CN206360662U - The multi-functional tube drawbench of marine drilling platform - Google Patents

The multi-functional tube drawbench of marine drilling platform Download PDF

Info

Publication number
CN206360662U
CN206360662U CN201621469069.XU CN201621469069U CN206360662U CN 206360662 U CN206360662 U CN 206360662U CN 201621469069 U CN201621469069 U CN 201621469069U CN 206360662 U CN206360662 U CN 206360662U
Authority
CN
China
Prior art keywords
mechanical arm
arm
column
centralising
centralising mechanical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621469069.XU
Other languages
Chinese (zh)
Inventor
吴爱萍
刘翠洁
赵世刚
张建
任得勇
师涛
苗波
聂景龙
李光美
杨晓燕
张小勇
杨建磊
隋守海
赵述祥
赵健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lanzhou Ls Energy Equipment Engineering Research Institute Co ltd
Lanzhou LS Group Co Ltd
Original Assignee
Lanzhou Ls Energy Equipment Engineering Research Institute Co ltd
Lanzhou LS Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lanzhou Ls Energy Equipment Engineering Research Institute Co ltd, Lanzhou LS Group Co Ltd filed Critical Lanzhou Ls Energy Equipment Engineering Research Institute Co ltd
Priority to CN201621469069.XU priority Critical patent/CN206360662U/en
Application granted granted Critical
Publication of CN206360662U publication Critical patent/CN206360662U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a kind of multi-functional tube drawbench of marine drilling platform, it includes upper rail, lower guideway, upper driving dolly, lower driving dolly, the column being parallel to each other, centralising mechanical arm, lower centralising mechanical arm are installed with column, provided with the lifting truck being installed on column between upper centralising mechanical arm and lower centralising mechanical arm, elevating mechanism arm is installed on lifting truck, lifting truck is connected to by steel wire rope on the hydraulic wireline winch being installed on below upper centralising mechanical arm, and hydraulic wireline winch is fixed on column.The utility model sets elevating mechanism arm between the upper centralising mechanical arm, lower centralising mechanical arm of column, elevating mechanism arm is after lengthening pipe fitting is clamped, under lifting/decentralization effect of hydraulic wireline winch, pipe fitting can will be lengthened to lift/transfer, clamping, discharge, the movement operation of 40 meters or so lengthening pipe fittings can be realized, the job area of tube drawbench has been expanded, the labor intensity of manual work is reduced, drillng operation efficiency is improved.

