CN206418588U - Prestressed steel structure and steel house framework - Google Patents

Prestressed steel structure and steel house framework Download PDF

Info

Publication number
CN206418588U
CN206418588U CN201720055323.XU CN201720055323U CN206418588U CN 206418588 U CN206418588 U CN 206418588U CN 201720055323 U CN201720055323 U CN 201720055323U CN 206418588 U CN206418588 U CN 206418588U
Authority
CN
China
Prior art keywords
girder
steel structure
bearing diagonal
column
connector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720055323.XU
Other languages
Chinese (zh)
Inventor
高昭宗
蔡菲
袁兴斌
吴崇双
张欣
梅世霞
杨燕
熊加强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shougang Shuicheng Iron And Steel (group) Saide Construction Co Ltd
Original Assignee
Shougang Shuicheng Iron And Steel (group) Saide Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shougang Shuicheng Iron And Steel (group) Saide Construction Co Ltd filed Critical Shougang Shuicheng Iron And Steel (group) Saide Construction Co Ltd
Priority to CN201720055323.XU priority Critical patent/CN206418588U/en
Application granted granted Critical
Publication of CN206418588U publication Critical patent/CN206418588U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model provides a kind of prestressed steel structure and steel house framework, is related to steel building field.Including girder, socket part, two first columns and two first bearing diagonals.Girder is arranged between two root posts, and one end of girder is connected with a wherein root post, the other end of girder is connected with another root post, one end of wherein one bearing diagonal is connected with the top of wherein one girder, one end of another bearing diagonal is connected with the top of another girder, and one end of the remote girder of two bearing diagonals is connected and is support end.The one end and support end for socketing part are fixed, and the centre position of the other end and girder that socket part is fixed, and socketing part has prestressing force.In the presence of part is socketed, the shearing of girder is converted into the power of bearing diagonal radial direction, increases the shear resistance and stability of structure, and be applied with prestressing force in the centre position of girder, bigger external force can be born, the stability and resistance to compression, shearing strength of girder is enhanced.

Description

Prestressed steel structure and steel house framework
Technical field
The utility model relates generally to steel building field, in particular to a kind of prestressed steel structure and steel knot Structure house frame.
Background technology
The house of steel construction belongs to third generation building, and it uses shaped steel or building framework for main body load-carrying members, is cut with waiting Face or variable cross-section shaped steel, column braces are connection assist, are fixed by modes such as bolt or welding, and roofing and wall are using color Color coating profiled sheet or color steel sandwich plate, replace traditional reinforced concrete building substantially in developed country.It has total Amount is light, span is big, save basis, short construction period, it is safe and reliable the advantages of.Steel house extensive use and the industrial factory of individual layer The buildings such as room, warehouse, commercial building, office block, parking lot and private residence.
Steel house of the prior art has mainly used the advantage of steel construction span, particularly some factory buildings or Megastore is often used, but at the same time, total amount is light, defect also occurs greatly in span, the steel construction more than two layers The problem of being walked on floor or can produce larger shake when carrying object, frequent shake can make the steady of whole house It is qualitative to become more and more lower, and many problems can be derived, for example:The object for being arranged on house ceiling or metope is easy to Drop, or produce waterproof problems of crack.
Utility model content
The purpose of this utility model is to provide a kind of prestressed steel structure and steel house framework, the problem of making above-mentioned It is effectively improved.
What the utility model was realized in:
Based on above-mentioned purpose, embodiment of the present utility model provides a kind of prestressed steel structure, including girder, sockets Part, two first columns and two first bearing diagonals, girder are arranged between two root posts, and one end of girder and wherein one Column is connected, and the other end of girder is connected with another root post, wherein one end of a bearing diagonal and the top of wherein one girder End connection, one end of another bearing diagonal is connected with the top of another girder, one end phase of the remote girder of two bearing diagonals Even, the connected one end of two bearing diagonals is support end, and the one end and support end for socketing part are fixed, and socket the other end and girder of part Centre position fix, socketing part has prestressing force.
Optionally, the above-mentioned part that sockets includes anchoring piece, regulating part and connector, and anchoring piece is arranged at the remote main of bearing diagonal The side of beam, connector is fixed through bearing diagonal and with anchoring piece;Regulating part is mobilizable to be arranged at girder, and regulating part is used for will One end of connector is strained and fixed in girder, and one end of the remote anchoring piece of connector is fixedly connected with regulating part.
Optionally, above-mentioned regulating part includes connection ring and push rod, and connection ring is sheathed on girder, and push rod is provided with external screw thread, One end of the close support end of connection ring is fixedly connected with connector, and the other end of connection ring offers the spiral shell matched with push rod Pit, push rod is abutted through screwed hole and with girder, has gap between one end of the remote push rod of connection ring and girder.
Optionally, above-mentioned anchoring piece is fixedly installed on support end, and anchoring piece includes Part I and Part II, first Divide and Part II connects into herringbone, Part I and Part II offer through hole, and connector is each passed through through hole and solid It is fixed.
Optionally, above-mentioned connector is made of steel strand wires.
Optionally, above-mentioned prestressed steel structure also includes at least two reinforcers, and reinforcer includes fastening part and top, Fastening part and top are connected to become L-shaped, and fastening part is connected by screw bolts with column, and top is connected by screw bolts with girder.
Optionally, above-mentioned prestressed steel structure also includes fix bar, and one end of fix bar is connected to wherein one bearing diagonal Centre position, the other end of fix bar is connected to the centre position of another bearing diagonal.
Optionally, above-mentioned column, girder and bearing diagonal are made of I-steel.
Embodiment of the present utility model additionally provides a kind of steel house framework, including at least two above-mentioned prestressing force Steel construction, at least two prestressed steel structures are arranged side by side.
Optionally, above-mentioned steel house framework includes normal steel structure and prestressed steel structure, normal steel structure bag The second column and the second bearing diagonal are included, normal steel structure is arranged side by side with prestressed steel structure interval, the second column and second oblique Support is connected with the first column and the first bearing diagonal by the way that tie-beam is corresponding.
Compared with prior art, the beneficial effects of the utility model:
The prestressing force of this prestressed steel structure, which comes from, sockets part, and the one end and support end for socketing part are fixed, and socket part The centre position of the other end and girder is fixed, and socketing part has prestressing force.In the presence of part is socketed, the width being subject to of girder The shearing in direction is converted into the power of bearing diagonal radial direction, increases the shear resistance and stability of structure, the centre position of girder by The shearing arrived is maximum, is applied with prestressing force in the centre position of girder, can bear bigger external force, enhance girder Stability and resistance to compression, shearing strength.This prestressed steel structure it is simple in construction, compact, can easily implement and extensively Be applied to building field.
