CN206418758U - A kind of scaffold board - Google Patents

A kind of scaffold board Download PDF

Info

Publication number
CN206418758U
CN206418758U CN201621376286.4U CN201621376286U CN206418758U CN 206418758 U CN206418758 U CN 206418758U CN 201621376286 U CN201621376286 U CN 201621376286U CN 206418758 U CN206418758 U CN 206418758U
Authority
CN
China
Prior art keywords
flange
fastening
hole
nut
hinged
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621376286.4U
Other languages
Chinese (zh)
Inventor
岳齐贤
王兴康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang 20 Smelter Construction Co ltd
China MCC20 Group Corp Ltd
Original Assignee
NINGBO MCC20 CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGBO MCC20 CONSTRUCTION CO Ltd filed Critical NINGBO MCC20 CONSTRUCTION CO Ltd
Priority to CN201621376286.4U priority Critical patent/CN206418758U/en
Application granted granted Critical
Publication of CN206418758U publication Critical patent/CN206418758U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

本实用新型提供了一种脚手板,包括:板体以及固定扣件,所述板体上开设有第一安装孔,所述板体的边缘上设置有第一孔销结构,所述固定扣件包括固定板、紧固螺栓、螺帽、两个紧固扣爪以及分别与两个所述紧固扣爪对应的两个连杆,所述固定扣件穿过所述第一安装孔并且抓扣在脚手架钢管上,所述紧固螺栓穿设在所述固定板上,所述螺帽螺纹连接在所述紧固螺栓上,两个所述紧固扣爪分别铰接在所述固定板的两侧,两个所述连杆的一端与所述螺帽铰接另一端与所述紧固扣爪铰接;本实用新型的有益效果为:拆装非常便利,和脚手架连接可靠,板体与挡脚板以及栏杆能够可靠的连接。

The utility model provides a scaffold board, comprising: a board body and a fixing fastener, the board body is provided with a first installation hole, the edge of the board body is provided with a first hole pin structure, and the fixing buckle The component includes a fixing plate, a fastening bolt, a nut, two fastening claws and two connecting rods respectively corresponding to the two fastening claws, the fixing fastener passes through the first mounting hole and The catch is buckled on the steel pipe of the scaffold, the fastening bolt is pierced on the fixing plate, the nut is threaded on the fastening bolt, and the two fastening claws are respectively hinged on the fixing plate On both sides of the two connecting rods, one end of the two connecting rods is hinged with the nut and the other end is hinged with the fastening claw; the beneficial effects of the utility model are: the disassembly and assembly are very convenient, and the connection with the scaffold is reliable. Foot guards and railings can be reliably connected.

Description

一种脚手板a scaffolding board

技术领域technical field

本实用新型属于建筑施工技术领域,涉及一种脚手板。The utility model belongs to the technical field of building construction and relates to a scaffold board.

背景技术Background technique

脚手板是铺设于脚手架、操作架上,便于工人在其上方行走、转运材料和施工作业的一种临时周转使用的建筑材料;建筑施工现场常用的脚手板有冲压钢脚手板、木脚手板、竹脚手板。Scaffolding is a kind of temporary turnover building material laid on scaffolding and operating racks, which is convenient for workers to walk on it, transfer materials and construction operations; scaffolding commonly used in construction sites includes stamped steel scaffolding, wooden scaffolding, Bamboo scaffolding.

扣件式钢管脚手架具有装拆方便,搭设灵活,通用性强,比较经济等优点,已成为当前使用量最多、应用最普遍的一种脚手架。The fastener-type steel pipe scaffold has the advantages of convenient assembly and disassembly, flexible erection, strong versatility, and relatively economical, and has become the most widely used and widely used scaffold.

由于建筑施工的性质,脚手板周转速度较快,因而,脚手板应该有足够的强度、稳定性,并且应具有质量轻,拆装方便,不易损坏等特点。Due to the nature of building construction, the turnover of scaffolding boards is fast. Therefore, scaffolding boards should have sufficient strength and stability, and should have the characteristics of light weight, easy disassembly and assembly, and not easy to damage.

如申请号为201410746085.8的中国实用新型专利,公开了一种脚手板,包括脚手板本体,所述脚手板本体包括底板和矩管,底板下部设置有若干加强筋,在所述底板相对的两侧沿底板长度方向均设有所述矩管,每个矩管上排列设置有若干装配孔,上述专利结构简单、成本低,安装拆卸方便,并且具有较大的抗压强度。For example, the Chinese utility model patent with the application number of 201410746085.8 discloses a scaffolding board, which includes a scaffolding board body. The scaffolding board body includes a base plate and a rectangular tube. The rectangular tubes are arranged along the length direction of the bottom plate, and each rectangular tube is arranged with a number of assembly holes. The above-mentioned patent has simple structure, low cost, convenient installation and disassembly, and has relatively high compressive strength.

近年来大量使用的钢制脚手板,实现了拆装的便利性,但是和脚手架缺乏可靠的连接,与挡脚板、栏杆也缺乏可靠的连接,使用过程中如果不加注意,也会产生安全问题。In recent years, a large number of steel scaffolding boards have been used to realize the convenience of disassembly and assembly, but there is no reliable connection with the scaffolding, and there is also a lack of reliable connection with the footboards and railings. If you do not pay attention to it during use, it will also cause safety problems. .

实用新型内容Utility model content

本实用新型的目的是针对现有技术存在的上述问题,提出了脚手板及其安装方法。The purpose of this utility model is to propose a scaffold board and an installation method thereof for the above-mentioned problems existing in the prior art.

本实用新型的目的可通过下列技术方案来实现:一种脚手板,包括:板体以及固定扣件,所述板体上开设有第一安装孔,所述板体的边缘上设置有第一孔销结构,所述固定扣件包括固定板、紧固螺栓、螺帽、两个紧固扣爪以及分别与两个所述紧固扣爪对应的两个连杆,所述固定扣件穿过所述第一安装孔并且抓扣在脚手架钢管上,所述紧固螺栓穿设在所述固定板上,所述螺帽螺纹连接在所述紧固螺栓上,两个所述紧固扣爪分别铰接在所述固定板的两侧,两个所述连杆的一端与所述螺帽铰接另一端与所述紧固扣爪铰接。The purpose of this utility model can be achieved through the following technical solutions: a scaffolding board, comprising: a board body and a fixing fastener, the board body is provided with a first installation hole, and the edge of the board body is provided with a first Hole pin structure, the fixed fastener includes a fixed plate, fastening bolts, nuts, two fastening claws and two connecting rods respectively corresponding to the two fastening claws, the fixed fastener wears Pass through the first installation hole and buckle on the steel pipe of the scaffold, the fastening bolt is passed through the fixing plate, the nut is threaded on the fastening bolt, and the two fastening buckles The claws are respectively hinged on both sides of the fixing plate, and one end of the two connecting rods is hinged to the nut and the other end is hinged to the fastening claw.

较佳的,所述板体的前侧边缘、后侧边缘、左侧边缘以及右侧边缘上分别设置有第一翻边、第二翻边、第三翻边以及第四翻边,所述第一孔销结构包括第一连接孔以及第一连接销,所述第一连接销设置在所述第一翻边以及第三翻边上,所述第一连接孔设置在所述第二翻边以及第四翻边上。Preferably, the front edge, the rear edge, the left edge and the right edge of the board are respectively provided with a first flange, a second flange, a third flange and a fourth flange, the The first hole pin structure includes a first connecting hole and a first connecting pin, the first connecting pin is arranged on the first flange and the third flange, and the first connecting hole is arranged on the second flange side and the fourth flange.

与现有技术相比,本实用新型的有益效果为:Compared with the prior art, the beneficial effects of the utility model are:

1、拆装非常便利,和脚手架连接可靠,板体与挡脚板以及栏杆要能够可靠的连接。1. It is very convenient to disassemble and assemble, and the connection with the scaffolding is reliable. The board body, the foot guard and the railing must be reliably connected.

2、紧固扣件具有连接可靠,拆卸方便的优点,并且结构也非常巧妙。2. Fastening fasteners have the advantages of reliable connection and convenient disassembly, and the structure is also very ingenious.

3、通过设置第一、第二、第三、第四翻边,便于板体安装时的对准以及定位,并且使得整体结构更加紧凑稳固,并且第一孔销结构能够起到非常好的连接效果。3. By setting the first, second, third, and fourth flanges, it is convenient for the alignment and positioning of the board during installation, and makes the overall structure more compact and stable, and the first hole pin structure can play a very good connection Effect.

