CN206457938U - A kind of complete bolted steel-combined concrete shear wall assembled module - Google Patents

A kind of complete bolted steel-combined concrete shear wall assembled module Download PDF

Info

Publication number
CN206457938U
CN206457938U CN201720040324.7U CN201720040324U CN206457938U CN 206457938 U CN206457938 U CN 206457938U CN 201720040324 U CN201720040324 U CN 201720040324U CN 206457938 U CN206457938 U CN 206457938U
Authority
CN
China
Prior art keywords
shear wall
steel
steel pipe
module
wall panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720040324.7U
Other languages
Chinese (zh)
Inventor
吴函恒
高立
姚欣梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changan University
Original Assignee
Changan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changan University filed Critical Changan University
Priority to CN201720040324.7U priority Critical patent/CN206457938U/en
Application granted granted Critical
Publication of CN206457938U publication Critical patent/CN206457938U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Panels For Use In Building Construction (AREA)

Abstract

The utility model discloses a kind of complete bolted steel-combined concrete shear wall assembled module, including steel pipe frame module and precast concrete shear wall plate module, the two can be according to modularization plant produced, " one " type of composition or " L " type, T-shape and " ten " type shear-wall element, and then form the stress system of fabricated shear wall structure, situ wet operation can be greatly reduced, Mechanization Level is high, save manpower, improve efficiency, and bolt connection structure is simple, construction is convenient, stress is reliable, it is widely used in structural steelwork, design theory and construction technology are ripe.

