CN206438600U - A kind of steel construction of Fast Installation - Google Patents
A kind of steel construction of Fast Installation Download PDFInfo
- Publication number
- CN206438600U CN206438600U CN201621427580.3U CN201621427580U CN206438600U CN 206438600 U CN206438600 U CN 206438600U CN 201621427580 U CN201621427580 U CN 201621427580U CN 206438600 U CN206438600 U CN 206438600U
- Authority
- CN
- China
- Prior art keywords
- steel plate
- contiguous block
- block
- fixedly connected
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of steel construction of Fast Installation, including the first steel plate and the second steel plate, the bottom of first steel plate is located at the top of the second steel plate, the bottom of first steel plate is fixedly connected with the first contiguous block, the second contiguous block is fixedly connected with the top of second steel plate, the first standing groove is offered at the top of second contiguous block, the front side of the second contiguous block inwall and rear side have been fixedly connected with sliding block.The utility model is by setting the first steel plate, the second steel plate, the first contiguous block, the second contiguous block, the first standing groove, sliding block, chute, rack, the first locating piece, the first support block, the second locating piece, the first locating slot, the second support block, the second locating slot, screw bolt and nut, solve existing steel construction installation when positioning time it is longer be unable to reach Fast Installation the problem of, the efficiency of Steel Structure Installation is improved, so as to reduce the cycle of construction.
Description
Technical field
The utility model is related to long strands field, specially a kind of steel construction of Fast Installation.
Background technology
The structure that steel construction is made up of steel material, is one of main building construction types, mainly by shaped steel and steel
The components such as girder steel, steel column, steel truss that plate etc. is made are constituted, generally using weld seam, bolt or rivet between each component or part
Connection, because its deadweight is lighter, and easy construction, it is widely used in the fields such as large-sized workshop, venue, Super High.
Steel construction is needed to use when large-scale house is built, but existing steel construction is when being attached
To be contacted by face with face, by welding or it is bolted, due to build it is larger when being docked, it is necessary to waste
Longer long-time is positioned to steel construction, steel structure connection and the speed installed is reduced, so as to reduce construction
Efficiency, waste the substantial amounts of time.
Utility model content
The purpose of this utility model is to provide a kind of steel construction of Fast Installation possess the advantage of quick location and installation,
Solve existing steel construction installation when positioning time it is longer be unable to reach Fast Installation the problem of.
To achieve the above object, the utility model provides following technical scheme:A kind of steel construction of Fast Installation, including the
One steel plate and the second steel plate, the bottom of first steel plate are located at the top of the second steel plate, and the bottom of first steel plate is fixed
It is connected with the top of the first contiguous block, second steel plate and is fixedly connected with the second contiguous block, the top of second contiguous block
The first standing groove is offered, the front side of the second contiguous block inwall and rear side have been fixedly connected with sliding block, first connection
The front side of block and rear side offer the chute used cooperatively with sliding block, and the both sides of second contiguous block, which have been fixedly connected with, puts
Frame is put, the bottom of the rack inwall is fixedly connected with the first locating piece, and the both sides of first contiguous block are fixedly connected with
Have and the second locating piece, the bottom symmetrical of first steel plate are fixedly connected with the top of the first support block, first support block
The first locating slot is offered, the bottom symmetrical of first steel plate is fixedly connected with the second support block, and the second support block is located at
The both sides of first locating slot, the bottom of second support block extends to the inside of rack, and the second support block is located at placement
The bottom of one end offers the second locating slot inside frame, and side of the rack away from the first contiguous block is through setting to there is spiral shell
Bolt, the right-hand member of the bolt sequentially passes through rack, the first support block, the second support block, the first contiguous block and the second contiguous block,
And it is connected with nut positioned at the thread surface of the terminal bolt of the first steel plate bottom right one.
It is preferred that, first locating piece is used cooperatively with the second locating slot, and the top of the first locating piece is determined with second
The bottom land contact of position groove.
It is preferred that, the surface of the bolt is socketed with pad, and pad is located at right side and the rack of the first contiguous block
Surface is contacted.
It is preferred that, second locating piece is used cooperatively with the first locating slot, and the top of the second locating piece is determined with first
The bottom land contact of position groove.
It is preferred that, the sliding block is used cooperatively with chute, the bottom of first contiguous block and the second contiguous block inwall
Bottom is contacted, the top contact of the bottom of first steel plate and the top of rack and the second contiguous block.
Compared with prior art, the beneficial effects of the utility model are as follows:
1st, the utility model is by setting the first steel plate, the second steel plate, the first contiguous block, the second contiguous block, first to place
Groove, sliding block, chute, rack, the first locating piece, the first support block, the second locating piece, the first locating slot, the second support block,
Two locating slots, screw bolt and nut, solving existing steel construction positioning time when installation longer is unable to reach quick peace
The problem of dress, the efficiency of Steel Structure Installation is improved, so as to reduce the cycle of construction.
2nd, the utility model plays by the setting of pad and is easy to bolt to be further fixed, and adds steel construction
Stability during connection, it is to avoid the phenomenon that dropping occurs after the completion of connection in steel construction occurs.
Brief description of the drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is the top view of the steel plate of the utility model second;
Fig. 3 is the upward view of the steel plate of the utility model second;
Fig. 4 is the utility model A-A partial enlarged drawing.
In figure:1 first steel plate, 2 second steel plates, 3 first contiguous blocks, 4 second contiguous blocks, 5 first standing grooves, 6 sliding blocks, 7
Chute, 8 racks, 9 first locating pieces, 10 first support blocks, 11 second locating pieces, 12 first locating slots, 13 second support blocks,
14 second locating slots, 15 bolts, 16 nuts, 17 pads.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belongs to the scope of the utility model protection.
Fig. 1-4, a kind of steel construction of Fast Installation, including the first steel plate 1 and the second steel plate 2 are referred to, the first steel plate 1
Bottom is located at the top of the second steel plate 2, and the bottom of the first steel plate 1 is fixedly connected with the first contiguous block 3, the top of the second steel plate 2
The second contiguous block 4 is fixedly connected with, the top of the second contiguous block 4 is offered before the first standing groove 5, the inwall of the second contiguous block 4
Side and rear side have been fixedly connected with sliding block 6, and sliding block 6 is used cooperatively with chute 7, by the setting of sliding block 6 and chute 7, is played just
In the effect being attached to the first steel plate 1 and the second steel plate 2, the effect that the first step is fixed, the bottom of the first contiguous block 3 have been reached
Portion is contacted with the bottom of the inwall of the second contiguous block 4, the bottom of the first steel plate 1 and the top of rack 8 and the top of the second contiguous block 4
Portion is contacted, and the front side of the first contiguous block 3 and rear side offer the chute 7 used cooperatively with sliding block 6, the two of the second contiguous block 4
Side has been fixedly connected with rack 8, and the bottom of the inwall of rack 8 is fixedly connected with the first locating piece 9, the first locating piece 9 and
Two locating slots 14 are used cooperatively, and the top of the first locating piece 9 is contacted with the bottom land of the second locating slot 14, passes through the first locating piece
9 and second locating slot 14 use cooperatively, the effect for being easy to the first steel plate 1 and the second steel plate 2 to be positioned, the first contiguous block 3
Both sides be fixedly connected with the first support block 10, the top of the first support block 10 is fixedly connected with the second locating piece 11, second
Locating piece 11 is used cooperatively with the first locating slot 12, and the top of the second locating piece 11 is contacted with the bottom land of the first locating slot 12,
By using cooperatively for the second locating piece 11 and the first locating slot 12, it is easy to the first steel plate 1 and the second steel plate 2 quickly to be positioned
Effect, improve the efficiency of steel construction positioning, the bottom symmetrical of the first steel plate 1 offers the first locating slot 12, the first steel plate 1
Bottom symmetrical be fixedly connected with the second support block 13, and the second support block 13 is located at the both sides of the first locating slot 12, second
The bottom of bracer 13 extends to the inside of rack 8, and the second support block 13 is offered positioned at the bottom of the inside one end of rack 8
Second locating slot 14, side of the rack 8 away from the first contiguous block 3 is through setting to there is bolt 15, and the surface of bolt 15 is socketed with
Pad 17, by the setting of pad 17, plays and is easy to bolt 15 to be further fixed, steady when adding steel structure connection
It is qualitative, it is to avoid the phenomenon that dropping occurs after the completion of connection in steel construction occurs, and pad 17 is located at the right side of first contiguous block 3
Contacted with the surface of rack 8, the right-hand member of bolt 15 sequentially passes through rack 8, the first support block 10, the second support block 13,
One contiguous block 3 and the second contiguous block 4, and it is connected with nut positioned at the thread surface of the terminal bolt 15 of 1 bottom right of the first steel plate one
16。
In use, when the first steel plate 1 and the second steel plate 2 are docked, by user on the first contiguous block 3
The sliding block 6 that is aligned inside the second contiguous block 4 of chute 7 docked, the first locating piece 9 is sticked into the second locating slot 14, it is logical
Cross the second locating piece 11 to stick into the first locating slot 12, be fixed by bolt 15.
In summary:The steel construction of the Fast Installation, by set the first steel plate 1, the second steel plate 2, the first contiguous block 3,
Second contiguous block 4, the first standing groove 5, sliding block 6, chute 7, rack 8, the first locating piece 9, the positioning of the first support block 10, second
Block 11, the first locating slot 12, the second support block 13, the second locating slot 14, bolt 15 and nut 16, solve existing steel construction
Install when positioning time it is longer be unable to reach Fast Installation the problem of.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art,
It is appreciated that these embodiments can be carried out in the case where not departing from principle of the present utility model and spirit a variety of changes, repaiies
Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of steel construction of Fast Installation, including the first steel plate (1) and the second steel plate (2), it is characterised in that:First steel
The bottom of plate (1) is located at the top of the second steel plate (2), and the bottom of first steel plate (1) is fixedly connected with the first contiguous block
(3), it is fixedly connected with the top of the second contiguous block (4), second contiguous block (4) and opens up at the top of second steel plate (2)
There is the first standing groove (5), the front side of the second contiguous block (4) inwall and rear side have been fixedly connected with sliding block (6), described first
The front side of contiguous block (3) and rear side offer the chute (7) used cooperatively with sliding block (6), the two of second contiguous block (4)
Side has been fixedly connected with rack (8), and the bottom of rack (8) inwall is fixedly connected with the first locating piece (9), described
The both sides of one contiguous block (3) have been fixedly connected with the top of the first support block (10), first support block (10) and have been fixedly connected
There is the second locating piece (11), the bottom symmetrical of first steel plate (1) offers the first locating slot (12), first steel plate
(1) bottom symmetrical is fixedly connected with the second support block (13), and the second support block (13) is located at the two of the first locating slot (12)
Side, the bottom of second support block (13) extends to the inside of rack (8), and the second support block (13) is located at rack
(8) bottom of internal one end offers the second locating slot (14), and side of the rack (8) away from the first contiguous block (3) is passed through
Wear to there is bolt (15), the right-hand member of the bolt (15) sequentially passes through rack (8), the first support block (10), the second support
Block (13), the first contiguous block (3) and the second contiguous block (4), and positioned at the table of the terminal bolt (15) of the first steel plate (1) bottom right one
Face is threaded with nut (16).
2. a kind of steel construction of Fast Installation according to claim 1, it is characterised in that:First locating piece (9) with
Second locating slot (14) is used cooperatively, and the top of the first locating piece (9) is contacted with the bottom land of the second locating slot (14).
3. a kind of steel construction of Fast Installation according to claim 1, it is characterised in that:The surface set of the bolt (15)
Pad (17) is connected to, and pad (17) is contacted positioned at the right side of the first contiguous block (3) with the surface of rack (8).
4. a kind of steel construction of Fast Installation according to claim 1, it is characterised in that:Second locating piece (11) with
First locating slot (12) is used cooperatively, and the top of the second locating piece (11) is contacted with the bottom land of the first locating slot (12).
5. a kind of steel construction of Fast Installation according to claim 1, it is characterised in that:The sliding block (6) and chute (7)
Use cooperatively, the bottom of first contiguous block (3) is contacted with the bottom of the second contiguous block (4) inwall, first steel plate (1)
Bottom and rack (8) top and the top contact of the second contiguous block (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621427580.3U CN206438600U (en) | 2016-12-23 | 2016-12-23 | A kind of steel construction of Fast Installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621427580.3U CN206438600U (en) | 2016-12-23 | 2016-12-23 | A kind of steel construction of Fast Installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206438600U true CN206438600U (en) | 2017-08-25 |
Family
ID=59647091
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621427580.3U Expired - Fee Related CN206438600U (en) | 2016-12-23 | 2016-12-23 | A kind of steel construction of Fast Installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206438600U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110778014A (en) * | 2019-11-08 | 2020-02-11 | 严克飞 | Light steel structure wall module |
CN112575903A (en) * | 2020-12-12 | 2021-03-30 | 深圳新艺华建筑装饰工程有限公司 | Ultrahigh special-shaped frame steel structure and construction method thereof |
-
2016
- 2016-12-23 CN CN201621427580.3U patent/CN206438600U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110778014A (en) * | 2019-11-08 | 2020-02-11 | 严克飞 | Light steel structure wall module |
CN110778014B (en) * | 2019-11-08 | 2021-07-30 | 华漾建设集团有限公司 | Light steel structure wall module |
CN112575903A (en) * | 2020-12-12 | 2021-03-30 | 深圳新艺华建筑装饰工程有限公司 | Ultrahigh special-shaped frame steel structure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201618894U (en) | Jig for gear shaping of rotary bearing internal gears | |
CN206438600U (en) | A kind of steel construction of Fast Installation | |
CN206047665U (en) | A kind of instrumental panel skeleton fixture | |
CN205571975U (en) | Numerical control efflux anchor clamps | |
CN203579273U (en) | Vice special for rotary machining center | |
CN105033696B (en) | A kind of flange processing platform | |
CN107256764B (en) | A kind of amorphous alloy transformer bottom location structure | |
CN204725062U (en) | Arm arm joint combined welding frock | |
CN207686018U (en) | A kind of construction site steel construction fastener | |
CN207710381U (en) | A kind of multi-station clamp for being convenient for a wall to process | |
CN210195038U (en) | Steel structure supporting column with good stability | |
CN201549133U (en) | Bolt tightening training table | |
CN109707151B (en) | Aluminum template structure for high-rise building | |
CN206254580U (en) | A kind of high-strength abrasion-proof novel energy-conserving liner plate | |
CN207171536U (en) | A kind of adjustable zinc-plated pipe fixing device | |
CN208221948U (en) | Attachment base is used in a kind of support of product | |
CN208451972U (en) | A kind of ceramic tile, which punches, universal determines hole device | |
CN207161881U (en) | A kind of para-seismic support longitudinal bracing connector | |
CN206335208U (en) | A kind of new screw burr remover | |
CN206636801U (en) | A kind of Sledge type immersible pump being moved easily | |
CN205480160U (en) | Aluminum alloy profile | |
CN207431734U (en) | A kind of high-precision horizontal Machining centers securing device | |
CN209496324U (en) | A kind of movable supporting legs of computer cabinet | |
CN204875746U (en) | Gyration trash cleaning machine sprocket variable -spacing adjustment structure | |
CN207566082U (en) | Plate-type work storage rack |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170825 Termination date: 20211223 |
|
CF01 | Termination of patent right due to non-payment of annual fee |