Description

The multi-functional tube drawbench of marine drilling platform
Technical field
The utility model is related to marine drilling platform mechanical equipment technical field, specifically a kind of marine drilling platform Multi-functional tube drawbench, under cat road machine, the cooperation of rat hole, realizing that single the hanging of drilling tool takes, unloaded, and thribble discharge, Unload.
Background technology
In traditional drilling technology, it is necessary to which drilling tool is sequentially placed into well head when being connected on drilling platforms to drilling tools such as thribbles In, recycle the wellhead equipments such as liquid gas tong to connect one by one, the lifting, connection in connection procedure for drilling tool are wasted time and energy, And, for severe marine drilling operating environment, great potential safety hazard can only be there is by operating personnel's manual control.Ocean The appearance of drilling platforms operation automation equipment changes this state.Marine drilling platform operation automation operation key be Each drilling tool(Drilling rod, drill collar etc.)Single and thribble to automatically process, tube drawbench is the important composition portion of pipe fitting automated processing system Point, automatic crawl and discharge pipe fitting are come and gone between frame and well head for being discharged in drilling process in rig floor, is marine drilling platform Device the busiest in drilling rod automatic-discharging.The conventional column tube drawbench of drilling platforms is by installed in column top and bottom Trolley body drive column to be moved on parallel orbit, column is provided with two mechanical arms, to realize that the vertical of pipe fitting is picked and placeed. But this tube drawbench, due to the limitation of stem height, the length of institute's discharge pipe fitting is not more than 30 meters, for long thribble, long drilling tool It can not be handled, it is impossible to meet the high efficiency requirement of ocean operation.
Utility model content
The purpose of this utility model is to provide a kind of multi-functional tube drawbench of marine drilling platform, to solve existing tube drawbench Can not lengthening pipe fitting of the treated length more than 30 meters the problem of discharge.
In order to solve the above technical problems, technical solution adopted in the utility model is:
A kind of multi-functional tube drawbench of marine drilling platform, upper rail that it includes being parallel to each other, lower guideway, installed in above leading Centering guide machine is installed with upper driving dolly on rail, lower driving dolly, column on lower guideway, the column Tool arm, lower centralising mechanical arm, provided with the lifting truck being installed on column between upper centralising mechanical arm and lower centralising mechanical arm, Elevating mechanism arm is installed, lifting truck is connected to the liquid being installed on below upper centralising mechanical arm by steel wire rope on lifting truck Press on winch, hydraulic wireline winch is fixed on column, the end of upper centralising mechanical arm is provided with upper righting binding clip, lower centralising mechanical arm End is provided with lower righting binding clip, and the end of elevating mechanism arm is provided with lifting grappling fixture;The bottom of column is provided with upper shackle mechanical arm, on Shackle mechanical arm is fixed on lower driving dolly.
It is preferred that, the telescopic arm top of the upper shackle mechanical arm is provided with upper shackle binding clip assembly, upper shackle binding clip assembly Including spinner, impact tong, clamping clip.
It is preferred that, the top of the column, which is arranged on, to be fixed on the last time rotation mechanism of driving dolly, the bottom of column On the lower slew gear being fixed at the top of upper shackle mechanical arm, lower slew gear is provided with drive motor, slew gear Lower section shackle mechanical arm is installed.
It is preferred that, the upper centralising mechanical arm, elevating mechanism arm, lower centralising mechanical arm are directly to stretch formula telescopic arm, are directly stretched Formula telescopic arm drives the telescopic arm linear telescopic that more piece is mutually socketed by fluid cylinder.
The utility model in the course of the work, column upper driving dolly, can be along upper under the drive of lower driving dolly Guide rail, lower guideway straight line moving;After first pipe fitting is erected, lower centralising mechanical arm, elevating mechanism arm clamp first Root pipe fitting, elevating mechanism arm can lift first pipe fitting under the castering action of hydraulic wireline winch, while unclamping lower centralising mechanical Arm, when the top of first pipe fitting is reached at upper centralising mechanical arm position, upper centralising mechanical arm clamps first pipe fitting;Second After root pipe fitting is erected, the upper shackle on shackle mechanical arm top in second pipe fitting, recycling is clamped by lower centralising mechanical arm Binding clip assembly clamps and rotates second pipe fitting, connects the end of first, second pipe fitting, and in upper centralising mechanical Under arm, the cooperation of lower centralising mechanical arm, clamping, discharge and the movement operation for lengthening pipe fitting are realized;Column is in turn-around machine simultaneously Under the driving of structure can 360 ° rotation, the comb operation of any direction drilling tool can be completed.
The beneficial effects of the utility model are:
(1)The utility model sets elevating mechanism arm between the upper centralising mechanical arm, lower centralising mechanical arm of column, and The bottom of column sets the upper shackle mechanical arm for being provided with shackle binding clip assembly, and first pipe is lifted by elevating mechanism arm Second pipe fitting of setting is connected by shackle binding clip assembly with first pipe fitting in part, recycling, you can realizes and lengthens pipe fitting Clamping, discharge, movement operation;The utility model incorporates drill floor equipment, full-featured, and work capacity is strong, can realize 40 The operations such as rice or so connection, discharge, the crawl of pipe fitting, have expanded the job area of tube drawbench, have reduced the work of manual work Intensity, improves drillng operation efficiency;
(2)Movement of the elevating mechanism arm on column is driven by hydraulic wireline winch in the utility model, is easy to remote control;
(3)The two ends of the utility model central post set slew gear, can realize the rotation of 360 ° of column, can complete The comb operation of any direction drilling tool;
(4)Upper centralising mechanical arm, elevating mechanism arm, lower centralising mechanical arm, upper shackle mechanical arm are in the utility model The straight telescopic arm structure for stretching formula, registration is easy to remote control, and safe operation is reliable.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation under the whole elongation states of each mechanical arm in Fig. 1;
Fig. 3 is the structural representation under the whole retracted states of a mechanical arm in Fig. 1;
Fig. 4 is the structural representation of upper shackle mechanical arm in Fig. 1;
In figure:1st, upper rail, 2, upper driving dolly, 3, last time rotation mechanism, 4, column, 5, lower guideway, 6, lower driving dolly, 7th, lower slew gear, 8, upper centralising mechanical arm, 9, elevating mechanism arm, 10, lower centralising mechanical arm, 11, upper shackle mechanical arm, 12, Hydraulic wireline winch, 13, steel wire rope, 14, upper righting binding clip, 15, lifting grappling fixture, 16, lower righting binding clip, 17, upper shackle binding clip assembly, 18th, spinner, 19, impact tong, 20, clamping clip.
Embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings.
The multi-functional tube drawbench of a kind of marine drilling platform as shown in Figures 1 to 4, it include be parallel to each other upper rail 1, Lower guideway 5, the upper driving dolly 2 on upper rail 1, lower driving dolly 6, column 4 on lower guideway 5, column 4 On be installed with centralising mechanical arm 8, lower centralising mechanical arm 10, between upper centralising mechanical arm 8 and lower centralising mechanical arm 10 Provided with the lifting truck being installed on column 4, elevating mechanism arm 9 is installed on lifting truck, lifting truck passes through steel wire rope 13 It is connected to and is installed on the hydraulic wireline winch 12 of the lower section of centralising mechanical arm 8, hydraulic wireline winch 12 is fixed on column 4, upper centering guide machine The end of tool arm 8 is provided with upper righting binding clip 14, and the end of lower centralising mechanical arm 10 is provided with lower righting binding clip 16, elevating mechanism arm 9 End provided with lifting grappling fixture 15;The bottom of column 4 is provided with upper shackle mechanical arm 11, and upper shackle mechanical arm 11 is fixed on lower driving On dolly 6.The telescopic arm top of upper shackle mechanical arm 11 is provided with upper shackle binding clip assembly 17, and upper shackle binding clip assembly 17 includes rotation Detain device 18, impact tong 19, clamping clip 20.
The top of column 4, which is arranged on, to be fixed on the last time rotation mechanism 3 of driving dolly 2, and the bottom of column 4 is arranged on solid Due on the lower slew gear 7 at the upper top of shackle mechanical arm 11, lower slew gear 7 is provided with drive motor, slew gear 7 Side is provided with shackle mechanical arm 11.
Upper centralising mechanical arm 8, elevating mechanism arm 9, lower centralising mechanical arm 10 are directly to stretch formula telescopic arm, directly stretch formula telescopic arm The telescopic arm linear telescopic that more piece is mutually socketed is driven by fluid cylinder.
The utility model sets elevating mechanism arm between the upper centralising mechanical arm, lower centralising mechanical arm of column, and vertical The bottom of post sets the upper shackle mechanical arm for being provided with shackle binding clip assembly, and first pipe fitting is lifted by elevating mechanism arm, Second pipe fitting of setting is connected by shackle binding clip assembly with first pipe fitting in recycling, you can realize the folder for lengthening pipe fitting Hold, discharge, movement operation;The utility model incorporates drill floor equipment, full-featured, and work capacity is strong, can realize 40 meters of left sides The operations such as connection, discharge, the crawl of right pipe fitting, have expanded the job area of tube drawbench, reduce the labor intensity of manual work, Improve drillng operation efficiency.

Claims (4)

1. a kind of multi-functional tube drawbench of marine drilling platform, it includes the upper rail being parallel to each other(1), lower guideway(5), be arranged on Upper rail(1)On upper driving dolly(2), installed in lower guideway(5)On lower driving dolly(6), column(4), its feature exists In:The column(4)On be installed with centralising mechanical arm(8), lower centralising mechanical arm(10), in upper centralising mechanical arm(8) With lower centralising mechanical arm(10)Between provided with being installed on column(4)On lifting truck, elevating mechanism is installed on lifting truck Arm(9), lifting truck passes through steel wire rope(13)It is connected to and is installed on centralising mechanical arm(8)The hydraulic wireline winch of lower section(12)On, Hydraulic wireline winch(12)It is fixed on column(4)On, upper centralising mechanical arm(8)End be provided with upper righting binding clip(14), lower centering guide machine Tool arm(10)End be provided with lower righting binding clip(16), elevating mechanism arm(9)End provided with lifting grappling fixture(15);Column(4) Bottom be provided with upper shackle mechanical arm(11), upper shackle mechanical arm(11)It is fixed on lower driving dolly(6)On.
2. the multi-functional tube drawbench of marine drilling platform according to claim 1, it is characterised in that:The upper shackle mechanical arm (11)Telescopic arm top be provided with upper shackle binding clip assembly(17), upper shackle binding clip assembly(17)Including spinner(18), punching button Pincers(19), clamping clip(20).
3. the multi-functional tube drawbench of marine drilling platform according to claim 1 or 2, it is characterised in that:The column(4)'s Top, which is arranged on, is fixed on driving dolly(2)Last time rotation mechanism(3)On, column(4)Bottom be arranged on and be fixed on and unload Detain mechanical arm(11)The lower slew gear at top(7)On, lower slew gear(7)It is provided with drive motor, slew gear(7)Under Side is provided with shackle mechanical arm(11).
4. the multi-functional tube drawbench of marine drilling platform according to claim 3, it is characterised in that:The upper centralising mechanical arm (8), elevating mechanism arm(9), lower centralising mechanical arm(10)It is directly to stretch formula telescopic arm, directly stretches formula telescopic arm many by fluid cylinder driving Save the telescopic arm linear telescopic being mutually socketed.
CN201621469069.XU 2016-12-29 2016-12-29 The multi-functional tube drawbench of marine drilling platform Expired - Fee Related CN206360662U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621469069.XU CN206360662U (en) 2016-12-29 2016-12-29 The multi-functional tube drawbench of marine drilling platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621469069.XU CN206360662U (en) 2016-12-29 2016-12-29 The multi-functional tube drawbench of marine drilling platform

