CN206455318U - A kind of welding for steel structure operation liftable is started to exchange fire basin and its attachment structure - Google Patents
A kind of welding for steel structure operation liftable is started to exchange fire basin and its attachment structure Download PDFInfo
- Publication number
- CN206455318U CN206455318U CN201621455482.0U CN201621455482U CN206455318U CN 206455318 U CN206455318 U CN 206455318U CN 201621455482 U CN201621455482 U CN 201621455482U CN 206455318 U CN206455318 U CN 206455318U
- Authority
- CN
- China
- Prior art keywords
- steel
- welding
- started
- basin
- exchange fire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
A kind of welding for steel structure operation liftable is started to exchange fire basin and its attachment structure, the liftable starts to exchange fire basin including horizontal flame receiving hopper and vertical suspension apparatus, also include the connection component between flame receiving hopper and suspension apparatus, connection component includes being fixedly connected on the level connection joint cross bar in the middle part of flame receiving hopper on inwall, suspension apparatus includes aluminium alloy expansion link and steel is linked up with, the bottom of the aluminium alloy expansion link is fixedly connected with a steel base, weld at the middle part of steel base and level connection joint cross bar, a steel top cap is fixedly connected with the top of aluminium alloy expansion link, steel links up with the side welding with steel top cap.By reinforcing bar, at middle part, bending is formed steel hook, including horizon bar and the brace with horizon bar degree of being bent into angle, and one end of the horizon bar is welded with the side of steel top cap.The flexible lifting come the basin that controls to start to exchange fire of the utility model regulation hanger bar, adjusts the scope started to exchange fire, realizes the purpose started to exchange fire under a variety of welding for steel structure faces.
Description
Technical field
The utility model belongs to Construction of Steel Structure appurtenance, more particularly to a kind of liftable system and its company of starting to exchange fire
Binding structure.
Background technology
In building field, because steel construction steel structure system has from heavy and light, installs easy, short construction period, shock resistance
Well, the features such as gain quick return, low in the pollution of the environment, spatial modelling plasticity is strong is invested, increasing steel building starts to occur,
Especially in high-rise building.However, Construction of Steel Structure needs substantial amounts of welding and cutting operation, the always steel construction of getting angry
Pith, and how to prevent fires that to start to exchange fire be the difficult point that annoying Construction of Steel Structure always.Construction of Steel Structure proposes to connect at this stage
Fire pot is started to exchange fire system, is only applicable to the welding of general common furniture construction factory building steel column, and in high-rise building, steel construction
Span is big, specification is more, and size is complicated, and existing basin of starting to exchange fire is not easy to regulation, malfunction in use.
Utility model content
The purpose of this utility model is to provide a kind of welding for steel structure operation liftable and started to exchange fire basin and its attachment structure, to solve
Certainly tradition basin height fixation of starting to exchange fire of starting to exchange fire can not be adjusted, it is impossible to meet super high steel structure multi-span, many specifications, solder side size
The problem of differing, the technical problem for causing substantial amounts of financial resource and material resource to waste.
To achieve the above object, the utility model is adopted the following technical scheme that:
A kind of welding for steel structure operation liftable is started to exchange fire basin, is included the flame receiving hopper and vertical suspension apparatus of level, is also wrapped
The connection component between flame receiving hopper and suspension apparatus is included, the connection component is included being fixedly connected in the middle part of flame receiving hopper on inwall
Level connection joint cross bar,
The suspension apparatus includes aluminium alloy expansion link and steel is linked up with, and the aluminium alloy expansion link closes for aluminium nested layer by layer
Jin Guan, the bottom of the aluminium alloy expansion link is fixedly connected with a steel base, and the middle part of the steel base and level connection joint cross bar is welded
Connect, a steel top cap is fixedly connected with the top of the aluminium alloy expansion link, the steel hook and the side of steel top cap are welded.
By reinforcing bar, at middle part, bending is formed the steel hook, including horizon bar and the brace with horizon bar degree of being bent into angle,
Welded with the side of steel top cap one end of the horizon bar.
The flame receiving hopper is the rectangle bucket being welded by galvanized iron sheet, including the side plate that bottom plate and surrounding are enclosed.
The twice that the connection component also includes welding on the inwall of two pieces of relative side plate corresponding positions are vertically connected
Vertical pole, the two ends of the level connection joint cross bar are vertically connected vertical pole welding with twice respectively.
The level connection joint cross bar is reinforcing bar or shaped steel.
The vertical connection vertical pole is reinforcing bar or shaped steel.
The splashproof fire prevention rock wool cloth soaked is completely equipped with the flame receiving hopper.
A kind of welding for steel structure operation liftable is started to exchange fire the attachment structure of basin, including welding for steel structure operation liftable is started to exchange fire
Basin and steel construction plate, the steel are articulated on steel construction plate.
The steel construction plate is shaped steel top flange plate, and the crooked place of the horizon bar and brace is hooked in the shaped steel top flange
On the edge of plate.
The utility model has the characteristics that and beneficial effect compared with prior art:
The utility model is by the scalable outstanding aluminium alloy rod of lightweight, and starting to exchange fire, basin is suspended under the pad of steel construction
Side, the flexible lifting come the basin that controls to start to exchange fire of regulation hanger bar adjusts the scope started to exchange fire, realized under a variety of welding for steel structure faces
The purpose started to exchange fire, it is simple to operate, labor productivity can be improved.
The utility model also solves the connectivity problem of aluminium alloy rod and disk of starting to exchange fire, it is ensured that the steadiness for basin of starting to exchange fire,
It can be linked up with when in use by fixed steel simultaneously, to realize the flexible of aluminium alloy rod, so that the lifting of whole basin of starting to exchange fire is reached,
Basin of starting to exchange fire is met flexibly to use on narrow and small complicated solder side.
Brief description of the drawings
The utility model is described in more detail below in conjunction with the accompanying drawings.
Fig. 1 is basin structural representation of the present utility model of starting to exchange fire.
Fig. 2 is the schematic diagram of basin attachment structure of the present utility model of starting to exchange fire.
Reference:1- flame receiving hoppers, 1.1- bottom plates, 1.2- side plates, 2- level connection joints cross bar, 3- aluminium alloys stretch
Bar, 4- steel hook, 4.1- horizon bars, 4.2- braces, 5- steel bases, 6- steel top cap, 7-, which vertically connect vertical pole, 8-, to be prevented
Splash fire prevention rock wool cloth, 9- shaped steel top flange plates.
Embodiment
Embodiment is shown in Figure 1, and a kind of welding for steel structure operation liftable is started to exchange fire basin, includes the He of flame receiving hopper 1 of level
Vertical suspension apparatus, in addition to the connection component between flame receiving hopper and suspension apparatus, the connection component include being fixedly connected
In the level connection joint cross bar 2 in the middle part of flame receiving hopper on inwall.
The suspension apparatus includes aluminium alloy expansion link 3 and steel hook 4, and the aluminium alloy expansion link 3 is nesting layer by layer
Aluminium-alloy pipe, the bottom of the aluminium alloy expansion link is fixedly connected with a steel base 5, the steel base 5 and level connection joint cross bar 2
Middle part is welded, and the top of the aluminium alloy expansion link 3 is fixedly connected with a steel top cap 6, the steel hook 4 and the one of steel top cap 6
Weld side.
By reinforcing bar, at middle part, bending is formed steel hook 4, including horizon bar 4.1 and with degree of the being bent into angle of horizon bar 4.1
Brace 4.2, be 45 degree in the present embodiment, one end of the horizon bar 4.1 and the side welding of steel top cap 6.
The flame receiving hopper 1 is the rectangle bucket being welded by galvanized iron sheet, including the side plate that bottom plate 1.1 and surrounding are enclosed
1.2.The twice that the connection component also includes welding on the inwall of two pieces of relative corresponding positions of side plate 1.2 vertically connect vertical
Bar 7, the two ends of the level connection joint cross bar 2 are vertically connected vertical pole 7 with twice respectively and welded.In the present embodiment, flame receiving hopper makes
The galvanized iron sheet for being more than 0.5mm with thickness, the height of side plate is 150mm, and the width and length of bottom plate are not less than 400mm.
The level connection joint cross bar is reinforcing bar or shaped steel.The vertical connection vertical pole is reinforcing bar or shaped steel.In the present embodiment,
Both are diameter 15mm reinforcing bar,
The splashproof fire prevention rock wool cloth 8 soaked is completely equipped with the flame receiving hopper 1, water is added when using, fireproof is played
Effect.
A kind of welding for steel structure operation liftable is started to exchange fire the attachment structure of basin, including welding for steel structure operation liftable is started to exchange fire
Basin and steel construction plate, the steel hook 4 are articulated on steel construction plate.
It is shown in Figure 2, when the steel construction plate is shaped steel top flange plate 9, the horizon bar 4.1 and brace 4.2
Crooked place is hooked on the edge of the shaped steel top flange plate.
In use, aluminium alloy expansion link can freely adjust the height for basin of starting to exchange fire, the welding for steel structure of diverse location is reached
It is liftable to require.
Claims (9)
- The basin 1. a kind of welding for steel structure operation liftable is started to exchange fire, includes the flame receiving hopper of level(1)With vertical suspension apparatus, it is special Levy and be:Also include the connection component between flame receiving hopper and suspension apparatus, the connection component includes being fixedly connected on flame receiving hopper Level connection joint cross bar on the inwall of middle part(2),The suspension apparatus includes aluminium alloy expansion link(3)With steel hook(4), the aluminium alloy expansion link(3)For nesting layer by layer Aluminium-alloy pipe, the bottom of the aluminium alloy expansion link is fixedly connected with a steel base(5), the steel base(5)With level connection joint Cross bar(2)Middle part welding, the aluminium alloy expansion link(3)Top be fixedly connected with a steel top cap(6), the steel hook (4)With steel top cap(6)Side welding.
- The basin 2. welding for steel structure operation liftable according to claim 1 is started to exchange fire, it is characterised in that:The steel hook(4) By reinforcing bar, at middle part, bending is formed, including horizon bar(4.1)With with horizon bar(4.1)The brace at degree of being bent into angle(4.2), it is described Horizon bar(4.1)One end and steel top cap(6)Side welding.
- The basin 3. welding for steel structure operation liftable according to claim 1 or 2 is started to exchange fire, it is characterised in that:The flame receiving hopper (1)It is the rectangle bucket being welded by galvanized iron sheet, including bottom plate(1.1)The side plate enclosed with surrounding(1.2).
- The basin 4. welding for steel structure operation liftable according to claim 3 is started to exchange fire, it is characterised in that:The connection component is also Including two blocks of relative side plates(1.2)The twice welded on the inwall of corresponding position vertically connect vertical pole(7), the level company Connect cross bar(2)Two ends be vertically connected vertical pole with twice respectively(7)Welding.
- The basin 5. the welding for steel structure operation liftable according to claim 1 or 4 is started to exchange fire, it is characterised in that:The level connects Cross bar is connect for reinforcing bar or shaped steel.
- The basin 6. welding for steel structure operation liftable according to claim 4 is started to exchange fire, it is characterised in that:The vertical connection is vertical Bar is reinforcing bar or shaped steel.
- The basin 7. welding for steel structure operation liftable according to claim 3 is started to exchange fire, it is characterised in that:The flame receiving hopper(1) Inside completely it is equipped with the splashproof fire prevention rock wool cloth soaked(8).
- The attachment structure of basin 8. a kind of welding for steel structure operation liftable is started to exchange fire, including according to claim 2-7 any one institute The welding for steel structure operation liftable stated is started to exchange fire basin and steel construction plate, it is characterised in that:The steel hook(4)It is articulated in steel construction On plate.
- The attachment structure of basin 9. welding for steel structure operation liftable according to claim 8 is started to exchange fire, it is characterised in that:It is described Steel construction plate is shaped steel top flange plate(9), the horizon bar(4.1)With brace(4.2)Crooked place hook in the shaped steel upper limb On the edge of listrium.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621455482.0U CN206455318U (en) | 2016-12-28 | 2016-12-28 | A kind of welding for steel structure operation liftable is started to exchange fire basin and its attachment structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621455482.0U CN206455318U (en) | 2016-12-28 | 2016-12-28 | A kind of welding for steel structure operation liftable is started to exchange fire basin and its attachment structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206455318U true CN206455318U (en) | 2017-09-01 |
Family
ID=59696540
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621455482.0U Active CN206455318U (en) | 2016-12-28 | 2016-12-28 | A kind of welding for steel structure operation liftable is started to exchange fire basin and its attachment structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206455318U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110469115A (en) * | 2019-08-28 | 2019-11-19 | 盐城工学院 | A kind of wind-driven generator concrete towers forming table shaping apparatus |
CN113118671A (en) * | 2021-03-25 | 2021-07-16 | 中国建筑第八工程局有限公司 | Suspended fire receiving hopper and using method thereof |
-
2016
- 2016-12-28 CN CN201621455482.0U patent/CN206455318U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110469115A (en) * | 2019-08-28 | 2019-11-19 | 盐城工学院 | A kind of wind-driven generator concrete towers forming table shaping apparatus |
CN113118671A (en) * | 2021-03-25 | 2021-07-16 | 中国建筑第八工程局有限公司 | Suspended fire receiving hopper and using method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106337589B (en) | Adjustable frustum of a cone class Hold Ceiling lift umbrella shape load steel structure and its construction method | |
CN206455318U (en) | A kind of welding for steel structure operation liftable is started to exchange fire basin and its attachment structure | |
CN202280266U (en) | Dismounting type wind-proof shed for full-automatic welding operation | |
CN203684631U (en) | Tripod construction platform structure for blast furnace shell | |
CN201794286U (en) | Hanging combined external scaffold and triangular supporting device thereof | |
CN214498388U (en) | Assembled overhanging formwork support bent | |
CN211118011U (en) | Assembled comprehensive support and hanger | |
CN102815631B (en) | Plug-in tower crane support frame | |
CN202466923U (en) | Suspended ceiling counter support | |
CN204940863U (en) | External wall construction outside large form bracket | |
CN206536146U (en) | A kind of magnetic absorption metal welds fire welding device | |
CN205764649U (en) | Welding process operation platform | |
CN205509388U (en) | Three cascades climbing crane span structure | |
CN205024920U (en) | Portable glass steel house beam structure for house | |
CN204782207U (en) | Supporting structure of be used for chimney steel inner tube | |
CN205617565U (en) | Upper assembling type steel corbel of thermal power factory structure | |
CN208347287U (en) | External hanging type mobile repairs vehicle | |
CN206786650U (en) | Lamp slot hanger device | |
CN204920416U (en) | Simple and easy transmission tower structure | |
CN205973671U (en) | Hanging flower basket linkage | |
CN205558030U (en) | Crossbeam structure for assembly type structure | |
CN211569862U (en) | Prefabricated hoist and mount piece of building convenient to dismouting | |
CN204418715U (en) | A kind of removable operating platform of encorbelmenting | |
CN204531467U (en) | A kind of superposed beam, plate support bar tripod | |
CN202829377U (en) | Outer-hanging tower crane support frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |