CN206357402U - A kind of prefabricated board stripper apparatus - Google Patents
A kind of prefabricated board stripper apparatus Download PDFInfo
- Publication number
- CN206357402U CN206357402U CN201621100251.8U CN201621100251U CN206357402U CN 206357402 U CN206357402 U CN 206357402U CN 201621100251 U CN201621100251 U CN 201621100251U CN 206357402 U CN206357402 U CN 206357402U
- Authority
- CN
- China
- Prior art keywords
- hole
- prefabricated
- push rod
- demoulding
- demoulding device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Moulds, Cores, Or Mandrels (AREA)
Abstract
本实用新型提出了一种预制板脱模装置,包括底模,以及设置于底模上的边模,所述底模上设有用于为所述边模脱模的第一顶持机构,以及用于对预制板施加压力的第二顶持机构,所述底模上开有第一通孔和第二通孔,所述第一顶持机构包括可伸缩的第一顶杆,其一端穿过所述第一通孔用于顶持所述边模;所述第二顶持机构包括可伸缩的第二顶杆,第二顶杆的一端穿过所述第二通孔用于顶持预制板。此结构的预制板脱模装置,需脱模时,对第一顶持机构和第二顶持机构施加压力,第一顶持机构和第二顶持机构在压力的作用下分别通过第一顶杆和第二顶杆对边模和预制板施加压力后,即可完成脱模。因此,其具有劳动强度小,脱模效率高及脱模质量好的优点。
The utility model proposes a demoulding device for prefabricated slabs, which includes a bottom mold and side molds arranged on the bottom mold, the bottom mold is provided with a first supporting mechanism for demoulding the side molds, and The second jacking mechanism for applying pressure to the prefabricated slab, the bottom mold is provided with a first through hole and a second through hole, the first jacking mechanism includes a telescopic first push rod, one end of which passes through through the first through hole for supporting the side form; the second supporting mechanism includes a telescopic second push rod, and one end of the second push rod passes through the second through hole for supporting Prefabricated panels. The demoulding device for prefabricated panels of this structure, when demoulding is required, applies pressure to the first and second jacking mechanisms, and the first and second jacking mechanisms pass through the first jacking mechanism under the action of pressure After the rod and the second ejector rod exert pressure on the side form and the prefabricated panel, the demoulding can be completed. Therefore, it has the advantages of low labor intensity, high demoulding efficiency and good demoulding quality.
Description
技术领域technical field
本实用新型涉及建筑领域,特别涉及一种预制板脱模装置。The utility model relates to the construction field, in particular to a demoulding device for prefabricated panels.
背景技术Background technique
目前,国内预制构件生产企业生产的超高强混凝土(UHPC)预制板,主要采用固定台模生产,养护至UHPC板达到脱模强度时,再由人工通过撬棍、吊具等工具进行脱模。此外,目前生产的UHPC板主要用作外挂板,规格尺寸相对较小,主要为1200mm×900mm或900mm×600mm,厚度较薄,一般小于25mm。At present, the ultra-high-strength concrete (UHPC) precast slabs produced by domestic prefabricated component manufacturers are mainly produced by fixed table formwork. When the UHPC slab reaches the demoulding strength, it is manually demoulded by tools such as crowbars and spreaders. In addition, the currently produced UHPC boards are mainly used as external hanging boards, and the specifications are relatively small, mainly 1200mm×900mm or 900mm×600mm, and the thickness is relatively thin, generally less than 25mm.
按目前的生产方式生产UHPC预制板时,主要存在以下问题,具体包括:When producing UHPC prefabricated panels according to the current production method, there are mainly the following problems, including:
首先,劳动强度大,生产效率低,生产UHPC预制板时,主要由人工通过简单工具进行脱模,因此,劳动强度较大,生产效率相对较低。First of all, the labor intensity is high and the production efficiency is low. When producing UHPC prefabricated panels, the demoulding is mainly done manually through simple tools. Therefore, the labor intensity is high and the production efficiency is relatively low.
其次,质量相对差,目前生产的UHPC预制板,在脱模过程中,撬棍等工具不可避免地对UHPC预制板造成损坏,UHPC预制板得不到有效保证。Secondly, the quality is relatively poor. For the UHPC prefabricated panels currently produced, tools such as crowbars will inevitably damage the UHPC prefabricated panels during the demoulding process, and the UHPC prefabricated panels cannot be effectively guaranteed.
综上所述,如何提供一种劳动强度小、生产效率高及质量好的预制板脱模装置,成了本领域技术人员亟需解决的技术问题。To sum up, how to provide a demoulding device for prefabricated panels with low labor intensity, high production efficiency and good quality has become an urgent technical problem to be solved by those skilled in the art.
实用新型内容Utility model content
本实用新型要解决的技术问题是:提供一种劳动强度小、生产效率高及质量好的预制板脱模装置。The technical problem to be solved by the utility model is to provide a demoulding device for prefabricated panels with low labor intensity, high production efficiency and good quality.
本实用新型的解决方案是这样实现的:本实用新型提出一种高强混凝土预制板脱模装置,包括底模,以及设置于底模上的边模,所述底模上设有用于为所述边模脱模的第一顶持机构,以及用于对预制板施加压力的第二顶持机构,所述底模上开有第一通孔和第二通孔,所述第一顶持机构包括可伸缩的第一顶杆,其一端穿过所述第一通孔用于顶持所述边模;所述第二顶持机构包括可伸缩的第二顶杆,第二顶杆的一端穿过所述第二通孔用于顶持预制板。此结构的预制板脱模装置,需脱模时,对第一顶持机构和第二顶持机构施加压力,第一顶持机构和第二顶持机构在压力的作用下分别通过第一顶杆和第二顶杆对边模和预制板施加压力,第一顶杆把边模顶离底模和预制板,第二顶杆则把预制板顶离底模,完成脱模。与现有结构的预制板脱模装置相比,不仅结构相对简单,操作方便,同时还具有劳动强度小,脱模效率高及脱模质量好的优点。The solution of the utility model is achieved in this way: the utility model proposes a demoulding device for high-strength concrete prefabricated slabs, including a bottom mold, and side molds arranged on the bottom mold, and the bottom mold is provided with a The first jacking mechanism for demoulding the side molds, and the second jacking mechanism for applying pressure to the prefabricated slab, the bottom mold is provided with a first through hole and a second through hole, and the first jacking mechanism It includes a telescopic first ejector rod, one end of which passes through the first through hole to support the side form; the second jacking mechanism includes a telescopic second ejector rod, and one end of the second ejector rod Passing through the second through hole is used to support the prefabricated board. The prefabricated panel demoulding device of this structure, when demoulding, applies pressure to the first holding mechanism and the second holding mechanism, and the first holding mechanism and the second holding mechanism respectively pass through the first holding mechanism The rod and the second ejector rod exert pressure on the side form and the precast panel, the first ejector pin pushes the side form away from the bottom form and the precast panel, and the second ejector pin pushes the precast panel away from the bottom form to complete demoulding. Compared with the demoulding device for prefabricated slabs in the existing structure, it not only has a relatively simple structure and is convenient to operate, but also has the advantages of low labor intensity, high demoulding efficiency and good demoulding quality.
本实用新型的另一技术方案在于在上述基础之上,所述第一顶持机构还包括设置于第一顶杆端部的万向球,所述万向球受力时,推动第一顶杆移动。此设置方式,通过在第一顶杆的一端端部设置可承受来自不同方向力的万向球,可有效提高第一顶持机构的顶持效率。Another technical solution of the present utility model is that on the basis of the above, the first jacking mechanism further includes a universal ball arranged at the end of the first ejector rod. When the universal ball is stressed, it pushes the first ejector The rod moves. This setting method can effectively improve the jacking efficiency of the first jacking mechanism by arranging a universal ball that can withstand forces from different directions at one end of the first jacking rod.