Publications (1)

Publication Number Publication Date
CN206360662U true CN206360662U (en) 2017-07-28

Family

ID=59378294

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621469069.XU Expired - Fee Related CN206360662U (en) 2016-12-29 2016-12-29 The multi-functional tube drawbench of marine drilling platform

Country Status (1)

Country Link
CN (1) CN206360662U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108408347A (en) * 2018-03-02 2018-08-17 兰州兰石集团有限公司 Has the vertical movement trolley of marine riser for helping function
CN109083605A (en) * 2018-10-23 2018-12-25 四川宏华石油设备有限公司 A kind of tube drawbench
CN109611038A (en) * 2018-11-27 2019-04-12 西安石油大学 An automatic pipe arrangement for an offshore drilling platform
CN110255089A (en) * 2019-05-27 2019-09-20 四川宏华石油设备有限公司 A kind of marine riser transporting system
CN110792113A (en) * 2019-12-02 2020-02-14 广州市建筑科学研究院有限公司 Lapping device and lapping method for deformation measuring pipe at deep part of soil body

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108408347A (en) * 2018-03-02 2018-08-17 兰州兰石集团有限公司 Has the vertical movement trolley of marine riser for helping function
CN109083605A (en) * 2018-10-23 2018-12-25 四川宏华石油设备有限公司 A kind of tube drawbench
CN109611038A (en) * 2018-11-27 2019-04-12 西安石油大学 An automatic pipe arrangement for an offshore drilling platform
CN110255089A (en) * 2019-05-27 2019-09-20 四川宏华石油设备有限公司 A kind of marine riser transporting system
CN110255089B (en) * 2019-05-27 2024-06-07 四川宏华石油设备有限公司 Water isolation pipe moving system
CN110792113A (en) * 2019-12-02 2020-02-14 广州市建筑科学研究院有限公司 Lapping device and lapping method for deformation measuring pipe at deep part of soil body

Similar Documents

Publication Publication Date Title
CN102720448B (en) Device and method for connecting drill rod with three-joint unit
CN101812977B (en) Drilling platform pipe racking system and method
CN102191923B (en) A remote control wellhead operation device for workover operations
CN202673195U (en) Device for connecting drill pipes with three-joint unit
CN103485735A (en) Automatic pulling service system and operating method
CN112343525B (en) Compact type efficient operation drilling machine and method
CN111594074B (en) Petroleum drilling machine drill rod elevator and drilling tool loading method thereof
CN201363107Y (en) Cantilever type drill pipe racking device
CN110295856A (en) A Hydraulic Vertical Lift Automatic Workover Rig
CN112983303B (en) An integrated sucker rod automatic slip and operation process
CN112096273B (en) Efficient operation drilling machine and method
CN111520088A (en) Vehicle-mounted small workover wellhead operation device and method
CN203603787U (en) Well mouth automation system for well workover
CN104139387A (en) Automatic drill rod discharge mechanical hand suitable for core drill
CN115949353B (en) Workover system and method with vertical guide lateral lifting follow-up manipulator
CN218117717U (en) Drilling platform automatic feeding and unloading drill pipe device
CN113669017B (en) Land continuous tripping drilling machine and continuous tripping operation method
CN204054039U (en) Be applicable to the drilling rod automatic-discharging manipulator of rock-core borer
CN216110587U (en) Novel drill rod elevator
CN102536140A (en) Automatic discharge mechanical movement mechanism for two-layer bench drill column three-joint unit of drilling machine and discharge method for automatic discharge mechanical movement mechanism
CN112127813B (en) A power device capable of lowering pipe strings in the moon pool area
CN112096274B (en) Efficient operation drilling machine and method
CN113585987A (en) Novel drill rod elevator and drilling tool loading method thereof
CN215804392U (en) Land continuous tripping drilling machine
CN120175230A (en) A method and system for automatically controlling pipe handling in oil drilling rigs

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170728

Termination date: 20211229