CN206374015U - Concrete pipe gallery vertical-forming die and system - Google Patents

Concrete pipe gallery vertical-forming die and system Download PDF

Info

Publication number
CN206374015U
CN206374015U CN201621000081.6U CN201621000081U CN206374015U CN 206374015 U CN206374015 U CN 206374015U CN 201621000081 U CN201621000081 U CN 201621000081U CN 206374015 U CN206374015 U CN 206374015U
Authority
CN
China
Prior art keywords
mould
internal model
external mold
mold
mold base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621000081.6U
Other languages
Chinese (zh)
Inventor
江中凡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Chuhong Machinery Co Ltd
Original Assignee
Changsha Chuhong Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Chuhong Machinery Co Ltd filed Critical Changsha Chuhong Machinery Co Ltd
Priority to CN201621000081.6U priority Critical patent/CN206374015U/en
Application granted granted Critical
Publication of CN206374015U publication Critical patent/CN206374015U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

Concrete pipe gallery vertical-forming die, the mould includes mold base (1), bellmouth terminal mould (2), external mold mould (3), one or more internal model moulds (4), wherein:Mold base (1) is fixed on the ground, bellmouth terminal mould (2) is arranged on mold base (1), external mold mould (3) is arranged on mold base (1) and positioned at the outside surrounding of bellmouth terminal mould (2), and one or more internal model moulds (4) are arranged on mold base (1) and positioned at the inner side surrounding of bellmouth terminal mould (2).A kind of high-quality is provided, on a large scale can quickly the concrete Dan Cang of volume production, Shuan Cang, many storehouse pipe gallery moulds, system and its production technology.