附图说明Description of drawings

图1为本实用新型的脚手板的结构简图;Fig. 1 is the structural diagram of scaffold board of the present utility model;

图2为本实用新型的板体的结构示意图;Fig. 2 is the structural representation of the plate body of the present utility model;

图3为本实用新型的板体的横断面图;Fig. 3 is the cross-sectional view of the plate body of the present utility model;

图4为本实用新型的固定扣件的结构示意图。Fig. 4 is a structural schematic diagram of the fixing fastener of the present invention.

图中,100、板体;110、第一安装孔;120、第一翻边;130、第二翻边;140、第三翻边;150、第四翻边;160、第一连接孔;170、第一连接销;200、排水孔;300、固定扣件;310、固定板;320、紧固螺栓;330、螺帽;340、紧固扣爪;350、连杆。In the figure, 100, the plate body; 110, the first installation hole; 120, the first flange; 130, the second flange; 140, the third flange; 150, the fourth flange; 160, the first connecting hole; 170, first connecting pin; 200, drainage hole; 300, fixing fastener; 310, fixing plate; 320, fastening bolt; 330, nut; 340, fastening claw; 350, connecting rod.

具体实施方式detailed description

以下是本实用新型的具体实施例并结合附图,对本实用新型的技术方案作进一步的描述,但本实用新型并不限于这些实施例。The following are specific embodiments of the utility model and in conjunction with the accompanying drawings, the technical solution of the utility model is further described, but the utility model is not limited to these embodiments.

如图1、图2、图3、图4所示,一种脚手板,包括:板体100以及固定扣件300,用以搭建在脚手架上,供施工人员站立以及施工。As shown in Fig. 1, Fig. 2, Fig. 3 and Fig. 4, a scaffold board includes: a board body 100 and fixing fasteners 300, which are used to build on the scaffold for construction workers to stand and construct.

其中,板体100就是平行设置的板状结构,主要用于供人踩踏站立,并且在实际的板体100通常是用冲压型钢板制作而成,上表面设置长条状凸起型防滑条以及排水孔200。Wherein, the plate body 100 is a plate-shaped structure arranged in parallel, mainly used for people to step on and stand on, and the actual plate body 100 is usually made of a stamped steel plate, and the upper surface is provided with elongated raised anti-skid strips and Drain hole 200.

所述板体100上开设有第一安装孔110,第一安装孔110用于安装固定扣件300,并且第一安装孔110的数量可以根据实际的需求调节,一般为了达到较好的固定安装效果,通常可以设置一排四个第一安装孔110。The plate body 100 is provided with a first installation hole 110, the first installation hole 110 is used to install the fixing fastener 300, and the number of the first installation holes 110 can be adjusted according to actual needs, generally in order to achieve better fixed installation As a result, a row of four first mounting holes 110 can usually be provided.

所述板体100的边缘上设置有第一孔销结构,第一销孔结构主要用于相邻板体100的组装以及板体100与拉板以及挡脚板的组装。The edge of the board body 100 is provided with a first hole pin structure, and the first pin hole structure is mainly used for the assembly of the adjacent board body 100 and the assembly of the board body 100 with the pull plate and the foot guard.

此外,板体的外侧设置有栏板,栏板竖直连接在所述板体的一侧上,栏板的两侧以及下端设置有第二孔销结构。In addition, a fence is arranged on the outside of the board, and the fence is vertically connected to one side of the board, and the two sides and the lower end of the fence are provided with a second hole pin structure.

此外,板体的另一侧设置有挡脚板,挡脚板竖直连接在所述板体100的另一侧上,此处优选为连接在板体100的内侧,并且实际的挡脚板是由冲压型钢板制作而成。In addition, the other side of the board body is provided with a foot guard, which is vertically connected to the other side of the board body 100, preferably connected to the inner side of the board body 100 here, and the actual foot guard is made of stamping Made of steel plate.

所述挡脚板的下侧以及两侧设置有第三孔销结构,挡脚板的下侧通过第三孔销结构插接在板体100的内侧边缘上。The lower side and both sides of the foot guard are provided with a third pin structure, and the lower side of the foot guard is inserted into the inner edge of the board body 100 through the third pin structure.