Description

A kind of complete bolted steel-combined concrete shear wall assembled module
Technical field
The utility model belongs to prefabricated construction technical field in architectural engineering, and in particular to a kind of full bolt connection Steel-combined concrete shear wall assembled module.
Background technology
It is an effective way for realizing building energy conservation emission reduction targets and housing industrialization to develop prefabrication.In advance The component and fitting production standard of assembled architecture processed, industrialization, production efficiency are high, and site operation mechanization, construction period is short, can To reduce building waste, harmful effect of the construction to environment is reduced, meets the Ecological Concept of " green low-carbon ", is to build in future The developing direction built.
Shear wall structure is the most frequently used structure type in many high residential buildings of China, therefore, and exploitation is adapted to prefabricated dress Shear wall structure system with formula, is the inevitable development trend of housing industrialization.But traditional fabricated shear wall structure is often Using the technical scheme of sleeve slip casting, second pouring etc. " wet type connection ", its switching performance is difficult to ensure that the overall stress of structure It is required that, and bar connecting is difficult, constructing operation and quality control difficulty are big, the duration is longer, construction cost increases, can not fully sent out Wave fabricated construction advantage.
The content of the invention
For above-mentioned problems of the prior art, the purpose of this utility model is that there is provided a kind of full bolt connection Steel-combined concrete shear wall assembled module, its component and fitting can according to modularization plant produced, scene pass through full spiral shell Bolt " dry type connection ", Mechanization Level is high, short construction period, and stress is reliable.
To achieve these goals, the utility model is adopted the following technical scheme that:
A kind of complete bolted steel-combined concrete shear wall assembled module, including steel pipe frame module and prefabricated Concrete shear wallboard module, the steel pipe frame module includes steel pipe and multiple junction steel plates, and multiple junction steel plates are distributed in On the side wall of steel pipe, the length direction of junction steel plate is consistent with the axis direction of steel pipe;The precast concrete shear wall template die Block includes being provided with steel reinforcement cage in wallboard, wallboard, and the surrounding of wallboard is provided with dentation built-in fitting, junction steel plate and dentation built-in fitting It is detachably connected.
Specifically, the steel pipe is square steel tube, and the junction steel plate is provided with one, two, three or four.
Specifically, when junction steel plate is provided with two and two junction steel plates are symmetricly set on two of square steel tube symmetrically When on the wall of side, steel pipe frame module can be connected to form " one " type shear wall list with two precast concrete shear wall plate modules Member.
Specifically, when junction steel plate is provided with two and two junction steel plates are arranged on two adjacent side walls of square steel tube When upper, steel pipe frame module can be connected to form " L " type shear-wall element with two precast concrete shear wall plate modules.
Specifically, when junction steel plate is provided with three and three junction steel plates are arranged on three side walls of square steel tube, Steel pipe frame module can be connected to form T-shape shear-wall element with three precast concrete shear wall plate modules.
Specifically, when junction steel plate is provided with four and four junction steel plates are arranged on four side walls of square steel tube, Steel pipe frame module can be connected to form " ten " type shear-wall element with four precast concrete shear wall plate modules.
Specifically, it is evenly equipped with the dentation built-in fitting between multiple sawtooth, adjacent saw-tooth and forms wave trough, is set on sawtooth Have and multiple bolts hole are evenly equipped with bolt hole, the junction steel plate, dentation built-in fitting is bolted with junction steel plate.
Specifically, the reinforcing steel bars of wallboards on the steel reinforcement cage bypasses the wave trough on the dentation built-in fitting.
Specifically, when described precast concrete shear wall plate module is arranged on above and below floor, positioned at upper The tooth that the precast concrete shear wall plate module and underlying precast concrete shear wall plate module of side pass through each self installation Shape built-in fitting is attached using the connected mode of bolt, after two dentation built-in fittings connections at the wave trough of dentation built-in fitting shape Into hole, passed through for floor bar.
Compared with prior art, the utility model has following technique effect:
1st, steel pipe frame and precast concrete shear wall plate can be according to modularization plant produceds, and scene passes through full bolt " dry type connection ", composition " one " type or " L " type, T-shape and " ten " type shear-wall element, and then form fabricated shear wall structure Stress system.High situ wet operation, Mechanization Level, saving manpower can be greatly reduced, efficiency, and bolt connection structure is improved Make simple, it is convenient to construct, stress is reliable, is widely used in structural steelwork, design theory and construction technology are ripe.
2nd, the utility model clear concept, using full bolt connection, connection is reliable, easy construction and system easy to control the quality, respectively Component and fitting can modularization plant produced, meet building industrialization development trend, with wide market application foreground.
Brief description of the drawings
Fig. 1 is the schematic diagram of steel pipe frame module, wherein, (a) is steel pipe frame mould when junction steel plate is set to one The schematic diagram of block, (b) is the signal of steel pipe frame module when junction steel plate is set to two on the symmetrical side of square steel tube Figure, (c) is the schematic diagram of steel pipe frame module when junction steel plate is set to two on the adjacent wall of square steel tube, and (d) is The schematic diagram of steel pipe frame module when junction steel plate is set to three, (e) is steel pipe side when junction steel plate is set to four The schematic diagram of frame module;