Description

Concrete pipe gallery vertical-forming die and system
Technical field
The utility model belongs to technical field of mold, and in particular to a kind of concrete pipe gallery vertical-forming die, be System and piping lane molding methods.
Background technology
Urban Underground " pipe gallery " refer to urban road the underground space build an intensive tunnel, by electric power, A variety of municipal pipelines such as communication, water supply and drainage, heating power, combustion gas concentrate on one, carry out " unified planning, unified construction, unified pipe Reason " pipe gallery is rationally to utilize Underground Space Resource, solves all kinds of pipe network facilities scarce capacities in underground, does things in his own way and cut open the chest Broken tripe, repeated construction, promote the effective way of underground space comprehensive utilization and resource-sharing.
In-situ precast being used existing pipe gallery, such a construction method construction operation time is long, site operation is chaotic more, The long period after the concrete curing Enhanced time that work operations amount is big, need are longer, fluting is set to backfill, it is unfavorable in city Shorten the construction period in road construction, meet the requirement of Quick-forming traffic.
The concrete impermeability of field fabrication is not as the concrete made in factory, and seepage, influence occur for easy waterproof cloth The use function of pipeline.Such as works local environment has corrosive medium, and medium invades structure by crack, draws reinforcing bar Corrosion, influence structures bearing capacity and durability, shorten the service life of underground piping.
Using prefabricated assembled pipe gallery construction can avoid due to lay and maintenance underground utilities frequently excavate road and Traffic and resident trip are impacted and disturbed, it is ensured that road surface is complete and attractive in appearance.Expense and work that reduction road surface is repeatedly overhauled The maintenance cost of journey pipeline, maintains the integrality on road surface and the durability of all kinds of pipelines, easily facilitate various pipelines laying, Increase and decrease, maintenance and daily management.
Because pipe gallery agent structure is completed in factory, reliable in quality, safety is guaranteed.After the completion of directly transport to and apply Work scene, so assembled in situ speed is fast, before piping lane is installed, behind can earth backing resume traffic, thus city system can be implemented Row rapid construction engineering method.
Power cable, communication cable (optical cable), feed pipe and Gas Pipe constitute include 4 kinds of underground pipe gallery it is basic Pipeline.Because underground pipe gallery storage pipeline influences each other, incompatible or needs individually lay a storehouse, this allows for single storehouse Pipe gallery can not meet use demand then needs production pair, many storehouses or many storehouse pipe galleries.
Concrete Double, many storehouse pipe gallery forming methods can be divided into two kinds of wet method and dry method.In Wet vertical moulding process Assembly and disassembly mould is to influence the key factor of production cycle, thus each production unit is all strongly improving punching block design, reduces assembly and disassembly The mould time, improve effect.
The vertical interior axially bored line for referring to pipe gallery during concrete formation in Concrete Double, many storehouse Wet vertical molding seat moulds Production method perpendicular to the ground.The Concrete Double of such a Wet vertical vibratory process production, multi-compartment tube corridor, can produce different shaped The concrete pipe gallery of formula interface, meets the functional requirement of different pipelines;It is adapted to make large-sized concrete piping lane;Make steel socket pipe Corridor steel bellmouth size Control precision, operational sequence is few.
Utility model content
The purpose of this utility model is:There is provided a kind of high-quality, on a large scale can quickly the concrete Dan Cang of volume production, Shuan Cang, Many storehouse pipe gallery moulds, system and its production technology.Particularly a kind of concrete pipe gallery Dan Cang, Shuan Cang, many storehouses Wet vertical shaping steel die mould and its application method.
Concrete Dan Cang, Shuan Zang, the key point of many storehouse pipe galleries production are mainly 2 points:Ensure quality and improve work( Effect.Concrete pipe gallery construction and installation, the docking of 2-section pipe corridor (or being box culvert, culvert pipe), center and angle have only in theory The characteristics of one property, i.e.,:Only alignment could abutting joint completely.Thus manufacture concrete pipe gallery need to pay special attention to interface Quality, it is ensured that the shape and size of interface can reach required precision, it is ensured that the sealing of piping lane.Punching block mold design fills it Tear open and more facilitate, improve production efficiency.
Concrete pipe gallery Wet vertical mould, draws both fixed mould and core mould vibrating mould Advantage.Internal model, external mold are designed to sliding mould, not only ensure that mould repeatedly assembled formation precision but also exempt mould handling, The operation of dismounting, reduces operation difficulty, reduces crane access times, is conducive to accelerating the production of piping lane.Bellmouth (can also claim For tongue and groove) terminal mould uses fabricated construction, be disposed on mold base, when conveniently stripped the lifting of concrete component and Mould time is reduced, accelerates production efficiency.Using the vibration integrated piping lane punching block of adhesion type, its site layout project is reasonable, environment Neatly.The technical parameter of vibrator is matched with structure of steel die, and all technical reaches technical requirements.From using effect See, not only pipe gallery speed of perfusion is fast, automaticity is high, and concrete is uniform, be not likely to produce crack, more effectively improves Setting rate, shortens the production cycle, improves production efficiency.
According to the first embodiment that the utility model is provided, there is provided a kind of concrete pipe gallery vertical forming mould Tool:
Concrete pipe gallery vertical-forming die, the mould includes mold base, bellmouth terminal mould, external mold mould, one Individual or multiple internal model moulds.Wherein:Mold base is fixed on the ground.Bellmouth terminal mould is arranged on mold base.External mold mould Tool is arranged on mold base and positioned at the outside surrounding of bellmouth terminal mould.One or more internal model moulds are arranged on mould bottom On seat and positioned at the inner side surrounding of bellmouth terminal mould
Wherein, a length of 1-20m of whole internal model mould, preferably preferably 1.5-18 meters, 2-15m.
In the utility model, when the mould is provided with an internal model mould, composition is concrete pipe gallery list storehouse Vertical-forming die.When the mould is provided with two internal model moulds, composition is the double storehouse vertical forming moulds of concrete pipe gallery Tool.When the mould is provided with three or more internal model moulds, composition is the storehouse of concrete pipe gallery three or many storehouse vertical formings Mould.That is concrete pipe gallery vertical-forming die contains several bins and determined by the number of internal model mould.Each The structure of internal model mould is identical, and the length and width of internal model mould be able to can also be differed with identical.
In the utility model, the outside surrounding of mold base is respectively provided with external mold guide rail.
Preferably, side of the external mold guide rail of each side of mold base perpendicular to each side of mold base.
Preferably, external mold guide rail is I-steel guide rail.
Preferably, the outside surrounding of mold base is respectively provided with external mold angle station.External mold angle station connects mould Have base and external mold mould.
In the utility model, the inner side of mold base is provided with internal model guide rail.
Preferably, the internal model guide rail on the inside of mold base is perpendicular to the side of mold base.
Preferably, internal model guide rail is I-steel guide rail.
Preferably, the inner side of mold base is provided with internal model angle station.Internal model angle station connecting mold base and interior Mould mould.
In the utility model, bellmouth terminal mould is arranged between external mold guide rail and internal model guide rail.
In the utility model, bellmouth terminal mould includes bellmouth end plates, female end supporting plate, female end reinforcement.Hold The back of mouth end plates is provided with female end reinforcement.Bellmouth end plates are surrounded by female end supporting plate.
Preferably, bellmouth terminal mould is provided with female end seal groove and female end water stopping trough.
Preferably, the junction of bellmouth terminal mould and mold base is provided with positioner and locking device;Preferably, The junction of bellmouth terminal mould and external mold mould and/or internal model mould is provided with locking device.
In the utility model, the lower end of external mold mould is provided with external mold roller.External mold roller and the external mold on mold base Guide rail is connected.
Preferably, external mold mould is provided with external mold pushing meanss, and one end of external mold pushing meanss connects external mold mould, outside The other end connecting mold base of mould pushing meanss.The quantity of external mold pushing meanss is unrestricted, as long as can realize that promotion is outer Mould mould;Usually, external mold pushing meanss are 1-50, and preferably 2-30, more preferably 4-20 is individual, further preferably For 6-15, most preferably 8-10.
Preferably, the lower end of external mold mould is connected with external mold angle station.
Preferably, external mold mould is provided with external mold retractor device.One end of external mold retractor device is connected with external mold mould, The other end of external mold retractor device is connected with mold base or ground.
In the utility model, external mold mould includes polylith external mold template.Polylith external mold template docks to form an entirety Framework.External mold pushing meanss are connected in the external mold template of external mold mould.Usually, it is connected with 1- in each piece of external mold template 2-3 external mold pushing meanss are connected with 5 external mold pushing meanss, preferably each piece external mold template.
Preferably, external mold mould includes four pieces of external mold templates.Four pieces of external mold templates dock the rectangle to form an entirety Framework.
Preferably, external mold template and external mold template dock the connected mode overlapped using diagonal hypotenuse.
Preferably, clamped between external mold template and external mold template by the way of expansion sleeve is tapped and clamped.
In the utility model, the top of external mold mould is provided with backform.Backform is connected with external mold template.Backform and mould bottom Bellmouth terminal mould on seat constitutes the bellmouth terminal mould and socket terminal mould of complete set.
Preferably, backform is provided with backform seal groove and backform water stopping trough.
Preferably, the contact surface of external mold mould and mold base and/or bellmouth terminal mould is provided with seal groove, and install Rubber weather strip.
Preferably, the junction of external mold mould and mold base is provided with locking device.External mold mould and internal model mould Junction is provided with locking device.
In the utility model, internal model mould includes internal model side form, internal model end mould and inside lock wing plate.Internal model side form is set In the left and right sides of internal model mould.Internal model end mould is arranged on the rear and front end of internal model mould.Inside lock wing plate is arranged on internal model side Between mould and internal model end mould.Internal model side form includes internal model left templates and internal model right mould plate.Internal model end mould include internal model front template and Internal model rear pattern plate.
In the utility model, the lower end of internal model side form and internal model end mould is provided with internal model roller.Internal model roller and mould bottom Internal model guide rail on seat is connected.Inside lock wing plate is connect by radial type connection with internal model side form or internal model end template strand.
Preferably, internal model pushing meanss, the one of internal model pushing meanss are respectively provided with internal model side form and internal model end mould End connection internal model side form and internal model end mould, the other end connecting mold base of internal model pushing meanss.The quantity of internal model pushing meanss It is unrestricted, as long as promotion internal model mould can be realized;Usually, internal model pushing meanss are 1-50, preferably 2-30 It is individual, more preferably 4-20, more preferably 6-15, most preferably 8-10.
Preferably, internal model retractor device is respectively equipped between internal model side form or internal model end mould and inside lock wing plate.Internal model is stretched One end connection internal model side form or internal model end mould of compression apparatus, the other end connection inside lock wing plate of internal model retractor device.
In the utility model, the lower end of internal model side form, internal model end mould and inside lock wing plate is equipped with internal model roller.Internal model Roller is connected with the internal model guide rail on mold base.
Preferably inside lock wing plate is connect by radial type connection with internal model side form or internal model end template strand.
In the utility model, internal model side form, internal model end mould and inside lock wing plate pass through radial type connection and mould respectively Base or ground are using connection.
Preferably, it is respectively equipped with internal model between internal model side form, internal model end mould and inside lock wing plate and mold base or ground Retractor device.One end of internal model retractor device connects internal model side form, internal model end mould or inside lock wing plate, internal model retractor device respectively Other end connecting mold base or ground.
Preferably, the mould also includes anchorage process mould.Inside lock wing plate is provided with perforate.Anchorage process mould is set In perforate.Anchorage process mould is connected with inside lock wing plate.The utility model is not any to the shape of anchorage process mould It is required that.Anchorage process mould can be the shapes such as cuboid, rectangular trapezoidal, cylindrical, half of cylindrical or the triangle bodily form Shape.The setting of anchorage process mould so that have anchorage fixed position on the pipe gallery component poured, two pieces or more than one piece are integrated When piping lane connection is placed, adjacent two pieces pipe gallery is connected by cable wire or other connecting elements, in horse anchorage fixed position Place is fixed so that adjacent two pieces pipe gallery is fixed together, it is to avoid the displacement or dislocation of pipe gallery.
Preferably, perforate is located at the point midway of inside lock wing plate.
Preferably, being equipped with perforate on each block of inside lock wing plate.Perforate can be rectangle, square, circle etc. It is variously-shaped.The utility model has no requirement to the shape of perforate.
Preferably, anchorage process mould is connected by bolt with inside lock wing plate.
Preferably, the contact surface of internal model mould and mold base and/or bellmouth terminal mould is provided with seal groove, and install Rubber weather strip.
Preferably, the junction of internal model mould and mold base is provided with locking device.Internal model mould and external mold mould Junction is provided with locking device.
Preferably, the mould also includes vibrator.Vibrator is optionally located at mold base, external mold mould, internal model On mould.Preferably vibrator is form vibrator.