固定扣件300的工作原理是通过穿过安装孔,使其本体与安装孔卡接,然后另一端夹扣住脚手架钢管,这样就能够实现固定目的。The working principle of the fixing fastener 300 is to pass through the installation hole so that its body is engaged with the installation hole, and then the other end clamps the scaffold steel pipe, so that the purpose of fixing can be achieved.

如图1、图4所示,在上述实施方式的基础上,所述固定扣件300包括固定板310、紧固螺栓320、螺帽330、两个紧固扣爪340以及分别与两个所述紧固扣爪340对应的两个连杆350。As shown in Fig. 1 and Fig. 4, on the basis of the above-mentioned embodiment, the fixed fastener 300 includes a fixed plate 310, a fastening bolt 320, a nut 330, two fastening claws 340, and two The two connecting rods 350 corresponding to the fastening claws 340 are described above.

固定扣件300穿过第一安装孔110后抓扣在脚手架钢管上。The fixing fastener 300 passes through the first installation hole 110 and is fastened on the steel pipe of the scaffold.

所述固定板310用于与所述第一安装孔110卡接,固定板310就是一个圆板状的结构,尺寸正好大于安装孔。The fixing plate 310 is used to engage with the first mounting hole 110 , and the fixing plate 310 is a circular plate-shaped structure whose size is just larger than the mounting hole.

所述紧固螺栓320穿设在所述固定板310上,此处值得指出的是,紧固螺栓320轴向固定在固定板310上,并且可以转动。The fastening bolt 320 is passed through the fixing plate 310. It should be noted here that the fastening bolt 320 is axially fixed on the fixing plate 310 and can rotate.

所述螺帽330螺纹连接在所述紧固螺栓320上,两个所述紧固扣爪340分别铰接在所述固定板310的两侧,两个所述连杆350的一端与所述螺帽330铰接另一端与所述紧固扣爪340铰接,此处值得指出的是,紧固扣爪340与连杆350是一一对应的,也就是说,左侧的紧固扣爪340连接左侧的连杆350,右侧的紧固扣爪340连接右侧的连杆350。The nut 330 is threadedly connected to the fastening bolt 320, the two fastening claws 340 are respectively hinged on both sides of the fixing plate 310, and one end of the two connecting rods 350 is connected to the screw. The other end of the cap 330 is hinged to the fastening claw 340. It is worth pointing out here that the fastening claw 340 is in one-to-one correspondence with the connecting rod 350, that is to say, the fastening claw 340 on the left is connected The connecting rod 350 on the left, and the fastening claw 340 on the right are connected to the connecting rod 350 on the right.

固定扣件300在工作时,首先穿过安装孔,由于紧固扣爪340的后端是铰接在固定板310上的,所以两个紧固扣爪340可以合拢或者张开,连杆350的一端铰接在紧固扣爪340中部偏靠后位置上,另一端铰接在螺帽330上,所以拧动紧固螺栓320,此时螺帽330沿着紧固螺栓320移动,带动连杆350的转动,这样就会带动紧固扣爪340合拢。When the fixed fastener 300 is working, it first passes through the installation hole. Since the rear end of the fastening claw 340 is hinged on the fixed plate 310, the two fastening claws 340 can be closed or opened, and the connecting rod 350 One end is hinged on the back position of the middle part of the fastening claw 340, and the other end is hinged on the nut 330, so when the fastening bolt 320 is screwed, the nut 330 moves along the fastening bolt 320, driving the connecting rod 350 Rotation will drive the fastening claws 340 to close up like this.

这种结构的紧固扣件具有连接可靠,拆卸方便,并且结构也非常巧妙。The fastening fastener of this structure has the advantages of reliable connection, convenient disassembly, and a very ingenious structure.