Fig. 2 is the schematic diagram of precast concrete shear wall plate module;
Fig. 3 is that steel pipe frame module is connected showing for a variety of shear-wall elements to be formed with precast concrete shear wall plate module It is intended to;Wherein, (a) is the schematic diagram of " one " type shear-wall element, and (b) is the schematic diagram of " L " type type shear-wall element, and (c) is The schematic diagram of T-shape type shear-wall element, (d) is the schematic diagram of " ten " type shear-wall element.
Fig. 4 is the signal of upper strata precast concrete shear wall plate module and lower floor's precast concrete shear wall plate module connection Figure;
Fig. 5 is the schematic diagram that dentation built-in fitting subdivision is molded;
Fig. 6 is the schematic diagram that reinforcing steel bars of wallboards bypasses the anchoring of dentation built-in fitting wave trough;
The label implication of each in figure:1-steel pipe frame module;1-1-steel pipe;1-2-junction steel plate;2-concrete Native shear wall slab module;2-1-steel reinforcement cage;2-2-dentation built-in fitting, 2-3-wallboard.
Explanation and illustration in further detail is made to scheme of the present utility model with reference to the accompanying drawings and detailed description.
Embodiment
Referring to Fig. 1 and Fig. 2, complete bolted steel-combined concrete shear wall assembled module of the present utility model, Including steel pipe frame module 1 and precast concrete shear wall plate module 2, the steel pipe frame module 1 includes steel pipe 1-1 and multiple Junction steel plate 1-2, multiple junction steel plate 1-2 are distributed on steel pipe 1-1 side wall, junction steel plate 1-2 length direction and steel pipe 1-1 axis direction is consistent;The precast concrete shear wall plate module 2 includes being provided with reinforcing bar in wallboard 2-3, wallboard 2-3 Cage 2-1, wallboard 2-3 surrounding are provided with dentation built-in fitting 2-2, junction steel plate 1-2 and are detachably connected with dentation built-in fitting 2-2.
The utility model is detachably connected by junction steel plate 1-2's and dentation built-in fitting 2-2, realizes steel pipe frame module 1 and the connection of precast concrete shear wall module 2, it is to avoid the defect that traditional " wet type connection " is brought, using " dry type connects Connect " mode, its Mechanization Level is high, short construction period, and stress is reliable.
Referring to Fig. 3, specifically, the steel pipe 1-1 is square steel tube, the junction steel plate 1-2 be provided with one, two, three It is individual or four.The steel pipe frame module 1 being differently formed according to junction steel plate 1-2 number, with precast concrete shear wall mould The combination connection of block 2 can make up " one " type, " L " type, T-shape or " ten " type shear-wall element, and then form assembled shearing The stress system of wall construction.Specific set-up mode is as follows:
When junction steel plate 1-2 is provided with two and two junction steel plate 1-2 be symmetricly set on square steel tube two symmetrically When on the wall of side, steel pipe frame module 1 can be connected to form " one " type shear wall list with two precast concrete shear wall plate modules 2 Member.
When junction steel plate 1-2 is provided with two and two junction steel plate 1-2 two adjacent side walls for being arranged on square steel tube When upper, steel pipe frame module 1 can be connected to form " L " type shear-wall element with two precast concrete shear wall plate modules 2.
When junction steel plate 1-2 is provided with three and three junction steel plate 1-2 are arranged on three side walls of square steel tube, steel Pipe frame module 1 can be connected to form T-shape shear-wall element with three precast concrete shear wall plate modules 2.
When junction steel plate 1-2 is provided with four and four junction steel plate 1-2 are arranged on four side walls of square steel tube, steel Pipe frame module 1 can be connected to form " ten " type shear-wall element with four precast concrete shear wall plate modules 2.
Junction steel plate 1-2 is provided with the steel pipe frame module 1 formed at one and may be provided at " one " type, " L " type, T-shape Or the side for the precast concrete shear wall plate module 2 not being connected in " ten " type shear-wall element with steel pipe frame module 1.
Specifically, it is evenly equipped with the dentation built-in fitting 2-2 between multiple sawtooth, adjacent saw-tooth and forms wave trough, on sawtooth It is provided with bolt hole, the junction steel plate 1-2 and is evenly equipped with multiple bolts hole, the pitch-row of adjacent bolt hole is 50mm~100mm, Dentation built-in fitting 2-2 is bolted with junction steel plate 1-2.The utility model uses the connected mode of bolt so that connection Mode is simple, and it is convenient to construct, and stress is reliable, and it is widely used in structural steelwork, and design theory and construction technology are ripe.
Referring to Fig. 5, dentation built-in fitting 2-2 molding mode is, using H types, I shaped steel or steel plate along dentate line subdivision and Into, open up bolt hole on the sawtooth of formation, the pitch-row of adjacent bolt hole is generally 50mm~100mm, and with junction steel plate 1-2 Pitch-row it is identical;Shear key, the cohesive force between enhancing and concrete are set on dentation built-in fitting 2-2.
Referring to Fig. 6, in order to ensure wall that steel reinforcement cage 2-1 is connected with dentation built-in fitting 2-2 on fastening, the steel reinforcement cage 2-1 Slab muscle bypasses the wave trough on the dentation built-in fitting 2-2.
Referring to Fig. 4, when precast concrete shear wall plate module 2 of the present utility model is arranged on above and below floor When, precast concrete shear wall plate module 2 above is with underlying precast concrete shear wall plate module 2 by each The dentation built-in fitting 2-2 of self installation is attached using the connected mode of bolt, in dentation after two dentation built-in fitting 2-2 connections Hole is formed at built-in fitting 2-2 wave trough, is passed through for floor bar.