Preferably, the mould also includes damping device.Damping device is arranged between mold base and ground.It is preferred that Be damping device be rubber shock-absorbing device.
Preferably, the mould also includes sound arrester.Sound arrester wraps up vibrator and/or whole mould.It is preferred that It is that sound arrester is blimp.
Preferably, external mold mould is provided with guardrail and cat ladder.
According to second of embodiment that the utility model is provided, there is provided a kind of concrete pipe gallery vertical forming system System:
A kind of horizontal formation system of concrete list storehouse pipe gallery, including the mould in the first embodiment, the mould Also include curing cover.Curing cover parcel mould formation confined space.Steam is passed through in curing cover.
Preferably, curing cover is brace type canvas steam-type curing cover.
According to the third embodiment that the utility model is provided, there is provided a kind of concrete pipe gallery molding methods, i.e. A kind of method for molding concrete pipe gallery using concrete pipe gallery vertical-forming die described above, this method bag Include following steps:
1) mould is assembled:Mould is cleared up, brushing interleaving agent fixes mold base on the ground, lay framework of steel reinforcement, peace Bellmouth terminal mould is filled, internal model mould is installed, external mold mould is installed, locking device is locked;
2) feeding jolt ramming:Concreting is vibrated;Concrete formation is wiped one's face;
3) steam curing:Conserved using steam-type, use brace type canvas steam-type curing cover;
4) it is stripped:Pretend according to set of molds anti-order stripping.
Preferably, this method also includes:
5) piping lane is overturn:Piping lane is at the uniform velocity overturn to horizontal level by upright position using hydraulic pressure tipping arrangement;
6) the secondary maintenance of piping lane:The modes such as spray, water maintenance or brushing protective agent are conserved;
7) rubber fastening band is pasted.
In the utility model, mold base (hereinafter referred to as " base ") be arranged on level ground using foundation bolt with Ground is connected, and can also directly be embedded in subsurface by steelframe structure.Mold base is whole punching block " pedestal ", is almost carried All load, overall structure form is designed as box-shaped.Consider the transmission of vibration force, chassis interior is designed as frame structure, It is welded by panel and chan frame.Welding process can ensure that base has enough using attachment weld and intermittent weld Strength and stiffness can effectively prevent panel welding deformation again.On the premise of ensureing that base has sufficient intensity and rigidity, it need to fit When mitigating base weight, therefore, base panel etc. selects relatively thin steel, is set in the junction of remaining side plate, end plate Reinforcement is to ensure the rigidity of punching block.Four sides, which is provided with the inside of external mold I-steel guide rail, framework, on the outside of framework is provided with internal model I-steel Guide rail.In the utility model, if single storehouse mould, interior empty (or the endoporus) of concrete pipe gallery longer direction is set For laterally (including left side and right side), the shorter direction of pipe gallery is longitudinal direction (including front-end and back-end).If double storehouses or Many storehouses, the then direction that mould includes the side in two storehouses side by side is the side for laterally (including left side and right side) only including a storehouse Direction is longitudinal direction (including front-end and back-end).
In the utility model, surrounding can be provided with external mold angle station on the outside of mold base, for connecting external mold mould, External mold mould can be rotated around external mold angle station relative to mold base, so as to open and close up external mold mould.Mould bottom The inner side surrounding of seat can be provided with internal model angle station, and for connecting internal model mould, internal model mould can be filled around internal model corner Put and rotated relative to mold base, so as to open and close up internal model mould.
In the utility model, bellmouth terminal mould is on mold base, and mold base is with bellmouth terminal mould using positioning Bolt connection, its main function is to improve production efficiency.1-100 can be equipped with simultaneously on a set of vertical forming seat mould (mould) Set (or more sets, preferably 2-50 sets, more preferably 3-20 sets, still more preferably covered for 4-10) bellmouth terminal mould is accelerated Speed of production, when a set of bellmouth terminal mould and vertical-forming die, which carry out assembly and disassembly mould, pours operation, its remainder set female end mould It can carry out delivering to other works such as fog room progress steam curing operation after the making of framework of steel reinforcement, or the integral hoisting demoulding on tool Sequence.Mutual without prejudice between them, work compound can greatly speed up the speed of production and efficiency of mould.
In the utility model, one set of die base, internal model mould and external mold mould can be equipped with many set bellmouth terminal moulds, That is mould of the present utility model, it is only necessary to which being equipped with many set bellmouth terminal moulds can be to realize many set comprehensive pipe gallery dies Function.Bellmouth terminal mould of the present utility model be free to installation and removal.In the prior art, bellmouth terminal mould is and mould Miscellaneous part together, bellmouth terminal mould must be used together with whole set of die.But, in the construction of pipe gallery During, the shaping and maintenance of pipe gallery need to wait long time, and the general time for being molded and conserving is pipe gallery Pour 20 times of the time or so;Meanwhile, the making of reinforcing bar keel (or steelframe skeleton) is also required to the time inside pipe gallery, typically Production Time of framework of steel reinforcement be that pipe gallery pours 5 times of the time or so.In the prior art, a pipe gallery is made, Taking the time of mould includes Production Time, the time of pouring, shaping and the curing time of framework of steel reinforcement, a generally 30 hours left sides It is right.And use mould of the present utility model, it is only necessary to many set bellmouth terminal moulds are equipped with, a set of bellmouth terminal mould is placed on base On, close up internal model mould and external mold mould, progress pours operation, after the completion of pouring, carry out preliminary shaping, it is possible to by synthesis Piping lane component removes mould together with bellmouth terminal mould, is placed on and carries out follow-up shaping and maintenance elsewhere;Carrying out While pouring operation, other bellmouth terminal moulds can carry out the making of framework of steel reinforcement, until after the completion of pouring, by pipe gallery Whole mould is removed together with bellmouth terminal mould, the framework of steel reinforcement that Making of reinforcement cage is completed is together with another set of bellmouth terminal mould one Rise and be put into mould, can thus realize that the continuous of whole set of die is used.Use mould of the present utility model, one set of die bottom Seat, internal model mould and external mold mould can be used continuously, using the form of pipelining, it is only necessary to change bellmouth terminal mould, Bellmouth terminal mould is using the pattern recycled.After the completion of a pipe gallery component is poured, by pipe gallery component together with Bellmouth terminal mould is removed together;Another bellmouth terminal mould is placed on mold base, same set of mold base, internal model mould is used Tool and external mold mould carry out pouring for next pipe gallery component;So circulation, one set of die base, internal model mould and external mold mould Sum set bellmouth terminal mould can realize the function of continuous production pipe gallery component.Using mould of the present utility model, make One pipe gallery, the time for taking mould is generally 2 hours, substantially increases mold use rate, improves efficiency, simultaneously It can work continuously.Because the cost of comprehensive pipe gallery die is higher, and bellmouth terminal mould cost for whole set of die is low It is honest and clean much therefore, in the case of it is pressed for time, to produce same amount of pipe gallery, the expense of mould input greatly reduces, Cost is saved.In addition, the use of pipe gallery, typically just nearby makes, in-site installation after completing on construction ground, because This, typically more urgent to the required time of pipe gallery and concentration, using mould of the present utility model, can be greatly shortened and applied Requirement between man-hour and to number of molds, so as to save cost and shorten construction period, reaches the effect efficiently constructed.
Bellmouth terminal mould is spliced using the weldering of bending plate group, and bellmouth end plates are provided with seal groove and water stopping trough, bellmouth The design in end face template face meets the geometry requirement of pipe gallery front end face, and seal groove and water stopping trough use numerical control gantry machine Bed machine-shaping.Surface Machining roughness is controlled in Ra3.2, to ensure the surface smoothness and flatness of pouring synthetic piping lane, Without adhesion phenomenon when making the demoulding.
Bellmouth terminal mould is formed using bellmouth end plates, supporting plate and reinforcement frame welding.Bellmouth end plates have Vertical and horizontal gusset, it is surrounded by supporting plate to strengthen side template rigidity, forms the frame structure of an entirety.
Bellmouth terminal mould installs rubber weather strip with opening seal groove on the contact surface of other moulds, with mortar leakage prevention.Hold The junction of mouth terminal mould and mold base is provided with positioner and locking device, and positioner is used to place bellmouth terminal mould In the setting position of mold base, locking device is used to fix bellmouth terminal mould and mold base.Bellmouth terminal mould and external mold, The junction of inside molding plate is provided with locking device.
In the utility model, external mold mould is arranged on the outside surrounding of punching block mold base, using roller and I-steel Track (or guide rail) is connected.Assemble and disassemble external mold mould on the spot using sliding method, such a method reduces operation compared with conventional method Time, the operation of handling punching block, reduces the access times of the crane gears such as crane when exempting dismounting external mold mould, is conducive to adding The speed of production of fast pipe gallery.
In the utility model, in the utility model, the lower end of external mold mould is provided with external mold roller.External mold roller and mould The external mold guide rail having on base is connected.Preferably, external mold mould is provided with external mold pushing meanss, external mold pushing meanss One end connects external mold mould, the other end connecting mold base of external mold pushing meanss.External mold pushing meanss can for hand push slide, One or more in hydraulic jack, cylinder, screw mandrel, motor.One end of external mold pushing meanss is acted on external mold mould, another End is acted on mold base, is slided by hand push, the one or more in hydraulic jack, cylinder, screw mandrel, motor can cause External mold mould is moved in parallel on external mold guide rail, realizes the opening and closing of external mold mould.
External mold mould, is plate face frame structure, is seated in roller seat, is mutually leaned on diagonal end plate, mainly carries concrete Lateral pressure, reduction is the problems such as there is buckling deformation.External mold mold stiffness and intensity requirement are high, using side form panel and rectangle steel Frame welding is formed.Side form panel back is provided with vertical and horizontal rectangle steel, to strengthen side template rigidity.
External mold mould is arranged on the outside surrounding of mold base, is divided into four pieces and moves in parallel, and formation one is whole during docking The rectangular frame of body is surrounded, and pours peripheral four wall for building up precast concrete.Outboard template is connected with outboard template using diagonal Line hypotenuse connected mode, this mode contrasts that traditional right angle connected mode is simpler, effective, stress is more preferable.Template and mould Between plate clamp using expansion sleeve tap clamp by the way of, this mode than its using screw mandrel clamping by the way of more quickly, just It is prompt.Expansion sleeve is a kind of keyless joint device, and expansion set connection mainly has the advantage that:Accuracy of alignment is high;Install, adjust, dismantle It is convenient;Intensity is high, and connective stability is reliable;Can be without damage with protection equipment in overload, be particularly suitable for use in transmission heavy loads; The service life of expansion set is long, and intensity is high.Expansion set relies on frictional drive, does not have keyway weakening to being coupled part, also without relative motion, Abrasion will not be produced in work;Expansion set will lose connection effect in overload, can be without prejudice with protection equipment.
The lower end of external mold mould can also be connected with the external mold angle station on mold base.External mold mould is provided with external mold Retractor device.One end of external mold retractor device is connected with external mold mould, the other end and mold base or the ground of external mold retractor device Face is connected.External mold retractor device is used for the opening for supporting external mold mould with closing up.When die-filling, close up external mold mould, for pouring; During form removal, mould is opened, external mold mould is separated with pipe gallery component, take out pipe gallery component.The flexible dress of external mold It is set to the one or more in screw mandrel, oil cylinder, cylinder, preferably bidirectional screw mandrel.
External mold mould is provided with backform (being used as socket terminal mould), is similarly divided into four pieces of front, rear, left and right and external mold Mould links together, and is moved forward and backward with external mold mould.Backform is spliced using the weldering of bending plate group, and backform is provided with seal groove And water stopping trough, the design of backform meets the geometry requirement of pipe gallery end face, and seal groove and water stopping trough use numerical control gantry Machine tooling is molded.The control of Surface Machining roughness is in Ra3.2, to ensure the surface smoothness of pouring synthetic piping lane and smooth Degree, without adhesion phenomenon when making the demoulding.Backform is held with the complete set of the bellmouth terminal mould composition pipe gallery on mold base Mouth terminal mould and socket terminal mould.
Preferably, backform be connected with external mold template using radial type, rotary opening ways, during form removal, backform around After external mold template is opened, then external mold mould is moved or rotates, so as to open external mold mould completely.
Backform is formed using cavity plate panel, end plate and reinforcement frame welding.Cavity plate panel back is provided with vertical and horizontal Gusset, it is surrounded by end plate to strengthen side template rigidity.
External mold mould installs rubber weather strip with opening seal groove on the contact surface of other moulds, with mortar leakage prevention.External mold The junction of mould and base is provided with locking device.The junction of external mold mould and inside molding plate is provided with locking device.
In the utility model, interior mould main function is the interior chamber size to form pipe gallery, using sliding method both sides The structure type shunk or supportted outside simultaneously, is made up of interior left and right side template, inside lock wing plate, interior front template, interior rear pattern plate etc..