如图2、图3所示,在上述实施方式的基础上,所述板体100的前侧边缘、后侧边缘、左侧边缘以及右侧边缘上分别设置有第一翻边120、第二翻边130、第三翻边140以及第四翻边150,此处值得指出的是,第一翻边120以及第三翻边140是上翻边,第二翻边130以及第四翻边150的下翻边,上翻边与下翻边能够扣合,在实际拼接时,位于左侧的板体100,其第四翻边150是下翻边,位于右侧的板体100,其第三翻边140是上翻边,所以第三翻边140能够扣到第四翻边150上去,同理,第一翻边120与第二翻边130也是上、下翻边结构,便于栏板以及挡脚板安装设置。As shown in Fig. 2 and Fig. 3, on the basis of the above-mentioned embodiment, the front side edge, the rear side edge, the left side edge and the right side edge of the board body 100 are respectively provided with a first flange 120, a second The flanging 130, the third flanging 140 and the fourth flanging 150, it is worth pointing out here that the first flanging 120 and the third flanging 140 are upper flanging, the second flanging 130 and the fourth flanging 150 The lower flanging, the upper flanging and the lower flanging can be fastened together. In actual splicing, the fourth flanging 150 of the plate body 100 on the left is the lower flanging, and the fourth flanging 150 of the plate body 100 on the right is the lower flanging. The three flanges 140 are upper flanges, so the third flanges 140 can be buckled to the fourth flanges 150. Similarly, the first flanges 120 and the second flanges 130 are also upper and lower flanges, which is convenient for railings. and toe fender mounting settings.

通过设置第一、第二、第三、第四翻边150,便于安装时的对准以及定位,并且使得整体结构更加紧凑稳固。By providing the first, second, third, and fourth flanges 150, alignment and positioning during installation are facilitated, and the overall structure is made more compact and stable.

所述第一孔销结构包括第一连接孔160以及第一连接销170,所述第一连接销170设置在所述第一翻边120以及第三翻边140上,所述第一连接孔160设置在所述第二翻边130以及第四翻边150上,简单来说,就是第一翻边120以及第三翻边140上设置有朝下的第一连接销170,第二翻边130以及第四翻边150上设置有第一连接孔160。The first hole pin structure includes a first connecting hole 160 and a first connecting pin 170, and the first connecting pin 170 is arranged on the first flange 120 and the third flange 140, and the first connecting hole 160 is arranged on the second flange 130 and the fourth flange 150, in simple terms, the first flange 120 and the third flange 140 are provided with a downward first connecting pin 170, and the second flange 130 and the fourth flange 150 are provided with a first connection hole 160 .

此处值得指出的是,在安装时,第三翻边140扣到第四翻边150上时,第一连接销170正好插接在第一连接孔160内,这样就能够使两块板体100稳定的连接在一起。It is worth pointing out here that during installation, when the third flange 140 is fastened to the fourth flange 150, the first connecting pin 170 is just inserted into the first connecting hole 160, so that the two boards can 100 stable connections together.

第一翻边120与第二翻边130用于连接栏板以及挡脚板。The first flange 120 and the second flange 130 are used to connect the fence board and the foot guard.

简单来说,栏板通过第二连接销插接在第二翻边130上的第一连接孔160内,从而使栏板与板体100固定在一起,挡脚板能够扣接在第一翻边120上,挡脚板上的第三连接销插接在第一连接孔160内,这样就能够使挡脚板与板体连接。To put it simply, the fence board is inserted into the first connection hole 160 on the second flange 130 through the second connecting pin, so that the fence board and the board body 100 are fixed together, and the foot guard can be buckled on the first flange 120, the third connecting pin on the foot baffle is plugged into the first connection hole 160, so that the foot baffle can be connected with the board body.

如图2、图3所示,在上述实施方式的基础上,所述板体100的表面上均开设有排水孔200,便于在雨天排水,防止脚手板上产生积水。As shown in FIG. 2 and FIG. 3 , on the basis of the above-mentioned embodiment, drainage holes 200 are opened on the surface of the board body 100 to facilitate drainage in rainy days and prevent water accumulation on the scaffolding board.

本文中所描述的具体实施例仅仅是对本实用新型精神作举例说明。本实用新型所属技术领域的技术人员可以对所描述的具体实施例做各种各样的修改或补充或采用类似的方式替代,但并不会偏离本实用新型的精神或者超越所附权利要求书所定义的范围。The specific embodiments described herein are only examples to illustrate the spirit of the present invention. Those skilled in the technical field to which the utility model belongs can make various modifications or supplements to the described specific embodiments or adopt similar methods to replace them, but they will not deviate from the spirit of the utility model or go beyond the appended claims defined range.

Claims (2)

1. a kind of scaffold board, it is characterised in that including:The first mounting hole is offered on plate body and attachment fastener, the plate body, Be provided with the first hole latch structure on the edge of the plate body, the attachment fastener include fixed plate, fastening bolt, nut, two Fasten snap finger and respectively with two corresponding two connecting rods of the fastening snap finger, the attachment fastener installs through described first Hole and snatch is on scaffolding steel pipe, the fastening bolt is located in the fixed plate, and the nut is threaded in institute State in fastening bolt, two fastening snap fingers are respectively hinged at the both sides of the fixed plate, one end of two connecting rods with The nut is hinged the other end and is hinged with the fastening snap finger.
2. scaffold board as described in claim 1, it is characterised in that:The forward edge of the plate body, posterior edges, left side The first flange, the second flange, the 3rd flange and the 4th flange, the first hole pin are respectively arranged with edge and right side edge Structure includes the first connecting hole and the first connecting pin, and first connecting pin is arranged on first flange and the 3rd flange On, first connecting hole is arranged on second flange and the 4th flange.
CN201621376286.4U 2016-12-15 2016-12-15 A kind of scaffold board Expired - Fee Related CN206418758U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621376286.4U CN206418758U (en) 2016-12-15 2016-12-15 A kind of scaffold board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621376286.4U CN206418758U (en) 2016-12-15 2016-12-15 A kind of scaffold board

Publications (1)

Publication Number Publication Date
CN206418758U true CN206418758U (en) 2017-08-18

Family

ID=59575462

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621376286.4U Expired - Fee Related CN206418758U (en) 2016-12-15 2016-12-15 A kind of scaffold board

Country Status (1)

Country Link
CN (1) CN206418758U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110525605A (en) * 2019-07-10 2019-12-03 沪东中华造船(集团)有限公司 A kind of Novel scaffold board and its building method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110525605A (en) * 2019-07-10 2019-12-03 沪东中华造船(集团)有限公司 A kind of Novel scaffold board and its building method

Similar Documents

Publication Publication Date Title
CN103410304A (en) Novel scaffold system
CN203320919U (en) Novel scaffolding system
CN1875161B (en) Decorative post stays for railing systems
CN107675624B (en) Pan-buckle ladder universal assembled telescopic buttress
KR200482903Y1 (en) Lifeline mounting pole
KR20090007331U (en) Fixture for installing falling object net
CN206418758U (en) A kind of scaffold board
CN205153495U (en) Scaffold
CN215407432U (en) Adjustable dish is buckled support frame and is held in palm
CN203742263U (en) Fencing framework connection structure
CN104499724B (en) Edge protection fence
CN210013444U (en) Closed Cantilever Scaffolding System
CN106869483B (en) Combined scaffold board and mounting method thereof
CN209228112U (en) One discharge plate button exit passageway frame
CN205591576U (en) Protector with adjustable face limit entrance to a cave
CN206615944U (en) A kind of tower crane driver climbing protector
CN205908008U (en) Dish knot formula scaffold external safety net coupling assembling of frame external corner and external safety net device
CN223577542U (en) Outer scaffold steel sheet net piece fixing device
CN205348062U (en) Interim guardrail of fast assembly road
CN218323856U (en) A detachable scaffold connector
CN219158347U (en) Scaffold convenient to assemble and disassemble
CN206128853U (en) A unit module assembled fence
CN211447762U (en) Corrugated net piece fixed knot constructs
CN219080921U (en) Assembled temporary support for overhauling thermal power plant
CN204266502U (en) Stainless steel guardrail mounting and stainless steel guardrail

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 315 800 Pearl River Road 429 Xindan Street, Beilun District, Ningbo City, Zhejiang Province

Patentee after: Zhejiang 20 Smelter Construction Co.,Ltd.

Address before: 315 800 Pearl River Road 429 Xindan Street, Beilun District, Ningbo City, Zhejiang Province

Patentee before: NINGBO MCC 20 CONSTRUCTION Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190611

Address after: 315 800 Pearl River Road 429 Xindan Street, Beilun District, Ningbo City, Zhejiang Province

Co-patentee after: CHINA MCC20 GROUP Corp.,Ltd.

Patentee after: Zhejiang 20 Smelter Construction Co.,Ltd.

Address before: 315 800 Pearl River Road 429 Xindan Street, Beilun District, Ningbo City, Zhejiang Province

Patentee before: Zhejiang 20 Smelter Construction Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170818