Foregoing prestressed steel structure is provided with this steel house framework, can be made up integrally-built unstable Property, makes the steel house framework more safe and stable, adds service life, with good practicality and very high Economic value.
Brief description of the drawings
, below will be to required in embodiment in order to illustrate more clearly of the technical scheme of the utility model embodiment The accompanying drawing used is briefly described, it will be appreciated that the following drawings illustrate only some embodiments of the present utility model, therefore not The restriction to scope is should be considered as, for those of ordinary skill in the art, on the premise of not paying creative work, Other related accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the structural representation for the prestressed steel structure that the utility model embodiment 1 is provided;
Fig. 2 is the structural representation of Fig. 1 anchoring piece;
Fig. 3 is the structural representation of Fig. 1 regulating part;
Fig. 4 is the structural representation of Fig. 1 reinforcer;
Fig. 5 is the structural representation of Fig. 1 fix bar;
Fig. 6 is the structural representation for the steel house framework that the utility model embodiment 2 is provided.
Icon:100- prestressed steel structures;200- steel houses;300- normal steel structures;The columns of 10- first;11- Two columns;20- girders;The bearing diagonals of 30- first;The bearing diagonals of 31- second;40- anchoring pieces;41- Part I;42- Part II; 50- connectors;60- regulating parts;61- connection rings;62- push rods;70- reinforcers;71- fastening parts;72- tops;80- is fixed Bar.
Embodiment
It is new below in conjunction with this practicality to make the purpose, technical scheme and advantage of the utility model embodiment clearer Accompanying drawing in type embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that retouched The embodiment stated is a part of embodiment of the utility model, rather than whole embodiments.Generally here described in accompanying drawing and The component of the utility model embodiment shown can be arranged and designed with a variety of configurations.
Therefore, the detailed description of embodiment of the present utility model below to providing in the accompanying drawings is not intended to limit requirement The scope of the present utility model of protection, but it is merely representative of selected embodiment of the present utility model.Based in the utility model Embodiment, the every other embodiment that those of ordinary skill in the art are obtained under the premise of creative work is not made, all Belong to the scope of the utility model protection.
It should be noted that:Similar label and letter represents similar terms in following accompanying drawing, therefore, once a certain Xiang Yi It is defined in individual accompanying drawing, then it further need not be defined and explained in subsequent accompanying drawing.
, it is necessary to explanation in description of the present utility model, term " on ", " interior ", " outer ", the orientation of the instruction such as " bottom " Or position relationship is that, based on orientation shown in the drawings or position relationship, or the utility model product is usually put when using Orientation or position relationship, are for only for ease of description the utility model and simplify description, rather than indicate or imply signified dress Put or element there must be specific orientation, with specific azimuth configuration and operation, therefore it is not intended that to the utility model Limitation in addition, term " first ", " second " etc. be only used for distinguish description, and it is not intended that indicate or imply relatively important Property.
In description of the present utility model, in addition it is also necessary to which explanation, unless otherwise clearly defined and limited, term " are set Put ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integratedly Connection;Can be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected to by intermediary, It can be the connection of two element internals.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition Concrete meaning of the language in the utility model.
Embodiment 1
It refer to shown in Fig. 1, embodiment 1 of the present utility model provides a kind of prestressed steel structure 100, including two pieces the One column 10, girder 20, two first bearing diagonals 30 and socket part.
First column 10 is the main body load-carrying members of prestressed steel structure 100, and the first column 10 is by whole prestress steel knot Structure 100 gets up from ground supports, makes it have certain height and space, so the first column 10 is needed with maximum load-bearing Power, the width and thickness of the first column 10 will be bigger than the first bearing diagonal 30 and girder 20, and in general, the first column 10 is used I-steel is made, it would however also be possible to employ other type steel supports, such as channel-section steel.
The quantity of first column 10 be two, or three or more than three, mainly the first column 10 Using cooperatively at least two first columns 10 is needed when being built into steel construction, makes structure between at least two first columns 10 Certain space is built up, the space is used as the position for accommodating other supporting constructions.At least two first columns 10 are typically along perpendicular Nogata is to being arranged side by side, but it is also possible to which, with certain angle of inclination, the first column 10 with angle of inclination is mainly used With on irregular building.