Interior mould is arranged on the inside of base on i-beam track (or guide rail), is connected by turning rolls, using sliding method just Inside molding plate is assembled and disassembled on ground, and such a method reduces the operating time compared with conventional method, handling steel when exempting dismounting external mold mould The operation of mould, reduces the access times of the crane gears such as crane, is conducive to accelerating the speed of production of pipe gallery (piping lane).
In the utility model, the lower end of internal model side form and internal model end mould is provided with internal model roller.Internal model roller and mould bottom Internal model guide rail on seat is connected.Inside lock wing plate is connect by radial type connection with internal model side form or internal model end template strand.It is preferred that , internal model pushing meanss, one end connection internal model side of internal model pushing meanss are respectively provided with internal model side form and internal model end mould Mould and internal model end mould, the other end connecting mold base of internal model pushing meanss.Internal model pushing meanss can be slided for hand push, hydraulic pressure One or more in oil cylinder, cylinder, screw mandrel, motor.One end of internal model pushing meanss is acted on internal model mould, and the other end is made One or more with mold base, being slided by hand push, in hydraulic jack, cylinder, screw mandrel, motor can cause internal model Mould is moved in parallel on internal model guide rail, realizes the opening and closing of internal model mould.
Internal model side form, internal model end mould and inside lock wing plate are used by radial type connection with mold base or ground respectively to be connected Connect.Internal model retractor device is respectively equipped between internal model side form, internal model end mould and inside lock wing plate and mold base or ground.Internal model is stretched One end of compression apparatus connects internal model side form, internal model end mould or inside lock wing plate, the other end connection mould of internal model retractor device respectively Has base or ground.
Interior mould is formed using panel, end plate and reinforcement frame welding.Panel back is provided with vertical and horizontal gusset, its End plate is surrounded by strengthen interior mould rigid.
Interior left and right side template is occupy the interior mould left and right sides and tight pattern formation integrated pipe is shunk or supported outside using sliding method Corridor intracavity sidewall.
Interior front template, rear pattern plate occupy interior mould front and rear portions, and inside lock wing plate is connected using articulated form.Interior left and right side After template two-way simultaneous shrinks or supportted outside, mould before and after inside lock wing plate, translation internal model is rotated, pipe gallery inner chamber cavity wall is formed.
Anchorage process mould is provided with the forming surface of inside lock wing plate, can be poured out in concrete casting forming process The tensioning of anchorage, cutting technique position.
Interior mould installs rubber weather strip with opening seal groove on the contact surface of other moulds, with mortar leakage prevention.Interior mould Locking device is provided with junction of the junction provided with locking device inside molding plate and external mold mould of mold base.
In the utility model, concrete pipe gallery needs vibrator in manufacturing process, the aggregate of shaking concrete, Concrete is set to reach effect that is closely knit, uniform, not isolating.The vibrator of this pipe gallery steel mold is preferentially vibrated from adhesion type Device, it is considered to the making of concrete pipe gallery, vibrating effect and by calculating, sets 1-20 adhesion type to shake on side form mould Dynamic device (being preferably 2-10, more preferably 3-8), multiple form vibrators are interlaced, are arranged in side form mould On side form panel, continuous weld is used between vibrator and side form panel, to ensure that vibrator is firmly installed, vibration force passes through steel The purpose that structure is transmitted.1-10 vibrator can also be set below mold base.It can also be set in die for inner Put 1-10 vibrator.The vibrating time used in pipe gallery is produced, by taking standard tube coupling as an example, 1 piece of tube coupling is often produced, when vibrating Between be only that former plug-in type vibrating rod vibrating time obtains 1/3, the production time greatly improves.
In the utility model, because mold base is directly contacted with ground, therefore meeting is stood in vibration produced when vibrating Influence is produced on punching block and is damaged, therefore devises on base damping device.Damping device is arranged on mold base and ground Between, make to be damping device between base and ground.Damping device is rubber shock-absorbing device.Damping device and the contact point on ground (being preferably at 2-15, at more preferably 4-10) is set at 1-20 altogether, is the application point in punching block work.Rubber shock-absorbing device is selected The form separated with multilayer rubber vibration isolator and steel plate.
In the utility model, the problem of adhesion type vibration punching block generally existing noise is larger.Therefore it is provided with sound insulation dress Put.Sound arrester is blimp.Twice blimp can be set, be arranged on together outside vibrator, another road is arranged on whole steel Outside mould, while sound insulation, the convenient use of punching block is taken into account again.Sound insulation case is mainly made up of shaped steel and sound insulation colored steel.
In the utility model, need to carry out the solidification that maintenance work accelerates concrete, concrete after concreting shaping During maintenance, emphasis is needed to strengthen the humidity and temperature control of concrete.The open-assembly time for reducing surface concrete as far as possible is right in time Concrete exposure, which carries out accurate covering (can be covered using tarpaulin, plastic cloth etc.), prevents surface moisture from evaporating.Adopted for this Conserved with steam-type, use curing cover.Curing cover is brace type canvas steam-type curing cover, and curing cover parcel mould forms closed Space, is passed through steam in space.This mode can be prevented effectively from covering and directly contact concrete surface, until concrete is whole Untill solidifying.
In the utility model, in the utility model, the overall process of concrete pipe gallery production technology is broadly divided into (1) mould assembling, (2) feeding jolt ramming, (3) steam curing, (4) demoulding, the upset of (5) piping lane, (6) storage stacking, (7) are verified This six stages of factory.
(1) mould is assembled:Cleaning mould → brushing interleaving agent → fixing mold base on the ground → lays reinforcing bar Frame → installation bellmouth terminal mould → installation internal model mould → installation external mold mould → locking locking device.
Clear up mould:The rubber seal of cleaning mould is checked, cement mortar above is removed, should be immediately for what is damaged Change.
Brushing interleaving agent:Interleaving agent can select grease, emulsified fat, rosin soap etc., its basic demand not to be bonded and Mould is polluted, moulding property is good, it is good with punching block tack easily to brush, interleaving agent brushes thickness unanimously, prevents holiday, lacks brush phenomenon.
Mold base is fixed on the ground.
Lay framework of steel reinforcement:Framework of steel reinforcement uses welded framework, bar diameter, in length and breadth skeleton diameter, quantity, length, ring Muscle quantity, spacing etc. are configured in strict accordance with drawing, and welding in advance, inspection are finished and be directly seated on bellmouth terminal mould.
Bellmouth terminal mould is installed:Bellmouth terminal mould and the framework of steel reinforcement being placed in thereon are hoisted on a mould together, and Locking is in place.
Internal model mould is installed:Slid using screw mandrel, oil cylinder or cylinder along internal model guide rail after the symmetrical top template of internal model, rotation is fixed Other corner formworks of position, complete fixed internal formwork.Clamped afterwards using positioning swelling pin and screw locking device positioning.
External mold mould is installed:External mold template is slid along external mold guide rail using screw mandrel, oil cylinder or cylinder, using positioning swelling pin And screw locking device positioning is clamped.
Lock locking device:Check whether the linear mark of mould corner aligns;It is stuck in the middle part of mould and is referred to special measuring tool Positioning is put, and checks whether the width of mould is accurate in the middle part of Measurement die.Forbid to leave gap, otherwise should be checked adjustment.Adopt With screw locking device, positioning and locking internal model is with external mold formation socket end, and the integral installation for completing mould enters feeding jolt ramming rank Section.
(2) feeding jolt ramming:Concreting vibrates → and concrete formation wipes one's face
Concreting is vibrated:Enter the feeding jolt ramming stage after the completion of mould installion, rate of feeding can pass through surge bunker Door adjusts feed quantity.Due to consideration that the stabilization of the support system of template, concreting will be layered progress, it is per thickness degree 400-500mm, should be carried out continuously during concreting.
Start the vibration stage within 0.5-1 minutes after feeding material, 2-3 minutes before feeding terminates, less feed quantity should be kept. Forming process is vibrated in feeding, only uses a kind of active force of vibration force.Due to the directionless powerful of vibration force, be conducive to mixing Solidifying soil flows freely and fills space mutually, so compact structure, concrete strength is high.
Concrete formation is wiped one's face:Pour rear concrete surface cement mortar thicker, after pouring, tentatively used before initial set by absolute altitude 3-5 receipts water of long floating rule point is floating, and then with wooden washboard, rubbing and pressure make its dense surface several times repeatedly, and iron washboard pressure is used before final set Light.
(3) steam curing (accelerating maintenance)
Enter steam curing (the accelerating maintenance) stage after the completion of mould feeding jolt ramming, type concrete steam maintenance (accelerates maintenance) It is that the hydration reaction for accelerating cement reaches fast, hard, early purpose.
Maintenance is accelerated more to acquire a special sense for concrete prefabricated element factory and products factory.In whole concrete In article manufacturing process, the time shared by maintenance process is most long, accounts for 80%-90%, and the shortening production cycle can improve work life Yield and reduction are founded the factory investment, in addition using accelerating maintaining process to shortening curing time, accelerate punching block turnover, with very big Economic implications.
During type concrete steam maintenance (accelerating maintenance), emphasis is needed to strengthen the humidity and temperature control of concrete.Subtract as far as possible The open-assembly time of few surface concrete carries out accurate covering to concrete exposure in time (can be carried out using tarpaulin, plastic cloth etc. Covering) prevent surface moisture from evaporating.Conserved, covered using brace type canvas using steam-type for this.This mode can effectively be kept away Exempt from covering and directly contact concrete surface, untill concrete final set.
(4) it is stripped:Mould die sinking lifting
Mould die sinking lifting:After component is integrally fixed-type, back out in, end, side mold.Crane will be comprehensive using professional suspender Close piping lane component to hang out slowly together, speed is unsuitable too fast or pauses.Pipe gallery component is slowly hoisted to storage region.
(5) piping lane is overturn:Overturn pipe gallery component using special hydraulic pressure tipping arrangement that piping lane is even by upright position Speed is overturn to horizontal level.
(6) storage is stacked:Piping lane horizontal transport → storage place piles up the → secondary maintenance of piping lane → brushing protective agent
Piping lane horizontal transport:Using gantry crane horizontal transport, it is careful not to allow bell and spigot to contact in transportation Ground.
Storage place is piled up:To being threaded to, horizontal piping lane carefully should be slowly moved to predetermined region by specification, credit rating and be put Put on sleeper, it is to avoid colliding surface, stack neat.
The secondary maintenance of piping lane:After piping lane is stacked neatly, in order that piping lane concrete continues to increase, thermal cracking is reduced, is gone out Piping lane after mould should carry out secondary maintenance.Non- winter using manually watering, automatic spray or water the mode such as conserve and carry out, typically Maintenance 7d or so should be continued, 14d can be conserved when having ready conditions.Can be using spraying maintenance agent method maintenance during winter construction.
Brushing protective agent:From organosilicon vapor-permeable type transparent protecting paint, concrete surface is brushed.Should during brushing Construction tool is invaded into full protective agent, it is general it is wet to wet coating brush twice, i.e., secondary brushing should it is not dry in previous brushing surface be to carry out, protect Protect agent and brush thickness unanimously, prevent holiday, lack brush phenomenon.Protective agent infiltrates into inside concrete completely effectively prevents moisture from entering And the accumulation of salt in the surface soil is prevented, form the hydrophobic protective layer of layer of transparent shape on its surface.
(7) examine and dispatch from the factory:Rubber fastening band → exfactory inspection → transport is pasted to dispatch from the factory
Paste rubber fastening band:Rubber water-proof bar is to ensure that the important measures of piping lane waterproof, is answered when pasting rubber water-proof bar Glue uniformly brushed after piping lane groove is cleaned out with groove and then static a period of time again installs rubber water-proof bar Real compression is struck in groove and with rubber hammer by rubber fastening band.
Exfactory inspection:It is the necessary condition dispatched from the factory that product inspection is qualified, inspection content include presentation quality, appearance and size, Structural strength and anti-permeability performance, assembled performance etc..
Transport is dispatched from the factory:Detect that qualified rear piping lane can be transported to dispatch from the factory, piping lane transport will have specialised vehicles, special chock, transport Defeated process wants smooth-ride.
In the utility model, external mold retractor device, internal model retractor device are one kind or many in screw mandrel, oil cylinder, cylinder Kind, preferably bidirectional screw mandrel.
In the utility model, the long 1-20m of whole internal model mould (summations of one or more internal model moulds), preferably 1.5-18 meters, more preferably preferably 2-15m, more preferably 3-12m, 5-10m.A height of 0.5-6m, preferably 1-5m, more Preferably 2-4m, more preferably 2.5-3.5m.A width of 0.5-6m, preferably 1-5m, more preferably 1.5-4m, it is further excellent Elect 2-3m as.In the utility model, with pipe gallery horizontal positioned (state when i.e. pipe gallery is used), that is to say, that mould Tool opening is horizontally oriented, and faces the direction of opening, and length is left and right directions in the horizontal direction, height be vertical direction (i.e. Above-below direction), a width of horizontal direction is perpendicular to the direction of length.
In the utility model, track (or guide rail), screw mandrel, oil cylinder, cylinder, Bidirectional-screw, radial type rotation die sinking knot Structure, parallel movable doorframe mold-opening structure, seal groove, water stopping trough, spring assembly, roller, vibrator, damping card device, sound insulation The devices such as device, locking device, positioning and locking device, guardrail, cat ladder, curing cover and equipment are device commonly used in the art and set It is standby, it is device well known to those skilled in the art and equipment.