本实用新型的另一技术方案在于在上述基础之上,所述第一顶持机构还包括连接块和套设于第一顶杆上的第一弹簧,所述连接块设置于所述万向球与第一顶杆的端部之间。此设置方式,通过在第一顶杆与万向球之间设置连接块,可确保万向球受力时准确传递至第一顶杆,同时,通过在第一顶杆上设置第一弹簧,可确保第一顶杆及时复位。Another technical solution of the present utility model is that on the basis of the above, the first holding mechanism further includes a connecting block and a first spring sleeved on the first push rod, and the connecting block is arranged on the universal between the ball and the end of the first plunger. This setting method, by setting the connecting block between the first push rod and the universal ball, can ensure that the universal ball is accurately transmitted to the first push rod when the force is applied, and at the same time, by setting the first spring on the first push rod, It can ensure that the first ejector pin is reset in time.
本实用新型的另一技术方案在于在上述基础之上,所述边模上还设有盲孔,所述第一顶杆远离所述万向球的一端置于所述盲孔内,并可在盲孔内伸缩。此设置方式,通过在边模上开设盲孔,可防止第一顶杆的端部在边模上滑动,顶持效率更高。Another technical solution of the present invention is that on the basis of the above, a blind hole is also provided on the side mold, and the end of the first ejector rod away from the universal ball is placed in the blind hole, and can be Telescoping in blind holes. This setting method can prevent the end of the first push rod from sliding on the side mold by opening a blind hole on the side mold, and the jacking efficiency is higher.
本实用新型的另一技术方案在于在上述基础之上,所述第一顶杆倾斜设置,所述盲孔为斜盲孔。此设置方式,当第一顶杆向上运动时,会带动边模向左上方移动,避免边模向正上方运动,脱模效率更高。Another technical solution of the present invention is that on the basis of the above, the first ejector rod is arranged obliquely, and the blind hole is an oblique blind hole. With this setting method, when the first ejector rod moves upward, it will drive the side mold to move upward to the left, avoiding the side mold to move directly upward, and the demoulding efficiency is higher.
本实用新型的另一技术方案在于在上述基础之上,所述预制板脱模装置还包括第一导向块,所述第一导向块固定设置于所述底模上,第一导向块上设有倾斜的导向孔,第一顶杆置于所述导向孔内,并可在导向孔内移动。此设置方式,通过在底模上设置为第一顶杆导向的第一导向块,第一顶杆移动的可靠性更好,顶持效率更高。Another technical solution of the utility model is that on the basis of the above, the demoulding device for the prefabricated panel also includes a first guide block, the first guide block is fixedly arranged on the bottom mold, and the first guide block is provided with a There is an inclined guide hole, and the first push rod is placed in the guide hole and can move in the guide hole. In this setting mode, by setting the first guide block on the bottom mold as the guide of the first ejector pin, the reliability of the movement of the first ejector pin is better, and the jacking efficiency is higher.
本实用新型的另一技术方案在于在上述基础之上,所述第二顶持机构包括顶块和套设于第二顶杆上的第二弹簧,所述顶块固定设置于所述第二顶杆的一端端部。此设置方式,通过在第二顶杆上设置第二弹簧,可有效推动第二顶杆及时复位,同时,在第二顶杆的下端设置顶块,可以较好的承受外在压力,并把压力传递至第二顶杆上。Another technical solution of the present utility model is that on the basis of the above, the second holding mechanism includes a top block and a second spring sleeved on the second push rod, and the top block is fixedly arranged on the second push rod. One end of the ejector rod. In this setting method, by setting the second spring on the second ejector rod, it can effectively push the second ejector rod to reset in time. The pressure is transmitted to the second ram.
本实用新型的另一技术方案在于在上述基础之上,所述第二顶持机构还包括堵头,所述堵头固定设置于所述第二顶杆的另一端。此设置方式,在第二顶杆的上端设置面积更大的堵头,顶持预制板时,预制板的受力面积更大,压强变小,可有效防止预制板损坏,保证预制板的脱模质量。Another technical solution of the present invention is that on the basis of the above, the second jacking mechanism further includes a plug, and the plug is fixedly arranged on the other end of the second push rod. In this setting method, a plug with a larger area is installed on the upper end of the second ejector rod. When the prefabricated slab is supported, the stress area of the prefabricated slab is larger and the pressure becomes smaller, which can effectively prevent the prefabricated slab from being damaged and ensure the prefabricated slab. mold quality.
