patent right due to non-payment of annual fee |