In the utility model, device, equipment and the operating method for not being described and limiting are people in the art Known to member.
In the utility model, " optionally " represents to carry out or without that can also carry out multiple (simultaneous selections simultaneously Various ways).
Compared with prior art, the utility model has following advantageous effects:
1st, concrete pipe gallery Wet vertical molding seat mould mould, draws fixed mould and core mould vibrating mould Both are a little.Using seat mode structure form, internal model, external mold are designed to sliding mould, that is, ensure that mould is assembled repeatedly Formed precision exempts mould handling, the operation of dismounting again, reduces operation difficulty, reduces crane access times, is conducive to adding The production of fast piping lane.
2nd, mould of the present utility model, high mechanization, automated production, production efficiency is high, and labour takes few, production Environment, working environment are greatly improved, and labor strength is low, beneficial to safe and civilized production.Mold station is fixed, conserves position Fixation is put, more efficient utilization place space can form pipeline system production model.
3rd, mould of the present utility model, because of vertical production, bellmouth is placed in bottom, (is alternatively referred to as looked forward to so being adapted to bell and spigot Mouthful) production, Product Precision is high, revolutionizes the technological factor of horizontal production bellmouth low intensity.In being taken off after molding component External mold is individually hung out, and every kind of bore only needs one set of die, and number set bellmouth terminal mould can be produced in batches, reach several mold productions Effect, yield do not limited by number of molds, and mould investment expense greatly reduces.
4th, bellmouth terminal mould uses fabricated construction, is disposed on mold base, concrete component when conveniently stripped Lifting and reduce mould time, accelerate production efficiency.Clamped between template and template and tap what is clamped using expansion sleeve Mode, this mode than its using screw mandrel clamping by the way of it is quicker, convenient.
5th, using adhesion type high frequency body vibration, make the abundant, uniform of concrete mixture vibration, compactness high, it is special It is not suitable for the production of piping lane.Frequency, amplitude and the exciting force of vibration can be easily adjusted according to different size of piping lane.
6th, slid using oil cylinder or cylinder along internal model guide rail after the symmetrical top template of internal model, other corner formworks of rotational positioning, Complete fixed internal formwork;External mold template is slid along external mold guide rail using oil cylinder or cylinder, external mold positioning is completed.With using mechanical lead screw Positioning method compares, simpler quick using the positioning method of oil cylinder or cylinder.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model mould;
Fig. 2 is the structural representation of the utility model mould;
Fig. 3 is the structural representation of the utility model mould;
Fig. 4 is the mold base schematic diagram of the utility model mould;
Fig. 5 is the female end schematic diagram of the utility model mould;
Fig. 6 is the external mold mould schematic diagram of the utility model mould;
Fig. 7 is the internal model mould schematic diagram of the utility model mould;
Fig. 8 is another structural representation of the utility model mould;
Fig. 9 is the backform structural representation of the utility model mould;
Figure 10 is that the utility model mould includes the structural representation of vibrator and damping device;
Figure 11 is that the utility model mould includes the structural representation of curing cover;
The structural representation of expansion sleeve in Figure 12 the utility model moulds;
Figure 13 is the process chart using the utility model mould.
Reference:1:Mold base;101:External mold guide rail;102:External mold angle station;103:Internal model guide rail;104:It is interior Mould angle station;2:Bellmouth terminal mould;201:Bellmouth end plates;202:Female end supporting plate;203 female end reinforcements;204: Female end seal groove;205:Female end water stopping trough;3:External mold mould;301:External mold roller;302:External mold retractor device;303:Outside Mould template;304:Backform;305:Backform seal groove;306:Backform water stopping trough;307:External mold pushing meanss;4:Internal model mould; 401:Internal model side form;402:Internal model end mould;403:Inside lock wing plate;404:Internal model left templates;405:Internal model right mould plate;406:It is interior Mould front template;407:Internal model rear pattern plate;408 internal model rollers;409:Internal model retractor device;410:Perforate;411:Internal model promotes dress Put;5:Positioner;6:Locking device;7:Seal groove;8:Anchorage process mould;9:Vibrator;10:Damping device;11:Sound insulation Device;12:Guardrail;13:Cat ladder;14:Curing cover;15:Expansion sleeve.
Embodiment
According to the first embodiment that the utility model is provided, there is provided a kind of concrete pipe gallery vertical forming mould Tool:
Concrete pipe gallery vertical-forming die, the mould include mold base 1, bellmouth terminal mould 2, external mold mould 3, One or more internal model moulds 4.Wherein:Mold base 1 is fixed on the ground.Bellmouth terminal mould 2 is arranged on mold base 1. External mold mould 3 is arranged on mold base 1 and positioned at the outside surrounding of bellmouth terminal mould 2.One or more internal model moulds 4 are set Put on mold base 1 and positioned at the inner side surrounding of bellmouth terminal mould 2;Wherein, the long 1-20m of whole internal model mould, preferably For 2-15m.
In the utility model, when the mould is provided with an internal model mould 4, composition is concrete pipe gallery list storehouse Vertical-forming die.When the mould is provided with two internal model moulds 4, composition is the double storehouse vertical forming moulds of concrete pipe gallery Tool.When the mould is provided with three or more internal model moulds 4, composition is the storehouse of concrete pipe gallery three or many storehouse vertical formings Mould.That is concrete pipe gallery vertical-forming die contains several bins and determined by the number of internal model mould.Each The structure of internal model mould is identical, and the length and width of internal model mould be able to can also be differed with identical.
In the utility model, the outside surrounding of mold base 1 is respectively provided with external mold guide rail 101.
Preferably, side of the external mold guide rail 101 of each side of mold base 1 perpendicular to each side of mold base 1.
Preferably, external mold guide rail 101 is I-steel guide rail.
Preferably, the outside surrounding of mold base 1 is respectively provided with external mold angle station 102.External mold angle station 102 Connecting mold base 1 and external mold mould 3.
In the utility model, the inner side of mold base 1 is provided with internal model guide rail 103.
Preferably, the internal model guide rail 103 of the inner side of mold base 1 is perpendicular to the side of mold base.
Preferably, internal model guide rail 103 is I-steel guide rail.
Preferably, the inner side of mold base 1 is provided with internal model angle station 104.The connecting mold bottom of internal model angle station 104 Seat 1 and internal model mould 4.
In the utility model, bellmouth terminal mould 2 is arranged between external mold guide rail 101 and internal model guide rail 103.
In the utility model, bellmouth terminal mould 2 includes bellmouth end plates 201, female end supporting plate 202, female end and added Strengthening tendons 203.The back of bellmouth end plates 201 is provided with female end reinforcement 203.Bellmouth end plates 201 are surrounded by female end Supporting plate 202.
Preferably, bellmouth terminal mould 2 is provided with female end seal groove 204 and female end water stopping trough 205.
Preferably, the junction of bellmouth terminal mould 2 and mold base 1 is provided with positioner 5 and locking device 6;It is preferred that , the junction of bellmouth terminal mould 2 and external mold mould 3 and/or internal model mould 4 is provided with locking device 6.
In the utility model, the lower end of external mold mould 3 is provided with external mold roller 301.External mold roller 301 and mold base 1 On external mold guide rail 101 be connected.
Preferably, external mold mould is provided with external mold pushing meanss 307, one end connection external mold of external mold pushing meanss 307 Mould 3, the other end connecting mold base 1 of external mold pushing meanss 307.
Preferably, the lower end of external mold mould 3 is connected with external mold angle station 102.
Preferably, external mold mould 3 is provided with external mold retractor device 302.One end of external mold retractor device 302 and external mold mould Tool 3 is connected, and the other end of external mold retractor device 302 is connected with mold base 1 or ground.
In the utility model, external mold mould 3 includes polylith external mold template 303.The docking of polylith external mold template 303 forms one Individual overall framework.
Preferably, external mold mould 3 includes four pieces of external mold templates 303.Four pieces of docking of external mold template 303 form an entirety Rectangular frame.
Preferably, external mold template 303 and external mold template 303 dock the connected mode overlapped using diagonal hypotenuse.
Preferably, clamped between external mold template 303 and external mold template 303 by the way of expansion sleeve 15 is tapped and clamped.
In the utility model, the top of external mold mould 3 is provided with backform 304.Backform 304 is connected with external mold template 303.Top Mould 304 constitutes the bellmouth terminal mould and socket terminal mould of complete set with the bellmouth terminal mould 2 on mold base 1.
Preferably, backform 304 is provided with backform seal groove 305 and backform water stopping trough 306.
Preferably, the contact surface of external mold mould 3 and mold base 1 and/or bellmouth terminal mould 2 is provided with seal groove 7, and Rubber weather strip is installed.
Preferably, the junction of external mold mould 3 and mold base 1 is provided with locking device 6.External mold mould 3 and internal model mould The junction of tool 4 is provided with locking device 6.
In the utility model, internal model mould 4 includes internal model side form 401, internal model end mould 402 and inside lock wing plate 403.It is interior Mould side form 401 is arranged on the left and right sides of internal model mould 4.Internal model end mould 402 is arranged on the rear and front end of internal model mould 4.Interior turn Angle blade plate 403 is arranged between internal model side form 401 and internal model end mould 402.Internal model side form 401 includes internal model left templates 404 and interior Mould right mould plate 405.Internal model end mould 402 includes internal model front template 406 and internal model rear pattern plate 407.
In the utility model, the lower end of internal model side form 401 and internal model end mould 402 is provided with internal model roller 408.Internal model roller 408 are connected with the internal model guide rail 103 on mold base 1.Inside lock wing plate 403 passes through radial type connection and internal model side form 401 or internal model end mould 402 link.
Preferably, internal model pushing meanss 411 are respectively provided with internal model side form 401 and internal model end mould 402, internal model is promoted One end connection internal model side form 401 and internal model end mould 402 of device 411, the other end connecting mold base of internal model pushing meanss 411 1。
Preferably, the flexible dress of internal model is respectively equipped between internal model side form 401 or internal model end mould 402 and inside lock wing plate 403 Put 409.One end connection internal model side form 401 or internal model end mould 402 of internal model retractor device 409, internal model retractor device 409 it is another End connection inside lock wing plate 403.
In the utility model, the lower end of internal model side form 401, internal model end mould 402 and inside lock wing plate 403 is equipped with internal model Roller 408.Internal model roller 408 is connected with the internal model guide rail 103 on mold base 1.
Preferably inside lock wing plate 403 is linked by radial type connection with internal model side form 401 or internal model end mould 402.
In the utility model, internal model side form 401, internal model end mould 402 and inside lock wing plate 403 are connected by radial type respectively Connect to use with mold base 1 or ground and be connected.
Preferably, divide between internal model side form 401, internal model end mould 402 and inside lock wing plate 403 and mold base 1 or ground She You not internal model retractor device 409.One end of internal model retractor device 409 connect respectively internal model side form 401, internal model end mould 402 or Inside lock wing plate 403, the other end connecting mold base 1 of internal model retractor device 409 or ground.
In the utility model, the long 1-20m of whole internal model mould (summations of one or more internal model moulds) is preferably 2-15m, more preferably 3-12m, more preferably 5-10m.A height of 0.5-6m, preferably 1-5m, more preferably 2-4m, enter one Step is preferably 2.5-3.5m.A width of 0.5-6m, preferably 1-5m, more preferably 1.5-4m, more preferably 2-3m.In this reality In new, with pipe gallery horizontal positioned (state when i.e. pipe gallery is used), that is to say, that mould openings are in level Direction, faces the direction of opening, and length is left and right directions in the horizontal direction, and height is vertical direction (i.e. above-below direction), a width of Horizontal direction is perpendicular to the direction of length.
Preferably, the mould also includes anchorage process mould 8.Inside lock wing plate 403 is provided with perforate 410.Anchorage technique Mould 8 is arranged in perforate 410.Anchorage process mould 8 is connected with inside lock wing plate 403.The utility model is to anchorage technique mould The shape of tool 8 has no requirement.Anchorage process mould 8 can be cuboid, rectangular trapezoidal, cylindrical, half of cylinder The shape such as the bodily form or the triangle bodily form.
Preferably, perforate 410 is located at the point midway of inside lock wing plate 403.
Preferably, being equipped with perforate 410 on each block of inside lock wing plate 403.Perforate 410 can be rectangle, pros Shape, circle etc. are variously-shaped.The utility model has no requirement to the shape of perforate 410.
Preferably, anchorage process mould 8 is connected by bolt with inside lock wing plate 403.
Preferably, the contact surface of internal model mould 4 and mold base 1 and/or bellmouth terminal mould 2 is provided with seal groove 7, and Rubber weather strip is installed.
Preferably, the junction of internal model mould 4 and mold base 1 is provided with locking device 6.Internal model mould 4 and external mold mould The junction of tool 3 is provided with locking device 6.
Preferably, the mould also includes vibrator 9.Vibrator 9 be optionally located at mold base 1, external mold mould 3, On internal model mould 4.Preferably vibrator 9 is form vibrator.
Preferably, the mould also includes damping device 10.Damping device 10 be arranged on mold base 1 and ground it Between.Preferably damping device 10 is rubber shock-absorbing device.
Preferably, the mould also includes sound arrester 11.Sound arrester 11 wraps up vibrator 9 and/or whole mould.It is excellent Choosing is that sound arrester 11 is blimp.
Preferably, external mold mould 3 is provided with guardrail 12 and cat ladder 13.
According to second of embodiment that the utility model is provided, there is provided a kind of concrete pipe gallery vertical forming system System:
A kind of horizontal formation system of concrete list storehouse pipe gallery, including the mould in the first embodiment, the mould Also include curing cover 14.The parcel mould formation confined space of curing cover 14.Steam is passed through in curing cover 14.
Preferably, curing cover 14 is brace type canvas steam-type curing cover.