Claims (9)

1.一种全螺栓连接的钢—混凝土组合剪力墙装配式模块,包括钢管边框模块(1)和预制混凝土剪力墙板模块(2),其特征在于,所述钢管边框模块(1)包括钢管(1-1)和多个连接钢板(1-2),多个连接钢板(1-2)分布在钢管(1-1)的侧壁上,连接钢板(1-2)的长度方向与钢管(1-1)的轴线方向一致;所述预制混凝土剪力墙板模块(2)包括墙板(2-3),墙板(2-3)内设置有钢筋笼(2-1),墙板(2-3)的四周设置有齿状预埋件(2-2),连接钢板(1-2)与齿状预埋件(2-2)可拆卸连接。1. A fully bolted steel-concrete composite shear wall assembly module, comprising a steel pipe frame module (1) and a prefabricated concrete shear wall panel module (2), characterized in that the steel pipe frame module (1) It includes a steel pipe (1-1) and a plurality of connecting steel plates (1-2), the plurality of connecting steel plates (1-2) are distributed on the side wall of the steel pipe (1-1), and the lengthwise direction of the connecting steel plates (1-2) Consistent with the axial direction of the steel pipe (1-1); the prefabricated concrete shear wall panel module (2) includes a wall panel (2-3), and a reinforcement cage (2-1) is arranged inside the wall panel (2-3) A toothed embedded part (2-2) is arranged around the wallboard (2-3), and the connecting steel plate (1-2) is detachably connected to the toothed embedded part (2-2). 2.如权利要求1所述的全螺栓连接的钢—混凝土组合剪力墙装配式模块,其特征在于,所述钢管(1-1)为方钢管,所述连接钢板(1-2)设置有一个、两个、三个或者四个。2. The steel-concrete composite shear wall assembly module of full bolt connection as claimed in claim 1, characterized in that, the steel pipe (1-1) is a square steel pipe, and the connecting steel plate (1-2) is set There are one, two, three or four. 3.如权利要求2所述的全螺栓连接的钢—混凝土组合剪力墙装配式模块,其特征在于,当连接钢板(1-2)设置有两个且两个连接钢板(1-2)对称设置在方钢管的两个对称的侧壁上时,钢管边框模块(1)与两个预制混凝土剪力墙板模块(2)能够连接形成“一”型剪力墙单元。3. The steel-concrete composite shear wall assembly module of full bolt connection as claimed in claim 2, is characterized in that, when connecting steel plate (1-2) is provided with two and two connecting steel plates (1-2) When symmetrically arranged on two symmetrical side walls of the square steel pipe, the steel pipe frame module (1) and the two prefabricated concrete shear wall panel modules (2) can be connected to form a "one" type shear wall unit. 4.如权利要求2所述的全螺栓连接的钢—混凝土组合剪力墙装配式模块,其特征在于,当连接钢板(1-2)设置有两个且两个连接钢板(1-2)设置在方钢管的两个相邻的侧壁上时,钢管边框模块(1)与两个预制混凝土剪力墙板模块(2)能够连接形成“L”型剪力墙单元。4. The steel-concrete composite shear wall assembly module of full bolt connection as claimed in claim 2, is characterized in that, when connecting steel plate (1-2) is provided with two and two connecting steel plates (1-2) When arranged on two adjacent side walls of the square steel pipe, the steel pipe frame module (1) and two prefabricated concrete shear wall panel modules (2) can be connected to form an "L"-shaped shear wall unit. 5.如权利要求2所述的全螺栓连接的钢—混凝土组合剪力墙装配式模块,其特征在于,当连接钢板(1-2)设置有三个且三个连接钢板(1-2)设置在方钢管的三个侧壁上时,钢管边框模块(1)与三个预制混凝土剪力墙板模块(2)能够连接形成“T”型剪力墙单元。