本实用新型的另一技术方案在于在上述基础之上,所述堵头为锥台形,所述第二通孔为锥形孔,所述堵头可在所述第二通孔内来回移动。此设置方式,把堵头设置成上大下小的锥台形,不仅可进一步增大锥台与预制板的接触面积,防止脱模时预制板损坏,同时,锥形状的第二通孔还更利于防止第二通孔漏浆。Another technical solution of the present utility model is that on the basis of the above, the plug is in the shape of a truncated cone, the second through hole is a tapered hole, and the plug can move back and forth in the second through hole. In this setting method, the plug is set in a truncated cone shape with a large top and a small bottom, which can not only further increase the contact area between the truncated cone and the prefabricated slab, and prevent the prefabricated slab from being damaged during demoulding, but also the conical second through hole is more It is beneficial to prevent slurry leakage from the second through hole.
本实用新型的另一技术方案在于在上述基础之上,所述预制板脱模装置还包括第二导向块,所述第二导向块固定设置于所述底模上,第二导向块上设有导向孔,第二顶杆置于导向孔内,并可在导向孔内移动。此设置方式,通过在底模上设置为第二顶杆导向的第二导向块,可有效保证第二顶杆的稳定性,提高脱模效率。Another technical solution of the utility model is that on the basis of the above, the demoulding device for the prefabricated panel also includes a second guide block, the second guide block is fixedly arranged on the bottom mold, and the second guide block is provided with a There is a guide hole, and the second push rod is placed in the guide hole and can move in the guide hole. This setting method can effectively ensure the stability of the second ejector pin and improve the demoulding efficiency by setting the second guide block on the bottom mold as the guide of the second ejector pin.
附图说明Description of drawings
构成本实用新型的一部分的附图用来提供对本实用新型的进一步理解,本实用新型的示意性实施例及其说明用于解释本实用新型,并不构成对本实用新型的不当限定。The accompanying drawings constituting a part of the utility model are used to provide a further understanding of the utility model, and the schematic embodiments of the utility model and their descriptions are used to explain the utility model, and do not constitute improper limitations to the utility model.
图1为本实用新型一种高强混凝土预制板脱模装置的主视图;Fig. 1 is the front view of a kind of demoulding device of high-strength concrete prefabricated slab of the present utility model;
图2为高强混凝土预制板脱模装置脱模时的结构状态示意图;Fig. 2 is the structural state schematic diagram when the demoulding device of high-strength concrete prefabricated slab demoulding;
图3为图1中A部的放大示意图;Fig. 3 is the enlarged schematic view of part A in Fig. 1;
图4为图2的俯视图。FIG. 4 is a top view of FIG. 2 .
附图标记对应关系为:The corresponding relationship of reference signs is:
1预制板 2边模 3第一弹簧1 prefabricated panel 2 side mold 3 first spring
4第一顶杆 5连接块 6万向球4 first push rod 5 connecting block 6 universal ball
7第二顶杆 8顶块 9第二弹簧7 second ejector rod 8 jacking block 9 second spring
10堵头 11底模 12第一导向块10 plug 11 bottom mold 12 first guide block
13第二导向块13 second guide block
具体实施方式detailed description
下面结合附图对本实用新型进行详细描述,本部分的描述仅是示范性和解释性,不应对本实用新型的保护范围有任何的限制作用。此外,本领域技术人员根据本文件的描述,可以对本文件中实施例中以及不同实施例中的特征进行相应组合。The utility model will be described in detail below in conjunction with the accompanying drawings. The description in this part is only exemplary and explanatory, and should not have any limiting effect on the protection scope of the utility model. In addition, those skilled in the art may make corresponding combinations of features in the embodiments in this document and in different embodiments according to the descriptions in this document.