According to the third embodiment that the utility model is provided, there is provided a kind of concrete pipe gallery molding methods, i.e. A kind of method for molding concrete pipe gallery using concrete pipe gallery vertical-forming die described above, this method bag Include following steps:
1) mould is assembled:Mould is cleared up, brushing interleaving agent fixes mold base 1 on the ground, lays framework of steel reinforcement, Bellmouth terminal mould 2 is installed, internal model mould 4 is installed, external mold mould 3 is installed, locking device 6 is locked;
2) feeding jolt ramming:Concreting is vibrated;Concrete formation is wiped one's face;
3) steam curing:Conserved using steam-type, use brace type canvas steam-type curing cover;
4) it is stripped:Pretend according to set of molds anti-order stripping.
Preferably, this method also includes:
5) piping lane is overturn:Piping lane is at the uniform velocity overturn to horizontal level by upright position using hydraulic pressure tipping arrangement;
6) the secondary maintenance of piping lane:The modes such as spray, water maintenance or brushing protective agent are conserved;
7) rubber fastening band is pasted.
Embodiment 1
Concrete pipe gallery vertical-forming die, the mould include mold base 1, bellmouth terminal mould 2, external mold mould 3, One internal model mould 4.Wherein:Mold base 1 is fixed on the ground.Bellmouth terminal mould 2 is arranged on mold base 1.External mold mould Tool 3 is arranged on mold base 1 and positioned at the outside surrounding of bellmouth terminal mould 2.3 internal model moulds 4 are arranged on mold base 1 Inner side surrounding upper and positioned at bellmouth terminal mould 2.The long 8m of whole internal model mould;A height of 3.6m;A width of 2m.3 inside story moulds The size of tool is identical.
The outside surrounding of mold base 1 is respectively provided with external mold guide rail 101.The external mold guide rail 101 of each side of mold base 1 hangs down Directly in the side of each side of mold base 1.External mold guide rail 101 is I-steel guide rail.The inner side of mold base 1 is provided with internal model guide rail 103. The internal model guide rail 103 of the inner side of mold base 1 is perpendicular to the side of mold base.Internal model guide rail 103 is I-steel guide rail.
Bellmouth terminal mould 2 is arranged between external mold guide rail 101 and internal model guide rail 103.Bellmouth terminal mould 2 includes bellmouth end face Plate 201, female end supporting plate 202, female end reinforcement 203.The back of bellmouth end plates 201 is provided with female end reinforcement 203. Bellmouth end plates 201 are surrounded by female end supporting plate 202.Bellmouth terminal mould 2 is provided with female end seal groove 204 and bellmouth Hold water stopping trough 205.The junction of bellmouth terminal mould 2 and mold base 1 is provided with positioner 5 and locking device 6;Preferably, The junction of bellmouth terminal mould 2 and external mold mould 3 and/or internal model mould 4 is provided with locking device 6.
The lower end of external mold mould 3 is provided with external mold roller 301.External mold roller 301 and the external mold guide rail 101 on mold base 1 It is connected.External mold mould 3 includes four pieces of external mold templates 303.Four pieces of docking of external mold template 303 form the rectangle frame of an entirety Frame.Each piece of external mold template 303 is provided with 2 external mold pushing meanss 307, one end connection external mold mould of external mold pushing meanss 307 Plate 303, the other end connecting mold base 1 of external mold pushing meanss 307.External mold pushing meanss are hydraulic jack.External mold template 303 With the connected mode docked using the coincidence of diagonal hypotenuse of external mold template 303.Adopted between external mold template 303 and external mold template 303 The mode clamped is tapped with expansion sleeve 15 to clamp.The top of external mold mould 3 is provided with backform 304.Backform 304 and external mold template 303 Connection.Backform 304 constitutes the bellmouth terminal mould and socket terminal mould of complete set with the bellmouth terminal mould 2 on mold base 1.Top Mould 304 is provided with backform seal groove 305 and backform water stopping trough 306.External mold mould 3 and mold base 1 and/or bellmouth terminal mould 2 Contact surface be provided with seal groove 7, and rubber weather strip is installed.The junction of external mold mould 3 and mold base 1 is filled provided with locking Put 6.The junction of external mold mould 3 and internal model mould 4 is provided with locking device 6.
Internal model mould 4 includes internal model side form 401, internal model end mould 402 and inside lock wing plate 403.Internal model side form 401 is arranged on The left and right sides of internal model mould 4.Internal model end mould 402 is arranged on the rear and front end of internal model mould 4.Inside lock wing plate 403 is arranged on Between internal model side form 401 and internal model end mould 402.Internal model side form 401 includes internal model left templates 404 and internal model right mould plate 405.Internal model Mould 402 is held to include internal model front template 406 and internal model rear pattern plate 407.The lower end of internal model side form 401 and internal model end mould 402 is provided with interior Mould roller 408.Internal model roller 408 is connected with the internal model guide rail 103 on mold base 1.Internal model side form 401 and internal model end mould Internal model pushing meanss 411, one end connection internal model side form 401 and internal model end mould of internal model pushing meanss 411 are respectively provided with 402 402, the other end connecting mold base 1 of internal model pushing meanss 411.Internal model pushing meanss are hydraulic jack.Inside lock wing plate 403 Linked by radial type connection with internal model end mould 402.Internal model is respectively equipped between internal model end mould 402 and inside lock wing plate 403 to stretch Device 409.Turn in one end connection internal model end mould 402 of internal model retractor device 409, the other end connection of internal model retractor device 409 Angle blade plate 403.The contact surface of internal model mould 4 and mold base 1 and bellmouth terminal mould 2 is provided with seal groove 7, and it is close to install rubber Strip of paper used for sealing.The junction of internal model mould 4 and mold base 1 is provided with locking device 6.The junction of internal model mould 4 and external mold mould 3 is set There is locking device 6.
Embodiment 2
Embodiment 1 is repeated, simply the mould includes two internal model moulds 4.The wherein long 6m of internal model mould.A width of 2m.It is high For 3m.
Embodiment 3
Embodiment 2 is repeated, simply the outside surrounding of mold base 1 is respectively provided with external mold angle station 102.External mold corner The connecting mold base 1 of device 102 and external mold mould 3.The inner side of mold base 1 is provided with internal model angle station 104.Internal model corner is filled Put 104 connecting mold bases 1 and internal model mould 4.The lower end of external mold mould 3 is connected with external mold angle station 102.External mold mould 3 It is provided with external mold retractor device 302.One end of external mold retractor device 302 is connected with external mold mould 3, external mold retractor device 302 The other end is connected with mold base 1.Internal model side form 401, internal model end mould 402 and inside lock wing plate 403 are connected by radial type respectively Connect to use with mold base 1 and be connected.Internal model side form 401, internal model end mould 402 and inside lock wing plate 403 and mold base 1 or ground Between be respectively equipped with internal model retractor device 409.One end of internal model retractor device 409 connects internal model side form 401, internal model end mould respectively 402 or inside lock wing plate 403, the other end connecting mold base 1 of internal model retractor device 409.
Embodiment 4
Embodiment 1 is repeated, simply the lower end of internal model side form 401, internal model end mould 402 and inside lock wing plate 403 is equipped with interior Mould roller 408.Internal model roller 408 is connected with the internal model guide rail 103 on mold base 1.
Embodiment 5
Embodiment 2 is repeated, simply the mould also includes anchorage process mould 8.Each block of inside lock wing plate 403 is provided with perforate 410.Anchorage process mould 8 is arranged in perforate 410.Anchorage process mould 8 is connected with inside lock wing plate 403.Anchorage technique mould Tool 8 can be the shapes such as triangle body shape.Perforate 410 is located at the point midway of inside lock wing plate 403.Anchorage process mould 8 passes through Bolt is connected with inside lock wing plate 403.
Embodiment 6
Embodiment 5 is repeated, simply the mould also includes vibrator 9.Vibrator 9 be arranged on mold base 1, external mold mould 3, On internal model mould 4.Vibrator 9 is form vibrator.Mould also includes damping device 10.Damping device 10 is arranged on mould bottom Between seat 1 and ground.Damping device 10 is rubber shock-absorbing device.The mould also includes sound arrester 11.Sound arrester 11 is wrapped up Vibrator 9 and whole mould.Sound arrester 11 is blimp.External mold mould 3 is provided with guardrail 12 and cat ladder 13.
Embodiment 7
Embodiment 2 is repeated, simply the mould also includes curing cover 14.The parcel mould formation confined space of curing cover 14. Curing cover 14 is passed through steam.Curing cover 14 is brace type canvas steam-type curing cover.
Embodiment 8
Embodiment 1 is repeated, simply external mold pushing meanss are cylinder, internal model pushing meanss are slided for hand push.
Embodiment 9
Embodiment 1 is repeated, simply external mold pushing meanss are screw mandrel, internal model pushing meanss are hand push motor.
Use embodiment 1
A kind of application method of concrete pipe gallery vertical-forming die, this method comprises the following steps:
(1) mould is assembled:Cleaning mould → brushing interleaving agent → fixing mold base on the ground → lays reinforcing bar Frame → installation bellmouth terminal mould → installation internal model mould → installation external mold mould → locking locking device.
Clear up mould:The rubber seal of cleaning mould is checked, cement mortar above is removed, should be immediately for what is damaged Change.
Brushing interleaving agent:Interleaving agent can select grease, emulsified fat, rosin soap etc., its basic demand not to be bonded and Mould is polluted, moulding property is good, it is good with punching block tack easily to brush, interleaving agent brushes thickness unanimously, prevents holiday, lacks brush phenomenon.
Mold base is fixed on the ground.
Lay framework of steel reinforcement:Framework of steel reinforcement uses welded framework, bar diameter, in length and breadth skeleton diameter, quantity, length, ring Muscle quantity, spacing etc. are configured in strict accordance with drawing, and welding in advance, inspection are finished and be directly seated on bellmouth terminal mould.
Bellmouth terminal mould is installed:Bellmouth terminal mould and the framework of steel reinforcement being placed in thereon are hoisted on a mould together, and Locking is in place.
Internal model mould is installed:Slid using cylinder along internal model guide rail after the symmetrical top template of internal model, other corners of rotational positioning Template, completes fixed internal formwork.Clamped afterwards using positioning swelling pin and screw locking device positioning.
External mold mould is installed:External mold template is slid along external mold guide rail using cylinder, locked using positioning swelling pin and screw rod Device positioning is clamped.
Lock locking device:Check whether the linear mark of mould corner aligns;It is stuck in the middle part of mould and is referred to special measuring tool Positioning is put, and checks whether the width of mould is accurate in the middle part of Measurement die.Forbid to leave gap, otherwise should be checked adjustment.Adopt With screw locking device, positioning and locking internal model is with external mold formation socket end, and the integral installation for completing mould enters feeding jolt ramming rank Section.
(2) feeding jolt ramming:Concreting vibrates → and concrete formation wipes one's face
Concreting is vibrated:Enter the feeding jolt ramming stage after the completion of mould installion, rate of feeding can pass through surge bunker Door adjusts feed quantity.Due to consideration that the stabilization of the support system of template, concreting will be layered progress, it is per thickness degree 450mm, should be carried out continuously during concreting.
Start the vibration stage within 1 minute after feeding material, 3 minutes before feeding terminates, less feed quantity should be kept.It was molded Journey is vibrated in feeding, only uses a kind of active force of vibration force.Due to the directionless powerful of vibration force, be conducive to concrete certainly Space is filled mutually by flowing, so compact structure, concrete strength is high.
Concrete formation is wiped one's face:Pour rear concrete surface cement mortar thicker, after pouring, tentatively used before initial set by absolute altitude 4 receipts water of long floating rule point are floating, and then with wooden washboard, rubbing and pressure make its dense surface several times repeatedly, and iron washboard pressure is used before final set Light.
(3) steam curing (accelerating maintenance)
Conserved, covered using brace type canvas using steam-type.
(4) it is stripped:Mould die sinking lifting
Mould die sinking lifting:After component is integrally fixed-type, back out in, end, side mold.Crane will be comprehensive using professional suspender Close piping lane component to hang out slowly together, speed is unsuitable too fast or pauses.Pipe gallery component is slowly hoisted to storage region.
Use embodiment 2
Embodiment 1 is repeated, simply this method also includes:
(5) piping lane is overturn:Overturn pipe gallery component using special hydraulic pressure tipping arrangement that piping lane is even by upright position Speed is overturn to horizontal level.
(6) storage is stacked:Piping lane horizontal transport → storage place piles up the → secondary maintenance of piping lane → brushing protective agent
Piping lane horizontal transport:Using gantry crane horizontal transport, it is careful not to allow bell and spigot to contact in transportation Ground.
Storage place is piled up:To being threaded to, horizontal piping lane carefully should be slowly moved to predetermined region by specification, credit rating and be put Put on sleeper, it is to avoid colliding surface, stack neat.
The secondary maintenance of piping lane:Carried out by the way of manually watering, continue to conserve 7d or so.
Brushing protective agent:From organosilicon vapor-permeable type transparent protecting paint, concrete surface is brushed.Should during brushing Construction tool is invaded into full protective agent, it is wet to wet coating brush twice, i.e., secondary brushing should it is not dry in previous brushing surface be to carry out, protective agent Brush thickness consistent, prevent holiday, lack brush phenomenon.Protective agent infiltrates into inside concrete completely effectively prevents moisture from entering and preventing Only the accumulation of salt in the surface soil occurs, and the hydrophobic protective layer of layer of transparent shape is formed on its surface.
(7) examine and dispatch from the factory:Rubber fastening band → exfactory inspection → transport is pasted to dispatch from the factory
Paste rubber fastening band:Paste rubber water-proof bar when piping lane groove should be cleaned out after glue is uniformly brushed with In groove and then rubber water-proof bar is arranged in groove and rubber fastening band is struck into real pressure with rubber hammer by static a period of time again Tightly.
Exfactory inspection:Inspection content includes presentation quality, appearance and size, structural strength and anti-permeability performance, assembled performance etc..
Transport is dispatched from the factory:Detect that qualified rear piping lane can be transported to dispatch from the factory, piping lane transport will have specialised vehicles, special chock.

Claims (46)

1. concrete pipe gallery vertical-forming die, the mould includes mold base (1), bellmouth terminal mould (2), external mold mould (3), one or more internal model moulds (4), wherein:Mold base (1) is fixed on the ground, and bellmouth terminal mould (2) is arranged on mould Have on base (1), external mold mould (3) is arranged on mold base (1) and positioned at the outside surrounding of bellmouth terminal mould (2), one Individual or multiple internal model moulds (4) are arranged on mold base (1) and positioned at the inner side surrounding of bellmouth terminal mould (2);
Wherein, a length of 1-20m of whole internal model mould (4).
2. mould according to claim 1, it is characterised in that:The outside surrounding of the mold base (1) is respectively provided with External mold guide rail (101), and/or
The outside surrounding of mold base (1) is respectively provided with external mold angle station (102), external mold angle station (102) connection mould Have base (1) and external mold mould (3).
3. mould according to claim 2, it is characterised in that:The external mold guide rail (101) of each side of the mold base (1) hangs down Directly in the side of mold base (1) each side, and/or
External mold guide rail (101) is I-steel guide rail.
4. mould according to claim 1, it is characterised in that:The inner side of mold base (1) is provided with internal model guide rail (103), And/or
The inner side of mold base (1) be provided with internal model angle station (104), internal model angle station (104) connecting mold base (1) and Internal model mould (4).
5. the mould according to Claims 2 or 3, it is characterised in that:The inner side of mold base (1) is provided with internal model guide rail (103), and/or
The inner side of mold base (1) be provided with internal model angle station (104), internal model angle station (104) connecting mold base (1) and Internal model mould (4).
6. mould according to claim 5, it is characterised in that:Internal model guide rail (103) on the inside of the mold base (1) hangs down Directly in the side of mold base, and/or
Internal model guide rail (103) is I-steel guide rail.
7. mould according to claim 5, it is characterised in that:Bellmouth terminal mould (2) is arranged on external mold guide rail (101) and interior Between mould guide rail (103), and/or
Bellmouth terminal mould (2) includes bellmouth end plates (201), female end supporting plate (202), female end reinforcement (203), bellmouth The back of end plates (201) is provided with female end reinforcement (203), and bellmouth end plates (201) are surrounded by female end supporting plate (202)。
8. mould according to claim 7, it is characterised in that:Bellmouth terminal mould (2) is provided with female end seal groove (204) With female end water stopping trough (205), and/or
The junction of bellmouth terminal mould (2) and mold base (1) is provided with positioner (5) and locking device (6);Bellmouth terminal mould (2) junction with external mold mould (3) and/or internal model mould (4) is provided with locking device (6).
9. the mould according to any one of claim 2,3,6-8, it is characterised in that:The lower end of external mold mould (3) is provided with External mold roller (301), external mold roller (301) is connected with the external mold guide rail (101) on mold base (1);And/or
The lower end of external mold mould (3) is connected with external mold angle station (102).
10. mould according to claim 5, it is characterised in that:The lower end of external mold mould (3) is provided with external mold roller (301), External mold roller (301) is connected with the external mold guide rail (101) on mold base (1);And/or
The lower end of external mold mould (3) is connected with external mold angle station (102).
11. mould according to claim 9, it is characterised in that:External mold mould is provided with external mold pushing meanss (307), outside One end connection external mold mould (3) of mould pushing meanss (307), the other end connecting mold base of external mold pushing meanss (307) (1);And/or
External mold mould (3) is provided with external mold retractor device (302), and one end and the external mold mould (3) of external mold retractor device (302) connect Connect, the other end of external mold retractor device (302) is connected with mold base (1) or ground.
12. mould according to claim 10, it is characterised in that:External mold mould is provided with external mold pushing meanss (307), outside One end connection external mold mould (3) of mould pushing meanss (307), the other end connecting mold base of external mold pushing meanss (307) (1);And/or
External mold mould (3) is provided with external mold retractor device (302), and one end and the external mold mould (3) of external mold retractor device (302) connect Connect, the other end of external mold retractor device (302) is connected with mold base (1) or ground.
13. the mould according to any one of claim 1-4,6-8 or 10-12, it is characterised in that:External mold mould (3) is wrapped Polylith external mold template (303) is included, polylith external mold template (303) docking forms the framework of an entirety;And/or
External mold template (303) docks the connected mode overlapped using diagonal hypotenuse with external mold template (303).
14. mould according to claim 5, it is characterised in that:External mold mould (3) includes polylith external mold template (303), many Block external mold template (303) docking forms the framework of an entirety;And/or
External mold template (303) docks the connected mode overlapped using diagonal hypotenuse with external mold template (303).
15. mould according to claim 9, it is characterised in that:External mold mould (3) includes polylith external mold template (303), many Block external mold template (303) docking forms the framework of an entirety;And/or
External mold template (303) docks the connected mode overlapped using diagonal hypotenuse with external mold template (303).
16. mould according to claim 13, it is characterised in that:External mold mould (3) includes four pieces of external mold templates (303), Four pieces of external mold template (303) docking form the rectangular frame of an entirety;And/or
Clamped between external mold template (303) and external mold template (303) by the way of expansion sleeve (15) is tapped and clamped.
17. the mould according to claims 14 or 15, it is characterised in that:External mold mould (3) includes four pieces of external mold templates (303), four pieces of external mold template (303) docking form the rectangular frame of an entirety;And/or
Clamped between external mold template (303) and external mold template (303) by the way of expansion sleeve (15) is tapped and clamped.
18. mould according to claim 13, it is characterised in that:The top of external mold mould (3) is provided with backform (304), top Mould (304) is connected with external mold template (303), and backform (304) constitutes a set of complete with the bellmouth terminal mould (2) on mold base (1) Whole bellmouth terminal mould and socket terminal mould, and/or
Backform (304) is provided with backform seal groove (305) and backform water stopping trough (306).
19. the mould according to any one of claim 14-16, it is characterised in that:The top of external mold mould (3) is provided with top Mould (304), backform (304) is connected with external mold template (303), backform (304) and the bellmouth terminal mould (2) on mold base (1) The bellmouth terminal mould and socket terminal mould of complete set are constituted, and/or
Backform (304) is provided with backform seal groove (305) and backform water stopping trough (306).
20. the mould according to any one of claim 1-4,6-8,10-12,14-16 or 18, it is characterised in that:External mold The contact surface of mould (3) and mold base (1) and/or bellmouth terminal mould (2) is provided with seal groove (7), and installs rubber seal Bar, and/or
The junction of external mold mould (3) and mold base (1) is provided with locking device (6), external mold mould (3) and internal model mould (4) Junction be provided with locking device (6).
21. mould according to claim 5, it is characterised in that:External mold mould (3) and mold base (1) and/or female end The contact surface of mould (2) is provided with seal groove (7), and installs rubber weather strip, and/or
The junction of external mold mould (3) and mold base (1) is provided with locking device (6), external mold mould (3) and internal model mould (4) Junction be provided with locking device (6).
22. mould according to claim 9, it is characterised in that:External mold mould (3) and mold base (1) and/or female end The contact surface of mould (2) is provided with seal groove (7), and installs rubber weather strip, and/or
The junction of external mold mould (3) and mold base (1) is provided with locking device (6), external mold mould (3) and internal model mould (4) Junction be provided with locking device (6).
23. the mould according to any one of claim 1-4,6-8,10-12,14-16,18 or 21-22, its feature exists In:Internal model mould (4) includes internal model side form (401), internal model end mould (402) and inside lock wing plate (403), internal model side form (401) The left and right sides of internal model mould (4) is arranged on, internal model end mould (402) is arranged on the rear and front end of internal model mould (4), the inside lock wing Plate (403) is arranged between internal model side form (401) and internal model end mould (402), and internal model side form (401) includes internal model left templates (404) and internal model right mould plate (405), internal model end mould (402) includes internal model front template (406) and internal model rear pattern plate (407).
24. mould according to claim 5, it is characterised in that:Internal model mould (4) includes internal model side form (401), internal model end Mould (402) and inside lock wing plate (403), internal model side form (401) are arranged on the left and right sides of internal model mould (4), internal model end mould (402) rear and front end of internal model mould (4) is arranged on, inside lock wing plate (403) is arranged on internal model side form (401) and internal model end mould (402) between, internal model side form (401) includes internal model left templates (404) and internal model right mould plate (405), and internal model end mould (402) includes Internal model front template (406) and internal model rear pattern plate (407).
25. mould according to claim 9, it is characterised in that:Internal model mould (4) includes internal model side form (401), internal model end Mould (402) and inside lock wing plate (403), internal model side form (401) are arranged on the left and right sides of internal model mould (4), internal model end mould (402) rear and front end of internal model mould (4) is arranged on, inside lock wing plate (403) is arranged on internal model side form (401) and internal model end mould (402) between, internal model side form (401) includes internal model left templates (404) and internal model right mould plate (405), and internal model end mould (402) includes Internal model front template (406) and internal model rear pattern plate (407).
26. mould according to claim 23, it is characterised in that:The lower end of internal model side form (401) and internal model end mould (402) Provided with internal model roller (408), internal model roller (408) is connected with the internal model guide rail (103) on mold base (1), inside lock Wing plate (403) is linked by radial type connection with internal model side form (401) or internal model end mould (402), and/or
The lower end of internal model side form (401), internal model end mould (402) and inside lock wing plate (403) is equipped with internal model roller (408), interior Mould roller (408) is connected with the internal model guide rail (103) on mold base (1).
27. the mould according to claim 24 or 25, it is characterised in that:Internal model side form (401) and internal model end mould (402) Lower end is provided with internal model roller (408), and internal model roller (408) is connected with the internal model guide rail (103) on mold base (1), interior Corner wing plate (403) is linked by radial type connection with internal model side form (401) or internal model end mould (402), and/or
The lower end of internal model side form (401), internal model end mould (402) and inside lock wing plate (403) is equipped with internal model roller (408), interior Mould roller (408) is connected with the internal model guide rail (103) on mold base (1).
28. mould according to claim 26, it is characterised in that:Internal model side form (401) or internal model end mould (402) with interior turn Internal model retractor device (409), one end connection internal model side form of internal model retractor device (409) are respectively equipped between angle blade plate (403) (401) or internal model end mould (402), the other end connection inside lock wing plate (403) of internal model retractor device (409), and/or
Inside lock wing plate (403) is linked by radial type connection with internal model side form (401) or internal model end mould (402);Internal model side form (401) internal model pushing meanss (411) and on internal model end mould (402) are respectively provided with, one end of internal model pushing meanss (411) is connected Internal model side form (401) and internal model end mould (402), the other end connecting mold base (1) of internal model pushing meanss (411).
29. mould according to claim 27, it is characterised in that:Internal model side form (401) or internal model end mould (402) with interior turn Internal model retractor device (409), one end connection internal model side form of internal model retractor device (409) are respectively equipped between angle blade plate (403) (401) or internal model end mould (402), the other end connection inside lock wing plate (403) of internal model retractor device (409), and/or
Inside lock wing plate (403) is linked by radial type connection with internal model side form (401) or internal model end mould (402);Internal model side form (401) internal model pushing meanss (411) and on internal model end mould (402) are respectively provided with, one end of internal model pushing meanss (411) is connected Internal model side form (401) and internal model end mould (402), the other end connecting mold base (1) of internal model pushing meanss (411).
30. mould according to claim 23, it is characterised in that:Internal model side form (401), internal model end mould (402) and interior turn Angle blade plate (403) is used with mold base (1) or ground by radial type connection be connected respectively.
31. the mould according to claim 24 or 25, it is characterised in that:Internal model side form (401), internal model end mould (402) and Inside lock wing plate (403) is used with mold base (1) or ground by radial type connection be connected respectively.
32. mould according to claim 30, it is characterised in that:Internal model side form (401), internal model end mould (402) and interior turn Internal model retractor device (409) is respectively equipped between angle blade plate (403) and mold base (1) or ground, internal model retractor device (409) One end connects internal model side form (401), internal model end mould (402) or inside lock wing plate (403) respectively, internal model retractor device (409) Other end connecting mold base (1) or ground.
33. mould according to claim 31, it is characterised in that:Internal model side form (401), internal model end mould (402) and interior turn Internal model retractor device (409) is respectively equipped between angle blade plate (403) and mold base (1) or ground, internal model retractor device (409) One end connects internal model side form (401), internal model end mould (402) or inside lock wing plate (403) respectively, internal model retractor device (409) Other end connecting mold base (1) or ground.
34. mould according to claim 23, it is characterised in that:The mould also includes anchorage process mould (8), inside lock Wing plate (403) is provided with perforate (410), and anchorage process mould (8) is arranged in perforate (410), anchorage process mould (8) with interior turn Angle blade plate (403) is connected;And/or
Perforate (410) is equipped with each piece of inside lock wing plate (403).
35. the mould according to any one of claim 24-26,28-30 or 32-33, it is characterised in that:The mould is also wrapped Anchorage process mould (8) is included, inside lock wing plate (403) is provided with perforate (410), and anchorage process mould (8) is arranged on perforate (410) Interior, anchorage process mould (8) is connected with inside lock wing plate (403);And/or
Perforate (410) is equipped with each piece of inside lock wing plate (403).
36. mould according to claim 34, it is characterised in that:Perforate (410) is located at the midpoint of inside lock wing plate (403) Position;And/or
Anchorage process mould (8) is connected by bolt with inside lock wing plate (403).
37. mould according to claim 35, it is characterised in that:Perforate (410) is located at the midpoint of inside lock wing plate (403) Position;And/or
Anchorage process mould (8) is connected by bolt with inside lock wing plate (403).
38. mould according to claim 23, it is characterised in that:Internal model mould (4) and mold base (1) and/or bellmouth The contact surface of terminal mould (2) is provided with seal groove (7), and installs rubber weather strip, and/or
The junction of internal model mould (4) and mold base (1) is provided with locking device (6), internal model mould (4) and external mold mould (3) Junction be provided with locking device (6).
39. the mould according to any one of claim 24-26,28-30,32-34 or 36-37, it is characterised in that:Internal model The contact surface of mould (4) and mold base (1) and/or bellmouth terminal mould (2) is provided with seal groove (7), and installs rubber seal Bar, and/or
The junction of internal model mould (4) and mold base (1) is provided with locking device (6), internal model mould (4) and external mold mould (3) Junction be provided with locking device (6).
40. appoint according in claim 1-4,6-8,10-12,14-16,18,21-22,24-26,28-30,32-34 or 36-38 Mould described in one, it is characterised in that:The mould also includes vibrator (9), and vibrator (9) is optionally located at mold base (1), external mold mould (3), on internal model mould (4);And/or
The mould also includes damping device (10), and damping device (10) is arranged on mold base (1) between ground.
41. mould according to claim 40, it is characterised in that:Vibrator (9) is form vibrator;And/or
Damping device (10) is rubber shock-absorbing device.
42. according in claim 1-4,6-8,10-12,14-16,18,21-22,24-26,28-30,32-34,36-38 or 41 Mould described in any one, it is characterised in that:The mould also includes sound arrester (11), sound arrester (11) parcel vibrator And/or whole mould (9).
43. mould according to claim 40, it is characterised in that:The mould also includes sound arrester (11), sound arrester (11) parcel vibrator (9) and/or whole mould.
44. mould according to claim 42, it is characterised in that:Sound arrester (11) is blimp.
45. a kind of concrete pipe gallery vertical forming system, including the mould any one of claim 1-44, are also wrapped Curing cover (14) is included, curing cover (14) parcel mould formation confined space is passed through steam in curing cover (14).
46. concrete pipe gallery vertical forming system according to claim 45, it is characterised in that:Curing cover (14) is Brace type canvas steam-type curing cover.
CN201621000081.6U 2016-08-31 2016-08-31 Concrete pipe gallery vertical-forming die and system Active CN206374015U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621000081.6U CN206374015U (en) 2016-08-31 2016-08-31 Concrete pipe gallery vertical-forming die and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621000081.6U CN206374015U (en) 2016-08-31 2016-08-31 Concrete pipe gallery vertical-forming die and system

Publications (1)

Publication Number Publication Date
CN206374015U true CN206374015U (en) 2017-08-04

Family

ID=59401268

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621000081.6U Active CN206374015U (en) 2016-08-31 2016-08-31 Concrete pipe gallery vertical-forming die and system

Country Status (1)

Country Link
CN (1) CN206374015U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107718243A (en) * 2017-11-17 2018-02-23 九州职业技术学院 A kind of assembled underground pipe gallery hypomere producing device and preparation method
CN108724433A (en) * 2018-06-21 2018-11-02 德州海天机电科技有限公司 A kind of accumulator type concrete formation equipment
CN109571748A (en) * 2018-11-30 2019-04-05 中铁八局集团桥梁工程有限责任公司 The manufacturing method of concrete prefabricated pipe gallery
CN110385772A (en) * 2019-07-14 2019-10-29 湖南农业大学 The mold of a set of simplicity three lattice concrete septic tank of cast-in-place
CN112092181A (en) * 2020-09-10 2020-12-18 连云港市成盛混凝土构件有限责任公司 Assembly type prefabricated square culvert forming device and manufacturing process thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107718243A (en) * 2017-11-17 2018-02-23 九州职业技术学院 A kind of assembled underground pipe gallery hypomere producing device and preparation method
CN108724433A (en) * 2018-06-21 2018-11-02 德州海天机电科技有限公司 A kind of accumulator type concrete formation equipment
CN109571748A (en) * 2018-11-30 2019-04-05 中铁八局集团桥梁工程有限责任公司 The manufacturing method of concrete prefabricated pipe gallery
CN110385772A (en) * 2019-07-14 2019-10-29 湖南农业大学 The mold of a set of simplicity three lattice concrete septic tank of cast-in-place
CN112092181A (en) * 2020-09-10 2020-12-18 连云港市成盛混凝土构件有限责任公司 Assembly type prefabricated square culvert forming device and manufacturing process thereof

Similar Documents

Publication Publication Date Title
CN106346595A (en) Vertical molding mold and system and application method for concrete utility tunnel
CN106182359A (en) The concrete list storehouse horizontal mould of pipe gallery, system and piping lane molding methods
CN206374015U (en) Concrete pipe gallery vertical-forming die and system
CN108149706A (en) Prefabricated assembled comprehensive pipe gallery spliced by cast-in-place hidden beams and laminated slabs and construction method thereof
CN105563640A (en) Manufacturing process for environment-friendly construction modularization tool type temporary road plate block
CN110952456A (en) Pile type bridge construction process
CN107268878A (en) The fabrication and installation method of prefabricated sandwich wallboard
CN208934425U (en) Self-propelled multifunctional material distributing machine
CN112045841B (en) Construction method of assembly type beam-making pedestal for prefabricating high-speed railway box beam
CN102303369A (en) Process for prefabricating square culvert
CN110552440A (en) safe and environment-friendly construction process for high-strength assembled integral type sandwich heat-insulation shear wall
KR20180082374A (en) Pre assemble pc composite mold and method for consructing concrete structure using this same
CN113152262A (en) Bridge single-column pier reinforcement construction method
CN109057351A (en) Self-propelled multifunctional material distributing machine
CN108457243B (en) Construction method of a prefabricated concrete wave retaining wall
CN110747762A (en) Cross-road cement component and installation method
CN108301440A (en) With waterproof, the underground pipe gallery construction method of drain function
CN110158656A (en) A kind of integrated template piping lane and its method of construction
CN115256615A (en) Intelligent shower maintenance standard construction system for prefabricated box girder of expressway
CN206623199U (en) The horizontal mould of concrete list storehouse pipe gallery and system
CN107386246A (en) A kind of lock chamber wall Construction Through Form on Traveler method
CN114182756A (en) Construction method for simply and movably pouring cable trench by using internal mold support system
CN207110214U (en) A kind of prefabricated interior fill concrete wallboard
CN114809000B (en) Rapid construction method of prefabricated plate brick moulding bed
CN107237448A (en) A kind of prefabricated interior fill concrete wallboard and its manufacture method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Vertical forming die of concrete utility tunnel and system

Effective date of registration: 20190219

Granted publication date: 20170804

Pledgee: Ningxiang Hunan rural commercial bank Limited by Share Ltd.

Pledgor: CHANGSHA CHUHONG MACHINERY Co.,Ltd.

Registration number: 2019430000012

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20210401

Granted publication date: 20170804

Pledgee: Ningxiang Hunan rural commercial bank Limited by Share Ltd.

Pledgor: CHANGSHA CHUHONG MACHINERY Co.,Ltd.

Registration number: 2019430000012

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Vertical forming mould and system of Concrete Utility Tunnel

Effective date of registration: 20210629

Granted publication date: 20170804

Pledgee: Ningxiang Hunan rural commercial bank Limited by Share Ltd.

Pledgor: CHANGSHA CHUHONG MACHINERY Co.,Ltd.

Registration number: Y2021430000025

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220908

Granted publication date: 20170804

Pledgee: Ningxiang Hunan rural commercial bank Limited by Share Ltd.

Pledgor: CHANGSHA CHUHONG MACHINERY Co.,Ltd.

Registration number: Y2021430000025