5. The steel-concrete composite shear wall assembly module of full bolt connection as claimed in claim 2, is characterized in that, when connecting steel plates (1-2) are provided with three and three connecting steel plates (1-2) are provided with When on the three side walls of the square steel pipe, the steel pipe frame module (1) and three prefabricated concrete shear wall panel modules (2) can be connected to form a "T"-shaped shear wall unit. 6.如权利要求2所述的全螺栓连接的钢—混凝土组合剪力墙装配式模块,其特征在于,当连接钢板(1-2)设置有四个且四个连接钢板(1-2)设置在方钢管的四个侧壁上时,钢管边框模块(1)与四个预制混凝土剪力墙板模块(2)能够连接形成“十”型剪力墙单元。6. The steel-concrete composite shear wall assembly module of full bolt connection as claimed in claim 2, is characterized in that, when the connecting steel plate (1-2) is provided with four and four connecting steel plates (1-2) When arranged on the four side walls of the square steel pipe, the steel pipe frame module (1) and the four prefabricated concrete shear wall panel modules (2) can be connected to form a "ten" type shear wall unit. 7.如权利要求1所述的全螺栓连接的钢—混凝土组合剪力墙装配式模块,其特征在于,所述齿状预埋件(2-2)上均布有多个锯齿,相邻锯齿之间形成波槽,锯齿上设置有螺栓孔,所述连接钢板(1-2)上均布有多个螺栓孔,齿状预埋件(2-2)与连接钢板(1-2)通过螺栓连接。7. The fully bolted steel-concrete composite shear wall assembly module according to claim 1, characterized in that a plurality of sawtooths are evenly distributed on the tooth-shaped embedded parts (2-2), adjacent to each other. Wave grooves are formed between the serrations, bolt holes are provided on the serrations, multiple bolt holes are evenly distributed on the connecting steel plate (1-2), the tooth-shaped embedded parts (2-2) and the connecting steel plate (1-2) Connected by bolts. 8.如权利要求7所述的全螺栓连接的钢—混凝土组合剪力墙装配式模块,其特征在于,所述钢筋笼(2-1)上的墙板钢筋绕过所述齿状预埋件(2-2)上的波槽。8. The fully bolted steel-concrete composite shear wall assembly module according to claim 7, characterized in that, the wallboard reinforcement on the reinforcement cage (2-1) bypasses the tooth-shaped pre-embedded groove on piece (2-2). 9.如权利要求7所述的全螺栓连接的钢—混凝土组合剪力墙装配式模块,其特征在于,当所述的预制混凝土剪力墙板模块(2)安装在楼板的上方和下方时,位于上方的预制混凝土剪力墙板模块(2)和位于下方的预制混凝土剪力墙板模块(2)通过各自安装的齿状预埋件(2-2)采用螺栓的连接方式连接,两个齿状预埋件连接后在齿状预埋件的波槽处形成洞口,用于楼板钢筋穿越。9. The fully bolted steel-concrete composite shear wall assembly module as claimed in claim 7, characterized in that, when the prefabricated concrete shear wall panel module (2) is installed above and below the floor slab , the upper precast concrete shear wall panel module (2) and the lower precast concrete shear wall panel module (2) are connected by bolts through the tooth-shaped embedded parts (2-2) respectively installed, and the two After the two tooth-shaped embedded parts are connected, an opening is formed at the wave groove of the tooth-shaped embedded parts, which is used for the crossing of the floor steel bars.
CN201720040324.7U 2017-01-13 2017-01-13 A kind of complete bolted steel-combined concrete shear wall assembled module Expired - Fee Related CN206457938U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720040324.7U CN206457938U (en) 2017-01-13 2017-01-13 A kind of complete bolted steel-combined concrete shear wall assembled module

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720040324.7U CN206457938U (en) 2017-01-13 2017-01-13 A kind of complete bolted steel-combined concrete shear wall assembled module

Publications (1)

Publication Number Publication Date
CN206457938U true CN206457938U (en) 2017-09-01

Family

ID=59695619

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720040324.7U Expired - Fee Related CN206457938U (en) 2017-01-13 2017-01-13 A kind of complete bolted steel-combined concrete shear wall assembled module

Country Status (1)

Country Link
CN (1) CN206457938U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107542185A (en) * 2017-09-30 2018-01-05 沈阳建筑大学 Assemble frame-shear structure curved scissors type combination keyway attachment structure and assembly method
CN107642179A (en) * 2017-09-30 2018-01-30 沈阳建筑大学 Assembled frame-shear structure steel plate keyway attachment structure and assembling method
CN108104310A (en) * 2017-12-01 2018-06-01 沈阳建筑大学 Assembled frame-shear structure column splitlevel connection structure and assembling method
CN113944255A (en) * 2021-11-26 2022-01-18 中国二十冶集团有限公司 Prefabricated shear wall connecting joint with Z-shaped connecting piece and construction method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107542185A (en) * 2017-09-30 2018-01-05 沈阳建筑大学 Assemble frame-shear structure curved scissors type combination keyway attachment structure and assembly method
CN107642179A (en) * 2017-09-30 2018-01-30 沈阳建筑大学 Assembled frame-shear structure steel plate keyway attachment structure and assembling method
CN107542185B (en) * 2017-09-30 2023-12-01 新疆玉龙河建设工程有限公司 Bending shear type combined key slot connecting structure of assembly frame shear structure and assembly method
CN107642179B (en) * 2017-09-30 2023-12-08 新疆玉龙河建设工程有限公司 Key groove connecting structure of steel plate of assembled frame shear structure and assembling method
CN108104310A (en) * 2017-12-01 2018-06-01 沈阳建筑大学 Assembled frame-shear structure column splitlevel connection structure and assembling method
CN108104310B (en) * 2017-12-01 2023-12-05 新疆中联建设工程有限公司 Assembled frame shear structure column staggered connection structure and assembling method
CN113944255A (en) * 2021-11-26 2022-01-18 中国二十冶集团有限公司 Prefabricated shear wall connecting joint with Z-shaped connecting piece and construction method thereof

Similar Documents

Publication Publication Date Title
CN206457938U (en) A kind of complete bolted steel-combined concrete shear wall assembled module
CN110158806A (en) A kind of assembled steel reinforced concrete shear force wall bolt fastening structure and preparation method thereof
CN206467788U (en) A kind of concrete floor magnetic bolts attachment structure
CN209179247U (en) A kind of novel precast reinforced concrete shearing force wall connection structure
CN107060074B (en) A kind of assembled Special-Shaped Column-concrete system
CN105239720A (en) Prefabricated assembled steel-concrete composite beam connected by adopting high-strength bolt
CN106759879A (en) Precast prestressed concrete frame is from rehabilitation energy dissipation node and its construction method
CN105804283A (en) Full assembly type steel pipe concrete side frame combined shear wall structure
CN108797840A (en) Prefabricated concrete shear force wall assembled connected node
CN109403509A (en) Assembled composite shear wall based on self-resetting combined end post-slurry anchor shear wall
CN106703290A (en) Detachable-assembly type concrete-filled steel tube column and construction method thereof
CN208502068U (en) A kind of partial precast assembly prestress girder with rolled steel section en cased in concrete
CN205712498U (en) A kind of precast wall body and prefabricated post or the attachment structure of dry wall
CN108643585A (en) Precast concrete sandwich heat preservation Side fascia and its preparation construction method
CN110685359B (en) Wallboard and steel beam slidable connection joint structure and construction method thereof
CN208899692U (en) Rigid connection node between fabricated concrete shear wall and out-of-plane beam
CN103696607A (en) Prestressed assembled board column structure with steel supports and construction method thereof
CN111021635A (en) Three-pipe rebar connector for rebar connection between fabricated concrete shear walls
CN206298957U (en) Bilateral formula precast prestressed concrete frame is from rehabilitation energy dissipation node
CN206562760U (en) A kind of new concrete building wall template
CN204850139U (en) Prefabricated assembled concrete shear force wall that reinforcing bar dislocation was laid
CN209468856U (en) A kind of assembly concrete column beam connecting node
CN206298955U (en) Unilateral formula precast prestressed concrete frame is from rehabilitation energy dissipation node
CN208502067U (en) A kind of partial precast assembly prestress steel reinforced concrete hybrid beam
CN216075495U (en) Prefabricated wallboard connected node

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170901

Termination date: 20180113