本实用新型实施例如下,请参见图1至图4所示的预制板脱模装置,包括底模11,底模11上还设有边模2,边模2具体设置于底模11的四周,底模11上还设有用于为边模2脱模的多个第一顶持机构,以及用于对预制板1施加压力的多个第二顶持机构,底模11上同时开设有第一通孔和第二通孔,第一顶持机构包括可以伸缩的第一顶杆4,第一顶杆4的一端,即图3所示的上端穿过第一通孔后顶持于边模2上。同样,第二顶持机构包括可伸缩的第二顶杆7,第二顶杆7的一端,即图3中所示的上端穿过第二通孔后顶持于预制板1上。此结构的预制板脱模装置,需脱模时,对第一顶持机构和第二顶持机构施加压力,第一顶持机构和第二顶持机构在压力的作用下分别通过第一顶杆4和第二顶杆7对边模2和预制板1施加压力,第一顶杆4把边模2顶离底模11和预制板1,第二顶杆7则把预制板1顶离底模11,完成脱模。与现有结构的预制板脱模装置相比,不仅结构相对简单,操作方便,同时还具有劳动强度小,脱模效率高及脱模质量好的优点。Embodiments of the present utility model are as follows, please refer to the demoulding device for prefabricated slabs shown in Figures 1 to 4, including a bottom mold 11, and the bottom mold 11 is also provided with side molds 2, and the side molds 2 are specifically arranged around the bottom mold 11 , the bottom mold 11 is also provided with a plurality of first holding mechanisms for demoulding the side mold 2, and a plurality of second holding mechanisms for applying pressure to the prefabricated panel 1, and the bottom mold 11 is simultaneously provided with a second holding mechanism. One through hole and the second through hole, the first jacking mechanism comprises the first push rod 4 that can be telescopic, and one end of the first push rod 4, namely the upper end shown in Figure 3 passes through the first through hole and is held on the side. Die 2 on. Similarly, the second jacking mechanism includes a telescopic second jacking rod 7, and one end of the second jacking pin 7, namely the upper end shown in FIG. The prefabricated panel demoulding device of this structure, when demoulding, applies pressure to the first holding mechanism and the second holding mechanism, and the first holding mechanism and the second holding mechanism respectively pass through the first holding mechanism The rod 4 and the second ejector rod 7 exert pressure on the side form 2 and the prefabricated panel 1, the first ejector rod 4 pushes the side form 2 away from the bottom mold 11 and the precast panel 1, and the second ejector rod 7 pushes the precast panel 1 away from Bottom mold 11, finishes demoulding. Compared with the demoulding device for prefabricated slabs in the existing structure, it not only has a relatively simple structure and is convenient to operate, but also has the advantages of low labor intensity, high demoulding efficiency and good demoulding quality.
在上述实施例的基础上,本实用新型另一实施例中,如图3中所示,第一顶持机构还包括可承受来自不同方向力的万向球6,万向球6本身可360度转动,通过基座可拆卸地固定设置于第一顶杆4的下端端部,万向球6受外力加压时,便可推动第一顶杆4向上移动。此设置方式,通过在第一顶杆4的一端端部设置可承受来自不同方向力的万向球6,可有效提高第一顶持机构的顶持效率。On the basis of the above embodiments, in another embodiment of the present utility model, as shown in Figure 3, the first holding mechanism also includes a universal ball 6 that can withstand forces from different directions, and the universal ball 6 itself can be 360 degree rotation, the base is detachably fixed on the lower end of the first push rod 4, and when the universal ball 6 is pressurized by an external force, it can push the first push rod 4 to move upward. In this arrangement, the universal ball 6 that can withstand forces from different directions is provided at one end of the first ejector rod 4, which can effectively improve the jacking efficiency of the first jacking mechanism.
在上述实施例的基础上,本实用新型另一实施例中,第一顶持机构还包括连接块5和第一弹簧3,连接块5具体设置于第一顶杆4的下端与万向球6之间,即万向球6通过连接块5与第一顶杆4的端部连接,以确保力的有效传递。第一弹簧3套设于第一顶杆4上,第一弹簧3的作用在于推动第一顶杆4复位。此设置方式,通过在第一顶杆4与万向球6之间设置连接块5,可确保万向球6受力时准确传递至第一顶杆4,同时,通过在第一顶杆4上设置第一弹簧3,可确保第一顶杆4及时复位。On the basis of the above embodiments, in another embodiment of the present utility model, the first holding mechanism further includes a connecting block 5 and a first spring 3, and the connecting block 5 is specifically arranged on the lower end of the first push rod 4 and the universal ball 6, that is, the universal ball 6 is connected to the end of the first push rod 4 through the connecting block 5, so as to ensure the effective transmission of force. The first spring 3 is sheathed on the first push rod 4 , and the function of the first spring 3 is to push the first push rod 4 back. In this way of setting, by setting the connecting block 5 between the first push rod 4 and the universal ball 6, it can ensure that the universal ball 6 is accurately transmitted to the first push rod 4 when the force is applied. The first spring 3 is arranged on the top, which can ensure that the first push rod 4 is reset in time.