Girder 20 is arranged between two first columns 10, and one end of girder 20 and wherein one phase of first column 10 Even, the other end of girder 20 is connected with another first column 10, and the connection of the column 10 of girder 20 and first can be by spiral shell Tether and connect or weld, the platy structure that the effect of girder 20 is mainly to be laid on girder 20 provides vertical direction On support, so generally that girder 20 is horizontally disposed.
The quantity of first bearing diagonal 30 is two, or more than two, wherein one end of first bearing diagonal 30 It is connected with the top of wherein one girder 20, one end of another first bearing diagonal 30 is connected with the top of another girder 20, One end of the remote girder 20 of two first bearing diagonals 30 is connected, and the connected one end of two first bearing diagonals 30 is support end, steel The house of structure can typically set inclined roof, can increase the problem of house headroom can guarantee that waterproof again, so the first bearing diagonal The utilization of 30 structure is commonplace, and in order that structural framing is more stablized and more beautiful, in the utility model Two first bearing diagonals 30 are symmetrical arranged, symmetrically arranged first bearing diagonal 30 can also form the more preferable structure of globality. In the present embodiment, the first bearing diagonal 30 is made of I-steel or channel-section steel, it would however also be possible to employ other kinds of shaped steel is made.
Because the first column 10, the bearing diagonal 30 of girder 20 and first substantially according to the mode being sequentially connected form steel construction Framework, the structure connection not intersected each other, so the stability of globality also has certain defect, so first Set between bearing diagonal 30 and girder 20 and socket part, the one end and support end for socketing part are fixed, and socket the other end and girder of part 20 centre position is fixed, and is socketed part and is connected the bearing diagonal 30 of girder 20 and first, is made on the vertical direction that girder 20 is subject to Shearing has been largely converted into the power of the radial direction of the first bearing diagonal 30, it is obvious that cutting on the width that girder 20 can be born Power is far smaller than the pressure for the radial direction that the first bearing diagonal 30 can be born, so, largely improve holding for girder 20 Beijing South Maxpower Technology Co. Ltd's power.
Preferably mode is will to socket part to be arranged to prestressed structure, due to using strip using girder 20 Steel are made, and with certain elastic deformation, elastic deformation repeatedly, institute can be produced when being acted on by certain external force With, part will be socketed and be arranged to prestressed structure, the centre position for making it hold girder 20, so that girder 20 is produced in advance The reverse strain of raw certain predetermined, the prestressing force needs to be more than or equal to the maximum lotus that girder 20 is born under normal conditions Carry, when in use, because prestressing force offsets the load being applied on girder 20, girder 20 is not in deformation or meeting There is the deformation of very little, the globality of structure is not interfered with substantially, the shake of girder 20 will not be also experienced, so as to protect pre- The safety of the agent structure of stress steel construction 100 and attached setting and stably.
Prestressing force can be applied by external equipment by socketing part, can also be produced when installing by the structure that carries Prestressing force, particularly:The above-mentioned part that sockets includes anchoring piece 40, regulating part 60 and connector 50.
It refer to shown in Fig. 2, anchoring piece 40 is arranged at the side of the remote girder 20 of the first bearing diagonal 30, connector 50 is worn Cross the first bearing diagonal 30 and fixed with anchoring piece 40;Regulating part 60 is mobilizable to be arranged at girder 20, and regulating part 60 is used for will even One end of fitting 50 is strained and fixed in girder 20, and one end of the remote anchoring piece 40 of connector 50 is fixedly connected with regulating part 60, Anchoring piece 40 is fixed with the first bearing diagonal 30, and regulating part 60 is fixed with girder 20, and connector 50 is by regulating part 60 and anchoring piece 40 It is fixed, realize being connected for the bearing diagonal 30 of girder 20 and first.
In the present embodiment, anchoring piece 40 is fixedly installed on support end, and anchoring piece 40 includes Part I 41 and second Divide 42, Part I 41 and Part II 42, which connect into herringbone, to be splayed or other shapes, be mainly The anchoring piece 40 is preferably fitted with the first bearing diagonal 30, be that its connection is more consolidated, Part I 41 and second Part 42 offers through hole, and Part I 41 and Part II 42 are arranged to symmetrical structure, and connector 50 is each passed through through hole And it is fixed.
It refer to shown in Fig. 3, and above-mentioned regulating part 60 includes connection ring 61 and push rod 62, connection ring 61 is the ring-type of closing Structure, for the ease of installing, can be arranged to hinged end, the other end relative with hinged end is arranged to by one end of connection ring 61 End is connected and fixed, connecting and fixing end can open and close, you can be very easily enclosed on girder 20.Specifically, girder 20 Centre position one bayonet socket for matching with connection ring 61 is set, bayonet socket from the two of girder 20 it is lateral in the middle of extensions, connection ring 61 are set on the bayonet socket of girder 20, and bayonet socket just blocks connection ring 61.Push rod 62 is provided with external screw thread, connection ring 61 it is close One end of support end is fixedly connected with connector 50, and the other end of connection ring 61 offers the screwed hole matched with push rod 62, Stable and firm screwed hole is opened up for the ease of connection ring 61, setting is widened in the position that connection ring 61 is threaded into hole.
Push rod 62 is abutted through screwed hole and with girder 20, between one end of the remote push rod 62 of connection ring 61 and girder 20 With certain gap, when installation, anchoring piece 40 is fixed with the first bearing diagonal 30, one end of connector 50 and anchoring piece 40 are fixed, and then regulating part 60 is set on girder 20, and the other end of connector 50 and regulating part 60 are fixed and will connected Fitting 50 is adjusted to certain rate of tension, now, and the bottom of the bottom of connection ring 61 substantially with girder 20 is abutted, finally, Push rod 62 is turned, makes the bottom constantly bottom away from girder 20 of connection ring 61, colleague's connection ring 61 is continuous by connector 50 Tense, untill reaching default rate of tension.
Because the prestressing force of application is larger, so also being improved to the quality requirement of connector 50, connector 50 here is adopted It is made of steel strand wires, with enough intensity.
It refer to shown in Fig. 4, in the present embodiment, due to the prestressed effect of connector 50, found girder 20 and first Connection between post 10 is influenceed by certain, and above-mentioned prestressed steel structure 100 also includes at least two reinforcers 70, reinforcer 70 are arranged on the position that girder 20 is connected with the first column 10, can strengthen the stabilization connected between the column 10 of girder 20 and first Property, reinforcer 70 includes fastening part 71 and top 72, and fastening part 71 and top 72 are connected to become L-shaped, fastening part 71 and the One column 10 is connected by screw bolts, and top 72 is connected by screw bolts with girder 20, and the quantity of reinforcer 70 can also be four, Two of which is arranged on the upper end of girder 20, and a lower end for being arranged on girder 20 is connected in addition, and four collective effects of reinforcer 70 are protected The stabilization between the column 10 of girder 20 and first is demonstrate,proved.
It refer to shown in Fig. 5, because the power that the first bearing diagonal 30 is subject to is radially, so can be horizontal to the first column 10 To active force, and the shearing very little that the first column 10 can be born, it is easy to produce it is laterally flexible, so above-mentioned prestressing force Steel construction 100 also includes fix bar 80, and the effect of fix bar 80 is to hold two first bearing diagonals 30, so that it is oblique to offset first The horizontal force that 30 pair of first column 10 of support applies, one end of fix bar 80 is connected to wherein one first bearing diagonal 30 Centre position, the other end of fix bar 80 is connected to the centre position of another first bearing diagonal 30, is offsetting to the first column 10 apply the colleague of horizontal active force, additionally it is possible to avoid the support end of the first bearing diagonal 30 in the presence of prestressing force to moving down It is dynamic, and two direct connection functions of first bearing diagonal 30 are destroyed, while also enhancing the globality of prestressed steel structure 100.
Embodiment 2
It refer to shown in Fig. 6, embodiment 2 of the present utility model additionally provides a kind of framework of steel house 200, including extremely Few two above-mentioned prestressed steel structures 100, at least two prestressed steel structures 100 are arranged side by side.That is the steel house 200 The major bearing structures of framework are made of prestressed steel structure 100, pass through connection between adjacent prestressed steel structure 100 Beam is connected.
In the present embodiment, the above-mentioned framework of steel house 200 can also include normal steel structure 300 and prestressing force 100 two kinds of structures of steel construction, normal steel structure 300 includes the second column 11 and the second bearing diagonal 31, normal steel structure 300 with it is pre- Stress steel construction 100, which is spaced, to be arranged side by side or sets prestressed steel structure 100 in main force part, secondary Position sets normal steel structure 300, and secondary position, which corresponds to, to be not frequently used, or is only intended to stack what will not often be moved The position of object, the second column 11 and the second bearing diagonal 31 connect with the first column 10 and the first bearing diagonal 30 by the way that tie-beam is corresponding Connect.
Preferred embodiment of the present utility model is the foregoing is only, the utility model is not limited to, for this For the technical staff in field, the utility model can have various modifications and variations.It is all it is of the present utility model spirit and principle Within, any modification, equivalent substitution and improvements made etc. should be included within protection domain of the present utility model.It should be noted that Arrive:Similar label and letter represents similar terms in following accompanying drawing, therefore, once determined in a certain Xiang Yi accompanying drawing Justice, then further need not be defined and be explained to it in subsequent accompanying drawing.
It is described above, embodiment only of the present utility model, but protection domain of the present utility model do not limit to In this, any one skilled in the art can readily occur in change in the technical scope that the utility model is disclosed Or replace, it should all cover within protection domain of the present utility model.Therefore, protection domain of the present utility model should be described with power The protection domain that profit is required is defined.

Claims (10)

1. a kind of prestressed steel structure, it is characterised in that including girder, socket part, two first columns and two first oblique branch Support, the girder is arranged between two columns, and one end of the girder is connected with a wherein root post, the girder The other end be connected with another column, wherein one end of a bearing diagonal and the top of wherein one girder Connection, one end of another bearing diagonal is connected with the top of another girder, the remote institute of two bearing diagonals The one end for stating girder is connected, and the connected one end of two bearing diagonals is support end, described one end for socketing part and the support End is fixed, and the centre position of the other end for socketing part and the girder is fixed, and the part that sockets has prestressing force.
2. prestressed steel structure according to claim 1, it is characterised in that the part that sockets includes anchoring piece, regulating part And connector, the anchoring piece is arranged at the side of the remote girder of the bearing diagonal, the connector through it is described tiltedly Support and fixed with the anchoring piece;The regulating part is mobilizable to be arranged at the girder, and the regulating part is used for will be described One end of connector is strained and fixed in the girder, and one end and the regulating part of the remote anchoring piece of the connector are consolidated Fixed connection.
3. prestressed steel structure according to claim 2, it is characterised in that the regulating part includes connection ring and push rod, The connection ring is sheathed on the girder, and the push rod is provided with external screw thread, the one of the close support end of the connection ring End is fixedly connected with the connector, and the other end of the connection ring offers the screwed hole matched with the push rod, described Push rod through the screwed hole and being abutted with the girder, one end of the remote push rod of the connection ring and the girder it Between have gap.
4. prestressed steel structure according to claim 2, it is characterised in that the anchoring piece is fixedly installed on the support End, the anchoring piece includes Part I and Part II, and the Part I and the Part II connect into herringbone, institute State Part I and the Part II offers through hole, the connector is each passed through the through hole and fixation.
5. prestressed steel structure according to claim 2, it is characterised in that the connector is made of steel strand wires.
6. prestressed steel structure according to claim 2, it is characterised in that the prestressed steel structure also includes at least two Individual reinforcer, the reinforcer includes fastening part and top, and the fastening part and the top are connected to become L-shaped, described Fastening part is connected by screw bolts with the column, and the top is connected by screw bolts with the girder.
7. prestressed steel structure according to claim 2, it is characterised in that the prestressed steel structure also includes fixing Bar, one end of the fix bar is connected to the centre position of wherein one bearing diagonal, the other end connection of the fix bar In the centre position of another bearing diagonal.
8. prestressed steel structure according to claim 1, it is characterised in that the column, the girder and the oblique branch Support is made of I-steel.
9. a kind of steel house framework, it is characterised in that should including pre- described at least two claim 1-8 any one Power steel construction, prestressed steel structure is arranged side by side described at least two.
10. steel house framework according to claim 9, it is characterised in that including normal steel structure and it is described it is pre- should Power steel construction, the normal steel structure includes the second column and the second bearing diagonal, the normal steel structure and the prestress steel Spacing structure is arranged side by side, and second column and second bearing diagonal lead to first column and first bearing diagonal Cross tie-beam correspondence connection.
CN201720055323.XU 2017-01-17 2017-01-17 Prestressed steel structure and steel house framework Expired - Fee Related CN206418588U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720055323.XU CN206418588U (en) 2017-01-17 2017-01-17 Prestressed steel structure and steel house framework

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720055323.XU CN206418588U (en) 2017-01-17 2017-01-17 Prestressed steel structure and steel house framework

Publications (1)

Publication Number Publication Date
CN206418588U true CN206418588U (en) 2017-08-18

Family

ID=59571358

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720055323.XU Expired - Fee Related CN206418588U (en) 2017-01-17 2017-01-17 Prestressed steel structure and steel house framework

Country Status (1)

Country Link
CN (1) CN206418588U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109235898A (en) * 2018-09-19 2019-01-18 哈尔滨工业大学建筑设计研究院 A kind of huge space transformational structure of novel large-span prestressed rigid body and its construction method
CN109592615A (en) * 2019-01-30 2019-04-09 华东交通大学 A kind of extending type motor-car rain brush inspection platform

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109235898A (en) * 2018-09-19 2019-01-18 哈尔滨工业大学建筑设计研究院 A kind of huge space transformational structure of novel large-span prestressed rigid body and its construction method
CN109235898B (en) * 2018-09-19 2020-09-29 哈尔滨工业大学建筑设计研究院 Large-span prestress rigid body giant space conversion structure and construction method thereof
CN109592615A (en) * 2019-01-30 2019-04-09 华东交通大学 A kind of extending type motor-car rain brush inspection platform
CN109592615B (en) * 2019-01-30 2024-01-19 华东交通大学 Unfolding type motor car wiper overhauls platform

Similar Documents

Publication Publication Date Title
CN108468397B (en) Prefabricated self-restoring energy-dissipating double steel plate slotted shear wall structure
CN208965708U (en) Steel structure system and house
CN102330470B (en) Single-layer prestressing frame structure
CN105909007A (en) High-weatherability nonmetal split mounting type inverter machine room
CN105625577A (en) Detachable large-span pre-stressed integral tension awning and construction method thereof
CN102080454A (en) Method for reinforcing pillars in buildings
CN206481251U (en) A kind of photovoltaic bracket device of use truss string structure beam
CN103821262B (en) A kind of assembling steel plate shear wall
CN206418588U (en) Prestressed steel structure and steel house framework
CN103821257A (en) Prestress steel plate shear wall
CN103821259B (en) The combined steel plate shearing force wall that a kind of tensile force of belt supports
CN202658873U (en) Upward pulling cantilever heavy frame of scaffolding
CN205382566U (en) Whole stretch -draw awning of detachable large -span prestressing force
CN207686133U (en) A kind of assembling truss purlin system
CN204475921U (en) The dismountable firm structural construction factory building of a kind of safety
CN213115585U (en) Stable form bearing structure that building engineering used
CN205857555U (en) The attachment structure that a kind of photovoltaic steel bracket and wood roof truss wind up
CN208981514U (en) Modular more high-rise assembling type steel structures are engaged steel girder frame central supported system
CN205743140U (en) High durable nonmetal assemble type inversion machine room
CN214614568U (en) A memory alloy inclined bar steel truss beam-column connection part
CN214941105U (en) Suspended truss beam connecting assembly for light steel structure
CN203867062U (en) Trapezoid steel roof truss with hollowed-out chord members
CN211622801U (en) Shallow round bin assembled bin top cover
CN102587556A (en) Super-span horizontal-cable-stayed roof frame
CN114908898A (en) ECC-enhanced assembled prestressed tendon supporting steel plate shear wall and assembling method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Prestressed steel structure and steel house room frame

Effective date of registration: 20180322

Granted publication date: 20170818

Pledgee: Liupanshui city Zijin Mountain village bank Limited by Share Ltd.

Pledgor: SHOUGANG SHUICHENG IRON AND STEEL (Group) SAIDE CONSTRUCTION Co.,Ltd.

Registration number: 2018520000002

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20190411

Granted publication date: 20170818

Pledgee: Liupanshui city Zijin Mountain village bank Limited by Share Ltd.

Pledgor: SHOUGANG SHUICHENG IRON AND STEEL (Group) SAIDE CONSTRUCTION Co.,Ltd.

Registration number: 2018520000002

PC01 Cancellation of the registration of the contract for pledge of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170818

CF01 Termination of patent right due to non-payment of annual fee