在上述实施例的基础上,本实用新型另一实施例中,如图3中所示,边模2上还设有盲孔,第一顶杆4远离万向球6的一端,即图中所示的上端置于盲孔内,并可在盲孔内上下移动。需要说明的是,在其它实施例中,也可以不设置盲孔,即第一顶杆4的上端直接抵持于边模2的下表面上,也能达到相同的技术效果。此设置方式,通过在边模2上开设盲孔,可防止第一顶杆4的端部在边模2上滑动,顶持效率更高。On the basis of the above embodiments, in another embodiment of the present utility model, as shown in Figure 3, a blind hole is also provided on the side mold 2, and the end of the first push rod 4 away from the universal ball 6, that is, in the figure The upper end shown rests in the blind hole and can move up and down in the blind hole. It should be noted that, in other embodiments, no blind hole may be provided, that is, the upper end of the first push rod 4 directly abuts against the lower surface of the side form 2, and the same technical effect can also be achieved. This setting method can prevent the end of the first push rod 4 from sliding on the side mold 2 by opening a blind hole on the side mold 2, and the jacking efficiency is higher.
在上述实施例的基础上,本实用新型另一实施例中,如图3中所示,第一顶杆4倾斜设置,同样,与之配合的盲孔为斜盲孔。此设置方式,当第一顶杆4向上运动时,会带动边模2向左上方移动,避免边模2向正上方运动,脱模效率更高。On the basis of the above-mentioned embodiments, in another embodiment of the present invention, as shown in FIG. 3 , the first push rod 4 is arranged obliquely, and similarly, the matching blind hole is an oblique blind hole. With this arrangement, when the first ejector rod 4 moves upward, it will drive the side mold 2 to move upward to the left, preventing the side mold 2 from moving directly upward, and the demoulding efficiency is higher.
在上述实施例的基础上,本实用新型另一实施例中,如图3中所示,预制板脱模装置还包括第一导向块12,第一导向块12用于为第一顶杆4导向,其一端固定设置于底模11下表面上,第一导向块12上开设有导向孔,且导向孔倾斜设置,第一顶杆4置于导向孔内,且导向孔与第一顶杆4之间的配合为间隙配合,第一顶杆4可根据需要实时在导向孔内移动。此设置方式,通过在底模11上设置为第一顶杆4导向的第一导向块12,第一顶杆4移动的可靠性更好,顶持效率更高。On the basis of the foregoing embodiments, in another embodiment of the present invention, as shown in FIG. 3 , the demoulding device for prefabricated slabs also includes a first guide block 12, which is used for the first push rod 4 Guide, one end of which is fixedly arranged on the lower surface of the bottom mold 11, a guide hole is provided on the first guide block 12, and the guide hole is arranged obliquely, the first push rod 4 is placed in the guide hole, and the guide hole and the first push rod The fit between 4 is clearance fit, and the first push rod 4 can move in the guide hole in real time as required. In this arrangement, by setting the first guide block 12 on the bottom mold 11 as the guide for the first ejector rod 4, the reliability of the movement of the first ejector rod 4 is better, and the jacking efficiency is higher.
在上述实施例的基础上,本实用新型另一实施例中,如图3所示,第二顶持机构包括用于承受外在压力的顶块8,顶块8固定设置于第二顶杆7的下端端部,还包括套设于第二顶杆7上的第二弹簧9,第二弹簧9的作用在于推动第二顶杆7复位。此设置方式,通过在第二顶杆7上设置第二弹簧9,可有效推动第二顶杆7及时复位,同时,在第二顶杆7的下端设置顶块8,可以较好的承受外在压力,并把压力传递至第二顶杆7上。On the basis of the above embodiments, in another embodiment of the present utility model, as shown in Figure 3, the second holding mechanism includes a jacking block 8 for bearing external pressure, and the jacking block 8 is fixedly arranged on the second jacking rod The lower end of 7 also includes a second spring 9 sheathed on the second push rod 7, and the function of the second spring 9 is to push the second push rod 7 back. In this setting method, by setting the second spring 9 on the second push rod 7, the second push rod 7 can be effectively pushed back in time. In pressure, and the pressure is transmitted to the second push rod 7.
在上述实施例的基础上,本实用新型另一实施例中,如图3所示,第二顶持机构还包括用于与预制板1直接接触的堵头10,堵头10固定设置于第二顶杆7的上端。此设置方式,在第二顶杆7的上端设置面积更大的堵头10,顶持预制板1时,预制板1的受力面积更大,压强变小,可有效防止预制板1损坏,保证预制板1的脱模质量。On the basis of the above embodiments, in another embodiment of the present utility model, as shown in Figure 3, the second holding mechanism also includes a plug 10 for direct contact with the prefabricated panel 1, and the plug 10 is fixedly arranged on the first The upper end of two push rods 7. In this setting method, a plug 10 with a larger area is arranged on the upper end of the second ejector rod 7. When the prefabricated slab 1 is supported, the stressed area of the prefabricated slab 1 is larger and the pressure becomes smaller, which can effectively prevent the prefabricated slab 1 from being damaged. Ensure the demoulding quality of the prefabricated panel 1.
在上述实施例的基础上,本实用新型另一实施例中,如图3所示,堵头10的开关为锥台形,具体可以为圆锥台形,相应地,与之配合的第二通孔也为上大下小的锥形孔,堵头10可在第二通孔内来回移动。此外,需要说明的是,为防止第二通孔漏浆,第二通孔与堵头10的配合面上还可以设置密封层。此设置方式,把堵头10设置成上大下小的锥台形,不仅可进一步增大锥台与预制板1的接触面积,防止脱模时预制板1损坏,同时,锥形状的第二通孔还更利于防止第二通孔漏浆。On the basis of the above embodiments, in another embodiment of the present utility model, as shown in Figure 3, the switch of the plug 10 is in the shape of a truncated cone, specifically a truncated cone, and correspondingly, the second through hole matched with it is also It is a tapered hole with a large top and a small bottom, and the plug 10 can move back and forth in the second through hole. In addition, it should be noted that, in order to prevent slurry leakage from the second through hole, a sealing layer may also be provided on the mating surface of the second through hole and the plug 10 . In this setting method, the plug 10 is set into a truncated cone with a large top and a small bottom, which can not only further increase the contact area between the truncated cone and the prefabricated slab 1, and prevent the prefabricated slab 1 from being damaged during demoulding, but also the conical second channel The hole is also more conducive to preventing the second through hole from leaking slurry.
在上述实施例的基础上,本实用新型另一实施例中,如图3所示,预制板脱模装置还包括第二导向块13,第二导向块13固定设置于底模11的下表面上,并与第一导向块12相对设置,与第一导向块12一样,第二导向块13内也设有导向孔,第二顶杆7置于导向孔内,并可在导向孔内移动。此设置方式,通过在底模11上设置为第二顶杆7导向的第二导向块13,可有效保证第二顶杆7的稳定性,提高脱模效率。On the basis of the above embodiments, in another embodiment of the present utility model, as shown in Figure 3, the demoulding device for prefabricated slabs also includes a second guide block 13, and the second guide block 13 is fixedly arranged on the lower surface of the bottom mold 11 and set opposite to the first guide block 12, like the first guide block 12, a guide hole is also provided in the second guide block 13, and the second push rod 7 is placed in the guide hole and can move in the guide hole . In this arrangement, by setting the second guide block 13 on the bottom mold 11 as the guide for the second ejector pin 7, the stability of the second ejector pin 7 can be effectively ensured and the demoulding efficiency can be improved.
以上所述仅是本实用新型的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本实用新型的保护范围。The above is only a preferred embodiment of the utility model, it should be pointed out that for those of ordinary skill in the art, without departing from the principle of the utility model, some improvements and modifications can also be made, these improvements and Retouching should also be regarded as the scope of protection of the present utility model.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201621100251.8U CN206357402U (en) | 2016-09-30 | 2016-09-30 | A kind of prefabricated board stripper apparatus |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201621100251.8U CN206357402U (en) | 2016-09-30 | 2016-09-30 | A kind of prefabricated board stripper apparatus |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206357402U true CN206357402U (en) | 2017-07-28 |
Family
ID=59369215
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201621100251.8U Expired - Fee Related CN206357402U (en) | 2016-09-30 | 2016-09-30 | A kind of prefabricated board stripper apparatus |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206357402U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112140292A (en) * | 2019-06-26 | 2020-12-29 | 湖南五新模板有限公司 | Pushing type demoulding mould for concrete prefabricated part |
| CN112140294A (en) * | 2019-06-26 | 2020-12-29 | 湖南五新模板有限公司 | Combined demolding mold for concrete prefabricated part |
| CN112140317A (en) * | 2019-06-26 | 2020-12-29 | 湖南五新模板有限公司 | Pushing type demolding mold for concrete prefabricated part |
-
2016
- 2016-09-30 CN CN201621100251.8U patent/CN206357402U/en not_active Expired - Fee Related
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112140292A (en) * | 2019-06-26 | 2020-12-29 | 湖南五新模板有限公司 | Pushing type demoulding mould for concrete prefabricated part |
| CN112140294A (en) * | 2019-06-26 | 2020-12-29 | 湖南五新模板有限公司 | Combined demolding mold for concrete prefabricated part |
| CN112140317A (en) * | 2019-06-26 | 2020-12-29 | 湖南五新模板有限公司 | Pushing type demolding mold for concrete prefabricated part |
| CN112140294B (en) * | 2019-06-26 | 2025-07-08 | 湖南五新模板有限公司 | Combined demoulding mould for concrete prefabricated part |
| CN112140317B (en) * | 2019-06-26 | 2025-08-05 | 湖南五新模板有限公司 | A push-type demoulding mold for precast concrete components |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206357402U (en) | A kind of prefabricated board stripper apparatus | |
| CN203745256U (en) | A demoulding tool for asphalt mixture Marshall test piece based on universal testing machine | |
| CN204405403U (en) | Electronic and manual integration test specimen stripper | |
| CN204817738U (en) | Mould ejection mechanism | |
| CN103308364B (en) | Manual demoulding device | |
| CN204640486U (en) | Impervious test block stripper | |
| CN104328907B (en) | A magnetic side formwork for concrete with a form removal device | |
| CN203864146U (en) | Backlight module lamination equipment | |
| CN204405406U (en) | Containing the hand-stripping instrument to further groove | |
| CN205990571U (en) | A kind of quick removing device based on CRTS III template | |
| CN204326075U (en) | A kind of drill steel extracting apparatus | |
| CN210820738U (en) | Automatic demoulding device of composite insulator injection mould | |
| CN207076836U (en) | A kind of folded plate section bar of rack nine rushes scarce device | |
| CN207014626U (en) | One kind is based on the adjustable ejecting mechanism three times of lever arm | |
| CN206562286U (en) | A kind of construction crowbar fulcrum adjusting means | |
| CN205206301U (en) | Integrally lift up formula shaft template | |
| CN211709513U (en) | Special manufacturing tool for rubber pad | |
| CN205497769U (en) | Impervious test block shedder of concrete | |
| CN105784442B (en) | Concrete sample assembling die and hand-stripping device | |
| CN211515640U (en) | A cylindrical shell shaping device | |
| CN206496954U (en) | New marshal piece stripper | |
| CN221876892U (en) | A cutting device for processing LCD TV screen | |
| CN207901709U (en) | A kind of antenna production jig that cold pressing is combined with RF tests | |
| CN218946832U (en) | Assembly device for a roller bearing | |
| CN206498144U (en) | Hot melt mylar peeling process device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170728 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |